You are on page 1of 3
ffehove Projects Department | Fabrication Division Soran cet Oc . apgruull gSoy! A warar, Sharjah - Use Saudi Aramco TRANSMITTAL FD/T-1135/18 Date: January 28, 2018 TO | PAOLO BORLANDELLI FROM | SAEED A. AL-SAEED, Sr. Project Engineer Contractor Representative OPD/IK Fabrication Unit/ Fabrication Di | SAIPEM S.p.A., C/O SAIPEM Star Yard Fabrication, Dammam Port, Aramco SHARJAH Bldg. ‘AL MAMZAR TOWERS Dammam, Saudi Arabia AL TAWAUN AREA, SHARJAH - UAE SUBJECT: CONTRACT NO. 6600035823 (IK) 10 SLIPOVER PLATFORMS, CABLES & PIPELINES AT SFNY (B1-10-00909}, CRPO# 65107919940(IkK) RESPONSE TO STAR YARD QUALITY PROCEDURE Ref.: TR-033872-3609 Attached please find the following documents: (orawings [Letter C1 Reports (lenvetope (others QTY DOCUMENT DESCRIPTION = REMARKS 00-C-C- -P-QA-00-067_A PROCEDURE FOR AMBIENT, APPROVED WITH 2 PAGES | INERT GAS, DRY AND NITROGEN LAYUP FOR RISER, PIPING & COMMETS AS PIPELINE SPOOLS ATTACHED The acceptance of the documents will not relive CONTRACTOR from his liability to contract’s terms/conditions and any deviation from mandatory SAUDI ARAMCO’s engineering specifications, drawings and standards. Should you have any question, please contact the undersigned as (dd 44 A. AL-SAEED, Sr, Project Engineer Ik/Fabrication Division oe RESTRICTED DOCUMENT aaa 7 Teceipt of these documents assigns the recipient as the responsible custodian to comply with SAEP-127 and Gh-710.002 for proper handling of sensitive documents. Do nat copy any portion of this document. If you require additional copies, please contact the above person. PLEASE RETURN A SIGNED COPY FOR OUR FILE, t Ching j~ RECEIVED BY: hay SIGNATURE met fader ra . FDM/MSS: jl File: 7.5.4.1 (SA Departments) 30 JAN 2018 UPSTREAM PROJECTS INSPECTION DIVISION OFFSHORE PROJECTS INSPECTION SECTION FABRICATION PROJECTS INSPECTION UNIT ‘STAR YARD DAMVAM PORT, Tel: 847 4937, Fax: Ref. No. UPID/FPIU/0030/18 Date: January 22, 2018 ‘SUBINDAS M. MOHANDAS ~ Perot ataeacla) Unit Supervisor (A) Sr. Project Engineer (A) UBIOPeEEnt OPDIIK Fabrication UnivFab. Division, STAR EAGT Vor TO | STAR Fabrication Yard, ARAMCO Bldg FROM | aramco Bldg. 22 King Abdulaziz Seaport, Gate 10 King Abdul Aziz Seaport Gate 10 ease Dammam, CONTRACT NO. 6600035823 (Ik) 10 SLIPOVER PLATFORMS, CABLES AND PIPELINES AT SAFANIYA (BI-10-00909) SUBJECT: STAR YARD ~ PROCEDURE FOR AMBIENT, INERT GAS, DRY AND NITROGEN LAY UP FOR RISER, PIPING AND PIPELINE SPOOLS SAPMT Ref. No: FO/T-00122/18 (Contractor Ref: TR-033872-3609) Please find the reply for the following 5. Reviewed with commonis 8. Roview/Approval not required 7 Rejected 1. Approved 2. Approved with comments 3. Not approved, correct and resubmit 4. Reviewed, no comments Remarks Comments as follows: Section 3.2: Add SAES-A-004. valve after field testing). | for Contractor and witness for company. l Drawings: Letter [] Reports Envelope [X] Transmittal Review Title SEG Comments PROCEDURE FOR AMBIENT, INERT GAS, DRY AND NITROGEN LAY UP FOR RISER, PIPING AND PIPELINE SPOOLS, 2 See Remarks (00-C-C-00-ST-P-QA-00-067 REV.A | As per scope of procedure: This procedure also defines the responsibilities of personnel involved and methodology for carrying out valve leak test (No defines the responsibilities and layup of Tin 5.1 Contractor QC/ Company Inspection desartment shall witness this stage and (as a) HOLD point (As repeated in same para). As per SATIP A-004-02, Item number 4.2 Layup Is a hold point 4. Include: General Requirements regarding: A) Water Quality B) Plan Lay Up. (SAIC-A-2007) 5, Include the Safety requirements during and after lay-up. 6. In Para 5.3, unless the system is hydrotested using Corrosion inhibitor mixed with hydrotest water in such cases the lay-up shall be carried out within 4 months from the first introduction of Hydrotest water (provide the reference of 4 month). 7, Include: Use gauges with a scale range not exceeding three times the target pressure to monitor the positive pressure in the system during lay-up (SAES-A-007 Para 5.2.2.4). UPID/FPIU/0030/18 and System Design for SUBINDAS M. MOHANDAS. Unit Supervisor (A) UPIDIOPIS/FPIU [eincrns7s Fila Received by

You might also like