REPLY: Overall site plan provided. Loading / unloading area provided. Will discuss regarding the cable
trench
Cable trench obstructing LOADING UNLOADING for bldg. provide typical section.
2 COMMENT: After you attach new schemes: Please name the floors of all the buildings \\ application of
green building standards of the proposed buildings and install green cards and review about the cards
and the number of floors where \\ provide ventilation and natural lighting \\ subject to the rules
regarding the foreign service the mezzanine stairs \\
REPLY: The buildings are for the process so no names are given. Green Building standards are not
applied since most of the buildings are open and for process. Not habitable. Will discuss regarding the
building card. Will discuss regarding the mezzanine stairs. Windows provided to rooms where
applicable.
Name all the floors in terms of G+M+F …… Multiple levels if any, take special approval. If any room
related to process has no ventilation and GB Standards, obtain special approval.
4 COMMENT: Subject to the rules regarding the exploitation of the surface in the building 5 WATER
TREATMENT and specify the use of the mezzanine
REPLY: The roof of Chemical Water Treatment, Building no. 5, is to keep equipments.
5 COMMENT: Audit regarding the multiplicity of floors in the building and design 6 SUPPLY WATER
TREATMENT
REPLY: The ground level and top level bldg. 6 are to keep the equipments and the 2 mezzanine levels are
for inspection.
6 COMMENT: System into account regarding building 8 COOLING TOWER Details (handrail)
7 COMMENT: Clarify the annexes to the building 9 CIRCULATING WATER PUMP STATION
REPLY: Circulating water pump, building no. 9, is used to house pumps. It takes water from the cooling
tower and sends it to the system. It also takes hot water from the system and sends it to the cooling
tower for cooling.
9 COMMENT: Clarify the uses of the building 10 WASTEWATER TREATMENT ventilation and lighting lab
REPLY: Waste water Treatment, building no. 10, is used for chemical water treatment. Windows are
provided and indicated on the drawing.
10 COMMENT: Record highs on the section of the building 3 AQC BOILER as in the exception
REPLY: Height in section of AQC Boiler, building no. 3, shown as per height indicated in special approval
Create task with uploading only architectural drgs. Will be returned by DCD.