You are on page 1of 1

Project BONTHI 1 The Concrete Centre

Client MAUSOOM Made by Date Page


Location C2 MMW 15-Jul-20
SYMMETRICALLY REINFORCED RECTANGULAR COLUMN DESIGN, BENT
ABOUT TWO AXES TO BS 8110:2005 Checked Revision Job No
Originated from RCC53.xls v3.2 on CD © 2006 TCC -

MATERIALS
fcu 25 N/mm² gm, steel 1.15 Cover to link 40 mm
fy 415 N/mm² gm, conc 1.5 h agg 20 mm
steel class A
SECTION
h 250 mm
b 200 mm
with 2 bars per 200 face X X
and 3 bars per 250 face
#N/A

RESTRAINTS Top Btm


Lo (mm) Condition Condition Braced ? ß Le (mm) Slenderness Status
X-AXIS 3150 2 1 N 1.3 4095 Lex/h = 16.38 Column is
Y-AXIS 3150 2 1 N 1.3 4095 Ley/b = 20.48 SLENDER

LOADCASES AXIAL TOP MOMENTS (kNm) BTM MOMENTS (kNm)


N (kN) M ix M iy M ix M iy
HIGHEST AXIAL 297 0.0 3.8 0.0 3.8
HIGHEST My 69 0.4 12.0 0.4 12.0
HIGHEST Mx 200 4.8 7.0 4.8 7.0
COMBINED My + Mx 142 3.3 6.5 3.3 6.5
0.0 0.0
0.0 0.0

BAR ARRANGEMENTS BAR CENTRES (mm)


Bar Ø Asc % Link Ø 200 Face 250 Face Nuz (kN) Checks
R 40 15.08 10 60 55 0 Asc > 6 % (3.12.6.2)
R 32 9.65 8 72 61 0 Asc > 6 % (3.12.6.2)
R 25 5.89 8 79 65 1588 ok
R 20 3.77 6 88 69 1218 ok
R 16 2.41 6 92 71 980 ok
R 12 1.36 6 96 73 796 ok

DESIGN MOMENTS (kNm) X AXIS Y AXIS COMBINED


K M add Mx M add My Axis M' REBAR max V *
HIGHEST AXIAL 0.910 9.1 9.1 11.3 15.1 Y 20.0 6 R12 27.2
HIGHEST My 1.000 2.3 2.7 2.9 14.9 Y 16.8 6 R12 27.1
HIGHEST Mx 1.000 6.7 11.5 8.4 15.4 Y 22.4 6 R12 27.1
COMBINED My + Mx 1.000 4.8 8.1 6.0 12.5 Y 17.7 6 R12 27.1
0 1.000 0.0 0.0 0.0 0.0 0.0 0.0 #N/A #DIV/0!
0 1.000 0.0 0.0 0.0 0.0 0.0 0.0 #N/A #DIV/0!

SEE CHARTS ON NEXT SHEET

You might also like