Professional Documents
Culture Documents
75 Footing
9.190
3.730 1.730 3.730 Reinforcement
Parallel to B Foundation
Ld Pit
C1 C1 C1 C1
1 1 B
F1 F1 F1 F1 Reinforcement
1.315 1.315 Parallel to
C1 C1 C1 C1 L
2 2
75
F1 F1 F1 F1 1 L
75 75
1.848 1.848 Typical Details of
5.240 5.240 Foundation Pit
C1 C1 C1 C1
3 3
F1 F1 F1 F1
Extra 50mm wide alround column below ground
level {provide extra cover 10mm below ground
2.078 2.078 level}
G.L.
C1 C1 C1 C1
4 4
F1 F1 F1 F1 d
50 mm Cover
9.190
150 mm Lean concrete
Sand filling
A B C D (1:5:10)