BOQ No.:- RAV_BOQ_19-20_20-REVISED Date: 30.11.

2019
Dear Sir/ Madam,
We feel pleasure to submit our rate for following materials mentioned below at your Ipol Lubricants - GP
Petrochem, Vasai.
Subject: Quotation for Installation of Fire Hydrant Systems

Sr. Supply Installation


Description Unit Qty
No. Unit Rate Total Unit Rate Total
Providing, fixing & commissioning of G.I. IS:
1 1239/ IS:3589 pipe with welding, fitting &
painting. (Make-Jindal C Class)
1.1 25 mm dia 150 Mtrs. 650.00 97,500.00 250.00 37,500.00
1.2 80 mm dia 170 Mtrs. 1,054.00 179,180.00 550.00 93,500.00
1.3 100 mm dia 200 Mtrs. 1,375.00 275,000.00 650.00 130,000.00
1.4 150MM dia 283 Mtrs. 1,565.00 443,192.35 750.00 212,392.50
Providing, fixing of MS Angle support with U
2 clamps, Anchor fastener etc. & painting 1 kg 12,000.00 12,000.00 5,000.00 5,000.00
(Pump Room & Hydrant Supports)
3 Providing, fixing of Orifice Plate 8 Nos. 650.00 5,200.00 250.00 2,000.00
Providing, fixing & commissioning of Double
4 Headed Hydrant valve 9 Nos. 9,950.00 89,550.00 1,750.00 15,750.00

Providing, fixing & commissioning of first aid


hose reel with 30 mtrs. long x 20 mm dia
5 4 Nos. 6,250.00 25,000.00 150.00 600.00
rubber hose pipe with shutoff nozzle,
including gate valve & brackets.
Providing, fixing & commissioning of MS Air
6 Release Valve - -

6.1 25 mm dia 2 Nos. 950.00 1,900.00 150.00 300.00


Providing, fixing & commissioning of MS Ball
7 Valve. - -

7.1 25 mm dia 4 Nos. 350.00 1,400.00 150.00 600.00


Providing fixing & commissioning of C.I.
8 Butterfly valve - -

8.1 65 mm dia 2 Nos. 2,000.00 4,000.00 1,200.00 2,400.00


8.2 80 mm dia 10 Nos. 2,250.00 22,500.00 1,250.00 12,500.00
8.3 100 mm dia 4 Nos. 2,600.00 10,400.00 1,500.00 6,000.00
8.4 150 mm dia 6 Nos. 2,900.00 17,400.00 1,750.00 10,500.00
9 Providing, fixing of M.S. Hose Cabinet 8 Nos. 2,000.00 16,000.00 - -
Providing, fixing of canvas hose pipe as per
10 IS:636 8 Nos. 3,600.00 28,800.00 - -

Providing, fixing of Aluminium short branch


11 pipe. 8 Nos. 2,400.00 19,200.00 - -

Providing, fixing Fire Brigade Collecting


12 Breaching with 4 nos. 63 mm dia. NRV type 2 Nos. 6,074.00 12,148.00 2,500.00 5,000.00
SS male couplings
Providing, fixing Fire Brigade Collecting
13 Breaching with 4 nos. 63 mm dia NRV type 1 Nos. 5,650.00 5,650.00 2,500.00 2,500.00
SS male couplings (For Water Tank)
Providing, fixing of 150 mm dia Dual plate
14 NRV 2 Nos. 4,125.00 8,250.00 1,750.00 3,500.00

15 Providing, fixing of High Tech Support 30 Nos. 80.00 2,400.00 60.00 1,800.00

Providing, fixing & commissioning of 2280LPM


@ 70 M head pump coupled with Diesel
16 Driven motor. Along with base frame, 2 Nos. 422,850.00 845,700.00 30,000.00 60,000.00
foundation bolts & coupling guard. As
Hydrant & Sprinkler Pump mono block
centrifugal pump -Make Kirloskar
Providing, fixing & commissioning of 2280LPM
@ 70 M head pump coupled with Electrical
17 Driven motor. Along with base frame, 1 Nos. 235,210.00 235,210.00 30,000.00 30,000.00
foundation bolts & coupling guard. As
Hydrant & Sprinkler Pump mono block
centrifugal pump -Make Kirloskar

Providing, fixing & commissioning of 180 LPM


@ 70 M head pump coupled with Electric
18 motor. Along with base frame, foundation 1 Nos. 70,000.00 70,000.00 20,000.00 20,000.00
bolts & coupling guard. As Jockey Pump -
Make Kirloskar
Providing and fixing of gun type rotating
19 nozzle 5 Nos. 25,000.00 125,000.00 3,000.00 15,000.00

Providing, fixing & commissioning of Wafer


20 type non return valve - -

20.1 150 mm dia 2 Nos. 2,800.00 5,600.00 1,750.00 3,500.00


20.2 80 mm dia 2 Nos. 2,000.00 4,000.00 1,250.00 2,500.00
20.3 65 mm dia 1 Nos. 2,365.00 2,365.00 1,100.00 1,100.00
Providing, fixing & commissioning of air
21 vessel tank with fittings 1 Nos. 16,500.00 16,500.00 4,500.00 4,500.00

22 Pressure Gauge 3 Nos. 950.00 2,850.00 150.00 450.00


23 Pressure Switch 3 Nos. 1,620.00 4,860.00 1,200.00 3,600.00
Providing, fixing & commissioning of M S
24 Angle support with U clamps, Anchor fastener 15 kg 9,000.00 135,000.00 1,000.00 15,000.00
etc. & painting (Hydrant Line)
Providing, Fixing & Commissioning of motor
25 control centre with cabling inside pump 1 Lot 110,000.00 110,000.00 27,000.00 27,000.00
house for Main Pump

26 Providing, fixing of commissioning of 3C x 95q 100 Mtrs. 620.00 62,000.00 100.00 10,000.00
mm aluminium conductor armoured cable.
Providing, fixing of MS Angle support with U
27 clamps, Anchor fastener etc. & painting 28 Kg. 72.00 2,016.00 65.00 1,820.00
(Sprinkler Line)
27.1 32 mm dia 100 Rm 650.00 65,000.00 450.00 45,000.00
27.2 25 mm dia 100 Rm 550.00 55,000.00 425.00 42,500.00
Providing, fixing of commissioning of Pendent
28 Sprinkler Bulb 68°C 120 Nos. 110.00 13,200.00 60.00 7,200.00

Providing, fixing of commissioning of High


29 Tech support 250 Kg 50.00 12,500.00 50.00 12,500.00

Providing, fixing & commissioning of Water


30 Foam Monitor 5 Nos. 32,000.00 160,000.00 5,000.00 25,000.00

Providing, fixing of commissioning of 2C x


31 1.5mm FLRS cable 500 Mtrs. 95.00 47,500.00 30.00 15,000.00

Providing, fixing of commissioning of Smoke


32 Detectors - Make - Agni 70 Nos. 650.00 45,500.00 150.00 10,500.00

Providing, fixing of commissioning of MCP -


33 Make - Agni 33 Nos. 625.00 20,625.00 150.00 4,950.00

Providing, fixing of commissioning of Hooter -


34 Make - Agni 1 Nos. 12,000.00 12,000.00 150.00 150.00

35 Providing, fixing of commissioning of 4 Zone 3 Nos. 8,500.00 25,500.00 1,500.00 4,500.00


Panel (non-conventional) -Make - Agni
Total of FireFighting System Servicing & rectification 3,354,596.00 903,613.00
TOTAL cost of Project (Excluding TAX) 4,258,209.00
Note:
Capitation fee will be charged extra as per fire department and receipt will be provided by VVCMC.
Terms & Conditions:
1) GST as applicable @18%
2) All civil work & scaffolding /hydra/forklift in your scope
3) Breaking of concrete and landing if any in your scope. Core cutting in our scope.
4) Payment to be made in favour of "RAV Fire services"
i) 20% of total value advance payment to commence the work
ii) 15% of total value after supply of pipe on site within 07 days
iii) 35% of total value advance payment before pumps installation
iv) 20% of total value advance payment before hydrant valve installation
v) 10% of total value after submitting final NOC within 07 days
5) If any non BOQ item required charges will be extra
6) Prices are subjected to change with prior notice Yours Faithfully
7) Quotation are valid up to 30 days
8) Quantity are tentative may change according to site condition
9) Quoted prices are unit rate only
10) Power supply in your scope Chief Executive Officer
11) Store house and accommodation in your scope RAV Fire Services