PEL
PURCHASE ORDER
Pak Elektron Limited
Works: ‘4m, Forozopur Road, GPO Box No.1814 Lahore-4760, Pakstan
Te ona s5@20801.59
FAK 002-42-36840950
EMAIL
Ghigo (Hong Kong) Trading Co Limited
Unit 08, 197°, Green Filed Tower Concordia Plaza,
4’ Museum Road Tsimshatsui KL
Hong Kong
PO
No
Date:
Revision No.
Date:
Your Reference:
Dat
AG 3764
08-FEB-2015
‘AA150128001YA
28/01/2015
We are pleased to place this order, subject to the conditions here on, all other attachments hereto and inthe letter of credit, for
the material described below
CONDENSOR CONSIST OF FLOWING PARTS
‘CONDENSOR (FLAT)
CONDENSOR STRIP
SUCTION PIPE
DISCHAGE PIPE
CAPPILARY ASSEMBLY
INTAKE PIPE
LIQUID COLLECTING PIPE
No [Dascription | HS Code Quantity) UOWT Unit Price) “Amount
' usd uso}
Parts / Components for Split Type Ait
Conditioner (Wall Mounted) — Desire Infinite Series
COVER FOR INNER BODY WITH LOUVER
1 PSAC 12K 8415,9030 330.00 NOS 12.0000 3,960.09)
2 PSAC 18K 8415,9030 693.00 NOS 18,0000 12,474.00)
3 PSAC 24k 8415.9030 77.00 NOS 22,0000 1,694.00)
CONDENSER KIT (DETAIL LIST ATTACHED)
4 PSAC 12K 8415,9029 330.00 NOS 16,0000 5,280.09]
5. PSAC 18K 8415,9029 693.00 NOS 22.6000 15,681.80)
6 PSAC 28K 8416,9029 77.00 NOS 28,0000 2,233.00)
For Pak Elektron Limited
4
(Muhammad Hanif Anm
Sr. Manager (FP)
PageT osPEL PURCHASE ORDER
Pak Elektron Limited
Works 1m, Ferozepur Road, GPO Gox No 1614 Lahore-54760, Pakistan
Tet ogo. asoues 50
FAX (on2-42.5870159
Ghigo (Hong Kong) Trading Co Limited PONS Re a768
Unit 08, 191, Green Filed Tower Concordia Plaza, Date: 09.FEB-2015
4 Museum Road Tsimshatsui KL Revision No.
Hong Kong pea
Your Reference: AA150128001YA
Date: 28/01/2015,
We are pleased to place this order, subject to the conditions here on, all other attachments hereto and in the letter of credit, for
the material described below:
CONNECTING PIPE
7 PSAC 12K, 18k 8416.9099 1023.00 SET 4.0000 4,092.09]
8 PSAC 24k 8415.9099, 77.00 SET 6.0000 462.0
tom Total uso 45,856.80]
TOTAL FOB NANSHA OR SANSHAN usp 45,856.80)
Note:-
= 1% Spare Parts FOC
= Consignments will be dispatched through our nominated Shipping Line / Freight Forwarder.
For Pak Elektron Limited
a
[Muhammad Hanif Anmed]
Import & Logistics Manager ‘Sr. Manager (F.P)
Page ZaleP.O No: AC - 3764
TERMS AND CONDITIONS:
‘These terms and conditions are an integral part of this Purchase Order.
1. PRICE
‘The Price mentioned above is net for delivery FOB NANSHA OR SANSHAN
2. COUNTRY OF ORIGIN: China
3. SHIPMENT: Week 12, 2015
4, MODE OF PAYMENT.
Through LC at Sight
LIC will be opened before shipment
5. INVOICING INSTRUCTIONS:
Invoice and Packing List should be made in the name of PAK ELEKTRON LIMITED. The Invoice should indicate
the quantity, description of material, rate as per our purchase order, while the packing list should clearly indicate
the marking, dimension, gross & net weight, total number of packages and volume and exact contents of each
package.
6. The following non-negotiable documents must be FAXED to us immediately after shipment of material,
Followed by copies dispatched to us by COURIER.
a) Invoice 40d
bb) Packing List (showing contents of each package) old
C) Bill of Lading /Airway Bill (showing Freight Prepaid) 4 fold
7. ADDRESS OF CONSIGNEE:
PAK ELEKTRON LIMITED, 14 KM, FEROZPURE ROAD, LAHORE, PAKISTAN
8. INSURANCE
Insurance is covered by us in Pakistan, Please intimate full particulars of consignment to the Insurance Company
after shipment of material. The name of the Insurance Company will be advised in the letter of credit.
9. ORDER CONFIRMATION:
(Order confirmation, in duplicate, should be sent to us immediately on receipt of this Purchase Order.
10. Goods should be strietly according to the specification in Purchase Order
44..In Case of containerized shipment 14 days "free time" at designation port should be negotiated and must be
mentioned on Bill of Lading
12. Following shipping ines are being restricted of movement for PEL’'s shipments:
(i) Emirates Line (2) Mexicon (3) TS Line (4) UASC (5)CMACGM (6) Perma Shipping Line
‘Their Bills of Lading shall not be accepted for negotiation purposes,
43. The Net and Gross weights mentioned on the packing list should be as per actual and physically verified. The|
ORIGINAL B/L must also show the exact gross weight, net weight ofthe consignment excluding Tare Weight of the
Container, in case the shipment rides upon House BIL, the Master B/L covering this shipment MUST also match the
Same information about GWT / Net weight of shipment as this information will be used for fling IGM at port of
discharge.
414.in Case that the specifications and quantty are not qualified, the seller shall replace such goods with the quali
‘goods in the corresponding quantity or pay compensation for sub-standard goods.
45. Original “Certificate of Origin China-Pakistan FTA" duly certified by competent Government authorities in China must
be dispatched with non-negotiable documents. Copy of the same must accompany origina documents,
For Pak Elektron Limited
aS ey
Trassawar Hanj Sahabyal) ‘(iuhamm¥a Hanif Anmedy”
Import & Logist{cs Manager ‘Sr. Manager (F.P)
Pages