Quality Control Plan Chart (QCPC) : Nama Part Cover Side Customer
Quality Control Plan Chart (QCPC) : Nama Part Cover Side Customer
1 Incoming Mat'l ABS Toray 2. Kesesuaian SJ, PO, C.Sheet 2.C. sheet 2. Hubungi bagian yang terkait
1. Setting parameter 1. Appearance MC Injection 330 Visual Opr. Produksi 100% Jig 1. Visual QC Line Per Jam Check sheet 1. Hold part, Produksi
ton ( B9 )
4 Proses Injection
2. Sample approval 2. Dimensi & fungsi Jig / Insert Cek Jig Caliper 2. Diukur SOP, Lap. 2. Hubungi leader, SPV, QC
No Burry - Cutter Visual Opr. Produksi 100% - Cutter Finishing QC Line Per Jam Daily Report 1. Hold Part
5 Process Finishing Sample Approval Appearance - Pencil marking
- Eye Visual 2.Hubungi Leader, QC
6 Inspection
Drawing 2. Fungsi, Jig inspection, Dimensi - Jig inspection Caliper 2. Diukur SOP, Lap. 2. Hubungi leader, SPV, QC
1 Incoming Mat'l PP-N4 ( PP ) 2. Kesesuaian SJ, PO, C.Sheet 2.C. sheet 2. Hubungi bagian yang terkait
AW864 3. Kemasan utuh, 3. CR 3. Buat Claim Report
1. Quantity 1. Srt.Jalan 1. Hold material
1. Rapih Hand pallet Penataan Opr. gudang 100%
2 Penyimpanan 2. Sesuai Layout 2. Penempatan part 2.Kartu stok 2. Hubungi Supplier
3. CR 3. Buat Claim Report
1. Hold material & Produksi
1. Setting Parameter 1. Suhu 60° - 70° C Temp Control Visual Opr.Material 100% 1. Std Mat'rl
3 Hopper Drying 2. Waktu Drying 2. Waktu Drying 1-2 jam Jam 2. Lapor Leader / Supervisor
1.Setting parameter 1.Appearance MC Injection, Visual Operator 100% Jig 1. Visual QC line per jam Check sheet 1. Hold part, Produksi
produksi
4 Proses Injection
2. Sample Approval 2.Dimensi & Fungsi Jig / Insert Cek Jig Caliper 2. Diukur SOP, Lap. 2. Hubungi leader, SPV, QC
- Appearance - Cutter Visual Opr. Produksi 100% Cutter Finishing QC line per jam Daily Report 1. Hold part
5 Process Finishing Sample Approval - Burry - Pencil Marking Tulis Eye Visual 2. Hubungi leader, SPV, QC
1. Appearance
( No Scracth,Flash,Silver,sink mark, Operator 1. Visual Aql 1. Hold part, Produksi
Sample Approval BD, Flow,EM,Short, dll ) - Cutter Visual produksi 100% Jig QC Line Sampling Check sheet
6 Inspection
Drawing 2. Fungsi, Jig inspection, - Jig inspection Caliper 2. Diukur SOP, Lap. 2. Hubungi leader, SPV, QC
Delay / Menunda
Inspection / Pemeriksaan
1. Setting Parameter Temp Control Visual Opr.Material 100% 1. Std Mat'rl 1. Hold material & Produksi
1. Suhu 60° - 70° C
3 Hopper Drying 2. Waktu Drying 2. Waktu Drying 1-2 jam Jam 2. Lapor Leader / Supervisor
- Appearance - Cutter Visual Opr. Produksi 100% Cutter Finishing QC line per jam Daily Report 1. Hold part
5 Process Finishing Sample Approval - Burry - Pencil Marking Tulis Eye Visual 2. Hubungi leader, SPV, QC
1. Appearance
Sample Approval ( No Scracth,Flash,Silver,sink mark, - Cutter Visual Operator 100% Jig 1. Visual QC Line Aql Check sheet 1. Hold part, Produksi
BD, Flow,EM,Short, dll ) produksi Sampling
6 Inspection
Drawing 2. Fungsi, Jig inspection, - Jig inspection Caliper 2. Diukur SOP, Lap. 2. Hubungi leader, SPV, QC
1. Setting Parameter Temp Control Visual Opr.Material 100% 1. Std Mat'rl 1. Hold material & Produksi
1. Suhu 60° - 70° C
3 Hopper Drying 2. Waktu Drying 2. Waktu Drying 1-2 jam Jam 2. Lapor Leader / Supervisor
1.Setting parameter 1.Appearance MC Injection, Visual Operator 100% Jig 1. Visual QC line per jam Check sheet 1. Hold part, Produksi
produksi
4 Proses Injection
2. Sample Approval 2.Dimensi & Fungsi Jig / Insert Cek Jig Caliper 2. Diukur SOP, Lap. 2. Hubungi leader, SPV, QC
- Appearance - Cutter Visual Opr. Produksi 100% Cutter Finishing QC line per jam Daily Report 1. Hold part
5 Process Finishing Sample Approval - Burry - Pencil Marking Tulis Eye Visual 2. Hubungi leader, SPV, QC
1. Appearance
( No Scracth,Flash,Silver,sink mark, Operator 1. Visual Aql 1. Hold part, Produksi
Sample Approval - Cutter Visual 100% Jig QC Line Check sheet
BD, Flow,EM,Short, dll ) produksi Sampling
6 Inspection
Drawing 2. Fungsi, Jig inspection, - Jig inspection Caliper 2. Diukur SOP, Lap. 2. Hubungi leader, SPV, QC
1 Incoming Mat'l PP-N2 Cosmoplene 2. Kesesuaian SJ, PO, C.Sheet 2.C. sheet 2. Hubungi bagian yang terkait
1. Rapih 1. Quantity Hand pallet Penataan Opr. gudang 100% 1. Srt.Jalan 1. Hold material
1. Pencampuran 1. Akurasi perband material 1. Mixing MC Ditimbang/ Opr.Material 100% 1. Std Mat'rl 1. Hold material & Produksi
3 Proses Mixing 2. Waktu Mixing 2. Waktu Mixing ( 10 ') 2. Timbangan Ditakar preparation 2. Lapor Leader / Supervisor
2. Literan
1.Setting parameter 1.Appearance MC Injection, Visual Operator 100% Jig 1. Visual QC line per jam Check sheet 1. Hold part, Produksi
produksi
4 Proses Injection 2. Sample Approval 2.Dimensi & Fungsi Jig / Insert Cek Jig Caliper 2. Diukur SOP, Lap. 2. Hubungi leader, SPV, QC
3.
Timbangan 3. Ditimbang harian, PCR Identifikasi,Analisa,perbaikan
- Appearance - Cutter Visual Opr. Produksi 100% Cutter Finishing QC line per jam Daily Report 1. Hold part
5 - Pencil
Process Finishing Sample Approval - Burry Marking Tulis Eye Visual 2. Hubungi leader, SPV, QC
1. Appearance
Sample Approval ( No Scracth, Flash, Silver, sink - Cutter Visual Operator 100% Jig 1. Visual QC Line Aql Sampling Check sheet 1. Hold part, Produksi
mark, BD, Flow, EM, Short, dll ) produksi
6 Inspection
- Jig
Drawing 2. Fungsi, Jig inspection, inspection Caliper 2. Diukur SOP, Lap. 2. Hubungi leader, SPV, QC
7 Packing Rapi & Sesuai Lay out 1.Quantity - Plastik Di Packing Operator 100% 1. Hold part
2.Label - dus Packing 2. Hitung ulang
1. Hold part, beri label
2. Jika NG dominan
1.Penempatan part pd layout 1. Pallet, Operator Caliper Lap. QC, maka part tdk boleh kirim,
8 Penyimpanan Rapi & Sesuai Lay out 2. sitem FIFO 2. kartu FIFO Gudang /Assy 100% Visual QC Outgoing Aql Sampling Check sheet, Buat PCR
FIFO SOP, PCR 3. Jika
NG ringan diperbaiki, shortir,
rework.
1. Pencampuran 1. Akurasi perband material 1. Mixing MC Ditimbang/ Opr.Material 100% 1. Std Mat'rl 1. Hold material & Produksi
3 Proses Mixing 2. Waktu Mixing 2. Waktu Mixing ( 10 ') 2. Timbangan Ditakar preparation 2. Lapor Leader / Supervisor
2. Literan
5 Inspection
Drawing 2. Fungsi, Jig inspection, - Jig inspection Caliper 2. Diukur SOP, Lap. 2. Hubungi leader, SPV, QC
6 Packing Rapi & Sesuai Lay out 1.Quantity - Plastik Di Packing Operator 100% 1. Hold part
2.Part card - dus Packing 2. Hitung ulang
1. Pencampuran 1. Akurasi perband material 1. Mixing MC Ditimbang/ Opr.Material 100% 1. Std Mat'rl 1. Hold material & Produksi
3 Proses Mixing 2. Waktu Mixing 2. Waktu Mixing ( 10 ') 2. Timbangan Ditakar preparation 2. Lapor Leader / Supervisor
2. Literan
5 Inspection
Drawing 2. Fungsi, Jig inspection, - Jig inspection Caliper 2. Diukur SOP, Lap. 2. Hubungi leader, SPV, QC
6 Packing Rapi & Sesuai Lay out 1.Quantity - Plastik Di Packing Operator 100% 1. Hold part
2.Part card - dus Packing 2. Hitung ulang
1. Pencampuran 1. Akurasi perband material 1. Mixing MC Ditimbang/ Opr.Material 100% 1. Std Mat'rl 1. Hold material & Produksi
3 Proses Mixing 2. Waktu Mixing 2. Waktu Mixing ( 10 ') 2. Timbangan Ditakar preparation 2. Lapor Leader / Supervisor
2. Literan
5 Inspection
Drawing 2. Fungsi, Jig inspection, - Jig inspection Caliper 2. Diukur SOP, Lap. 2. Hubungi leader, SPV, QC
6 Packing Rapi & Sesuai Lay out 1.Quantity - Plastik Di Packing Operator 100% 1. Hold part
2.Part card - dus Packing 2. Hitung ulang
1 Incoming Mat'l HIPS STYRON 2. Kesesuain SJ, PO, C.Sheet 2.C. sheet 2. Hubungi bagian yang terkait
MB = BLACK 3. Kemasan utuh, 3. CR 3. Buat Claim Report
1. Quantity 1. Srt.Jalan 1. Hold material
1. Rapih Hand pallet Penataan Opr. gudang 100%
2 Penyimpanan 2. Sesuai Layout 2. Penempatan part 2.Kartu stok 2. Hubungi Supplier
3. CR 3. Buat Claim Report
1. Hold material & Produksi
1. Pencampuran 1. Akurasi perband material 1. Mixing MC Ditimbang/ Opr.Material 100% 1. Std Mat'rl
3 Proses Mixing 2. Waktu Mixing 2. Waktu Mixing ( 10 ') 2. Timbangan Ditakar preparation 2. Lapor Leader / Supervisor
2. Literan
Operator 1. Visual 1. Hold part, Produksi
1.Setting parameter 1.Appearance MC Injection, Visual 100% Jig QC line per jam Check sheet
produksi
4 Proses Injection
2. Sample Approval 2.Dimensi & Fungsi Jig / Insert Cek Jig Caliper 2. Diukur SOP, Lap. 2. Hubungi leader, SPV, QC
Proses Hotstamp
2.Sample Approval 2.Tape Test Nichiban tape 2x/day 2.Test Tape 2x/Day SOP, Lap. 2. Hubungi leader, SPV, QC
5 Inspection
Drawing 2. Fungsi, Jig inspection, - Jig inspection Caliper 2. Diukur SOP, Lap. 2. Hubungi leader, SPV, QC
6 Packing Rapi & Sesuai Lay out 1.Quantity - Plastik Di Packing Operator 100% SOP 1. Hold part
2.Part card - dus Packing 2. Hitung ulang
1. Pencampuran 1. Akurasi perband material 1. Mixing MC Ditimbang/ Opr.Material 100% 1. Std Mat'rl 1. Hold material & Produksi
3 Proses Mixing 2. Waktu Mixing 2. Waktu Mixing ( 10 ') 2. Timbangan Ditakar preparation 2. Lapor Leader / Supervisor
2. Literan
5 Inspection
Drawing 2. Fungsi, Jig inspection, - Jig inspection Caliper 2. Diukur SOP, Lap. 2. Hubungi leader, SPV, QC
6 Packing Rapi & Sesuai Lay out 1.Quantity - Plastik Di Packing Operator 100% SOP 1. Hold part
2.Part card - dus Packing 2. Hitung ulang
1 Incoming Mat'l PS 2. Kesesuain SJ, PO, C.Sheet 2.C. sheet 2. Hubungi bagian yang terkait
MB = Neo Crystal 3. Kemasan utuh, 3. CR 3. Buat Claim Report
White
1. Rapih 1. Quantity Hand pallet Penataan Opr. gudang 100% 1. Srt.Jalan 1. Hold material
3 Proses Mixing 2. Waktu Mixing 2. Waktu Mixing ( 10 ') 2. Timbangan Ditakar preparation 2. Lapor Leader / Supervisor
2. Literan
4 Proses Injection
2. Sample Approval 2.Dimensi & Fungsi Jig / Insert Cek Jig Caliper 2. Diukur SOP, Lap. 2. Hubungi leader, SPV, QC
5 Inspection
Drawing 2. Fungsi, Jig inspection, - Jig inspection Caliper 2. Diukur SOP, Lap. 2. Hubungi leader, SPV, QC
Mat'l Spec = 1. Quantity Timbangan Cek Qty Opr. gudang 100% Visual QC incoming Sampling 1. Lap.IQC 1. Hold Material
1 Incoming Mat'l ABS 2. Kesesuain SJ, PO, C.Sheet 2.C. sheet 2. Hubungi bagian yang terkait
MB = Olive Green 3. Kemasan utuh, 3. CR 3. Buat Claim Report
1. Quantity 1. Srt.Jalan 1. Hold material
1. Rapih Hand pallet Penataan Opr. gudang 100%
2 Penyimpanan 2. Sesuai Layout 2. Penempatan part 2.Kartu stok 2. Hubungi Supplier
3. CR 3. Buat Claim Report
1. Hold material & Produksi
1. Pencampuran 1. Akurasi perband material 1. Mixing MC Ditimbang/ Opr.Material 100% 1. Std Mat'rl
3 Proses Mixing 2. Waktu Mixing 2. Waktu Mixing ( 10 ') 2. Timbangan Ditakar preparation 2. Lapor Leader / Supervisor
2. Literan
5 Inspection
Drawing 2. Fungsi, Jig inspection, - Jig inspection Caliper 2. Diukur SOP, Lap. 2. Hubungi leader, SPV, QC
6 Packing Rapi & Sesuai Lay out 1.Quantity - Plastik Di Packing Operator 100% 1. Hold part
2.Part card - Box Packing 2. Hitung ulang