Production Review Meeting Details Held on : 09.07.

2020

ContractNo  : B2002 Ledger    : Goodwatts WTE Ahmedabad Pvt Ltd


SaleOrderId : GWAPL BoilerNo :

Product Product DDR Date DDR LLI Date LLI RMA Date RMA DAS Date DAS Remaks SDO Date SDO DES Date DES Remaks
Code Description Remaks Remaks Remaks Remaks
107 Roof Tubes 30/07/2020 30/08/2020 16/01/2021

108 Water Wall 30/07/2020 30/08/2020 27/12/2021


Headers

117 Economiser 20/07/2020 31/08/2020 27/12/2020


Headers

118 Risers and 30/07/2020 30/08/2020 26/02/2021


Downcomers

160 Baffle Water 30/07/2020 30/08/2020 26/02/2021


Wall Panel -
Pass2

161 Baffle Water 30/07/2020 30/08/2020 10/02/2021


Wall Header

162 Super Heater 20/07/2020 31/08/2020 27/01/2021


Coils -Stage 1

163 Super Heater 20/07/2020 31/08/2020 26/02/2021


Coils -Stage 2

164 Super Heater 20/07/2020 30/09/2020 08/03/2021


Coils -Stage 3

Note: 1. DDR ‐ Design Document Releas 2. RMA ‐ Raw material Availability at Shop Page 1 of 5


e
3. DAS ‐ Sub Delivery Indent to purchase Departmen 4. SDO ‐ Sub Delivery Purchase order ordering date 
5. DES ‐ Manufacturing Rediness at Shop‐ Ready for Despatc
Product Product DDR Date DDR LLI Date LLI RMA Date RMA DAS Date DAS Remaks SDO Date SDO DES Date DES Remaks
Code Description Remaks Remaks Remaks Remaks
165 Super Heater 20/07/2020 30/10/2020 08/03/2021
Coils -Stage 4

166 Superheater 20/07/2020 30/08/2020 26/02/2021


Headers - Stage1

167 Superheater 20/07/2020 31/08/2020 26/02/2021


Headers - Stage2

168 Superheater 20/07/2020 31/08/2020 08/03/2021


Headers - Stage3

169 Superheater 20/07/2020 30/09/2020 08/03/2021


Headers - Stage4

170 Economiser 20/07/2020 31/07/2020 27/12/2020


Coils - Block 1

171 Economiser 20/07/2020 31/07/2020 27/12/2020


Coils - Block 2

172 Economiser 20/07/2020 31/08/2020 27/12/2020


Coils - Block 3

173 Economiser 20/07/2020 31/08/2020 27/12/2020


Coils - Block 4

174 Economiser 20/07/2020 30/09/2020 27/12/2020


Coils - Block 5

175 Economiser 20/07/2020 30/09/2020 27/12/2020


Coils - Block 6

Note: 1. DDR ‐ Design Document Releas 2. RMA ‐ Raw material Availability at Shop Page 2 of 5


e
3. DAS ‐ Sub Delivery Indent to purchase Departmen 4. SDO ‐ Sub Delivery Purchase order ordering date 
5. DES ‐ Manufacturing Rediness at Shop‐ Ready for Despatc
Product Product DDR Date DDR LLI Date LLI RMA Date RMA DAS Date DAS Remaks SDO Date SDO DES Date DES Remaks
Code Description Remaks Remaks Remaks Remaks
207 Peep Holes, 30/09/2020 31/10/2020 28/02/2021
Manhole Doors

310 Economiser 30/09/2020 30/09/2020 27/12/2020


Casing

312 Buckstays 30/09/2020 31/10/2020 29/01/2021

315 Blow Down Tank 30/08/2020 31/10/2020 30/03/2021

323 Deaerator 30/08/2020 31/10/2020 30/03/2021

324 Deaerator 30/08/2020 31/10/2020 30/03/2021


Storage Tank

350 PRDS Piping 28/11/2020 29/12/2020 28/05/2021

352 Main Steam 28/11/2020 29/12/2020 28/05/2021


Piping - External

370 Soot Blower 28/11/2020 29/12/2020 28/05/2021


Piping

371 Steam Piping for 28/11/2020 29/12/2020 28/05/2021


SCAPH

101 Steam Drum 20/07/2020 sv stub size 20/07/2020 31/12/2020 plate plus 5
09.07 months, sep
end dish end

Note: 1. DDR ‐ Design Document Releas 2. RMA ‐ Raw material Availability at Shop Page 3 of 5


e
3. DAS ‐ Sub Delivery Indent to purchase Departmen 4. SDO ‐ Sub Delivery Purchase order ordering date 
5. DES ‐ Manufacturing Rediness at Shop‐ Ready for Despatc
Product Product DDR Date DDR LLI Date LLI RMA Date RMA DAS Date DAS Remaks SDO Date SDO DES Date DES Remaks
Code Description Remaks Remaks Remaks Remaks
119 Attemperator 30/07/2020 nozzle 31/10/2020 28/02/2021

120 Integral Piping 30/07/2020 31/10/2020 30/03/2021

121 Auxiliary Piping 28/11/2020 29/12/2020 28/05/2021

122 Feed Delivery 28/11/2020 31/10/2020 14/04/2021


Piping

123 Main Steam 30/07/2020 31/10/2020 30/03/2021


Piping

126 Pressure Part 16/09/2020 16/09/2020 14/01/2021


Attachments

127 Evaporator Coils 30/07/2020 30/08/2020 26/02/2021

133 Evaporator 30/07/2020 30/08/2020 26/02/2021


Headers

134 Feed Suction 28/11/2020 29/12/2020 28/05/2021


Piping

138 Spray Water 28/11/2020 29/12/2020 28/05/2021


Piping

141 Headers 30/07/2020 30/08/2020 10/02/2021

Note: 1. DDR ‐ Design Document Releas 2. RMA ‐ Raw material Availability at Shop Page 4 of 5


e
3. DAS ‐ Sub Delivery Indent to purchase Departmen 4. SDO ‐ Sub Delivery Purchase order ordering date 
5. DES ‐ Manufacturing Rediness at Shop‐ Ready for Despatc
Product Product DDR Date DDR LLI Date LLI RMA Date RMA DAS Date DAS Remaks SDO Date SDO DES Date DES Remaks
Code Description Remaks Remaks Remaks Remaks
148 Front Wall 30/07/2020 30/08/2020 16/01/2021
Panels - Pass1

149 Front Wall 30/07/2020 30/08/2020 26/02/2021


Panels - Hopper

150 Side Wall 30/07/2020 30/08/2020 16/01/2021


Panels- Pass1

151 Side Wall 30/07/2020 30/08/2020 16/01/2021


Panels- Pass2

152 Side Wall 30/07/2020 aug 1 week 30/08/2020 16/01/2021


Panels- Pass3 approval

153 Side Wall 30/07/2020 30/08/2020 26/02/2021


Panels- Hopper

155 Rear Wall 30/07/2020 30/08/2020 26/02/2021


Panels - Pass1

156 Rear Wall 30/07/2020 30/08/2020 26/02/2021


Panels - Pass2

157 Rear Wall 30/07/2020 30/08/2020 26/02/2021


Panels - Pass3

158 Rear Wall 30/07/2020 30/08/2020 26/02/2021


Panels - Hopper

159 Furnance Exit 30/07/2020 30/08/2020 26/02/2021


Screen Tubes
with Headers

Note: 1. DDR ‐ Design Document Releas 2. RMA ‐ Raw material Availability at Shop Page 5 of 5


e
3. DAS ‐ Sub Delivery Indent to purchase Departmen 4. SDO ‐ Sub Delivery Purchase order ordering date 
5. DES ‐ Manufacturing Rediness at Shop‐ Ready for Despatc