You are on page 1of 11
PROCESS INDUSTRY PRACTICES — \ | ) ons MA D) » 1is38 PAGE 1 OF 2 ABBREV1 AT (ONS PRACTICE REF. PICOOT ABOVE GROUND Mr MATERIAL MAX MAXIMUM MIN MINIMUN BOTTOM TANGENT LINE wov MOTOR OPERATED VALVE By BYPASS ww MANWAY CHEMICAL CLEANQUT NC NORMALLY CLOSE! NORMALLY NO Fl NORMALLY OPEN’ CONN CONNECT 1ON NOZZLE csc CAR SEAL CLOSED ave OPEN/CLOSE cso CAR SEAL OPEN avo ON/OFF cir CENTER 2° ouTPU nes DISTRIBUTED CONTROL SYSTEM asa QUISIDE BATTERY LIMITS DES DESIGN OvHD OVERHEAD Dia DIAMETER PLC ROGRANWABLE LOGIC oP DESIGN PRESSURE ONTROLLER bP DIFFERENTIAL PRESSURE PRESS PRESSURE DORN DRAIN PROCESS VARIABLE D DESIGN TENPERATURE R@ RELOCATED Dac DRAWING REQD REQUIRED (ey EXISTING RTD RESISTANCE TEMPERATURE gL ELEVATION DETECTOR ESO EMERGENCY SHUTDOWN sc SAMPLE CONNECTION FACE OF FLANGE SCH SCHEDULE FURNISHED $0 SHUTDOWN FAIL CLOSED SG SPECIFIC GRAVITY FAIL. INDETERMINATE sis SAFETY INSTRUVENTED SYSTEM FAIL LOCKED (LAST POSITION) so STEAM QUT FL FLANG! sP SET POINT Fo. FAIL OPEN 5S STAINLESS STEE FP FULL POR S/S STARI/ST Fy FULL VACUUM sT0 STANDARD co GEAR OPERATED re THERMOCOUPLE cr GRADE TH OTAL DIFFERENTIAL HEAD He HOSE CONNECTION TEMP EWPERATURE HOR THRD THREADED HE qT TANGENT LINE HOA HAND/OFF /AUTONATIC T IGHT SHUT-OFF HP HIGH PRESSURE Vi TANGENT TD TANGENT HPT HIGH POINT TYP TYPICAL IAS. INSTRUMENT AIR SUPPLY us UNDERGROUND SB INSIDE BATTERY LIMITS WNT VENT Le vac vACUUM Lo \B VORTEX BREAKER LP W/ WITH LPT Low POIN w/o WITHOU PROCESS INgUSTRY PRACTICES = APPENDIX: A | 1is38 PIP MISCELLANEOUS, SYMBOLS PAOE 2 OF 2 PRACTICE REF. PICOOT ® + & XXX ® XXY NOTE REFERENCE SYMBOL OOC = NOTE NUMBER. ROTATE ARROW AS REQUIRED) POINT OF CHANGE IN LINE CLASS OR INSULATION REQUIREMENT BATTERY LINITS (OR MATCH LINED PURGE CONNECTION (OOKXX = PURGE PRESSURE AND NEDIUM) SAMPLE CONNECTION OOX/YY = TYPE/NUNBER) PACKAGED EQUIPMENT LINITS NOTE: SYMBOLS ARE SHOWN HERE AT ACTUAL SIZE USED ON 22"x34" SIZE DOCUMENTS PIE APPE DIX PROCESS INDUSTRY PRACTICES A2 1538 PuMes, EQUIPMENT SYMBOLS flo U on t NOTE 2, HORIZONTAL CENTRIFUG| PUMP. VERTICAL INLINE PUNP CENTRIFUGAL SUMP PUMP NOTE 1. SYNBOLS 2. LENGTH VARIES 3. MOTORS. SHOWN SYMBOLS, SEE al wa} ) SSIVE CAV Y PUMP SHOWN HE} PENDING UPON DEPTH OF DIX A-2s D.3. TO ILLUSTRATE ORIVER ORIENTATION. POSITIVE DISPLACEMENT PUMP = LJ louio Ring VACUUM PUMP S H_H CAL CAN PUMP r + www) REN PUVP AT ACTUAL SIZE USED ON 22"x34" DOCUMENTS. SUMP FOR OR eR Gg 1538 EQUIPMENT SYMBOLS PASE 2 OF 8 PROCESS INDUSTRY PRACTICES 7 » APPENDIX A2 COMPRESSORS & BLOWERS PRACTICE POSITIVE DISPLACEMENT BLOWER : re) 0 el CENTRIFUGAL CONPRESSOR CENTRIFUGAL BLOWER No’ 1. SYMBOLS ARE SHOWN HERE AT ACTUAL SIZE USED ON 22"x34" DOCUMENTS. 2. MOTORS SHOWN HERE TO ILLUSTRATE ORIVER ORIENTATION. FOR DR SYMBOLS, SEE APPENDIX A-2y p. 3. PROCESS INDUSTRY PRACTICES APPENDIX. PIP EQUIPMENT SYNBOLS DRIVERS & AGITATOR/MIXER A2 18/38 Pace 3 oF 9 PRACTICE REF. PICOON F of ELECTRIC MOTOR TURBINE DRIVER DIESEL ENGINE AGITATOR/MIXER NOTE: SYMBOLS SHOWN HERE AT ACTUAL SIZE USED ON 22"x34" DOCUMENTS. Sy APPENDIX Eau TEMA PENT. SYN = | = PROCESS INDUSTRY PRACTICES TEMA TYPE TEMA TYPE BEU x _ oe ti ryt = x a xr a ! + = 1 ' TEMA TYPE BKU xr xr ! x (OTE + SYMBOLS ARE SHOWN HERE AT ACTUAL SIZE USED ON 22"x34" DOCUMENTS. ULT TEMA FOR TYPES OTHER THAN THOSE SHOWN IANGERS SHOWN HERE REPRESENT SINGLE PASS SHELL AND EVEN NUMBER PROCESS INDUSTRY PRACTICES \ Dy) APPENDIX Y y EQUIPMENT SYNBOLS MISCELLANEOUS EXCHANGERS > PICO) AIR CODLED EXCHANGER (LOUVERS OPTIONAL) HANGER DOUBLE PIPE EXC ZF NOTE: SYMBOLS SHOWN HERE AT ACTUAL SIZE USED ON 22x34" DOCUMENTS GY PROCESS INDUSTRY PRACTICES APPENDIX Gg EQUIPMENT SYMBOLS STORAGE TANKS eS NOTE: ACTUAL SIZE WILL VARY. A2 1538 DOME ROOF TANK OPEN TOP TANK INTERNAL FLOATING ROOF TANK GY PROCESS INDUSTRY PRACTICES 7 D) APPENDIX A2 » i538 EQUIPMENT SYNBOLS STORAGE TANKS ee CONE ROOF TANK DOUBLE WALL TANK NG ROOF TANK NOTE: ACTUAL SIZE WILL VARY. PROCESS INDUSTRY PRACTICES APPENDIX. EQUIPMENT SYNBOLS STORAGE SPHERE AND FURNACE A2 18/38 Paoe 8 oF 9 PRACTICE REF. PICOOT NOTE: ACTUAL SIZE WILL VARY. SPHERE FURNACE, = PROCESS INDUSTRY PRACTICES ‘yy APPENDIX y EQUIPMENT SYNBOLS SCELLANEQUS VESSEL L TWO PASS. ENERIC TRAY NOTE: ACTUAL SIZE WILL VARY

You might also like