DATE : 3-Jul-20 WELL NAME/ JOB : FARC-11/ WBS NO:OS20D22120 / PUMP REPAIR REASON Field Specialist/ Jusman Indra K R. TIME 105 Days / Hrs Onboard Operator (S) Ahmad K Fendi SHUT IN Days / Hrs RC D1000NX 218STG/VGSA/MAX BPBSL POOH 90 HP - 1516 V -38.7 A + xT 150_1 E.S.P TYPE PUMP RC1000 218STG/ VGSA D20-60 / PROT MXMS BPBSL 400S/ RIH 105HP 1020V 67.1A/ XT150 TYPE 1/ PSD 7990 FT/ SHROUD 5.5 / @7990 [PACKER/SSD/RCV]
OPERATION @ 05:00 AM POOH Muleshoe Assembly @30std
ACTIVITIES ESP Related Activities and Issues RIG/ Barge TIME (05:00 - 18:00) TIME (05:00 - 18:00) 08:00-10:00 Modify Casing shroud 5.5" 05:00-15:00 RIH Muleshoe assembly Modify CCP Cable Protector Nail 15:00-18:00 Fill well fluid and injectivity test 1-5BPM Mix and Pump Sandstone Stimulation treatment
TIME (18:00 - 05:00) TIME (18:00 - 05:00)
18:00-05:00 POOH Muleshoe Assembly @30std
No. Type PN SN Remarks
CABLE ON BOARD
DISMANTLE REPORT VISUAL INSPECTION / ELECTRICAL TEST
PUMP UT Shaft rotation rough, Found Scale on top of pump3, Housing covered by scale PUMP CT Shaft rotation free, Found Scale on top of pump2, Housing covered by scale PUMP LT Shaft rotation free, Found Scale on top of pump1, Housing covered by scale AGH INTAKE/ VGSA Shaft rotation free, No foreign material inside Screen, Housing covered by scale PROTECTOR Shaft rotation free, Empty oil on upper chamber, Dirty Oil at middle and bottom of Protector, Housing covered by scale MOTOR S/R free, Pothead Damaged ,Burn Out from inside,Low Reading (pothead still attached)P-P:OL Ω OL Ω OL ΩP-G: 0.2Ω 0.2Ω 0.2Ω DMT/SENSOR Tool Fault (cLA:0.872,CZ:1.305,CF:1.301), Housing good CASING SHROUD Good Condition, No Corrosive indication, No Broken on Housing or Thread SCREEN
BIW PENT. / CONNECT.
CABLE PACK OFF D.M.T Test on Surface PIP Psig ROUND+ FLAT CABLE Operable Condition, No Broken Armor and Insulation BHT O F Mot T O F ELECTRIC READING BY MEGGER WELL NAME : DATA START P-G PHASE 1 PHASE 2 PHASE 3 DATE / TIME : MOTOR S/A A SBHP PSI D.M.T R/A A SBHT/Tm o F ROUND CBL PUT Minutes FBHP PSI FLAT CBL RTP PSI FBHT/Tm o F ROT. RATE BFPD Pulling Result: Pothead was Damaged, Burn Out, Reading at Pothead OL/Open Last Backload Ex-Well YVOA-05 MTD No :
Equipment on Board : Equipment for Backload - Jakarta (MTD#)