Professional Documents
Culture Documents
November 2009
SCHEME OF TESTING AND INSPECTION
FOR CERIFICATION OF
ETCH PRIMER
ACCORDING TO IS 5666:1970
(Incorporating Amendment No. 1)
1.1 All the testing apparatus shall be periodically checked and calibrated and records
of such checks/calibration maintained.
2.0 TEST RECORDS- All records of tests and inspection shall be kept in suitable
forms approved by the Bureau of Indian Standards.
2.1 Copies of any records and other connected papers that may be required by
Bureau shall be made available at any time on request.
4.0 STANDARD MARK - The standard mark(s) as given in column (1) of the first
schedule of the licence shall be printed on each container and on the label applied
to the container provided always that the material in each container to which mark
is thus applied conforms to every requirement of the specification.
6.0 PACKING- The material shall be packed as per clause 4.1 of IS 5666:1970.
Doc: STI/5666/1
November 2009
7.0 LEVELS OF CONTROL: - The tests as indicated in Table
1 and at the levels of control specified therein shall
be carried out on the whole production of the factory
which is covered by this scheme and appropriate
records and charts maintained in accordance with
paragraph 2 above. All the production which conforms
to the Indian Standard and covered by this licence
shall be marked with the ISI Certification Mark.
IS 5666:1970
ETCH PRIMER
TABLE 1 LEVELS OF CONTROL
(Para 7.0 of the Scheme of Testing and Inspection)
Test Details Levels of Control
Clause Requirement Test No. of Frequency Remarks
Method Samples
Clause Reference
3.1 Composition 3.1 IS One Each
5666:1970 Control
Unit
3.2 Preparation 3.2 -do- One -do-
of primer
3.3 Consistency 3.3 -do- One -do-
3.4 Viscosity 3.4 -do- One -do-
3.5 Drying Time 3.5 -do- One -do-
3.6 Finish 3.6 -do- One -do-
3.7 Fineness of 3.7 -do- One -do-
Dispersion
3.8 Fitness to 3.8 -do- One -do-
take a coat of
primer,
cellulose
finish
3.9 Keeping 3.9 -do- One Once in
Quality three
months