You are on page 1of 8
QMIS: RFI Entry Page | of 2 / scoatgen Ml q Panes ChE OM ELE eet oon eas RCO Ee JOH NRE oe RFE View (Work Inspected-Accepted) , Projet Nts one an Contractor RPL Reference: AYCSFRAE-S a - 2 icp ae Se Sar Ret #10002 SATIP Tes A tBu Sten 1 SAIC Ret #124015 ' Scheduled Yap Date 1202097 ‘Sched ep. Tne:220 e ulpment 10/beserpton Cu Issn Isecton (CHAS PANGAN Asa QC yma, ann, Ana, a Hs ' Layout orawing HosVA-0709004 Layout Drawing Rev No‘0OF Purcase Orer Mo. Armco Atty Ho35 - e 2 {Le Detripton: 6106, 200: HAINTENANCE BLOG 328 2a 200K (6 17-18A-9 AN, 197,138 8 39, an vet IrslstonIrealtion Inspection nBLEG 20- MAINTENANCE BLOG. 128 2c FLOOR (GL ITAAIACRALM RY. A373 Description 139 9 per tached hint’ ar, exceptions: ‘Cora Reps : om maa m2 ' [FERRY FER | Fare tucar)_fapecinenr com nie pane tho aoe nS — . PMT Repos } = ear i ' ws = ¢ ce SAPD Replies = Fp yea ' [PREPRESS [i cn sasion nnn n 8 0 wee ee S = <=" a ies — ‘= — er ' = = = ” ‘losing Comments: Duct Instn istalaton inspecten BLOG. 20 nas done an ound acaptale Close Date: 12/472017 01:8 hps://qmis.aramco.com.sa:1001 1/qmisv4/site/r_rfi_view.asp?l_serial_no=11161651 12/5/2017 QMIS: RFI Entry Page 2 of 2 (Gate racic NAOT) ial Ferrer sae Po ube $88 eae ont Qty Rage oan ten We Yr 4 sr Sas | ‘hea ety una https://qmis.aramco.com.sa:1001 1/qmisv4/site/r_rfi_view.asp?_serial_no=11161651 12/5/2017 . 3107 REQUEST FOR INSPECTION Sa hranco7-EN6 (198) (200 mgactn Degen fo AEP 160123 site SOF 1 s001055 10 J00WSSano Fase _CONST__TRe _SFB/ NOUSTRA SUPPORT FROLITS BURLING ‘To: PrectsInepecionUnitNt. FERDINAND GARABLES [T] cn tec, Cpu, }conms. CT] eect, ner vac Inspetonmoitong is requred on (ste) BO/U/ 2017 sattine) 3°20 PM prerte fore lowing oat pent MANT. BUDG.JzR. 27] ize 7M. 187,133 § 13: WerrPemiveqtet: — ] ye ea ‘APN preserves vera at he wor ead eraspecn ‘CONTRACTOR has wed Bal he wor tbe npg ad confoms one procure: ‘seampll ard camplarce th he tewengspecScaens JOHN 19819 SAESSAMSIONE# SAES-K-001 (> AMC“ ADIS /2.5 ContacrCarpery _ALYAMAMA COMPANY. QWOCName __cHRIS PANGAN Janae sanatre Gon ae 30/11/17 om DEC BOT toe [NOTE Inpecors Strate is resi threes ony ed ot or approval rddapprcal ofthe wrk ora opera “This ceva bythe undersigned nspecon Depron erplyes: Name Mr FERONAND 6. GARABLES Sonate Dssbuton: A Onl: Projectlanagerert toy specon 6. 2nd Copy Contato IS80LsTIOd [SaUDTARAMGO TYPICAL INSPECTION PLAN = ama dial [avAC wets Duct System sanpscaotas | seapets Hvac —559 ISFB 10-01055-0006 AYC ‘0 DOCUMENT REVIEW — =] s (eaten Ss wow Prec erigeeare aes todas » Rea as, ee eee Wa Ree rae » eit | Se wow aan " 4 | ee 1 ed a fates seas a, | ws Ter evan Deke, Grane Rees 3a eepetaargrmens | HAE ip ilo | > eae menor, a Stone HoramaniPreevto, SAR SAE wis ‘rey nepteten Compas NIE 2 ouavarges en Seer (ekarg SAC. SAC & ‘Sena hanes be ies oso ty eer Bee v | Some ” Seaoer noun ae ew be See ene a SEO Oren Bo w | wiser nea a ” ve Aenean ingen WEES wow » exemmlomentrmcenmee we, ae, wwe) Settomstemaen enone a Eo os Setanta nen Fe Dampe Fanon Test ee | ae How T-fapaases at cguames asus tapes tne oma 3 i Gort neat eee int Succ ei SNS nav ee te eM ered Kes Tes — Page tet west? “636Pu [SAUDI ARAMCO INSPECTION CHECKLIST [Metal Duct Insulation Installation SAIC-K-4015 30-Apr-13 Hvac —559, isee 10-01056-0006, ave aT =a. = ae Leet a ot wseieg nrc oer Tne 30/n/20r7 § 3:30PM ‘30/M (207 § 3'30PM) far” 9 3s etc TNE roRrcaaGaT jieraniconarroram: San OR ar wa Ww ne Acceptance enema REFERENCE | PASS FAL WA REMSPOATE ‘Ducts shal be inguated in accordance wih he Uniform Mechanical (Code. Saul Aramco Mechanical (HVAC) Code (SAES-K-100) and the fotiowing: 1) All elum air ducts, located outdoors ar exposed to unconditioned air, shal be insulate, 2) All Supply ducts shall be insulated AY 3) Allexposed insulate cucts shal be protected in ‘accordance wih 48.135. 4)Rowmn ae ducts shell be insulated Exception Insulation is not required for fetun air ducts which ate located in a ceiling space, where both sides ofthe caling space are exposed to andttoned air andthe cing space is nol used 26 a relury air plenum ‘AZ Duct joints shall be sealed prior to insulation. (SMACNA Para S 1.9) al the intervals specified in the constuction drawings or specications shall be used ine installation of te duct insulation, UMC 1987 para 608.3 Intemal duct ring of fibrous material shal ol be used. Only NEPA ‘ated closed cell material shall be permitted wth prior approval of the HVAC Standards Committee Chatman Exception: 'M_ ‘boxes and aichanding units. This ner shal iid protective coeting Lining shal be insted in accordance with tho laestroauraments of 'SMACNA ~ Duct Linrinsalaion Metal nosing or sleeves shal bo ‘instal over exposed duct ner edges thas opposite 10 the deection of arfow er minute (10.2 ms) shall be fastened wh both adhesive and ‘AS Nole: Air velocities may be read rom the cortract specication or volocty atthe concerned duct section (a) shal he provided by SAPMT trough designers ‘ag Ducts shall be insulated in accordance with Table 6:0 ofthe Uniform Mechanical Code, See atlcnment no. 1 Mechanical fasteners, achesive, tapes, metal sraps or any ether means Fibrous Intra ting complying with UL 18% is permite for air ternal to prevent erosion, conasion, and growth of mots, bacteria ard fungus. Duct ners in systems operating wih ar elocties exceeding 2.000 fest ‘mechanical fasteners and n accordance wth SMACNA Liner instalation. Drawings However, he air veloctes are not shown, the expected air SAES--001 Paraaiss SAES-K-001 Paae125 SAESK-100 Paes SAES-K001 8132 SAES-K-100 Section 1 SAES.K001 Para4813.1 0 ¥~ Page 1 of 1 SAUDI ARAMCO INSPECTION CHECKLIST ee ee ae [Metal Duct insulation Installation SAIC-K-4015 30-Apr-13 HVAC ~ 959 ISFB 10-01055-0006 AYC Insulate nstaed cudoor shall be protected om mist an suight ‘a7 29radaion by an approved and acceptable method SAeS001 es (Materal and Motto shal be approved by Sout Aramco por Para 48.135 ppleaton) 1g, auton aed dors aba poet tom mechanical amoge SAES KAD, | by an approved and acceptable method. Para 48-136 Insulation apled tothe exterior surface of duct located in bulings shallhave a lame spread index of nat mare than 25, smoke deny AS index not excaeding 50 when tesied as 2 compost instalation including insulation, facing materal tapes and adhesive ae normally applied UMC 1997 para 004.3 SAES-K-100 Paracas Vv Insvlations for metal ducts shall be legibly printedidentiied withthe name of the manufacturer, the thermal resistance (R) value at installed thickness, and the fame-spread index and emoke-developed index of the composite material, UMC 1987 pare 64.4 ato trina ut nun ee cen old Nb ‘Pate eg pte orien at tonal gener so at hahes(otamejuh ne nanectie maracas be ber) | SASSOON we ‘resistance R-value at the specified installed thickness and the flame * ‘ex ad smcadevoupe dees ote coos ete (REMARKS: [REFERENCE DOCUMENTS: 1-SAES-K-001 ~ Design and Installation of Heating, Ventilation and Air Conditioning Systems, 10 March 2012 [2-SAES-K-100 ~ Saudi Aramco Mechanical Code, May 31, 2004 |S-SMACNA ~ HVAC Duct Construction Standards, Metal & Flexible, 2005 [é-Unitorm Mechanical Code (UMC), 2009 [arTacHMENTs 1. Table 6:D-Insulaton of Ducts Contractor / Third-Party Saudi Aramco [Construction Reprosentatve™ [PMT Representative es a Rear er SESS [itineeses: [NfocroadRaiems [Jer vite Zn oe Tete Ye 11 | 20e7 Jac inapectr Pio Represonatve hare remeron Persson [ron rteveniyrone | sen sone LI [Joe earns, [en vers oc sinennar ABS EH Hos soy |" ee Gyaieyis® s wofef Nave Oronaign, I'S insbes []Oe Rc Refs aoe is Page 1 of 1 SMOIARINCO BPO seuN 5 FEV Odes ae) nt sess [SAUDI ARAMCO INSPECTION CHECKLIST reer peerertteey Zane IMetal Duct insulation Installation SAIC-K-4015 34-Aug-11 HVAC ~.559 Attachment 4 -- 1997 UNIFORM MECHANICAL ‘TABLE 6.0- INSULATION OF DUCTS Ton aT why de aps cau agi a hana Se lo kat en edn th eto lat wAGR se win wal Co sig ce whee INSULATION Tvs AA mail ith anal xt W48 (272 Wk uals rari gol of mating he bore reas {xt an thou (gr) al sess i (13 mm 1S 3.4. 240 8 gt in rsh dct 4 pine (mm, 3 Bex 8 [Amn er Amal witha led omc 2436 or) oc te quake tm esta Examples of meri meting the above umes int... (06 gal Bake, int 28 m1 0 3B 24 ke) al ir ankt ct ier inh 28a, 310. 481014?) a her nod (Antti vital conduct 4016] ark ct vals hl essa of 63.1 (ky vues mai mig the ao guia $a tm Nu ge ia ike 1 yng my 5103 Fn, tor gin i Mak ic 1 pc 8m. 3a he 8 IA ie ch \ Nar etd Malwa om ag eal Spor 9 Pa), Asi te W-Apprve west ai Apex inp of merle areca litravalk hsneanddent emia wie etal tkcat roi hoi hyde tml ban (ek) nk Page 1 of 1 _ QMS # BI - PF) #559 fe —+N 9 © @ © © © © © 6 \ (Saeed PREM eter | unas | ater | mus | MEU pin seme esate pe b : i? git. ass , l Bit Se i I: fe A Soper tea in Be ‘ i He ’ : Be gu tele e, | 8. 62 By ck rz 60 OF of oy on om Se | Ge @ Ge Gp oe Se oe ves orice MLN) Counce satu ENLARGED HVAC LAYOUT OFFICES - 2ND, FLOOR 2e/Spf fr7 CONTROLLED GEEY Meza] Copy no 1.01! MLARGED HVAC LAYOUT [eFIcES 200 FLA. aint. euLoG~ 2m 12 OVERALL REFINING FACILITIES

You might also like