QMIS: RFI Entry Page 1 of 2
es) me coomteny Mal
CuI EME Sue EM
(Ger Foon sar] Rewsenuner Ge | ees | ere al
RFI View (Work Inspected-Accepted)
Project No 10-0105. 0008 Plan
‘Contractor RF Reference: AYCISFB HVAC 41 an!
- ¢
Eng. Index
: Project Prase:INSTALATION
‘SATIP Te: HVAC Meta uct Sse
1 SAIC Ret #:S4C4012 ‘
‘SAIC Te: Ouct Hangers and Supports (rela fsteer et)
contractor Ine. Lava: W Scheduled Insp. Date 11/01/2017
‘Aramco Insp, Love! ‘Schad isp, Time: 280 PH
- “
estpment 1 esefon OH i Sorta (nea (QC CHS A An A
1 Layout Drawing V5 001 Layo Drang Ra, NOS Purchase Ode Ne.
Aramco Atv Wo3
Le Desxipton:6LD6, 270 DISPATOH OFFICE 6L.23/¢ 8)
| RFT Description: Ou Hangers & Support Insalaton a per aached highighted own BLOG. 270 DISPATCH OFFICE (GL. 29/8) '
exceptions
- ‘
= Gonacor Rape =
1 a ei '
= ¢
- PHT Reps =
— = =
f saor0 ples |
a samy — Pa '
[FRAZEE [Pegi toren ins unten moon ote
S = 4
‘ATR Replies : =]
‘=e :
. = = 2
‘losing Comments: Dict Hangers an Suppor instal spcton was dove ad foun acceptable
(loses Date: 1/4/2017 62428 a8
httys://amis.aramco.com.sa:1001 1/qmisv4/site/r_rfi_view.asp?1_serial_no=10835219 11/6/2017QMIS: RFI Entry Page 2 of 2
orf hon Pea so or
ere net Geyser Vos A na | SM
‘para Sosy ns POA.
i_view.asp?I_serial_no=10835219 11/6/2017
https://qmis.aramco.com.sa: 1001 1/qmisv4/site/r_1REQUEST FOR INSPECTION
Savin 7172 118) 2820) spe Dap masacpusosws seine Ad}
1001055 _J0 J0n1s6000€ Prase__CONST. _ Tae _ISFB/ NOJSTRAL SUPPORT FACIITES BURONG
TecPrjects pete UWA, F. 8 GARABLES Colom ein, ene, oes. eet __ over vn
insetnotenatng route on ate) ON I / 2p sin) 240M pre DUCT HANGTRR § SUPPORTS
fertettonigesiovenipnet JNISTALLATION FOr SUPPLY AR QI @ BLES. 270 DISpATOH
wer Pumtegaes — (es Proje uty Pan [ol Pie
[SAP eprecniave has vied fal he works ead for nspesion (CONTRACTOR vere Pathe we be npected
and conforms toh rectrequreret ‘scanple and compare wh he elowng spestcetns:
JOHN LORD SAESSANSOner# sAgs-K-001-0 (S410 -K- 4012.
CcntactCempany _ALVAWAMA COMPANY
JONOC Name _cHAIS PANGAN
wa Senaure Ake: pas /1/7
‘Ths orm raved by the vsersgedIspecinn Deparent enpbee:
Name Mc FERNAND 8, GARABLES Syravie f coe A LIN) QT tie
[NOTE nspeco’s sanatue or receiving hs request oriy and olor approval or ibpreva of he wark tact inspected.
Dison; &,Orginal-Prjeet Management B.tstCopy- pectin 6.208 Copy Contac:[SAUDI ARAMCO TYPICAL INSPECTION PLAN. ee pan
[HVAC Metal Ouet System samipc-oot-o3 | s0-apet3 Hvac ~ 44]
Cn ISEB roorossa0s | AY.
Te eam
cna ae tts ean
Since minder
irecrrontoavee
(Seeson deetonstaccen ee ae
ferwruaang
est ee oboe
tal pase: ee | ete H (ina ae ny amar
> Mes, OAS guna hl inet esa Vitons Ht se fen topan 6 Sha ORO RTT AEE
+ fee vacenineron ste est gt apencr tn ave, een ea eam Pe Pe ON apn petra ee
5 i rea nein rd apa eos Penn rin ate ded wma a aR
Torn tad Rae OO ramen Ta
inter epeavTat xe opr Sauna
‘ener 1s eves toon
Paget ot
sonaianr7 "a712[AS assembly shall be select to avo siructural fur of closure fare in
the duct. (UMC Para, 6.208 A) Section 1
The Support eyetem shall nl cause corion by galvanic action at
points of eontact wih the duct
AT (UNC Para 6204 F) saes.c100
Noe: Corrasion by galvanic action occurs when dissimiar mets are io
contact with each other
The support system shal not penetrate enclosures containing fuds or
AS lolecttical wring in uch a manner to create a hazard
(UMC Pars. 6.2046)
The suppor eystom shall penetrate a bearing momberin such a
Ag. |manner a8 to cause exceesive landing on he member
(UMC Para.6.2046)
‘When Ducis ae supporied from wal hey shal be located against he
‘A10_ wall or maximum of 2" away rom wall Weld, bolt or No. 8 (Min) screw
‘may be used as fasteners. (SMACNA FIG 5.9 Note No.2)
SAES--100
Section
Sy [ST AN TSS AEN VPS
sAzscoot
Pera 48.12.66 A
Page 1 of 1
[SAUDI ARAMCO INSPECTION CHECKLIST ‘aces Pere ees.
[Metal Duct Hangers and Support Installation SAIC-K-4012 30-Apr-13 «HVAC - 4.4]
SFB |10-01055-0008 AYC
Sao SIREN DRCRTOR TEAC STS RT
“Metal Duct Hanger Support vee Sos
001 i - ‘
O/ I 2017 ¢ 240% ary" 4"2:40) "SAUDI ARAMCO USE ONLY
mar A Recreate "WO" PERT REOUE
K.001.03 a4
Jnuoisemconsrecron tev ONTRNETOR REPECTON LEVEL NIA
w
Trew
He ACCEPTANCE CRITERIA REFERENCE | PASS FAIL NIA_REANEP DATE|
Rectangular duct supports. Svppors for rectenguler duct 8 se forth
‘ayn Table 87 when suspended remabove shel nates sassy
‘opposite sides ofeach dict and shal be veld, bolted or metal Section 6042
‘Seemed te each side of he gt a at mere han th nerval species
Horizontal round duct supports. Horizonlal round ducts 40 inches
(10t6 mm) eles i lamater when suspended fom above shall be
Supported at nerva's not more than as setferthin Table 67 wih one _SAES-K-100 v
han installed 6 comply wih he requirements sted below. Section 6042.4
+ Ducts shal be eouipped wt etiting eel bands extending
‘round the ene permaer of he duct teach species Suppor ner
a se i
2. Greular bends shal not be less than 1 inch (25mm) wie nor " SAES-K-100 7
less than equivalent tothe gage ofthe duct tera it supports. Section 604.22
8. Each creuiar band shal be provided wih a sutable means of ‘SAES-K-100 /
‘connecting tothe suspending support. Section 604.23
SAES-K-100
4 Ducts hat be braced and oye prevent ral or horzoial wns. Son tot? «
‘a3 Hotizontal Duct shall have @ support wihin Wo feet ofeach elbow and SAES-K.001
within 4 feet of each branch intersection (SMACNA Para 8.11) Para 68.128
‘ag Conerte inane shal be instaledbelore the concrete is poured [SAES-K.001
(SMACNA Para. 5.21) Para 48.12.56
‘as. Concrete fstorers shal be installed ater the conrels has been poured _SAES-K.001
|and the forms have been removed. (SMACNA Para, 522) Para 48.12.60
The support specing interval and method of conact wth the duct qeSAUD! ARAMCO INSPECTION CHECKLIST pores eee =
[Metal Duct Hangers and Support Installation SAIC-K-4012 30-Apr-43 HVAG ~ 4.44
ISFB 10-01055-0006 AYC
eM ACCEPTANCE CRITERIA REFERENCE PASS FAL WA _REINSP DATE
FasTener (io supporing ducts Far wall) shal be cated with T of he
‘ary. (dict edge (val side) and within 2 ofthe duct outer edge. Minimum of 9 SAESK-00t | op
‘on 24" width and up is required in addition along sides nearest anchors. Para 4.8.12.56 | |
(SMACNA FIGS.) at
Rectangular duc risers rom for shall be supported by angles
(channels secured the sides of duct wih welds, bots, sheet metal
‘sctows. or blind rivets. (SMACNA Para 6 2.10)
va te: conan
1 he spacing ofthe fasteners are nol specied/shown, then spacing | Pare 48.126
Shall be as inshucted by Saud) Aremco.
2-Angle sizes and ther spacing shal be as shown onthe Construction
‘Drawings, ithey are nol shown / specie, then sizes and spacing sha |
be as instuctedbySaudl Aramco
Round Ducis rise tom floor shal be supparte by split bend support by
supplemental angle or channel spanning the slab opening ras
recommended by te manufacturer, Mrimurn of two fasteners in each
haf of bang require. (SMACNA FIG. 5-70)
SAES-K.001
AI Note Paaaai2se 7
No, of fasteners and spacing shall be as shown in Construction
‘rewings. If Constuction drawings do not address the number of the
fasteners and/or spacing of them then the number ofthe fasteners and
‘spacing shall be as insructed by Saucl Aramco (SMACNA FIG 5-10)
‘Riser suppor intervals should be at one or two storey intervals as
suitable for loading. Load can be ansferes tothe riser support By
_angles or by rods. (SMACNA Para 6.2.10)
aa
SAES--001
Para 48.12.56
(REMARKS:
[REFERENCE DOCUMENTS:
2-SAES-K-100 Saudi Aramco Mechanical (HVAC) Code, 34 May 2004
|¢-Uniform Mechanical Code (UMC), 2009
}-SAES-K.001 ~ Design and Installation of Heating, Ventilating and Air Conditioning Systems, 10 March 2012
S-SMACNA-- HVAC Duct Construction Standards, Metal & Flexible, 2005 Fourth Edition
[ATTACHMENTS:
1 -Table 6-£-Duct Supports
Contractor / Third-Party
[Construction Representative
we
Nae. itt ana ae |
PAT Reieoemai
vanes [_] Werke
None otal rote ee ys, obper
lac inspector
[OC Supervisor
ane, Sign and Oa
PID Representative
|Proponent and oH
“asso oe.
ere ees
aS ee rinsed [Joe rea
RITE
Page 1 of 1[SAUDI ARAMCO INSPECTION CHECKLIST eae
Metal Duct Hangers and Support Installation SAIC-K-4012
30-Apr13 HVAC ~ 4.4)
Attachment 1 --
1997 UNIFORM MECHANICAL CODE
tauces
ott Sioa
A vertet Dect
—
—
wees! |e me
Spat ye
erry = | eae
| Seca nere.
ratarsor_ [eT eben
=o.
Baanearcat| a | eas
Het anniieeas [Tar =s| sae
Sire
B. Horizontal Ducts:
=
= | Ga anm | eemaae rE
we Sree endear arias
- Perales mndeder ran /e mele
oe a SSeS
=
Page 1 of 1Hvac_Lavour
*
SE OREAT F SRRT
FODH DESCRIPTION
El
Epa
SAUDI ARABIAN OiL COMPANY
wae LAYOUT ihe
DISPATCH OFFICE TRANSPO. FAC.
OVERALL REFINING FACILITIES
ara S200) eas |
[595] & | va-4306%4 1001 bors?
BEE
Hvac ROOF Layout
Ey
= T T (aesraierep) ety cn