1
OBJECTIVE
• Introductions
• Oilfield Left to Right
• Facilities Data Vernacular
• Case Studies
• Risk
• License to Operate
• Royalties
• Knowledge Digitization
• Discussion
• Very simplified
• Flow Diagrams
• Numbering Systems
• Datasheet
• Basic Architecture
• Handover between Project and Operate Phases
Chemica
l
Storage
de
TYPICAL FLOW DIAGRAMS (CONT.)
Piping and
Instrumentation
Diagram
(P&ID)
Carbon Steel
T,= 12343
P=, 3344
Carbon Steel
T,= 12343
P=, 3344
Corrosion
Flow Diagram Carbon Steel
T,= 12343
Carbon Steel P=, 3344
(MCFD)
Carbon Steel
T,= 12343
T,= 12343
P=, 3344
P=, 3344
Carbon Steel
T,= 12343
P=, 3344
de
NUMBERING SYSTEMS COMPARISON
de
SAMPLE DATA SHEET : PUMP
Pump-Centrifugal
As-built Criticality
Attribute Class Specific Requirement Accountable UoM required? required? dependance Users
Uses/Location Attributes System No EPC
P&ID No EPC
Parent Tag No Owner
Equipment Attributes Equipment Description Vendor
Manufacturer Vendor
Model No Vendor
Serial No Vendor
Date/Batch Vendor
Engineering Attributes Diameter Vendor Yes
Height Vendor Yes
Length Vendor Yes
Weight Dry Vendor Yes
Wight (operating) Vendor Yes
Power Consumption Vendor Yes
Rated Capacity Vendor Yes
Rated Flow Vendor Yes
Rated pressure Vendor Yes
Rated pressure Vendor Yes
Normal Psuct Vendor Yes
Normal Pdis Vendor Yes
No of stages Vendor Yes
No of vanes per stage Vendor H, M PdM Pgm
Body Type Vendor
Shaft Sealing Configuration Vendor H, M
Radial Bearing Type Vendor
Radial Bearing Number Vendor
Thrust Bearing Type Vendor
Thrust Bearing Number Vendor
Normal Operating Speed Vendor Yes H,M PdM Pgm
Impeller Material Vendor H Integrity Pgm
Casing Material Vendor H Integrity Pgm
Rotor 1st Critical Speed Vendor Yes H PdM Pgm
Design Code Specifications Vendor
Project Attributes PO Number EPC
Supplier EPC
Order Date EPC
Delivery Date EPC
FAT/QA Specification Reference Owner
Required Documentation General Arrangement EPC yes
Sectional Drawing Vendor
P&ID Number EPC yes
Seal Plan Drawing EPC yes
Operating Manual Vendor
Maintenance Manual Vendor H, M
Repair Manual Vendor H, M
FMEA Vendor H
Pump Curves Vendor
Base and alignment specifications Vendor
Condition Monitoring Baselines EPC H, M PdM Pgm
Lubricant Specifications Vendor PdM Pgm
Coolant Specifications Vendor
FAT/Performance Certificates EPC yes H, M
Operational Attributes Normal Capacity Utilization % EPC H, M
Normal Operating Mode EPC H, M
Initial Installation Date EPC H, M
Initial Commissioning Date EPC
Equipment Criticality Owner
Maintenance Strategy No Owner H, M
Vibration envelope settings Yes H PdM Pgm
BOM Ref No Owner
Type of Driver EPC
Fluid Handled EPC Integrity Pgm
SPIR Ref No EPC
Additional Components (separate data sheets) Sealing arrangements and associated equipment EPC yes
Transmission EPC yes
Instrumentation EPC yes
Cooling EPC yes
Lubrication EPC yes
Valves EPC yes
PSVs EPC yes
15
ENGINEERING INFORMATION
ARCHITECTURE
16
HANDOVER DOCUMENTATION
de
CASE STUDIES
• Risk
• License to Operate
• Royalties
100/16-06-056-02W5/02
VS.
VS
.
SOME OF THE VALUE VECTORS FROM AN
ACCURATE MEASUREMENT SCHEMATIC
• Joint Interest can use them to see what facilities
third party wells flow through.
• HSE can confirm where the dehydrators are that
need annual benzene testing.
• Schedulers know which meters need calibrating
(accounting), and which do not (non-accounting).
• Production Accountants know which wells are on
artificial lift and thus might get a royalty break.
• But; Getting a common, standard view across a
company is difficult, though every new user (and
shut-down private Excel spreadsheet) strengthens
the whole system.
CASE STUDY : ROYALTIES & SUSPENDED
Image provided by
Image provided by
Image provided by
Unsuccessful Projects
Mismanaged FEL
Level of Effort
Well-managed FEL
Construction &
FEED Commissioning Successful Project
Phase
Inadequate FEL
de
TYPICAL WORK MANAGEMENT PROCESS
Planning &
Plan Work Schedule Work Record Work
Scheduling
Warehouse Spares
49