You are on page 1of 8
QMIS: RFI Entry Page 1 of 2 es) me coomteny Mal CuI EME Sue EM (Ger Foon sar] Rewsenuner Ge | ees | ere al RFI View (Work Inspected-Accepted) Project No 10-0105. 0008 Plan ‘Contractor RF Reference: AYCISFB HVAC 41 an! - ¢ Eng. Index : Project Prase:INSTALATION ‘SATIP Te: HVAC Meta uct Sse 1 SAIC Ret #:S4C4012 ‘ ‘SAIC Te: Ouct Hangers and Supports (rela fsteer et) contractor Ine. Lava: W Scheduled Insp. Date 11/01/2017 ‘Aramco Insp, Love! ‘Schad isp, Time: 280 PH - “ estpment 1 esefon OH i Sorta (nea (QC CHS A An A 1 Layout Drawing V5 001 Layo Drang Ra, NOS Purchase Ode Ne. Aramco Atv Wo3 Le Desxipton:6LD6, 270 DISPATOH OFFICE 6L.23/¢ 8) | RFT Description: Ou Hangers & Support Insalaton a per aached highighted own BLOG. 270 DISPATCH OFFICE (GL. 29/8) ' exceptions - ‘ = Gonacor Rape = 1 a ei ' = ¢ - PHT Reps = — = = f saor0 ples | a samy — Pa ' [FRAZEE [Pegi toren ins unten moon ote S = 4 ‘ATR Replies : =] ‘=e : . = = 2 ‘losing Comments: Dict Hangers an Suppor instal spcton was dove ad foun acceptable (loses Date: 1/4/2017 62428 a8 httys://amis.aramco.com.sa:1001 1/qmisv4/site/r_rfi_view.asp?1_serial_no=10835219 11/6/2017 QMIS: RFI Entry Page 2 of 2 orf hon Pea so or ere net Geyser Vos A na | SM ‘para Sosy ns POA. i_view.asp?I_serial_no=10835219 11/6/2017 https://qmis.aramco.com.sa: 1001 1/qmisv4/site/r_1 REQUEST FOR INSPECTION Savin 7172 118) 2820) spe Dap masacpusosws seine Ad} 1001055 _J0 J0n1s6000€ Prase__CONST. _ Tae _ISFB/ NOJSTRAL SUPPORT FACIITES BURONG TecPrjects pete UWA, F. 8 GARABLES Colom ein, ene, oes. eet __ over vn insetnotenatng route on ate) ON I / 2p sin) 240M pre DUCT HANGTRR § SUPPORTS fertettonigesiovenipnet JNISTALLATION FOr SUPPLY AR QI @ BLES. 270 DISpATOH wer Pumtegaes — (es Proje uty Pan [ol Pie [SAP eprecniave has vied fal he works ead for nspesion (CONTRACTOR vere Pathe we be npected and conforms toh rectrequreret ‘scanple and compare wh he elowng spestcetns: JOHN LORD SAESSANSOner# sAgs-K-001-0 (S410 -K- 4012. CcntactCempany _ALVAWAMA COMPANY JONOC Name _cHAIS PANGAN wa Senaure Ake: pas /1/7 ‘Ths orm raved by the vsersgedIspecinn Deparent enpbee: Name Mc FERNAND 8, GARABLES Syravie f coe A LIN) QT tie [NOTE nspeco’s sanatue or receiving hs request oriy and olor approval or ibpreva of he wark tact inspected. Dison; &,Orginal-Prjeet Management B.tstCopy- pectin 6.208 Copy Contac: [SAUDI ARAMCO TYPICAL INSPECTION PLAN. ee pan [HVAC Metal Ouet System samipc-oot-o3 | s0-apet3 Hvac ~ 44] Cn ISEB roorossa0s | AY. Te eam cna ae tts ean Since minder irecrrontoavee (Seeson deetonstaccen ee ae ferwruaang est ee oboe tal pase: ee | ete H (ina ae ny amar > Mes, OAS guna hl inet esa Vitons Ht se fen topan 6 Sha ORO RTT AEE + fee vacenineron ste est gt apencr tn ave, een ea eam Pe Pe ON apn petra ee 5 i rea nein rd apa eos Penn rin ate ded wma a aR Torn tad Rae OO ramen Ta inter epeavTat xe opr Sauna ‘ener 1s eves toon Paget ot sonaianr7 "a712 [AS assembly shall be select to avo siructural fur of closure fare in the duct. (UMC Para, 6.208 A) Section 1 The Support eyetem shall nl cause corion by galvanic action at points of eontact wih the duct AT (UNC Para 6204 F) saes.c100 Noe: Corrasion by galvanic action occurs when dissimiar mets are io contact with each other The support system shal not penetrate enclosures containing fuds or AS lolecttical wring in uch a manner to create a hazard (UMC Pars. 6.2046) The suppor eystom shall penetrate a bearing momberin such a Ag. |manner a8 to cause exceesive landing on he member (UMC Para.6.2046) ‘When Ducis ae supporied from wal hey shal be located against he ‘A10_ wall or maximum of 2" away rom wall Weld, bolt or No. 8 (Min) screw ‘may be used as fasteners. (SMACNA FIG 5.9 Note No.2) SAES--100 Section Sy [ST AN TSS AEN VPS sAzscoot Pera 48.12.66 A Page 1 of 1 [SAUDI ARAMCO INSPECTION CHECKLIST ‘aces Pere ees. [Metal Duct Hangers and Support Installation SAIC-K-4012 30-Apr-13 «HVAC - 4.4] SFB |10-01055-0008 AYC Sao SIREN DRCRTOR TEAC STS RT “Metal Duct Hanger Support vee Sos 001 i - ‘ O/ I 2017 ¢ 240% ary" 4"2:40) "SAUDI ARAMCO USE ONLY mar A Recreate "WO" PERT REOUE K.001.03 a4 Jnuoisemconsrecron tev ONTRNETOR REPECTON LEVEL NIA w Trew He ACCEPTANCE CRITERIA REFERENCE | PASS FAIL NIA_REANEP DATE| Rectangular duct supports. Svppors for rectenguler duct 8 se forth ‘ayn Table 87 when suspended remabove shel nates sassy ‘opposite sides ofeach dict and shal be veld, bolted or metal Section 6042 ‘Seemed te each side of he gt a at mere han th nerval species Horizontal round duct supports. Horizonlal round ducts 40 inches (10t6 mm) eles i lamater when suspended fom above shall be Supported at nerva's not more than as setferthin Table 67 wih one _SAES-K-100 v han installed 6 comply wih he requirements sted below. Section 6042.4 + Ducts shal be eouipped wt etiting eel bands extending ‘round the ene permaer of he duct teach species Suppor ner a se i 2. Greular bends shal not be less than 1 inch (25mm) wie nor " SAES-K-100 7 less than equivalent tothe gage ofthe duct tera it supports. Section 604.22 8. Each creuiar band shal be provided wih a sutable means of ‘SAES-K-100 / ‘connecting tothe suspending support. Section 604.23 SAES-K-100 4 Ducts hat be braced and oye prevent ral or horzoial wns. Son tot? « ‘a3 Hotizontal Duct shall have @ support wihin Wo feet ofeach elbow and SAES-K.001 within 4 feet of each branch intersection (SMACNA Para 8.11) Para 68.128 ‘ag Conerte inane shal be instaledbelore the concrete is poured [SAES-K.001 (SMACNA Para. 5.21) Para 48.12.56 ‘as. Concrete fstorers shal be installed ater the conrels has been poured _SAES-K.001 |and the forms have been removed. (SMACNA Para, 522) Para 48.12.60 The support specing interval and method of conact wth the duct qe SAUD! ARAMCO INSPECTION CHECKLIST pores eee = [Metal Duct Hangers and Support Installation SAIC-K-4012 30-Apr-43 HVAG ~ 4.44 ISFB 10-01055-0006 AYC eM ACCEPTANCE CRITERIA REFERENCE PASS FAL WA _REINSP DATE FasTener (io supporing ducts Far wall) shal be cated with T of he ‘ary. (dict edge (val side) and within 2 ofthe duct outer edge. Minimum of 9 SAESK-00t | op ‘on 24" width and up is required in addition along sides nearest anchors. Para 4.8.12.56 | | (SMACNA FIGS.) at Rectangular duc risers rom for shall be supported by angles (channels secured the sides of duct wih welds, bots, sheet metal ‘sctows. or blind rivets. (SMACNA Para 6 2.10) va te: conan 1 he spacing ofthe fasteners are nol specied/shown, then spacing | Pare 48.126 Shall be as inshucted by Saud) Aremco. 2-Angle sizes and ther spacing shal be as shown onthe Construction ‘Drawings, ithey are nol shown / specie, then sizes and spacing sha | be as instuctedbySaudl Aramco Round Ducis rise tom floor shal be supparte by split bend support by supplemental angle or channel spanning the slab opening ras recommended by te manufacturer, Mrimurn of two fasteners in each haf of bang require. (SMACNA FIG. 5-70) SAES-K.001 AI Note Paaaai2se 7 No, of fasteners and spacing shall be as shown in Construction ‘rewings. If Constuction drawings do not address the number of the fasteners and/or spacing of them then the number ofthe fasteners and ‘spacing shall be as insructed by Saucl Aramco (SMACNA FIG 5-10) ‘Riser suppor intervals should be at one or two storey intervals as suitable for loading. Load can be ansferes tothe riser support By _angles or by rods. (SMACNA Para 6.2.10) aa SAES--001 Para 48.12.56 (REMARKS: [REFERENCE DOCUMENTS: 2-SAES-K-100 Saudi Aramco Mechanical (HVAC) Code, 34 May 2004 |¢-Uniform Mechanical Code (UMC), 2009 }-SAES-K.001 ~ Design and Installation of Heating, Ventilating and Air Conditioning Systems, 10 March 2012 S-SMACNA-- HVAC Duct Construction Standards, Metal & Flexible, 2005 Fourth Edition [ATTACHMENTS: 1 -Table 6-£-Duct Supports Contractor / Third-Party [Construction Representative we Nae. itt ana ae | PAT Reieoemai vanes [_] Werke None otal rote ee ys, obper lac inspector [OC Supervisor ane, Sign and Oa PID Representative |Proponent and oH “asso oe. ere ees aS ee rinsed [Joe rea RITE Page 1 of 1 [SAUDI ARAMCO INSPECTION CHECKLIST eae Metal Duct Hangers and Support Installation SAIC-K-4012 30-Apr13 HVAC ~ 4.4) Attachment 1 -- 1997 UNIFORM MECHANICAL CODE tauces ott Sioa A vertet Dect — — wees! |e me Spat ye erry = | eae | Seca nere. ratarsor_ [eT eben =o. Baanearcat| a | eas Het anniieeas [Tar =s| sae Sire B. Horizontal Ducts: = = | Ga anm | eemaae rE we Sree endear arias - Perales mndeder ran /e mele oe a SSeS = Page 1 of 1 Hvac_Lavour * SE OREAT F SRRT FODH DESCRIPTION El Epa SAUDI ARABIAN OiL COMPANY wae LAYOUT ihe DISPATCH OFFICE TRANSPO. FAC. OVERALL REFINING FACILITIES ara S200) eas | [595] & | va-4306%4 1001 bors? BEE Hvac ROOF Layout Ey = T T (aesraierep) ety cn

You might also like