You are on page 1of 5

HANDOVER REPORT

EMMANUEL MISA
Prepared by
28 SEPTEMBER 2019
Date
I600 PALLET RACKING SYSTEM & CANTILEVER
Product
RACK
SSI Job Number SGE190068

 SSI Schaefer 14.07.2020


Handover Report
1.0 PROJECT SUMMARY

SSI Schaefer is supplying and installing the racking system for this project. The racking
structures are mainly produced in SSI-Schaefer Factory in Malaysia/ China.

Main Scope of Supply

- I600 PALLET RACKING SYSTEM & CANTILEVER RACK system for:

End User: VIDDACOM (B) SDN BHD

Project Location: VIDDACOM MUARA INTEGRATED SUPPLY BASE (MISB)


Serasa Muara
Negara Brunei Darussalam

Please refer to the quotation document E190024-01R1 for technical information, racking
dimensions and pallet location

Primary contact details:

Name:

Ganasan Subramaniam

Position: Managing Director

Company: ARZA SDN BHD for SSI SCHAEFER Brunei

Tel: +673 2342534

Fax: +673 2342535

Mobile: +673 8746038

E-mail : info@arzabrunei.com

 SSI Schaefer 14.07.2020


Handover Report
2.0 COMPLETION CERTIFICATE

Customer: VIDDACOM (B) SDN BHD

Site Address: Lot 677, Jalan Bolkiah


Seria KB1133
Negara Brunei Darussalam

We (as above) hereby confirm that the installation of racking system supplied by SSI Schaefer
covered
below;

SSI Quote Ref.: E190068-01R0 Date: 23 April 2019

NURUL MHD
Customer Name

____________________________
Customer Signature & Date

_______________________________________________________________________________________

SSI Schaefer

Note: Actions to be taken (where applicable)

______________________________________________________________________________________

______________________________________________________________________________________

On behalf of SSI Schaefer

GANASAN SUBRAMANIAM SGE190068


Managing Director SSI Job No.

06 SEPTEMBER 2019 09 SEPTEMBER 2019


Installation Completion Date Project Handover Date
 SSI Schaefer 14.07.2020
Handover Report
3.0 Site Photos

 SSI Schaefer 14.07.2020


Handover Report
 SSI Schaefer 14.07.2020
Handover Report

You might also like