You are on page 1of 2

Schlumberger MORNING REPORT

PT. SCHLUMBERGER GEOPHYSIC NUSANTARA

BARGE : COSL 223


DATE : 3-Jul-20 WELL NAME/ JOB : FARC-11/ WBS NO:OS20D22120 / PUMP REPAIR
REASON
Field Specialist/ Jusman Indra K R. TIME 105 Days / Hrs
Onboard
Operator (S) Ahmad K Fendi SHUT IN Days / Hrs
RC D1000NX 218STG/VGSA/MAX BPBSL
POOH
90 HP - 1516 V -38.7 A + xT 150_1
E.S.P TYPE
PUMP RC1000 218STG/ VGSA D20-60 / PROT MXMS BPBSL 400S/
RIH
105HP 1020V 67.1A/ XT150 TYPE 1/ PSD 7990 FT/ SHROUD 5.5 / @7990 [PACKER/SSD/RCV]

OPERATION @ 05:00 AM POOH Muleshoe Assembly @30std


ACTIVITIES
ESP Related Activities and Issues RIG/ Barge
TIME (05:00 - 18:00) TIME (05:00 - 18:00)
08:00-10:00 Modify Casing shroud 5.5" 05:00-15:00 RIH Muleshoe assembly
Modify CCP Cable Protector Nail 15:00-18:00 Fill well fluid and injectivity test 1-5BPM
Mix and Pump Sandstone Stimulation treatment

TIME (18:00 - 05:00) TIME (18:00 - 05:00)


18:00-05:00 POOH Muleshoe Assembly @30std

No. Type PN SN Remarks


CABLE ON BOARD

DISMANTLE REPORT VISUAL INSPECTION / ELECTRICAL TEST


PUMP UT Shaft rotation rough, Found Scale on top of pump3, Housing covered by scale
PUMP CT Shaft rotation free, Found Scale on top of pump2, Housing covered by scale
PUMP LT Shaft rotation free, Found Scale on top of pump1, Housing covered by scale
AGH
INTAKE/ VGSA Shaft rotation free, No foreign material inside Screen, Housing covered by scale
PROTECTOR Shaft rotation free, Empty oil on upper chamber, Dirty Oil at middle and bottom of Protector, Housing covered by scale
MOTOR S/R free, Pothead Damaged ,Burn Out from inside,Low Reading (pothead still attached)P-P:OL Ω OL Ω OL ΩP-G: 0.2Ω 0.2Ω 0.2Ω
DMT/SENSOR Tool Fault (cLA:0.872,CZ:1.305,CF:1.301), Housing good
CASING SHROUD Good Condition, No Corrosive indication, No Broken on Housing or Thread
SCREEN

BIW PENT. / CONNECT.


CABLE PACK OFF D.M.T Test on Surface
PIP Psig
ROUND+ FLAT CABLE Operable Condition, No Broken Armor and Insulation BHT O
F
Mot T O
F
ELECTRIC READING BY MEGGER WELL NAME :
DATA START
P-G PHASE 1 PHASE 2 PHASE 3 DATE / TIME :
MOTOR S/A A SBHP PSI
D.M.T R/A A SBHT/Tm o
F
ROUND CBL PUT Minutes FBHP PSI
FLAT CBL RTP PSI FBHT/Tm o
F
ROT. RATE BFPD
Pulling Result: Pothead was Damaged, Burn Out, Reading at Pothead OL/Open
Last Backload
Ex-Well YVOA-05
MTD No :

Equipment on Board : Equipment for Backload - Jakarta (MTD#)


#ESP EX-FARC-15
1EA LONG BASKET ESP SLB 15485
1EA REEL CABLE INSIDE CABLE BASKET RPI-17
1EA CLAMP BASKET RPI-10
1EA CONTAINER BASKET AORU 2301815

000000Schlumberger Private# 00000Schlumberger-Private


0
FS Equipment
Toolbox #FSSM 829 MPI date : Nov 2020
Spooler #RPI-03 Nov 2020

000000Schlumberger Private# 00000Schlumberger-Private


0

You might also like