Nama : Dwi Listyadi Kurniawan

NIM : 1710813210002
Mata Kuliah : Rekayasa Tambang BawahTanah

TUGAS!!!
1. Penambangan room and pillar, menggunakan continuous mining dengan alat
angkut shuttle car. Kondisi kerja adalah sebagai berikut:
 Working place= 6 x 20 ft(1.8 x 6.0 m)
 Working time= 7 hr/shift, 2 shifts/day, 250 days/yr
 Working section= 14
 Advance/cut (10 ft,width) = 40 ft( 12 m)
 Tonnage factor = 24 ft3/ton (0.75 m3/tonne)
 Required shift production = 1000 tons/machine
 Net shift working time = 6 hr55 min
 Number of shuttle cars per miner = 2
 Capacity of car = 6.25 tons
 Delays while loading car = 0.6 min
 Delay while changing cars = 0.4 min
 Delay while miner place changing = 3 min/cut
 Cuts/shift= 12

a. Cut yang harys dibuat per shift adalah 12


b. Volume mined/cut V= (6)(20)(40) = 4.800 ft3
Weight/cut W = V/TF = 4.800/24 = 200 tons
Section production = (200 tons) (12cuts/shift)
= 2.400 tons/shift X 2 shifts/day
= 4.800 tons/day
Mine Production = (4.800 tons/day per section)(14)
= 67.200 tons/day x 250days/yr
= 16.800.000 tons/yr
2.

Diketahui : W1 = 2m, W2 = 4m, Dimensi roomnya = 2m


Hitung mining recovery pada tambang room and pillar pada gambar diatas
Jawab:
C1 = 2 + W1 + 2
C1 = 2 + 2 + 2
C1 = 6m
C2 = 2 + W2 + 2
C2 = 2 + 4 + 2
C2 = 8m
A = C1 x C2
A = 6m x 8m
A = 48m
Ap = W1 x W2
Ap = 2m x 4m
Ap = 8m
Am = A – Ap
Am = 48m – 8m
Am = 40m
Recovery = Am / A = 40 / 48 = 0,83