You are on page 1of 64

PLANILLA DE METRADOS

PARCHADO A NIVEL DE ASFALTO EN LAS AVENIDAS DEAN SAAVEDRA, CALLE PROLONGACION, CALLE 3, CALLE TUPAC AMARU, AV. LA RIBERA - TRUJILLO –
PROYECTO LA LIBERTAD

CLIENTE: CLIENTE: MUNICIPALIDAD DISTRITAL DE HUANCHACO FECHA: Feb-20

MEDIDAS
N° DE
ITEM DESCRIPCION UNID CANT. PARCIAL TOTAL
ESTRUC.
ÁREA LARGO ANCHO ALTURA

CALLE LOS FICOS

PARCHADO DE ASFALTO
01 TRABAJOS PRELIMIMARES

01.01 TRAZO Y REPLANTEO DE CARPETA ASFALTICA 268.99


m² 1.00 1.00 - 3.00 6.00 - 18.00
m² 1.00 1.00 - 3.00 2.00 - 6.00
m² 1.00 1.00 - 1.00 1.00 - 1.00
m² 1.00 1.00 - 15.00 3.00 - 45.00
m² 1.00 1.00 - 1.00 2.00 - 2.00
m² 1.00 1.00 - 3.00 1.00 - 3.00
m² 1.00 1.00 - 95.00 0.50 - 47.50
m² 1.00 1.00 - 2.00 1.00 - 2.00
m² 1.00 1.00 - 0.50 0.50 - 0.25
m² 1.00 1.00 - 0.50 0.50 - 0.25
m² 1.00 1.00 - 0.80 0.80 - 0.64
m² 1.00 1.00 - 0.40 0.40 - 0.16
m² 1.00 1.00 - 2.00 0.80 - 1.60
m² 1.00 1.00 - 1.00 4.00 - 4.00
m² 1.00 1.00 - 1.00 0.60 - 0.60
m² 1.00 1.00 - 1.00 1.00 - 1.00
m² 1.00 1.00 - 0.50 0.50 - 0.25
m² 1.00 1.00 - 0.50 0.50 - 0.25
m² 1.00 1.00 - 1.00 2.00 - 2.00
m² 1.00 1.00 - 9.00 2.00 - 18.00
m² 1.00 1.00 - 1.00 0.60 - 0.60
m² 1.00 1.00 - 2.00 0.80 - 1.60
m² 1.00 1.00 - 2.80 1.50 - 4.20
m² 1.00 1.00 - 1.00 1.00 - 1.00
m² 1.00 1.00 - 1.00 1.00 - 1.00
m² 1.00 1.00 - 1.00 1.00 - 1.00
m² 1.00 1.00 - 4.00 1.00 - 4.00
m² 1.00 1.00 - 1.50 0.50 - 0.75
m² 1.00 1.00 - 3.00 0.40 - 1.20
m² 1.00 1.00 - 1.00 0.50 - 0.50
m² 1.00 1.00 - 6.00 0.30 - 1.80
m² 1.00 1.00 - 6.00 0.30 - 1.80
m² 1.00 1.00 - 4.00 0.80 - 3.20
m² 1.00 1.00 - 1.00 1.00 - 1.00
m² 1.00 1.00 - 0.80 0.80 - 0.64
m² 1.00 1.00 - 70.00 0.70 - 49.00
m² 1.00 1.00 - 3.00 1.00 - 3.00
m² 1.00 1.00 - 4.00 2.00 - 8.00
m² 1.00 1.00 - 1.00 0.8 - 0.80
m² 1.00 1.00 - 3.00 3.00 - 9.00
m² 1.00 1.00 - 8.00 2.00 - 16.00
m² 1.00 1.00 - 2.00 1.00 - 2.00
m² 1.00 1.00 - 4.00 0.60 - 2.40
m² 1.00 1.00 - 1.00 1.00 - 1.00
01.02 DEMOLICION DE PAVIMENTO ASFALTICO 2" 268.99
m² 1.00 1.00 - 3.00 6.00 - 18.00
m² 1.00 1.00 - 3.00 2.00 - 6.00
m² 1.00 1.00 - 1.00 1.00 - 1.00
m² 1.00 1.00 - 15.00 3.00 - 45.00
m² 1.00 1.00 - 1.00 2.00 - 2.00
m² 1.00 1.00 - 3.00 1.00 - 3.00
m² 1.00 1.00 - 95.00 0.50 - 47.50
m² 1.00 1.00 - 2.00 1.00 - 2.00
m² 1.00 1.00 - 0.50 0.50 - 0.25
m² 1.00 1.00 - 0.50 0.50 - 0.25
m² 1.00 1.00 - 0.80 0.80 - 0.64
m² 1.00 1.00 - 0.40 0.40 - 0.16
m² 1.00 1.00 - 2.00 0.80 - 1.60
m² 1.00 1.00 - 1.00 4.00 - 4.00
m² 1.00 1.00 - 1.00 0.60 - 0.60
m² 1.00 1.00 - 1.00 1.00 - 1.00
m² 1.00 1.00 - 0.50 0.50 - 0.25
m² 1.00 1.00 - 0.50 0.50 - 0.25
m² 1.00 1.00 - 1.00 2.00 - 2.00
m² 1.00 1.00 - 9.00 2.00 - 18.00
m² 1.00 1.00 - 1.00 0.60 - 0.60
m² 1.00 1.00 - 2.00 0.80 - 1.60
m² 1.00 1.00 - 2.80 1.50 - 4.20
m² 1.00 1.00 - 1.00 1.00 - 1.00
m² 1.00 1.00 - 1.00 1.00 - 1.00
m² 1.00 1.00 - 1.00 1.00 - 1.00
m² 1.00 1.00 - 4.00 1.00 - 4.00
m² 1.00 1.00 - 1.50 0.50 - 0.75
m² 1.00 1.00 - 3.00 0.40 - 1.20
m² 1.00 1.00 - 1.00 0.50 - 0.50
m² 1.00 1.00 - 6.00 0.30 - 1.80
m² 1.00 1.00 - 6.00 0.30 - 1.80
m² 1.00 1.00 - 4.00 0.80 - 3.20
m² 1.00 1.00 - 1.00 1.00 - 1.00
m² 1.00 1.00 - 0.80 0.80 - 0.64
m² 1.00 1.00 - 70.00 0.70 - 49.00
m² 1.00 1.00 - 3.00 1.00 - 3.00
m² 1.00 1.00 - 4.00 2.00 - 8.00
m² 1.00 1.00 - 1.00 0.8 - 0.80
m² 1.00 1.00 - 3.00 3.00 - 9.00
m² 1.00 1.00 - 8.00 2.00 - 16.00
m² 1.00 1.00 - 2.00 1.00 - 2.00
m² 1.00 1.00 - 4.00 0.60 - 2.40
m² 1.00 1.00 - 1.00 1.00 - 1.00
02 MOVIMIENTO DE TIERRAS
02.01 ELIMINACION DE MATERIAL EXCEDENTE 32.28
ELIMINACION DE MATERIAL EXCEDENTE m³ 1.00 1.20 268.99 - - 0.10 32.28

03 PAVIMENTOS
04.01 BARRIDO, LIMPIEZA Y COMPACTACION PARA IMPRIMACION ASFALTICA 268.99
ELIMINACION DE MATERIAL EXCEDENTE m² 1.00 1.00 268.99 - - - 268.99

04.02 IMPRIMACION ASFALTICA 268.99


IMPRIMACION ASFALTICA m² 1.00 1.00 268.99 - - - 268.99

04.03 SUMINISTRO Y COLOCACION DE CARPETA ASFALTICA EN FRIO DE 2" 268.99


IMPRIMACION ASFALTICA m² 1.00 1.00 268.99 - - - 268.99

04.03 COLOCACION DE SLURRY SEAL DE APERTURA LENTA AL TRANSITO E=10mm. 2.69


IMPRIMACION ASFALTICA m² 1.00 1.00 268.99 - - 0.01 2.69

CALLE LAS BETAS


PARCHADO DE ASFALTO
01 OBRAS PRELIMIMARES

01.01 TRAZO Y REPLANTEO DE CARPETA ASFALTICA 80.00


m² 1.00 1.00 - 3.00 10.00 - 30.00
m² 1.00 1.00 - 1.00 1.00 - 1.00
m² 1.00 1.00 - 2.00 1.00 - 2.00
m² 1.00 1.00 - 7.00 2.00 - 14.00
m² 1.00 1.00 - 28.00 1.00 - 28.00
m² 1.00 1.00 - 1.00 1.00 - 1.00
m² 1.00 1.00 - 4.00 1.00 - 4.00
01.02 DEMOLICION DE PAVIMENTO ASFALTICO 2" 80.00
m² 1.00 1.00 - 3.00 10.00 - 30.00
m² 1.00 1.00 - 1.00 1.00 - 1.00
m² 1.00 1.00 - 2.00 1.00 - 2.00
m² 1.00 1.00 - 7.00 2.00 - 14.00
m² 1.00 1.00 - 28.00 1.00 - 28.00
m² 1.00 1.00 - 1.00 1.00 - 1.00
m² 1.00 1.00 - 4.00 1.00 - 4.00
02 MOVIMIENTO DE TIERRAS
02.01 ELIMINACION DE MATERIAL EXCEDENTE 9.60
ELIMINACION DE MATERIAL EXCEDENTE m³ 1.00 1.20 80.00 - - 0.10 9.60

03 PAVIMENTOS

03.01 BARRIDO, LIMPIEZA Y COMPACTACION PARA IMPRIMACION ASFALTICA 80.00


BARRIDO Y LIMPIEZA PARA IMPRIMACION ASFALTICA m² 1.00 1.00 80.00 - - - 80.00

03.02 IMPRIMACION ASFALTICA 80.00


IMPRIMACION ASFALTICA m² 1.00 1.00 80.00 - - - 80.00

03.03 SUMINISTRO Y COLOCACION DE CARPETA ASFALTICA EN FRIO DE 2" 80.00


IMPRIMACION ASFALTICA m² 1.00 1.00 80.00 - - - 80.00
-
03.04 COLOCACION DE SLURRY SEAL DE APERTURA LENTA AL TRANSITO E=10mm. 0.80
IMPRIMACION ASFALTICA m³ 1.00 1.00 80.00 - - 0.01 0.80

CALLE LAS ORTENCIAS


PARCHADO DE ASFALTO
01 OBRAS PRELIMIMARES
01.01 TRAZO Y REPLANTEO DE CARPETA ASFALTICA 5.00
m² 1.00 1.00 - 5.00 1.00 - 5.00
01.02 DEMOLICION DE PAVIMENTO ASFALTICO 2" 5.00
m² 1.00 1.00 - 5.00 1.00 - 5.00
02 MOVIMIENTO DE TIERRAS
02.01 ELIMINACION DE MATERIAL EXCEDENTE 0.60
ELIMINACION DE MATERIAL EXCEDENTE m³ 1.00 1.20 5.00 - - 0.10 0.60

03 PAVIMENTOS
03.01 BARRIDO, LIMPIEZA Y COMPACTACION PARA IMPRIMACION ASFALTICA 5.00
ELIMINACION DE MATERIAL EXCEDENTE m² 1.00 1.00 5.00 - - - 5.00

03.02 IMPRIMACION ASFALTICA 5.00


IMPRIMACION ASFALTICA m² 1.00 1.00 5.00 - - - 5.00

03.03 SUMINISTRO Y COLOCACION DE CARPETA ASFALTICA EN FRIO DE 2" 5.00


IMPRIMACION ASFALTICA m² 1.00 1.00 5.00 - - - 5.00

03.04 COLOCACION DE SLURRY SEAL DE APERTURA LENTA AL TRANSITO E=10mm. 0.05


IMPRIMACION ASFALTICA m² 1.00 1.00 5.00 - - 0.01 0.05

CALLE LOS PINOS


PARCHADO DE ASFALTO
01 OBRAS PRELIMIMARES
01.01 TRAZO Y REPLANTEO DE CARPETA ASFALTICA 50.75
m² 1.00 1.00 - 2.00 2.00 - 4.00
m² 1.00 1.00 - 5.00 0.90 - 4.50
m² 1.00 1.00 - 2.00 2.00 - 4.00
m² 1.00 1.00 - 2.00 2.00 - 4.00
m² 1.00 1.00 - 10.00 0.80 - 8.00
m² 1.00 1.00 - 4.00 0.60 - 2.40
m² 1.00 1.00 - 0.50 0.50 - 0.25
m² 1.00 1.00 - 2.00 0.80 - 1.60
m² 1.00 1.00 - 1.00 1.00 - 1.00
m² 1.00 1.00 - 3.00 1.00 - 3.00
m² 1.00 1.00 - 5.00 1.00 - 5.00
m² 1.00 1.00 - 13.00 1.00 - 13.00
01.02 DEMOLICION DE PAVIMENTO ASFALTICO 2" 50.75
m² 1.00 1.00 - 2.00 2.00 - 4.00
m² 1.00 1.00 - 5.00 0.90 - 4.50
m² 1.00 1.00 - 2.00 2.00 - 4.00
m² 1.00 1.00 - 2.00 2.00 - 4.00
m² 1.00 1.00 - 10.00 0.80 - 8.00
m² 1.00 1.00 - 4.00 0.60 - 2.40
m² 1.00 1.00 - 0.50 0.50 - 0.25
m² 1.00 1.00 - 2.00 0.80 - 1.60
m² 1.00 1.00 - 1.00 1.00 - 1.00
m² 1.00 1.00 - 3.00 1.00 - 3.00
m² 1.00 1.00 - 5.00 1.00 - 5.00
m² 1.00 1.00 - 13.00 1.00 - 13.00
02 MOVIMIENTO DE TIERRAS
02.01 ELIMINACION DE MATERIAL EXCEDENTE 6.09
ELIMINACION DE MATERIAL EXCEDENTE m³ 1.00 1.20 50.75 - - 0.10 6.09

03 PAVIMENTOS
03.01 BARRIDO, LIMPIEZA Y COMPACTACION PARA IMPRIMACION ASFALTICA 50.75
BARRIDO Y LIMPIEZA PARA IMPRIMACION ASFALTICA m² 1.00 1.00 50.75 - - - 50.75

03.02 IMPRIMACION ASFALTICA 50.75


IMPRIMACION ASFALTICA m² 1.00 1.00 50.75 - - - 50.75

03.03 SUMINISTRO Y COLOCACION DE CARPETA ASFALTICA EN FRIO DE 2" 50.75


IMPRIMACION ASFALTICA m² 1.00 1.00 50.75 - - - 50.75
-
03.04 COLOCACION DE SLURRY SEAL DE APERTURA LENTA AL TRANSITO E=10mm. 0.51
IMPRIMACION ASFALTICA m³ 1.00 1.00 50.75 - - 0.01 0.51
CALLE LA LIBERTAD
PARCHADO DE ASFALTO
01 OBRAS PRELIMIMARES
01.01 TRAZO Y REPLANTEO DE CARPETA ASFALTICA 167.19
m² 1.00 1.00 - 28.00 1.00 - 28.00
m² 1.00 1.00 - 0.50 0.60 - 0.30
m² 1.00 1.00 - 2.00 1.00 - 2.00
m² 1.00 1.00 - 4.00 2.00 - 8.00
m² 1.00 1.00 - 1.00 1.00 - 1.00
m² 1.00 1.00 - 4.00 1.00 - 4.00
m² 1.00 1.00 - 3.00 0.60 - 1.80
m² 1.00 1.00 - 6.00 1.00 - 6.00
m² 1.00 1.00 - 7.00 1.00 - 7.00
m² 1.00 1.00 - 8.00 0.80 - 6.40
m² 1.00 1.00 - 1.00 1.00 - 1.00
m² 1.00 1.00 - 0.80 0.80 - 0.64
m² 1.00 1.00 - 2.00 1.00 - 2.00
m² 1.00 1.00 - 1.00 1.00 - 1.00
m² 1.00 1.00 - 2.00 2.00 - 4.00
m² 1.00 1.00 - 1.00 1.00 - 1.00
m² 1.00 1.00 - 3.00 0.80 - 2.40
m² 1.00 1.00 - 1.00 0.30 - 0.30
m² 1.00 1.00 - 0.50 0.50 - 0.25
m² 1.00 1.00 - 1.00 1.00 - 1.00
m² 1.00 1.00 - 1.00 1.00 - 1.00
m² 1.00 1.00 - 3.00 7.00 - 21.00
m² 1.00 1.00 - 1.00 1.00 - 1.00
m² 1.00 1.00 - 1.00 0.60 - 0.60
m² 1.00 1.00 - 1.00 1.00 - 1.00
m² 1.00 1.00 - 4.00 1.00 - 4.00
m² 1.00 1.00 - 1.00 1.00 - 1.00
m² 1.00 1.00 - 1.00 1.00 - 1.00
m² 1.00 1.00 - 1.00 0.5 - 0.50
m² 1.00 1.00 - 2.00 2.00 - 4.00
m² 1.00 1.00 - 0.70 70.00 - 49.00
m² 1.00 1.00 - 1.00 1.00 - 1.00
m² 1.00 1.00 - 2.00 2.00 - 4.00
01.02 DEMOLICION DE PAVIMENTO ASFALTICO 2" 167.19
m² 1.00 1.00 - 28.00 1.00 - 28.00
m² 1.00 1.00 - 0.50 0.60 - 0.30
m² 1.00 1.00 - 2.00 1.00 - 2.00
m² 1.00 1.00 - 4.00 2.00 - 8.00
m² 1.00 1.00 - 1.00 1.00 - 1.00
m² 1.00 1.00 - 4.00 1.00 - 4.00
m² 1.00 1.00 - 3.00 0.60 - 1.80
m² 1.00 1.00 - 6.00 1.00 - 6.00
m² 1.00 1.00 - 7.00 1.00 - 7.00
m² 1.00 1.00 - 8.00 0.80 - 6.40
m² 1.00 1.00 - 1.00 1.00 - 1.00
m² 1.00 1.00 - 0.80 0.80 - 0.64
m² 1.00 1.00 - 2.00 1.00 - 2.00
m² 1.00 1.00 - 1.00 1.00 - 1.00
m² 1.00 1.00 - 2.00 2.00 - 4.00
m² 1.00 1.00 - 1.00 1.00 - 1.00
m² 1.00 1.00 - 3.00 0.80 - 2.40
m² 1.00 1.00 - 1.00 0.30 - 0.30
m² 1.00 1.00 - 0.50 0.50 - 0.25
m² 1.00 1.00 - 1.00 1.00 - 1.00
m² 1.00 1.00 - 1.00 1.00 - 1.00
m² 1.00 1.00 - 3.00 7.00 - 21.00
m² 1.00 1.00 - 1.00 1.00 - 1.00
m² 1.00 1.00 - 1.00 0.60 - 0.60
m² 1.00 1.00 - 1.00 1.00 - 1.00
m² 1.00 1.00 - 4.00 1.00 - 4.00
m² 1.00 1.00 - 1.00 1.00 - 1.00
m² 1.00 1.00 - 1.00 1.00 - 1.00
m² 1.00 1.00 - 1.00 0.5 - 0.50
m² 1.00 1.00 - 2.00 2.00 - 4.00
m² 1.00 1.00 - 0.70 70.00 - 49.00
m² 1.00 1.00 - 1.00 1.00 - 1.00
m² 1.00 1.00 - 2.00 2.00 - 4.00
02 MOVIMIENTO DE TIERRAS
02.01 ELIMINACION DE MATERIAL EXCEDENTE 20.06
ELIMINACION DE MATERIAL EXCEDENTE m³ 1.00 1.20 167.19 - - 0.10 20.06

03 PAVIMENTOS
03.01 BARRIDO, LIMPIEZA Y COMPACTACION PARA IMPRIMACION ASFALTICA 167.19
BARRIDO Y LIMPIEZA PARA IMPRIMACION ASFALTICA m² 1.00 1.00 167.19 - - - 167.19

03.02 IMPRIMACION ASFALTICA 167.19


IMPRIMACION ASFALTICA m² 1.00 1.00 167.19 - - - 167.19

03.03 SUMINISTRO Y COLOCACION DE CARPETA ASFALTICA EN FRIO DE 2" 167.19


IMPRIMACION ASFALTICA m² 1.00 1.00 167.19 - - - 167.19
-
03.04 COLOCACION DE SLURRY SEAL DE APERTURA LENTA AL TRANSITO E=10mm. 1.67
IMPRIMACION ASFALTICA m³ 1.00 1.00 167.19 - - 0.01 1.67

CALLE LAS GARDENIAS


PARCHADO DE ASFALTO
01 OBRAS PRELIMIMARES
01.01 TRAZO Y REPLANTEO DE CARPETA ASFALTICA 29.40
m² 1.00 1.00 - 3.00 3.00 - 9.00
m² 1.00 1.00 - 3.00 0.80 - 2.40
m² 1.00 1.00 - 1.00 1.00 - 1.00
m² 1.00 1.00 - 1.00 1.00 - 1.00
m² 1.00 1.00 - 1.00 1.00 - 1.00
m² 1.00 1.00 - 8.00 0.50 - 4.00
m² 1.00 1.00 - 4.00 1.00 - 4.00
m² 1.00 1.00 - 2.00 2.00 - 4.00
m² 1.00 1.00 - 1.00 2.00 - 2.00
m² 1.00 1.00 - 1.00 1.00 - 1.00
01.02 DEMOLICION DE PAVIMENTO ASFALTICO 2" 29.40
m² 1.00 1.00 - 3.00 3.00 - 9.00
m² 1.00 1.00 - 3.00 0.80 - 2.40
m² 1.00 1.00 - 1.00 1.00 - 1.00
m² 1.00 1.00 - 1.00 1.00 - 1.00
m² 1.00 1.00 - 1.00 1.00 - 1.00
m² 1.00 1.00 - 8.00 0.50 - 4.00
m² 1.00 1.00 - 4.00 1.00 - 4.00
m² 1.00 1.00 - 2.00 2.00 - 4.00
m² 1.00 1.00 - 1.00 2.00 - 2.00
m² 1.00 1.00 - 1.00 1.00 - 1.00
02 MOVIMIENTO DE TIERRAS
02.01 ELIMINACION DE MATERIAL EXCEDENTE 3.53
ELIMINACION DE MATERIAL EXCEDENTE m³ 1.00 1.20 29.40 - - 0.10 3.53

03 PAVIMENTOS
03.01 BARRIDO, LIMPIEZA Y COMPACTACION PARA IMPRIMACION ASFALTICA 29.40
BARRIDO Y LIMPIEZA PARA IMPRIMACION ASFALTICA m² 1.00 1.00 29.40 - - - 29.40

03.02 IMPRIMACION ASFALTICA 29.40


IMPRIMACION ASFALTICA m² 1.00 1.00 29.40 - - - 29.40

03.03 SUMINISTRO Y COLOCACION DE CARPETA ASFALTICA EN FRIO DE 2" 29.40


IMPRIMACION ASFALTICA m² 1.00 1.00 29.40 - - - 29.40
-
03.03 COLOCACION DE SLURRY SEAL DE APERTURA LENTA AL TRANSITO E=10mm. 0.29
IMPRIMACION ASFALTICA m³ 1.00 1.00 29.40 - - 0.01 0.29

CALLE MIGUEL GRAU


PARCHADO DE ASFALTO
01 OBRAS PRELIMIMARES
01.01 TRAZO Y REPLANTEO DE CARPETA ASFALTICA 40.00
m² 1.00 1.00 - 1.00 1.00 - 1.00
m² 1.00 1.00 - 5.00 5.00 - 25.00
m² 1.00 1.00 - 7.00 2.00 - 14.00
01.02 DEMOLICION DE PAVIMENTO ASFALTICO 2" 40.00
m² 1.00 1.00 - 1.00 1.00 - 1.00
m² 1.00 1.00 - 5.00 5.00 - 25.00
m² 1.00 1.00 - 7.00 2.00 - 14.00
02 MOVIMIENTO DE TIERRAS
02.01 ELIMINACION DE MATERIAL EXCEDENTE 4.80
ELIMINACION DE MATERIAL EXCEDENTE m³ 1.00 1.20 40.00 - - 0.10 4.80

03 PAVIMENTOS
03.01 BARRIDO, LIMPIEZA Y COMPACTACION PARA IMPRIMACION ASFALTICA 40.00
BARRIDO Y LIMPIEZA PARA IMPRIMACION ASFALTICA m² 1.00 1.00 40.00 - - - 40.00

03.02 IMPRIMACION ASFALTICA 40.00


IMPRIMACION ASFALTICA m² 1.00 1.00 40.00 - - - 40.00

03.03 SUMINISTRO Y COLOCACION DE CARPETA ASFALTICA EN FRIO DE 2" 40.00


IMPRIMACION ASFALTICA m² 1.00 1.00 40.00 - - - 40.00
-
03.04 COLOCACION DE SLURRY SEAL DE APERTURA LENTA AL TRANSITO E=10mm. 0.40
IMPRIMACION ASFALTICA m³ 1.00 1.00 40.00 - - 0.01 0.40

CALLE ANDRES RETURI


PARCHADO DE ASFALTO
01 OBRAS PRELIMIMARES
01.01 TRAZO Y REPLANTEO DE CARPETA ASFALTICA 49.10
m² 1.00 1.00 - 5.00 1.00 - 5.00
m² 1.00 1.00 - 3.00 1.00 - 3.00
m² 1.00 1.00 - 4.00 1.00 - 4.00
m² 1.00 1.00 - 6.00 1.00 - 6.00
m² 1.00 1.00 - 1.00 1.00 - 1.00
m² 1.00 1.00 - 1.00 1.00 - 1.00
m² 1.00 1.00 - 1.00 1.00 - 1.00
m² 1.00 1.00 - 9.00 0.90 - 8.10
m² 1.00 1.00 - 10.00 2.00 - 20.00
01.02 DEMOLICION DE PAVIMENTO ASFALTICO 2" 49.10
m² 1.00 1.00 - 5.00 1.00 - 5.00
m² 1.00 1.00 - 3.00 1.00 - 3.00
m² 1.00 1.00 - 4.00 1.00 - 4.00
m² 1.00 1.00 - 6.00 1.00 - 6.00
m² 1.00 1.00 - 1.00 1.00 - 1.00
m² 1.00 1.00 - 1.00 1.00 - 1.00
m² 1.00 1.00 - 1.00 1.00 - 1.00
m² 1.00 1.00 - 9.00 0.90 - 8.10
m² 1.00 1.00 - 10.00 2.00 - 20.00
02 MOVIMIENTO DE TIERRAS
02.01 ELIMINACION DE MATERIAL EXCEDENTE 5.89
ELIMINACION DE MATERIAL EXCEDENTE m³ 1.00 1.20 49.10 - - 0.10 5.89

03 PAVIMENTOS
03.01 BARRIDO, LIMPIEZA Y COMPACTACION PARA IMPRIMACION ASFALTICA 49.10
BARRIDO Y LIMPIEZA PARA IMPRIMACION ASFALTICA m² 1.00 1.00 49.10 - - - 49.10

03.02 IMPRIMACION ASFALTICA 49.10


IMPRIMACION ASFALTICA m² 1.00 1.00 49.10 - - - 49.10

03.03 SUMINISTRO Y COLOCACION DE CARPETA ASFALTICA EN FRIO DE 2" 49.10


IMPRIMACION ASFALTICA m² 1.00 1.00 49.10 - - - 49.10
-
04.03 COLOCACION DE SLURRY SEAL DE APERTURA LENTA AL TRANSITO E=10mm. 0.49
IMPRIMACION ASFALTICA m³ 1.00 1.00 49.10 - - 0.01 0.49

CALLE TUCUMAN
PARCHADO DE ASFALTO
01 OBRAS PRELIMIMARES
01.01 TRAZO Y REPLANTEO DE CARPETA ASFALTICA 11.00
m² 1.00 1.00 - 5.00 1.00 - 5.00
m² 1.00 1.00 - 6.00 1.00 - 6.00
01.02 DEMOLICION DE PAVIMENTO ASFALTICO 2" 11.00
m² 1.00 1.00 - 5.00 1.00 - 5.00
m² 1.00 1.00 - 6.00 1.00 - 6.00
02 MOVIMIENTO DE TIERRAS
02.01 ELIMINACION DE MATERIAL EXCEDENTE 1.32
ELIMINACION DE MATERIAL EXCEDENTE m³ 1.00 1.20 11.00 - - 0.10 1.32

03 PAVIMENTOS
03.01 BARRIDO, LIMPIEZA Y COMPACTACION PARA IMPRIMACION ASFALTICA 11.00
BARRIDO Y LIMPIEZA PARA IMPRIMACION ASFALTICA m² 1.00 1.00 11.00 - - - 11.00

03.02 IMPRIMACION ASFALTICA 11.00


IMPRIMACION ASFALTICA m² 1.00 1.00 11.00 - - - 11.00

03.03 SUMINISTRO Y COLOCACION DE CARPETA ASFALTICA EN FRIO DE 2" 11.00


IMPRIMACION ASFALTICA m² 1.00 1.00 11.00 - - - 11.00
-
03.04 COLOCACION DE SLURRY SEAL DE APERTURA LENTA AL TRANSITO E=10mm. 0.11
IMPRIMACION ASFALTICA m³ 1.00 1.00 11.00 - - 0.01 0.11

SOBRE ESTADIO
PARCHADO DE ASFALTO
01 OBRAS PRELIMIMARES
01.01 TRAZO Y REPLANTEO DE CARPETA ASFALTICA 90.99
m² 1.00 1.00 - 3.00 1.00 - 3.00
m² 1.00 1.00 - 3.00 1.00 - 3.00
m² 1.00 1.00 - 5.00 1.00 - 5.00
m² 1.00 1.00 - 0.80 0.80 - 0.64
m² 1.00 1.00 - 1.50 1.00 - 1.50
m² 1.00 1.00 - 0.70 0.50 - 0.35
m² 1.00 1.00 - 1.00 0.80 - 0.80
m² 1.00 1.00 - 1.00 1.00 - 1.00
m² 1.00 1.00 - 5.00 1.00 - 5.00
m² 1.00 1.00 - 7.00 0.80 - 5.60
m² 1.00 1.00 - 12.00 0.80 - 9.60
m² 1.00 1.00 - 20.00 0.80 - 16.00
m² 1.00 1.00 - 12.00 0.50 - 6.00
m² 1.00 1.00 - 10.00 0.50 - 5.00
m² 1.00 1.00 - 7.00 1.50 - 10.50
m² 1.00 1.00 - 18.00 1.00 - 18.00
01.02 DEMOLICION DE PAVIMENTO ASFALTICO 2" 90.99
m² 1.00 1.00 - 3.00 1.00 - 3.00
m² 1.00 1.00 - 3.00 1.00 - 3.00
m² 1.00 1.00 - 5.00 1.00 - 5.00
m² 1.00 1.00 - 0.80 0.80 - 0.64
m² 1.00 1.00 - 1.50 1.00 - 1.50
m² 1.00 1.00 - 0.70 0.50 - 0.35
m² 1.00 1.00 - 1.00 0.80 - 0.80
m² 1.00 1.00 - 1.00 1.00 - 1.00
m² 1.00 1.00 - 5.00 1.00 - 5.00
m² 1.00 1.00 - 7.00 0.80 - 5.60
m² 1.00 1.00 - 12.00 0.80 - 9.60
m² 1.00 1.00 - 20.00 0.80 - 16.00
m² 1.00 1.00 - 12.00 0.50 - 6.00
m² 1.00 1.00 - 10.00 0.50 - 5.00
m² 1.00 1.00 - 7.00 1.50 - 10.50
m² 1.00 1.00 - 18.00 1.00 - 18.00
02 MOVIMIENTO DE TIERRAS
02.01 ELIMINACION DE MATERIAL EXCEDENTE 10.92
ELIMINACION DE MATERIAL EXCEDENTE m³ 1.00 1.20 90.99 - - 0.10 10.92

03 PAVIMENTOS
03.01 BARRIDO, LIMPIEZA Y COMPACTACION PARA IMPRIMACION ASFALTICA 90.99
BARRIDO Y LIMPIEZA PARA IMPRIMACION ASFALTICA m² 1.00 1.00 90.99 - - - 90.99

03.02 IMPRIMACION ASFALTICA 90.99


IMPRIMACION ASFALTICA m² 1.00 1.00 90.99 - - - 90.99

03.03 SUMINISTRO Y COLOCACION DE CARPETA ASFALTICA EN FRIO DE 2" 90.99


p IMPRIMACION ASFALTICA m² 1.00 1.00 90.99 - - - 90.99
-
03.04 COLOCACION DE SLURRY SEAL DE APERTURA LENTA AL TRANSITO E=10mm. 0.91
IMPRIMACION ASFALTICA m³ 1.00 1.00 90.99 - - 0.01 0.91
792.42
792.42
523.43
CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE:
CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE:
CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE:
CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE:
CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE:
CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE:
CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE:
CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE:
CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE:
CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE:
CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE:
CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE:
CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE:
CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE:
CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE:
CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE:
CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE:
CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE:
CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE:
CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE:
CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE:
CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE:
CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE:
CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE:
CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE:
CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE:
CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE:
CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE:
CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE:
CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE:
CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE:
CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE:
CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE:
CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE:
CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE:
CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE:
CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE:
CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE:
CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE:
CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE:
CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE:
CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE:
CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE:
CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE:
CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE:
CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE:
CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE:
CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE:
CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE:
CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE:
CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE:
CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE:
CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE: CLIENTE:
PLANILLA DE METRADOS

PROYECTO: PARCHADO A NIVEL DE ASFALTO EN LAS AVENIDAS DEAN SAAVEDRA, CALLE


PROLONGACION, CALLE 3, CALLE TUPAC AMARU, AV. LA RIBERA - TRUJILLO – LA
LIBERTAD

Cliente: MUNICIPALIDAD DISTRITAL DE HUANCHACO


Departamento: LA LIBERTAD
Fecha: 2/5/2020

N° de
Item Descripción Und. Estructuras

01 OBRAS PRELIMIMARES
01.01 TRAZO Y REPLANTEO DE CARPETA ASFALTICA m² 792.42
01.02 DEMOLICION DE PAVIMENTO ASFALTICO 2" m² 792.42
02 MOVIMIENTO DE TIERRAS
02.01 ELIMINACION DE MATERIAL EXCEDENTE m³ 95.05
03 PAVIMENTOS
03.01 BARRIDO, LIMPIEZA Y COMPACTACION PARA IMPRIMACION ASFALTICA m² 792.42
03.02 IMPRIMACION ASFALTICA m² 792.42
03.03 SUMINISTRO Y COLOCACION DE CARPETA ASFALTICA EN FRIO DE 2" m² 792.42
03.04 COLOCACION DE SLURRY SEAL DE APERTURA LENTA AL TRANSITO E=10 mm m³ 7.92