To,
Schwing Stetter (India) Pvt Ltd
|Works & Factory -G12IG12 A,
|Sriperumbudur, Kan
[Tamil Nadu Dist, 602105
ram,
|SIPCOT Industrial Park —Irungattukottal
Date:
Dated :
[PONO PO/PHPL/EGS/14-15/043
15-Jul-14
Ref: offer no 803/SC/101 & 102
13June 14
[Contact no. Sohit - 09820203847
Mr Ansari - 07504908906,
Dear sir,
lorder for supply of equipment as under
PO type :- Procurement of Equipments - Stetter Batching CP30 Compartment Batcher Plant
With reference to your offer dated 13 June 2014 & revisied offer dated 11 July 2014,we are pleased to place an
Se Description vom Qty. [| Rate.(Rs) ‘Total Amount (Rs)
1 [Shewing Stetter cP30 Nos {1 | 3,800,000 3,800,000
[Compartment batcher along with
Jsccessories as per Annexure- B
Total 3,800,000]
Excise Duty@ 10.3% 391,400]
CST @2%| 83,828]
Grand Total 275,228
PIPL MP TIN-23091204559,
PAN: AABCE7719E
Kindly confirm acceptance of the same.
Pan India Infrdprojects Pvt. Ltd.
a
Authorised Signatory
ie1 [Payment Terms: |100% advance agaisnt Proforma Invoice , prior to delivery
Your Tax invoice should clearly mention your CST/ WAT Service Tex no/ TIN] Cess
2 [Tax Invoice: [Registration nos. ete with mandatory Tax dectaration.
3__[Bxeise & CST [included in total Amount
alps [To despatch from Ex-Chennai within 3 weeks after receipt of 100% advance.
‘5. [Transportation & — included in the above cost. To be arranged by M/s Schwing Steller fll project Seat
Insurance |Gwalior-Shivpuri,
6 |rps./w.cr: [Taxes will be deducted as applicable
[Pan India Infreprojects Private Limited
7 {pitt Address: | Village Post Chhokta, Tehsil Badnawer,
|Badnawer, Dhar, Madhya Pradesh,
[Essel Gwalior Skivpari Toll Roads Pvt Lid
l2nd Floor, Bhhadura Residency,
8 |Shipto Address fsitash Vihar, City Center, :
|Gwatior (M.P.) - 474011
9 [Warranty 13 months from the date of delivery or 12 months fom commissioning
[To the best oftheir ability the parties hereto shall try and Endeavour to setile and clarify
10. |Arbiteation: all disputes arising in connection with the order by discussions and with the intention to
resolve the matter amicably,
[he service delivery should be as per the agreed terms and conditions.In case of
11 fpenaty: Haliure/deley in delivery 0.5% penalty per week delay & maximum upto 10% would be
[29plicable on the contract value,
[The Contract shall, in all respects, be construed and operate in conformity with the Indian
12 [Burisdietion: [Laws and will be subject to jurisdiction of Mumbai Court.
[Terms & Conditions as per Annexure"A" Le "STANDARD TERMS & Conditions” are
13. Jother-Terms: also applicable as apart of this contract.
Pan India Intraprojects Pvt. Ltd.
Authorised Signatory
jee’Annexure B
STETTER Compact Concrete Mixing Plant
CP30 Compartment Batcher Execution
Aggregate storage:
ina compartment batcher for direet
filling by front-end loader 4 compartments / 40m?
types of aggregates max. 4
size of aggregates max. 45 mm.
Cement/iller storage:
In max. 3 silos
types of cement/filler max. 2
Batching:
Aggregates by weight
Cement/fller by weight
Mixing water by weight
Admixtures by weight
Batching accuracy acc. to IS 4925
In automatic mode for batches
of 50-100 %
Mixer:
1 Stetter turbo mixer
Capacity:
‘Compacted fresh concrete in continuous
operation based on mixing recipes with
4 aggregate components
1 cementfiller component
1 mixing water component
Normal fluidity
Max. 300 kg cement/fller per m?
Sand moisture content 5%
Water/cement ratio 0.5
30s mixing time 30 mh
Concrete or mixture discharge:
For filling truck mixers
for filling trucks
(@epending on equipment
Control system:
Fully automatic
with microcomputer MCI 70 N Ver 3.0
Operator's stand:
On the plantPos. Quantity
104
2 41
3 1
4 4
5 4
Object
Power connection:
Three-phase supply 415V 50Hz
(Special voltage, special frequency and
tropic proof insulation against surplus
price)
‘Water connection to be provided by the customer DN 50 28 m?/h.
SCOPE OF SUPPLY
The plant consists of:
Basic structure of plant, pre-assembled in our works
With
~ built-in skip track
~ Maintenance unit for the pneumatic equipment
~ Compressed air hoses
~ Cabling
+ Operator’s and mixer platform
Ascent stairs to the operator's and mixer platform
4 pneumatically operated aggregate batching gates
outlets i the basic structure of the plant
3 units size 250 x 330
L units size 400 x 330
Each equipped with electromagnetic pneumatic valve for
gate actuation
Aggregate weighing system
as electromechanical skip weighing system in the basic
structure of the plant, maximum load 1250 kg
with 2 load cells
Feeder skip in 2-rope technique in the basie structure of the
plant
with
- tilting skip
~ skip rollers lubricated for lifetime
- double rope winch driven by two pole-changing three-phase
Bear motors 1.3/4 KW each for slow entering and leaving
the filling position as well as for reduced speed between
waiting and discharge position
adIndependent cement/filler and water weighing system in the
basic structure of the plant, Cement/ Water max.300/150 Kg
with
~ independent weighing container for weighing of cement/
filler and mixing water,
~ 3 inlets for screw conveyors into the cemenv/iller weighing compartment
~ pneumatically actuated container discharge gates
~ limit switches on the discharge gates for position "closed"
~ spillway on the water weighing compartment (overflow line
to be provided by customer)
~ ventilation line from the cement/filler weighing compartment to the mixer
~ clectromechanical weighing system, execution with two load cells,
for cement and one load cell for water
~ pneumatically actuated metering valve DN $0 for batching
of mixing water into the water weighing compartment
~ electromagnetic pneumatic valve for the actuation of discharge
gate and metering valve.
‘The metering valves belonging to the weighing system are
laid out for fresh water,
Compressor
in the basic structure of plant, suction volume 110 Vimin,,
‘max. pressure 10 bar with
~ three-phase drive motor 1.5 KW
~ compressed-air tank 1001
~ pressure gauge
~ Pressure adjusting device for automatie switching on
and off of compressor
Stetter turbo mixer T 500
mixer size (dry filling capacity/compacted fresh concrete output)
750/500 1
with
~ trough shell and inner cylinder lined with 10 mm thick
anti-wear plates, which can be turned upside down
~ spring-mounted mixing arms
- wear protection for the mixing arms
~ adjustable mixing blades made of special chilled casting
~ three-phase drive motor 22 KW
- oil bath gear
~ hydraulically actuated mixer discharge flap
~ hydraulic pump for the actuation of the discharge flap
driven by the mixer drive
- limit switch on the discharge flap for positions “open” and “closed”
~ hydraulic hand pump for emergency discharge
~~ mixing trough covering
~ large hinged cover in the mixing trough covering
~ safety switch for automatic mixer cut-out when opening the hinged cover
- sight flap
~ aggregate, cement/filler and mixing water inlets
Loe”Pos.
9
10
uu
Quantity
1
ing on the mixing trough bottom
‘on the Stetter turbo mixer made of highly wear-resisting
special chilled casting tiles
Mixer discharge hopper with rubber hose
for concrete or mixture discharge onto truck mixers
Fully automatic microcomputer control system type MCI 70 N
Ver. 3.0 in a light grey coloured (RAL 7035) enclosure.
‘Mounted level with the operator's stand in the basic structure of the plant with
~ Power part for batching and mixing operation
~ Main switch with on button element
~ operating elements feather touch membrane keypad on the board front
door mounted in a fibre enclosure with buzzer for touch feedback
= memory for 99 concrete recipes as a standard is available and if the
computer SCADA software optional package is opted the plant can be
operated through computer with the unlimited memory space for recipe and
other masters storage.
~ Possibility to enter 4 aggregate components additive
3 cement/iller components additive, | mixing water components additive, 1
ice component additive (optional), I silica additive (optional) and 1 + 1
‘admixture component (optional) per recipe each for combined Cement and
‘Water weigher model, For separate cement and water weigher model the fifth
‘weigher option can be chosen for ice (optional) or silica (optional)
‘component additive respectively.
+ Automatic material-in-air compensation and manual material inair
compensation is available
~ Possibility to enter one basic value for material-in-ait compensation
~ Adjustable water correction up to +Y- 50 I per Batch compacted concrete
~ Quantity selection for production of 0.25 - 80.00 m? compacted concrete
with one starting pulse
~ Possibility to switch over to manual operation
~ Emergency stop switch
= Power supply to the control system, connection to the main switch,
lightning rod and earthing to be provided by customer)
~ Printer interface card with Printer (optional)
= Computer (laptop) with SCADA software (optional)
- GSM modem for SMS triggering (optional)
> Generic interface for ERP (optional, to work together with customer
based oni the requirement).
= Auto moisture for sand bin (optional)
Compartments for aggregate bins 4 x10 mi? = 40 m?
complete stee! structure fabricated out of corrugated mild steel
sheets prime coated and finished with final coat of painting.
Vibrator for the sand compartment outlet of the aggregate
bi
with three-phase unbalance motor and connection cable
ee”uo4 Admixture weighing system 6 Itr
with
~ acrylic weighing cylinder
- 12 Ipm batching pump for each jar
~ pneumatically operated 2/2 way valve for dosing and discharge
15 1 ‘Serew conveyor for cement, conveying length
max, 10m
nominal diameter 219 mm, inclination max. 45°, capacity
22 th based on a piled weight of 1.13 kg/dm*
~ cleaning hole
- three-phase gear motor 7.5 kW
+ connection pars
16 Cement Screw Conveyor 10m, 219 dia Quty—1No.
17 Flyash Screw Conveyor 6m, 219 dia Quty ~ 1 No.
18 Set of Silo Accessories ~ 2 Nos,
1) Hand-operated cement silo discharge gate DN 300 Qnty —1 Set
2) De-aeration filter ‘Qnty —1 No.
3) Min-Maax Silo Level Meter. Qnty ~1 Set
4) Airinjection Nozzles Quty—1 Set
yA