Professional Documents
Culture Documents
Su M Tu W Th F Sa
January 2013
Su M Tu W Th F Sa
February 2013
Su M Tu W Th F Sa
1 1 2 3 4 5 1 2
2 3 4 5 6 7 8 6 7 8 9 10 11 12 3 4 5 6 7 8 9
Mon, Jan 7 - Sun, Jan 13 9 10 11 12 13 14 15 13 14 15 16 17 18 19 10 11 12 13 14 15 16
16 17 18 19 20 21 22 20 21 22 23 24 25 26 17 18 19 20 21 22 23
W02-1 to W02-7
23 24 25 26 27 28 29 27 28 29 30 31 24 25 26 27 28
30 31
8 8
9 9
10 10
11 11
12 12
1 1
2 2
3 3
4 4
5 5
6 6
þ ABC Prioritized Task List
8 8
9 9
10 10
11 11
12 12
1 1
2 2
3 3
4 4
5 5
6 6
Additional Notes:
-- Column A is named "arr_event" and is the text displayed on
the planner.
-- Column F is named "arr_eventdate" and is used by both the
mini calendars and the planner to determine what events
should be listed or highlighted.
-- Columns D (week) and E (WeekDay) are for calculating
floating holidays. For example, Thanksgiving is on the 4th
Thursday of November.
-- Columns B (month) and C (Day) are for calculating the
date using DATE(year,month,day).
December 2012
Wk Su M Tu W Th F Sa These dates and those in the Events sheet must be formatted the same way
48 1
49 2 3 4 5 6 7 8 12/2/2012 12/3/2012 12/4/2012 12/5/2012 12/6/2012
50 9 10 11 12 13 14 15 12/9/2012 12/10/2012 12/11/2012 12/12/2012 12/13/2012
51 16 17 18 19 20 21 22 12/16/2012 12/17/2012 12/18/2012 12/19/2012 12/20/2012
52 23 24 25 26 27 28 29 12/23/2012 12/24/2012 12/25/2012 12/26/2012 12/27/2012
53 30 31 12/30/2012 12/31/2012
January 2013
Wk Su M Tu W Th F Sa
1 1 2 3 4 5 1/1/2013 1/2/2013 1/3/2013
2 6 7 8 9 10 11 12 1/6/2013 1/7/2013 1/8/2013 1/9/2013 1/10/2013
3 13 14 15 16 17 18 19 1/13/2013 1/14/2013 1/15/2013 1/16/2013 1/17/2013
4 20 21 22 23 24 25 26 1/20/2013 1/21/2013 1/22/2013 1/23/2013 1/24/2013
5 27 28 29 30 31 1/27/2013 1/28/2013 1/29/2013 1/30/2013 1/31/2013
February 2013
Wk Su M Tu W Th F Sa
5 1 2
6 3 4 5 6 7 8 9 2/3/2013 2/4/2013 2/5/2013 2/6/2013 2/7/2013
7 10 11 12 13 14 15 16 2/10/2013 2/11/2013 2/12/2013 2/13/2013 2/14/2013
8 17 18 19 20 21 22 23 2/17/2013 2/18/2013 2/19/2013 2/20/2013 2/21/2013
9 24 25 26 27 28 2/24/2013 2/25/2013 2/26/2013 2/27/2013 2/28/2013
US
US :: Use Start Day=1 (Sunday). Week 1 contains January 1
ISO :: Must use Start Day=2 (Monday). Week 1 contains the first Thursday
Note: When using the US week number, you must have the Analysis ToolPak add-in installed
1/4/2013 1/5/2013
1/11/2013 1/12/2013
1/18/2013 1/19/2013
1/25/2013 1/26/2013
2/1/2013 2/2/2013
2/8/2013 2/9/2013
2/15/2013 2/16/2013
2/22/2013 2/23/2013