SPEED Post 14/07/2017-18/1PC-H/TPP/ \nagt December 11, 2017 To ’ M/s BarsingsaThermai Power Station NLC Ind, td, Barsingar Village, Taluk, Dist, Bikaner, Sub: Directions under Section 5 of the Fnvironment (Protection) Act, 1986 regarding compliance of emission limit notified vide notification No.S.0.3305 (I) dated 07.12.2015 ~ reg. S, taking into consideration pollution from thermal power plants, Ministry of Environment, Forest & Climate Change had issued notification in the year 1984 laying out standards for thermal power plants. Further, the stack height regulation was notified in the year 1989 and effluent standard for thermal power plants was notified in the year 1986. The revised temperature limit of discharge of cooling water from the plants was notified in the year 1999 and thereafter use of beneficiated coal in the plants was issued in June 2002. The fly ash utilization notification was also issued On 14th September, 1999 and amended in the year 2003 and 2009, Thereafter, MoEF&CC vide Notification No. $.0.3305(1) dated 07.12.2015 has amended emission limit for particulate matter and notified new limits for Sulphur tlioxide (SOx), Oxides of Nitrogen (NOx) and mercury emission, and water consumption limit for coal/lignite based thermal power plants. As per the nolification dated 07.12.2015, thermal power plants are required to achieve the notified limit within two years from the date of the notification i.e, by 07.12.2017; WHEREAS, with the implementation of the amendment dated 0Y.12.2015, it is expected that there would be reduction in emission of PM, Sulphur dioxide and oxide of Nitrogen, which in turn will help in improvement in Ambient Air Quality in and around thermal power plants, besides reduction of mercury emission and water use in the thermal power plants will reduce; WHEREAS, in the meeting on Coal Washeries (Environment & Forest Clearances) and Emission Notms for Thermal Power Plants chaired by the Hon'ble Minister of Environment, Forest & Climate Change and Minister of Power, Coal & Renewable Hnergy on June 08, 2016, it was decided that a committce comprising representatives from MoEF & CC, Ministry of Power (MoP),Central electricity Authority (CHA), Ministry of Coal (MoC), Power Grid Corporation of India Limited (PGCI) and Central Pollution Control Board (CPCB) may be constituted to look into the all issues related to implementation of norms; WILEREAS, following decisions were taken in the wting 1, MoP/CEA s of the powe! 2, MoP / CEA shall submit action plan by December, 2016 in respect of power plants commissioned during, January, 2004 to December, 2016 indicating unit wise retrofit / renovation for each power plant. The implementation of action plan shall be taken up in backword manner starting from the plans commissioned in the 2015 and the shall be completed by 15.08.202 3.MoP and CEA shall coordinate with cach State Public Sector Undertakings separately for submission of action plan by December, 2016 for all the power plants all submit action plan by December 2016 for phasing out plants commissioned before December, 2003. WIIEREAS, it was further decided that MoP shall take action for installation of Flue gas Desulphurisation (GD) if needed to achieve prescribed SO2 norms based on the SOs emission levels from power plants; WHEREAS, it was also pointed out that NOx control technology in case of Indian coal is not establishee!. Selective Catalytic Reduction (SCR) technology is used for NOx control, however, its feasibility for Indian coal needs to be established. MoP suggested (hat Pilot studies may be taken up in bwo plants and based on the results, further action plan to be drawn regarding, retrofitting of SCR in. plants to achieve prescribed NOx norms; WHEREAS, the MoP constituted a committee under the Chairmanship of Chairman, Central Electricity Authority (CEA) on 21.09.2016 to prepare an action plan for implementation of new emission limits; WHEREAS, lo ensure compliance of the new emission norms the MOEF&CC convened a meeting on 23.05.2017 in which CEA, NTPC and the Central Pollution Control Board participated; WHEREAS, the MOEF&CC received a letter from Secretary Ministry of Power vide their D.O, letter FU-1/2016-IPC dated 30% June, 2017 indicating the concerns of various thermal power plant in the country with regard to the compliance with the new emission norms for the thermal power plants notified on 7.12.2015 particularly w.r.t. Particulate Matter (PM), Sulphur dioxide (SO2) & Oxides of Nitrogen (NO,); WHEREAS, it was noted thal out of present 196667 MW installed capacily, about 60 % capacity (115,214 MW) meets the new PM norms with existing FSP installations, Remaining, capacity of 64,334 MW which docs not meet the new environmental norms regarding PM, requiring, retrofitting, additional fields in Electrostatic Procipitator (ESP)/ replacement of ESP in existing, plants to mect the new emission norms of PM; WHEREAS, Ministry of Power after consultation with Central electricity Authority informed that retrofitling additional fields in ESP/replacement of ESP in ex 4-6 months for each unit: sting plants will need complete shutdown of WHEREAS, in order to meet SO emission norms, FGD system shall be roquired lo be installed in all plants. MoP informed that about 30-36 months Fequired for design & engineering, approvals, funds arrangements, tendering, erection and commissioning of will be required as all plants,cannot be shut down simultaneously. Another Challenge highlighted for installation of FGD was availability of lechnologies/supplicrs. In adllition, issues relating Lo availability of good quality lime stone for operation of EGD and disposal of Gypsum to run the EGD in existing plants wore also taken note of; 3D. Besides, planned shutdown WHEREAS, the standard of 300 & 100 mg/NM* would require installation of Selective Non Catalytic Reduction (SNCR) or Selective Non Catalytic Reduction (SCR). While these technologies are established globally, these are not established for Indian Coal, which has high ash content Therefore, it was decided to engage various technology vendors to run pilots at NIPC stations to validate technology ef SNCR/SCR system for Indian coal; WHEREAS, the Ministry of Power in the letter dated 30.06.2017 enelosed the report outlining, the plan of action for implementation of the new norms keeping in mind the techno-cconomic feasibility and ensuring availability of power to all at affordable cost without any disruption; WHEREAS, as per the phasing plan proposed by MOP after consultation with CEA and Regional Power Committees, out of the installed capacity of I, 87,162 MW (as on December, 2016), 8217 MW have been identified for retirement/already retired. Further, 12,974 MW of capacity already have either CFBC boilers or FGDs will coal bal $, a phasing plan was proposed for the balance 165971 MW of cd thermal capacity for achieving compliance with 145977 MW capacity proposing installation of FGDs within a period of 7 years to be undertaken in a phased manner. About 3205 MW of coal based capacity was slated to be compliant with revised norms of SO? emission: WHEREAS, it was further noted that approximately about 16789 MW would not be able to install FGDs due to various constraints which include lack of space, ete.; WHEREAS, CEA has worked out the requirement of capacity of coal based thermal power plants including hydro, wind, solar, mect the estimated peak demand of 225 GW in 2021-22; based unils to WIIEREAS, MoP suggested that the compliance period of PM for the plants installing FGD may be kept same as per the FGD phasing plan; WHEREAS, it was requested that for implementation of NOx norms in the plants installed before 31.12.2003 a period of three years may be permitted to achieve specified standards of 600 mg/Nm:. For other plants a relaxation of 600 mg/Nm? in place of 300 and 100 mg/Nm? for a period of 3 years was also requested; WHEREAS, taking into account the issues/concerns raised by the MoP and the sensitivity involved in the matter as it relates to general public of the country, the Ministry undertgok detailed analysis of each of the issues in the meetings held on 06.07.2017, 27.07.2017, 11.08.2017 and 01.09.2017. These meetings were also attended by the various stakeholders including Ministry of Power, CEA, NTPC etc.; | WHEREAS, MORK & CC in the meeting with MoP, CEA, NTPC & CPCB plember 1, 2017 decided that the action plan submitted by MoP for 7 years i.e. up to 2024 was too long and it should instead commence from 2018 and implemented by 2022 with respect to all pollutants. It was further suggested that action plan should be revised prioritising the plants located in critically polluted area /close to habitation /urban area. Based on the decisions taken in the meeting Ministry af Power vide letter No, FU- 1/2017-IPC dated 13.10.2017 submitted the revised action plan, to implement/ phasing FGD installation/ ESP upgradation to meet new emission norms for thermal power plants; etc. held on § WHEREAS, as per the revised plan submitted by the MoP vide letter dated 13.102.17, 650 units comprising 196667 MW need to meet the new emission limits. Out of 650 units, FGD will be installed to achieve the emission limit of 5O2 by the year 2022 in all 415 units comprising 161522 MW (01 unit by 2018, 08 units by 2019, and 55 units by 2020, 172 units by 2021 and 178 units by 2022, for O1 units with 150 MW capacity plan is not received). Remaining 255 units comprised of 35145 MW either complying with SO2 emission limits or planned for phasing out; WHEREAS, ESP upgradation to achieve emission limit of particulate matter will be completed by the year 2022 in PM for 231 units comprising of 65925 MW capacity out of 650 unils (01 unit by 2018, 02 units by 2019, 28 units by 2020, 97 units by 2021 and 94 units by 2022, for 09 units of 1400 MW capacity plan by 2022); WHEREAS, with regard to compliance of emission limit of NOx, it is suggested that pre combustion modification such as in situ modification in boiler, installation of Low NOx burners and Over Fire Air shall be adopted besides installation of SCR/SNCR systems wherever needed by the year 2022; WHEREAS, electricity is cleanest form of energy which helps in mitigating house hold air pollution which is matter of concern; WHEREAS, there is need to. provide electricity supply to people who do nol yet have access to it; WHEREAS, taking into consideration the technical challenges and time requirements for installation of FGD and other technologies to meet the new emission limits, the MoEF&CC vide its letter F. No, Q-15017/40/2007-CPW dated 07.12.2017 has directed CPCB to direct all the thermal power plants to ensure compliance with the norms laid down in the 07.12.2015 notification in accordance with the revised Plan submitted by the Ministry of Power letter dated 13.10.2017 as well as NOx by 2022 WHEREAS, the Ministry of Environment, Forest & Climate Change , Government of India, vide Notifications No. $. ©. 187 (B) of 27.02.1996 and 5. QO. 730 (1) dated 10.07.2002, has delegated the powers vested under Section 5 of the Iinvironmeght (Protection) Act, 1986 (29 of 1986) to the Chairman, Central Pollutiop Control Board, to issue directions to any industry or any local bodyor any other authority for violations of the standards and rules notified under the Environment (Protection) Rules, 1986 and amendment thereof NOW, THEREFORE, taking into consideration all material facts including environmental concerns and ensuring stability of power supply and need for phasing the implementation, in exercise of powers vested under Section 5 of the Environment (Protection) Act, 1986, following directions are issued to M/s Barsingsar 'hermal Power Station, NLC India Ltd i That plant shall install/retrofit Electrostatic Precipitator (ESP) by August 31, 2020 & April 30, 2020 in Unit 1 & 2 respectively so as to comply PM emission limit ii, ‘That plant shall meet SO2 emission limit by installing FGD/lime injection as applicable immediately iii, ‘That plant shall take immediate measure like installation of low NOx burners, providing Over Fire Air ( OFA) etc. and achieve progressive reduction so as to comply NOx emission limit by the year 2022 The time line mentioned above (i to iii) for compliance of PM, SO: & NOx emission limits shall be reviewed by CPCB within a period of three months and shall be brought down further considering the location specificity of the plant such as critical polluted area/ closeness to habitation/ urban area The time line for compliance of water consumption limit shall also be finalised in consultation of plants M/s Barsingsar Thermal Power Station, NLC India Ltd shall ensure compliance of directions mentioned above (i to iii) failing which action will be taken under the appropriate provisions of the Environment (Protection) Act, 1986 (AK Mey Chatfinan WG Copy to: 1. The Chairman Rajasthan Pollution Control Board A-4, Institutional Area Jalana Dungri 5 Jaipur-302 004 Rajagthan The Joint Secretary (cP!bivision) Ministry of Environment, Forests and Climate Change Prithvi Wing, 2nd Floor, Room No. 216 Indira Paryavaran Bhawan, Aliganj, Jor Bagh Road, New Delhi - 110003 The Joint Secretary ( Thermal) Ministry of power Shram Shakti Bhawan, Rafi Marg New Delhi ‘The Regional Director, Central Pollution Control Board 4th Floor, Sahkar Bhawan, North TT Nagar Bhopal ~ 462 003 i The Divisional Head - IT, CPCB Reray (A. Sudhakar) Member Secretary

You might also like