You are on page 1of 7
To, Schwing Stetter (India) Pvt Ltd |Works & Factory -G12IG12 A, |Sriperumbudur, Kan [Tamil Nadu Dist, 602105 ram, |SIPCOT Industrial Park —Irungattukottal Date: Dated : [PONO PO/PHPL/EGS/14-15/043 15-Jul-14 Ref: offer no 803/SC/101 & 102 13June 14 [Contact no. Sohit - 09820203847 Mr Ansari - 07504908906, Dear sir, lorder for supply of equipment as under PO type :- Procurement of Equipments - Stetter Batching CP30 Compartment Batcher Plant With reference to your offer dated 13 June 2014 & revisied offer dated 11 July 2014,we are pleased to place an Se Description vom Qty. [| Rate.(Rs) ‘Total Amount (Rs) 1 [Shewing Stetter cP30 Nos {1 | 3,800,000 3,800,000 [Compartment batcher along with Jsccessories as per Annexure- B Total 3,800,000] Excise Duty@ 10.3% 391,400] CST @2%| 83,828] Grand Total 275,228 PIPL MP TIN-23091204559, PAN: AABCE7719E Kindly confirm acceptance of the same. Pan India Infrdprojects Pvt. Ltd. a Authorised Signatory ie 1 [Payment Terms: |100% advance agaisnt Proforma Invoice , prior to delivery Your Tax invoice should clearly mention your CST/ WAT Service Tex no/ TIN] Cess 2 [Tax Invoice: [Registration nos. ete with mandatory Tax dectaration. 3__[Bxeise & CST [included in total Amount alps [To despatch from Ex-Chennai within 3 weeks after receipt of 100% advance. ‘5. [Transportation & — included in the above cost. To be arranged by M/s Schwing Steller fll project Seat Insurance |Gwalior-Shivpuri, 6 |rps./w.cr: [Taxes will be deducted as applicable [Pan India Infreprojects Private Limited 7 {pitt Address: | Village Post Chhokta, Tehsil Badnawer, |Badnawer, Dhar, Madhya Pradesh, [Essel Gwalior Skivpari Toll Roads Pvt Lid l2nd Floor, Bhhadura Residency, 8 |Shipto Address fsitash Vihar, City Center, : |Gwatior (M.P.) - 474011 9 [Warranty 13 months from the date of delivery or 12 months fom commissioning [To the best oftheir ability the parties hereto shall try and Endeavour to setile and clarify 10. |Arbiteation: all disputes arising in connection with the order by discussions and with the intention to resolve the matter amicably, [he service delivery should be as per the agreed terms and conditions.In case of 11 fpenaty: Haliure/deley in delivery 0.5% penalty per week delay & maximum upto 10% would be [29plicable on the contract value, [The Contract shall, in all respects, be construed and operate in conformity with the Indian 12 [Burisdietion: [Laws and will be subject to jurisdiction of Mumbai Court. [Terms & Conditions as per Annexure"A" Le "STANDARD TERMS & Conditions” are 13. Jother-Terms: also applicable as apart of this contract. Pan India Intraprojects Pvt. Ltd. Authorised Signatory jee’ Annexure B STETTER Compact Concrete Mixing Plant CP30 Compartment Batcher Execution Aggregate storage: ina compartment batcher for direet filling by front-end loader 4 compartments / 40m? types of aggregates max. 4 size of aggregates max. 45 mm. Cement/iller storage: In max. 3 silos types of cement/filler max. 2 Batching: Aggregates by weight Cement/fller by weight Mixing water by weight Admixtures by weight Batching accuracy acc. to IS 4925 In automatic mode for batches of 50-100 % Mixer: 1 Stetter turbo mixer Capacity: ‘Compacted fresh concrete in continuous operation based on mixing recipes with 4 aggregate components 1 cementfiller component 1 mixing water component Normal fluidity Max. 300 kg cement/fller per m? Sand moisture content 5% Water/cement ratio 0.5 30s mixing time 30 mh Concrete or mixture discharge: For filling truck mixers for filling trucks (@epending on equipment Control system: Fully automatic with microcomputer MCI 70 N Ver 3.0 Operator's stand: On the plant Pos. Quantity 104 2 41 3 1 4 4 5 4 Object Power connection: Three-phase supply 415V 50Hz (Special voltage, special frequency and tropic proof insulation against surplus price) ‘Water connection to be provided by the customer DN 50 28 m?/h. SCOPE OF SUPPLY The plant consists of: Basic structure of plant, pre-assembled in our works With ~ built-in skip track ~ Maintenance unit for the pneumatic equipment ~ Compressed air hoses ~ Cabling + Operator’s and mixer platform Ascent stairs to the operator's and mixer platform 4 pneumatically operated aggregate batching gates outlets i the basic structure of the plant 3 units size 250 x 330 L units size 400 x 330 Each equipped with electromagnetic pneumatic valve for gate actuation Aggregate weighing system as electromechanical skip weighing system in the basic structure of the plant, maximum load 1250 kg with 2 load cells Feeder skip in 2-rope technique in the basie structure of the plant with - tilting skip ~ skip rollers lubricated for lifetime - double rope winch driven by two pole-changing three-phase Bear motors 1.3/4 KW each for slow entering and leaving the filling position as well as for reduced speed between waiting and discharge position ad Independent cement/filler and water weighing system in the basic structure of the plant, Cement/ Water max.300/150 Kg with ~ independent weighing container for weighing of cement/ filler and mixing water, ~ 3 inlets for screw conveyors into the cemenv/iller weighing compartment ~ pneumatically actuated container discharge gates ~ limit switches on the discharge gates for position "closed" ~ spillway on the water weighing compartment (overflow line to be provided by customer) ~ ventilation line from the cement/filler weighing compartment to the mixer ~ clectromechanical weighing system, execution with two load cells, for cement and one load cell for water ~ pneumatically actuated metering valve DN $0 for batching of mixing water into the water weighing compartment ~ electromagnetic pneumatic valve for the actuation of discharge gate and metering valve. ‘The metering valves belonging to the weighing system are laid out for fresh water, Compressor in the basic structure of plant, suction volume 110 Vimin,, ‘max. pressure 10 bar with ~ three-phase drive motor 1.5 KW ~ compressed-air tank 1001 ~ pressure gauge ~ Pressure adjusting device for automatie switching on and off of compressor Stetter turbo mixer T 500 mixer size (dry filling capacity/compacted fresh concrete output) 750/500 1 with ~ trough shell and inner cylinder lined with 10 mm thick anti-wear plates, which can be turned upside down ~ spring-mounted mixing arms - wear protection for the mixing arms ~ adjustable mixing blades made of special chilled casting ~ three-phase drive motor 22 KW - oil bath gear ~ hydraulically actuated mixer discharge flap ~ hydraulic pump for the actuation of the discharge flap driven by the mixer drive - limit switch on the discharge flap for positions “open” and “closed” ~ hydraulic hand pump for emergency discharge ~~ mixing trough covering ~ large hinged cover in the mixing trough covering ~ safety switch for automatic mixer cut-out when opening the hinged cover - sight flap ~ aggregate, cement/filler and mixing water inlets Loe” Pos. 9 10 uu Quantity 1 ing on the mixing trough bottom ‘on the Stetter turbo mixer made of highly wear-resisting special chilled casting tiles Mixer discharge hopper with rubber hose for concrete or mixture discharge onto truck mixers Fully automatic microcomputer control system type MCI 70 N Ver. 3.0 in a light grey coloured (RAL 7035) enclosure. ‘Mounted level with the operator's stand in the basic structure of the plant with ~ Power part for batching and mixing operation ~ Main switch with on button element ~ operating elements feather touch membrane keypad on the board front door mounted in a fibre enclosure with buzzer for touch feedback = memory for 99 concrete recipes as a standard is available and if the computer SCADA software optional package is opted the plant can be operated through computer with the unlimited memory space for recipe and other masters storage. ~ Possibility to enter 4 aggregate components additive 3 cement/iller components additive, | mixing water components additive, 1 ice component additive (optional), I silica additive (optional) and 1 + 1 ‘admixture component (optional) per recipe each for combined Cement and ‘Water weigher model, For separate cement and water weigher model the fifth ‘weigher option can be chosen for ice (optional) or silica (optional) ‘component additive respectively. + Automatic material-in-air compensation and manual material inair compensation is available ~ Possibility to enter one basic value for material-in-ait compensation ~ Adjustable water correction up to +Y- 50 I per Batch compacted concrete ~ Quantity selection for production of 0.25 - 80.00 m? compacted concrete with one starting pulse ~ Possibility to switch over to manual operation ~ Emergency stop switch = Power supply to the control system, connection to the main switch, lightning rod and earthing to be provided by customer) ~ Printer interface card with Printer (optional) = Computer (laptop) with SCADA software (optional) - GSM modem for SMS triggering (optional) > Generic interface for ERP (optional, to work together with customer based oni the requirement). = Auto moisture for sand bin (optional) Compartments for aggregate bins 4 x10 mi? = 40 m? complete stee! structure fabricated out of corrugated mild steel sheets prime coated and finished with final coat of painting. Vibrator for the sand compartment outlet of the aggregate bi with three-phase unbalance motor and connection cable ee” uo4 Admixture weighing system 6 Itr with ~ acrylic weighing cylinder - 12 Ipm batching pump for each jar ~ pneumatically operated 2/2 way valve for dosing and discharge 15 1 ‘Serew conveyor for cement, conveying length max, 10m nominal diameter 219 mm, inclination max. 45°, capacity 22 th based on a piled weight of 1.13 kg/dm* ~ cleaning hole - three-phase gear motor 7.5 kW + connection pars 16 Cement Screw Conveyor 10m, 219 dia Quty—1No. 17 Flyash Screw Conveyor 6m, 219 dia Quty ~ 1 No. 18 Set of Silo Accessories ~ 2 Nos, 1) Hand-operated cement silo discharge gate DN 300 Qnty —1 Set 2) De-aeration filter ‘Qnty —1 No. 3) Min-Maax Silo Level Meter. Qnty ~1 Set 4) Airinjection Nozzles Quty—1 Set yA

You might also like