You are on page 1of 1
[ KAPCO G.T-P-S Combined Cycle Power Plant (CCPP) 1600MW, Punjab, Pakistan (1 Year) The technical training consists of four months classroom training on Gas Turbine, Steam Turbine and Electrical Systems, five months on site training in Operation Department and 3 months in Maintenance Department. i ssr001 -05-2017 to 02-09-21 * Studied Gas Turbines and Steam Turbines from Manuals with line tracing. * Electrical interconnections and protections. * Visited and studied 132kV and 220kV Switch Yard. Sidiaee Nesinees (Ooera (03-09-2017 to 03-02-2018) Performed duty of 2 months on Gas Turbine (M/S ALSTHOM France 90016) and 2 months on Steam Turbine (RATEAU, France VEGA209-110B) and | month on Electrical Desk whose salient features are: * To run and operate the Gas Turbines and Steam Turbines in safe, efficient and smooth manner by taking careof load demand and instructions by NPCC. * Ensure recording of parameters and monitor them as per station log sheet * Gas Turbine, HRSG and Steam Turbine alarms and protections. * P&ID’s and Electrical Single Line Diagrams. * Communicate with NPCC, RCC and SNGPL during shift hours. * Communication through Fax and Telephonic with NPCC, RCC and SNGPL. * Brief introduction of control system (SPPA-T3000).

You might also like