Annexure

Format for working out Bench Mark costs for Major Activities posed for RIDF Loan 2020-21
1.Roads
Construction of Roads (Excluding CD and Protection works)
S.No Road Roadway width Carriage way Cost of Annual Cost of Cost of Annual Cost of Assumption/Parameters
Classification (in mtr) width (in mtr) Construction Maintainance Construction Maintainance
(Rs Lakh/Km) (Rs Lakh/Km) (Rs Lakh/Km) (Rs Lakh/Km)

1 2 3 4 5 6 7 8 9
Bituminous Roads Concrete Roads
1 Village Roads 5.95 3.75 42.17 0.67 146.62 - 1. Pavement thickness 300
mm

2 Other District - - - - - - 2. California Bearing Ratio


Roads of 5 to 7 %

a Single Lane - - - - - - 3. Design period of 10 years

b Intermediate/D - - - - - - 4. Cost of cross drainage


ouble Lane and protection