ffehove Projects Department | Fabrication Division
Soran cet Oc . apgruull gSoy!
A warar, Sharjah - Use Saudi Aramco
TRANSMITTAL
FD/T-1135/18 Date: January 28, 2018
TO | PAOLO BORLANDELLI FROM | SAEED A. AL-SAEED, Sr. Project Engineer
Contractor Representative OPD/IK Fabrication Unit/ Fabrication Di |
SAIPEM S.p.A., C/O SAIPEM Star Yard Fabrication, Dammam Port, Aramco
SHARJAH Bldg.
‘AL MAMZAR TOWERS Dammam, Saudi Arabia
AL TAWAUN AREA, SHARJAH - UAE
SUBJECT: CONTRACT NO. 6600035823 (IK) 10 SLIPOVER PLATFORMS, CABLES & PIPELINES AT SFNY
(B1-10-00909}, CRPO# 65107919940(IkK)
RESPONSE TO STAR YARD QUALITY PROCEDURE
Ref.: TR-033872-3609
Attached please find the following documents:
(orawings [Letter C1 Reports (lenvetope (others
QTY DOCUMENT DESCRIPTION = REMARKS
00-C-C- -P-QA-00-067_A PROCEDURE FOR AMBIENT, APPROVED WITH
2 PAGES | INERT GAS, DRY AND NITROGEN LAYUP FOR RISER, PIPING & COMMETS AS
PIPELINE SPOOLS ATTACHED
The acceptance of the documents will not relive CONTRACTOR from his liability to contract’s
terms/conditions and any deviation from mandatory SAUDI ARAMCO’s engineering specifications,
drawings and standards.
Should you have any question, please contact the undersigned
as (dd 44
A. AL-SAEED, Sr, Project Engineer
Ik/Fabrication Division
oe RESTRICTED DOCUMENT aaa 7
Teceipt of these documents assigns the recipient as the responsible custodian to comply with SAEP-127 and Gh-710.002
for proper handling of sensitive documents. Do nat copy any portion of this document. If you require additional copies,
please contact the above person.
PLEASE RETURN A SIGNED COPY FOR OUR FILE, t
Ching
j~
RECEIVED BY: hay SIGNATURE
met fader
ra .
FDM/MSS: jl
File: 7.5.4.1 (SA Departments)
30 JAN 2018UPSTREAM PROJECTS INSPECTION DIVISION
OFFSHORE PROJECTS INSPECTION SECTION
FABRICATION PROJECTS INSPECTION UNIT
‘STAR YARD DAMVAM PORT, Tel: 847 4937, Fax:
Ref. No. UPID/FPIU/0030/18 Date: January 22, 2018
‘SUBINDAS M. MOHANDAS ~
Perot ataeacla) Unit Supervisor (A)
Sr. Project Engineer (A) UBIOPeEEnt
OPDIIK Fabrication UnivFab. Division, STAR EAGT Vor
TO | STAR Fabrication Yard, ARAMCO Bldg FROM | aramco Bldg. 22
King Abdulaziz Seaport, Gate 10 King Abdul Aziz Seaport Gate 10
ease Dammam,
CONTRACT NO. 6600035823 (Ik) 10 SLIPOVER PLATFORMS, CABLES AND PIPELINES
AT SAFANIYA (BI-10-00909)
SUBJECT: STAR YARD ~ PROCEDURE FOR AMBIENT, INERT GAS, DRY AND NITROGEN LAY UP FOR
RISER, PIPING AND PIPELINE SPOOLS
SAPMT Ref. No: FO/T-00122/18
(Contractor Ref: TR-033872-3609)
Please find the reply for the following
5. Reviewed with commonis
8. Roview/Approval not required
7 Rejected
1. Approved
2. Approved with comments
3. Not approved, correct and resubmit
4. Reviewed, no comments
Remarks
Comments as follows:
Section 3.2: Add SAES-A-004.
valve after field testing).
| for Contractor and witness for company.
l
Drawings: Letter [] Reports Envelope [X] Transmittal
Review
Title SEG Comments
PROCEDURE FOR AMBIENT, INERT GAS, DRY AND NITROGEN
LAY UP FOR RISER, PIPING AND PIPELINE SPOOLS, 2 See Remarks
(00-C-C-00-ST-P-QA-00-067 REV.A |
As per scope of procedure: This procedure also defines the responsibilities of personnel involved
and methodology for carrying out valve leak test (No defines the responsibilities and layup of
Tin 5.1 Contractor QC/ Company Inspection desartment shall witness this stage and (as a) HOLD
point (As repeated in same para). As per SATIP A-004-02, Item number 4.2 Layup Is a hold point4. Include: General Requirements regarding: A) Water Quality B) Plan
Lay Up. (SAIC-A-2007)
5, Include the Safety requirements during and after lay-up.
6. In Para 5.3, unless the system is hydrotested using Corrosion inhibitor mixed with hydrotest water
in such cases the lay-up shall be carried out within 4 months from the first introduction of
Hydrotest water (provide the reference of 4 month).
7, Include: Use gauges with a scale range not exceeding three times the target pressure to monitor
the positive pressure in the system during lay-up (SAES-A-007 Para 5.2.2.4).
UPID/FPIU/0030/18
and System Design for
SUBINDAS M. MOHANDAS.
Unit Supervisor (A)
UPIDIOPIS/FPIU
[eincrns7s
Fila
Received by