A B C D

75 Footing
9.190
3.730 1.730 3.730 Reinforcement
Parallel to B Foundation
Ld Pit
C1 C1 C1 C1
1 1 B
F1 F1 F1 F1 Reinforcement
1.315 1.315 Parallel to
C1 C1 C1 C1 L
2 2
75
F1 F1 F1 F1 1 L
75 75
1.848 1.848 Typical Details of
5.240 5.240 Foundation Pit
C1 C1 C1 C1
3 3
F1 F1 F1 F1
Extra 50mm wide alround column below ground
level {provide extra cover 10mm below ground
2.078 2.078 level}
G.L.
C1 C1 C1 C1
4 4
F1 F1 F1 F1 d
50 mm Cover

3.730 1.730 3.730


D D
Ld 75 mm (min)

9.190
150 mm Lean concrete
Sand filling
A B C D (1:5:10)

GENERAL NOTES

1. THE STEEL FABRICATION SHOULD BE CHECKED


Footing Footing Size Reinforcement WITH THE DRAWINGS BEFORE CONCRETING
Type of Nos. 2. SETTING OUT OF ALL COLUMNS AND FOOTINGS
Mark footing L B D along L along B SHOULD BE BASED ON ARCHITECT'S DIMENSION
NOTE FOR FOOTINGS ONLY
3. ULTIMATE NUMBER OF FLOORS CONSTRUCTED
1. GRADE OF CONCRETE MIX SHALL BE M20
SHOULD BE - G + 2 .
16 0.3 CONFIRMING TO IS:456-2000
F1 ISOLATED FOOTING 1.05 1.05
c/c c/c 2. COVER TO REINFORCEMENT SHALL BE 25 mm 4. REFER TO KEY PLAN FOR NUMBERING
3. DEPTH OF FOOTING PIT SHOULD BE MAINTAINED 5. THE EFFECTS OF WATER PRESSURE IS NEGLECTED
WELL BELOW THE CLAYEY PORTION OF THE SOIL. AS PER THE SITE ENGINEERS INSTRUCTIONS.
ADEQUATE FILLING SHOULD BE DONE USING SAND.
6. USE STEEL OF GRADE Fe 500(TMT Rod) AS PER
4. THE SAFE BEARING CAPACITY OF SOIL AT SITE IS THE ENGINEER'S SPECIFICATIONS
ASSUMED AS 250 kN/m2 BASED ON SITE
ENGINEER'S INFERENCES FROM SITE.

NATIONAL HIGHWAYS AUTHORITY .\NIT_Trichy_logo.jpg


National Institute of Technology Arunachalam towers, 1st floor, No.31/9,
.\download (1).png EKK logo.jpg
OF INDIA Trichy-620 015 South K.R.Koil st, west mambalam,
Chennai-33. Ph: 044 43016370.

Balance work for two Laning with Paved Shoulder of Dindigul -


Theni Section from Km 2. 750 to Km 73.400 of NH-45 (Extn) and
Theni- Kumili Section of NH-220 from Km 215.500 to Km 273.600 in
the State of Tamil Nadu under item rate Contract. 0