You are on page 1of 4
adaro& MINING Tanjung, 12 Agustus 2019 Nomor 4128/A-ERDIVII2019 Lampiran 4 (satu) berkas Perihal _: Permohonan Izin Titik Penaatan Pembuangan Air Limbah PT Adaro Indonesia Kepada Yth, Bupati Tabalong Cq. Kepala Dinas Penanaman Modal Perijinan Terpadu Satu Pintu Kabupaten Tabalong Di- Tempat Dengan hormat, Sehubungan dengan kegiatan operasionel PT Adaro Indonesia, maka kami sampaikan permohonan agar dapat diberikan izin baru Lokasi Titik Penaatan Pembuangan Air Limbah dengan data sebagai berikut: i | Koordinat Tk Sistem Pengolahan Nama Penaatan Baden | Debit | Setting | Longitude | Latitude | Sumber Sediment | Safety | Mud | air | Ouder(ms)| Peta | Pond ‘Air Pond” | Pond | Pond | Penerima 7 (Ha) Diol | ‘SP2CWara | 15°30" | 02°08 | PompaPt 3kolam | 965 | @1Ha | Anak 2,228 Peta | zaz0 | 36.370" | Tuupan | @32 Ho Las toiat | Sungai catchment Cisposel | Luss ttal 24Ha | Jaing Tetlamar s1203456| 96 Ha Demikian permohonan ini kami sampaikan, atas perhatian dan kerjasamanya diucapkan terima kasih. v Tembusan : 1. Yth. Kepala Dinas Lingkungan Hidup Kabupaten Tabalong 1 Adaro Indes HN0 Fo6221 2589 308 wna adaro& DATA DIMENSI DAN DEBIT SETTLING POND MINING aa TF a roa ana ating oe sg rieo tsaanar | cachoenaes |, Pers tongue | atte : seaimerrona | SN Mud pord enema a) sewn | usarmam | ore scr tuna | ms | Citcaaene [Prtsiesiing| 2208 L ian ara WEA oe SE Sen esa Sg Pa Seed Sead ag Hoa Fand Pong tart [sone | rani [ tebar | nes | sone tetar [roew [ sooe [ rommee | wtar | ts ] soe cat a a ae «[s oo [8 s [2 fx[ «fo» | « |» sc Rear DoD aaa Sig Pond seerrdtin|_Suneetee [useomneree] tne tewntinain [oan | aman [vata a a a ina ra a vee 2st ost ore 17 eos ® 2 Sa Feira oh apo rT a ey paw: 301% 79 ‘eputy Teac Services Dl Hen FanMsp.ot-005| PTADARO INDONESTA WATER BALANCE SIMULATION © [Settling Pond SP.2C WARA eau sian, Date of Simulation 27-sul-19 4.471.596 m°/day 691,200 m*/day Setting Pond Water Balance Simulation [Value [Units tT [water in Runoff Coeffident 080 | | Catchment Area 3228 | ha [Eatchment Runoff 971.596 | ma. ‘Number of Pump Une Plan 20 Max Pump Capacity 200| We Setting pond capacity (minus Pumping from it 264,960 |_m3/day ead storage) Total Water Volume to SP (m3/day) 736,556 | m3/dey 5,012,652 m/day Water our 2 72500 3.00] 3/5 51,200] ma/day_| Pond Water Balance Safety Pond Capacity 6733,058 | ma Deas Storage Capacity 1,220,402 [ma Balance : [water in Pond (m3) 3:265,758 | _ma 967,296 m/day Batance/day 967,296 | m3 |summary: | Data Value [Units Rainfall intensity 223 [[ram/day) Catchment Area) 2280] He 1 éey maxsimulation! oyscharge Permit Pan 8.00] im3/at FALNSPOTO06 Rev.00 adaro@ Pye @® ing Fond iL ware anggal Smee 2rul9 PETA, suMMaRy: Rencara Luas Catchment Area 2228 Ha F-ALMsP-04.007 ev.o0

You might also like