1 COMMENT: Meet previous observation provides overall site plan clearly (loading and unloading area

Interlock \\ \\ CABLE TRENCH)

REPLY: Overall site plan provided. Loading / unloading area provided. Will discuss regarding the cable
trench

Cable trench obstructing LOADING UNLOADING for bldg. provide typical section.

2 COMMENT: After you attach new schemes: Please name the floors of all the buildings \\ application of
green building standards of the proposed buildings and install green cards and review about the cards
and the number of floors where \\ provide ventilation and natural lighting \\ subject to the rules
regarding the foreign service the mezzanine stairs \\

REPLY: The buildings are for the process so no names are given. Green Building standards are not
applied since most of the buildings are open and for process. Not habitable. Will discuss regarding the
building card. Will discuss regarding the mezzanine stairs. Windows provided to rooms where
applicable.

Name all the floors in terms of G+M+F …… Multiple levels if any, take special approval. If any room
related to process has no ventilation and GB Standards, obtain special approval.

3 COMMENT: Please use generally clarify in Building No. 1 TURBINE

REPLY: To generate electriciy from Steam

4 COMMENT: Subject to the rules regarding the exploitation of the surface in the building 5 WATER
TREATMENT and specify the use of the mezzanine

REPLY: The roof of Chemical Water Treatment, Building no. 5, is to keep equipments.

Obtain special approval for roof usage and railing around.

5 COMMENT: Audit regarding the multiplicity of floors in the building and design 6 SUPPLY WATER
TREATMENT

REPLY: The ground level and top level bldg. 6 are to keep the equipments and the 2 mezzanine levels are
for inspection.

Obtain special approval for roof usage and railing around.

6 COMMENT: System into account regarding building 8 COOLING TOWER Details (handrail)

REPLY: Handrail detail for Cooling Tower, building 8, enclosed.

7 COMMENT: Clarify the annexes to the building 9 CIRCULATING WATER PUMP STATION

REPLY: Circulating water pump, building no. 9, is used to house pumps. It takes water from the cooling
tower and sends it to the system. It also takes hot water from the system and sends it to the cooling
tower for cooling.

Clarify building details and provide process flow diagram

8 COMMENT: 7 attachments building details CLEAN WATER RESERVOIR


REPLY: Clean water reservoir is underground pond. Details attached.

9 COMMENT: Clarify the uses of the building 10 WASTEWATER TREATMENT ventilation and lighting lab

REPLY: Waste water Treatment, building no. 10, is used for chemical water treatment. Windows are
provided and indicated on the drawing.

10 COMMENT: Record highs on the section of the building 3 AQC BOILER as in the exception

REPLY: Height in section of AQC Boiler, building no. 3, shown as per height indicated in special approval

11 COMMENT: Determine the use of the room in the building 4 SP BOILER

REPLY: Room in SP Boiler, building no. 4, is water sampling room

12 COMMENT: Adoption of the Civil Defense

REPLY: Civil Defense approval will be obtained

Create task with uploading only architectural drgs. Will be returned by DCD.