Professional Documents
Culture Documents
Hydraulic Pressure:
Hourly/Daily Production:
Machine Package Price: 45-50 Lacks. (with installation, Laboure training, 1-year warranty service).
Total Laboure Needed: 6-9 person.
Raw Materials:
1. Cement (PPC).
2. Local Sand (1-1.5 fm).
3. Sylhety Sand (1.8-2.5 fm).
4. Crushed Stone (dust powder 4mm- 8mm).
5. Fly Ash.
>> Every Raw material that bonds properly with cement << Local Sand