You are on page 1of 2

CEMENTING

FO™ Multiple-Stage Cementing System


The FO™ (full-opening) multiple-stage
cementer (or FO cementer) is used to place
any number of stages of cement or other
fluids outside a casing string at different
selected points along the casing. This tool is
operated manually and requires the use of a
drill or tubing string and the sleeve
positioner operating tools. These operating FO™ Stage
tools are available through Halliburton tool Cementer
FO Operating
departments as rental items. In addition, Positioners
they are also manufactured for customer
purchase.

These cementers are made of heat-treated


stock to a maximum hardness of RC 21.
FO cementers are suitable for use with H-40,
J-55, K-55, L-80, and N-80 grades of casing.
They can even be used in sour service Annular
applications (sour gas – H2S and sour oil) Casing
at any temperature. Packer
HAL30274

FO multi-stage cementer
Delta Stim®
Sleeve
The Halliburton series of FO(full-opening) cementing tools consists
of the following equipment:

• FO multiple-stage cementers

• Opening and closing sleeve positioners


Swellpacker®
• Standard isolation packers Isolation
System
• Port valve isolation packers

• RTTS™ circulating valves

• FO inflatable packer collars


Delta Stim®
Features Sleeve

The FO cementer has the following unique advantages:


HAL30273

• Any number of tools can be run in the same string.


• No plugs or seats must be drilled out at the cementer.
FO stage cementer shown in a typical off-bottom cementing
• Operators can open or close the tool whenever necessary. application where Delta Stim® sleeve collars, Swellpacker®
isolation system and annular casing packers are all run in a
• The tool can be used to test, treat, and evaluate a zone in the well single string.
before it is reclosed.
HALLIBURTON
Applications
FO cementers have the following applications:
• In addition to being used with combination strings, these cementers can
be used for selective water injection/production.
• If located across from a suitable uncemented zone, they can be used for
mud disposal.
• They can be used to perform inner-string cementing when used with
standard inner-string cementing equipment.
• The tool can be used to test, treat, and evaluate a zone in the well before
it is re-closed.
• Can be used in sour gas applications

HAL30278
Flow of well fluid through
positioner tool with port
isolation packer

Surface Pack-0ff
Requirements
When using standard
operating tools, a high
HAL30276

HAL30275

pressure surface pack-off


(QUICK-PAK™ or
QUICK-PAK casing head FO sleeve
positioner tool
similar) is required, and
when using operating
packers, a low pressure
For more information about the FO Multiple-Stage pack-off can be used.

Cementing System contact us at


HAL30277

cementing@halliburton.com.
FO sleeve positioner tool
with port isolation packer
www.halliburton.com

H06768 3/09
© 2009 Halliburton
Sales of Halliburton products and services will
be in accord solely with the terms and conditions
HALLIBURTON
All Rights Reserved contained in the contract between Halliburton and
Printed in U.S.A. the customer that is applicable to the sale.

You might also like