1. Introduction - What
is Test Management?
2. Test Planning and
Estimation
3. Test Progress
Monitoring and
Control
4. Risk-Based Testing
• Resources
• Documentation templates
• Metrics
• Level of detail
✔ Visibility, transparency
✔ Percentage of work done (preparation,
execution)
✔ Defects metrics (density, fixed)
✔ Coverage
Test Reporting
Test Control
Project Risks
• Organizational (training, personnel)
• Technical (requirements, environment)
• Supplier (contractual, 3rd party failure)
Product Risks
• Requirements
• Defects
• Performance
Tool:
https://tree.taiga.io/project/dragosdragan-tas-2020/issues
User: sebi.draghici+ase@qualitance.com
Pass: ASEtas2019
Obiective:
- Citiți specificațiile din pagină.
- TestRail: Scrieți cel puțin 2 teste pentru fiecare tip de parcare din
specificații.
- Testrail: Folositi Boundary Value Analysis și alte tehnici de la cursul
anterior ☺
- TestRail: Executați testele
- Taiga: Logați defecte ( Scrieți-vă numele în titlu sau descriere). Nu uitați să
adăugați un link în TestRail cu id-ul defectului pentru a le lega.
1. Introduction - What is
Test Management?
2. Test Planning and
Estimation
3. Test Progress
Monitoring and
Control
4. Risk-Based Testing