| OIL AND NATURAL GAS CORPORATION
JECT
—— : HRD PROCESS PLATFORM PRO
MAIN CONTRACTOR: AFCONS INFRASTRUCTURE LD
‘SUBCONTRACTOR: FETKOVIETNAM TECHNICAL SERVICES CORPORATION M&C
__PISC MECHANICAL & CONSTRUCTION
THERMAL SPRAY ALUMINIUM COATIN(
PROCEDURE
Document No.: HRD-TS-CF-P-0011
Mens TE: va pa/atenrse re [ence font
th ome Ldbe> ome fst fe] rafers
f we fea)rel™
x
AFCONSONGC‘ONGCIAFCONS
PISCMC
HRD PROCESS FLATFORM PROJECT
Dosument Naz [Page tor 16
HIRD-TS-CF-P-0011 THERMAL SPRAY ALUMINIUM |
Revision No.2 COATING PROCEDURE Date: 24 Jaa. 18
REVISION RECORD SHEET
No, | REY.NO, | CONTENT OF REVISION DATE OF REVISION
L BI__| Issa for eview by Company 16. Mar. 2013
2 0 | Approved for construction 10. April. 2013
3 1 | Revised as per comment from CA, 16. May. 2013,
Incorpoated with TSAC Vendor Procedure | 24. an. 2014
aPISCMC
HRD PROCESS FLATFORM PROJECT
‘THERMAL SPRAY ALUMINIUM
Revision No.2 COATING PROCEDURE
Page of 16
‘TABLE OF CONTENTS
1.0 SCOPE
LL ITEMS TO BE THERMALLY SPRAVED:
2.0 CODES AND STANDARDS.
3.0 SURFACE PREPARATION
3.1Presurfae preparation. .
5.2 Abrasive blasting:
40. THERMAL SRAY ALUMINIUM AND SEALER COATING PROCEDURE:
41. Thenmal Spray Aluminium.
42 Sealer & Topeoat aplication,
‘SO INSPECTION/ QUALITY CONTROL.
a
52. Surfaee preparation
53 Film Thickness... .
54 Temperature and Relative Humidity. ee
55 Adhesion Tensile band testing, B
56 Ben-Test Cracking B
5.7 Visual Inspection: 4
60 SAFETY,
7.0 REPAIR,
80 DOCUMENTATION:ONGCAECONS PISCMC
HIRD PROCESS FLATFORM PROJECT.
Document No ~ [Pages or te |
HIRD-TS-CF-P-0011 ‘THERMAL SPRAY ALUMINIUM
Revision No.2 COATING PROCEDURE
LD SCOPE,
‘This procedire covers the requirements for surfce prepaiion, Themal Spray Aluminium
Costing (ern calls TSAC) and sealer coat application for structural see, piping and 3s
Indieated inthe extent of work that are installing on PROJECT a per defined in Spec. No.
2008: Specification For Protective Couting.
|LL ITEMS TO BE THERMALLY SPRAYED
Coating system of TSAC are to be used starting fem () .8m elevation below Chart Datum
and upto Cellar deck structure excluding top of Cellar deck plating,
{Caisson external shall be painted fhom () 1.8m elevation below Chart Datum to top of
Cellar deck structure with TSAC asp pint manufacturers specification,
120 CODES AND STANDARDS,
“The latest edition ofillowing Codes and Standards shall ppl:
Spee. No. 2005
Speciation foe Paning and Protective Costing
American Society for Testing and Materials (ASTM:
ASTM 0633
Standard test method fo adhesion or cohesive suengh of flame and are-xprayed coatings
SSPCABL
Requirements for Tesing performed by Manufacturer fo Properly Classify the Abrasives &
Feld Testing for Consminants
SsPc-aBs
Specitiaton for requcement of ferrous metallic abrasives for removed of rus, msl sek,
pinto oher surface coating system by blast cleaning
as 1475
‘Speciation for wrought aluminium & sluminium alloys fr general engineering purposes
>
Ast 47
‘Standard Test Method for Field Measurement of surface profile of lat cleaned steet
ASTM Ds9s0.
‘Standard Test Methoe for conduct meric Analysis of water soluble nie Contamination of
Blasting abrasive
ASTM D285
Standard Test Method fo Indicating Oil or Water in Compressed Ait
_ a|
PISCMG
HRD PROCESS FLATFORM PROJECT
Document No Paget or We
RD-TS-CP-P-0011 ‘THERMAL SPRAY ALUMINIUM
Revision Ne COATING PROCEDURE Date: 24 Jan. 14
ASTM Déstt
Standard Test Method for PulLOff Stength of Coatings Using Potable Adhesion Testers
ASTM F315
Standard Practice for Measuring Coating Thickness by Magnetic-Fild or Bddy-Current
(Electromagnetic) Examination Methods
‘The Saciety for Protective Coatings (SSPC)
SSPC PAL
Paint Application Speification No, 1, Shop, Field and Maintenance Painting of Stel
spe Pa2
Paint Applicaton Specification No. 2, Measurement of Dry Coating Thickness with
Magnetic Gauges
spc PA3
Paint Application Gite No.3, A Guide to Safety in Pint Applications
sere vis
Guide and Reference Photographs for Stol Surfaces Prepared by Dry Abrasive Blast
Cleaning
sspc-sP 1
Solvent Cleaning
sspe-sp2
Hand Tool Cleaning
sspc-sp3
Povser Tool Cleaning
SSPC-SP 5/NACE No.1
White Metal Blast Cleaning
SSPC-SP6
Commercial Bast Cleaning
'SSPC-SPY (NACE No.4
Brush-Of Blast Cleaning
SSPC-SP 8/ NACE No.3
Pickling
[SSPC-SP 10) NACE No.2
[Near-White Bist Cleaning
“LYHRD PROCESS FLATFORM PROJECT
HRD-TS.C¥-P-0011 ‘THERMAL SPRAY ALUMINIUM
revision No 2 COATING PROCEDURE
Document No
Page Sof 16
Date: 24. Jaa. 14
S8PC-SP IL
Posser Tool Cleaning Bare Metal
SSPC-SP 12 /NACENo.S
Surface Preparation and Cleaning of Metals by Water
prior to Recoating
BS/DINASO Standards
HS EN ISO 14918: 198
Approval esting of thal spray opeators
BS EN 1S0 14919
Thermal Spraying, Wies, Rods and Conds fer Flame and Are Spraying; Classification;
Technical Supply Coeditions
Bs 3900-E 10
Pull-OF Tes for Adhesion
Bs 5093
Code of Practice for Fotestive Coting of on and Stel Structures against Comesion
BS-EN.ISO 8502.9
Feed Methed forthe Conductometrie Deteminaton of Water Soluble Sal
is a94e4
‘Method For Cleaning The Surface In Case Salt Content Exceeds Spsifed Limit
[BS-EN-ISO 85023
Assessment of Dust on Steel Surices Prepared for Painting (Presure-Sensitve tape
method),
DIN 8566-2
Materials for Thersal Spraying; Solid Wie for Arc Spraying: Technical Delivery
Condition.
pin 32821
/Accepance Inspection of Thema Spraying Equipment
150 2608,
“Thermal spraying ~ Metallic and other inrgani catings- Zine, aluminium and ther slloys
180 4628
Pull-Off test fr adhesion
180 8501-1
Preparation of Stel Substrates before Application of Paints and Related Products — Visual
Assessment of Surfae2 Cleanliness
PAONGCIAFCONS
HRD PROCESS FLATFORM PROJECT
Document Nos Page6of 16 |
HIRD-TS.CF-P-0011 ‘THERMAL SPRAY ALUMINIUM
Revision Nos? COATING PROCEDURE
130 8502-3
Preparation of Ste! Substrates before Applicaton of Pains and related Products — Test
forthe Astessment of Surface Clesnines -Part 3+ Assesment of Dust on Steel Surfices
Prepared for Painting ressure Sensiive Tape Method).
150 8502-6
Preparation of Stee! Subsrates before Applicaton of Paints and related. Products — Test
forthe Assessment of Surface Cleanliness Sampling of Soluble Impurities on Surfaces to
‘bs Painted — The Brsle Method.
180 8805 Part 1,2,3.4 and 5
Preparation of Steel Substrates before Application of Pains and Related Products ~ Surface
Roughness Charteris of Blst-Cleaned Stel Substates
‘National Associaton of Corrosion Engineers (NACE)
RP 0287
Feld Measurement of Surface Profile of Abrasive Blast Cleaned Stol Surfaces Using &
Replica Tape
[NACE No. 12
Specifieation forthe application of thermal spray coating of Aluminium, Zinc and their
alloys and composites ste protection.
3.0 SURFACE PREPARATION
3.1 Presurface preparation:
Sucface preperation fr ening application should be carrying out after all structural
mechanical, piping and welding works have een completed onthe suctre or equipment.
All fised flax shall te removed from welded areas and appurtenances. When electrodes
‘sng a basie Max have been use, the welded area shall be cleaned of aaline residues by
rinsing with warm wae pine oblast leaning.
Before any cleaning cperation commences, all rough edges shall be reduced, surfice silvers
and laps shall be ground out (ll comers and edges are to be rounded to @ 2mm minimum
Pang) and weld spt a wel eahiing excessive sf eghness shal be smaed
‘0 ensuce proper paintadhesion and uniform thikness
‘Before basting, ll weldments shal be closely inspected fo the presence of welding ux and
sate, silvers, inclushns, lamination, and underlying mil sal,
Working parts of machinery and valves, instruments, glas fees of gauges, Hight fitings,
willeay out inspecin or equivalent certied inspectors
“The Sub-Contractor sal give a Coating schedule (Coating Inspection Request client
‘minimum of 24 hoursnoied in advance of surveillance,
Application vendoc cualied repesenative shall be present during execution of TSAC
‘pplication & inspection
Operator shall be quate by application of TSA on a separate sample measuring approx.
£450 x 450 x 6m thickness. Ihe actual waak less han 6 rm thik then the sample shal
‘bemade fom materia of respective thickness,
52, Surface preparation
‘Compressed ar quality test by blter test hall be done prior starting abrasive bast.
The blast claanad sure sal be inspected Yo ensure tha he areas are clean, dat Sve, ey
and comply with standard requirements.
Surface prot salle checked with surface comparator accordingly 19 ISO 8503.2. Also
the angular profile depth messurement shall be done by Press "O" film tape end minimum,
75 um depth profile sal be achieved
‘The above reading shall be submited togeher with the daily blasting and Coating
mtn
raHRD PROCESS FLATFORM PROJECT
Document N
HIRD-TS CEPOL THERMAL SPRAY ALUMINIUM
COATING PROCEDURE
| Pagettor te |
Revision i
Nove:
Measurement of dst evel afer bast cleaning Refer to 150 8502-3 Class 2 or beter
Frequency: Twice per shit
Tests for soluble salts on Based surfce — Refer to ISO 8502-9 Measurement ofthe levels
of soluble sts Sapiens
‘5.3 Film Thickness
S34. Measurement
During sealer and topcoat application, the wet film thickness shall be spot-checked,
‘thickness of each cou shall be measwed DET by the suuges scoeding 19 SSPC-PA2 type 2
fixed probe gauge
532. Dry Fil Thikness (DET) Value of TSA coating:
For fat surfaces a measurement ine shal be used. The average value of five readings taken
inline at 25-em (1.0) intervals shall be determined The line measurement measures the
peaks and valleys ofthe TSAC. One measurement ine for every 1m of applied TSAC.
For complex geometies and geomety transitions @ measurement spot shall bo used, Five
measurement shall be taken in an area of approximately 10 em (1.6 in"). The spot
measurement may no measure the peaks and valleys a he TSA coating
“Measurement Schedule: One ine o spot measuremcat shall be iaken every 10015 m* of
plied TSA coating.
Mustrate 1: Line and spot measurement
‘5.4 Temperature and Relative Humidity
Temperature ad relative humidity shall be messured with Hygrometer (eg Eleometer type
113 and 116 respetivly) Readings shal be taken atthe beginning ofeach shift and every
‘vo hours theeafor curing brave blast leaning and painting.
ZODocument No:
HRD-TS.CF-P-0O11
HRD PROCESS FLATFORM PROJECT
THERMAL SPRAY ALUMINIUM
Revision No 2
COATING PROCEDURE
Page Dot Te
Date: 24. Jan. 16HRD PROCESS FLATFORM PROJECT.
Document No Page 130F 16 |
HRD-TS.CF-P-0011 ‘THERMAL SPRAY ALUMINIUM
Revision No? COATING PROCEDURE
A
a
5. Adhesion/Tensie bord testing
Coatings will be exe by the COMPANY for adhesion during test panel and when
deficiencies in the suiee preparation or TSAC system are suspected dering application,
‘Where adhesion is at suicient provide sound peoectio, the coating shall be removed
an the area ected a specified
‘Adhesion wll be checked with an Eleomeler Auhesion Tester in accordance with ASTM.
‘D841 at actions seected by the COMPANY. At Teast one measurement shall e made for
covery SU mr
‘Minimum eequtemert foe aahesion 1st is 6:89 Mpa (1000 psi for lame Spry and 10.3
‘Mpa (1500 ps) for Ar Spay application with an average of 13.8 Mpa (2000 ps,
6 Bend-Test Crackiog
Bena test shal be care ou at he bemng ofeach work shi, Bend test shall also be
conducted a5 sample coupons efor iat of thera spraying work
‘During regular preston. a the beginning ofeach shiR, Bond stength of TSAC shall he