Obective
To plan and cary out bia production under controlled conditions,
Scope
‘Applicable tothe manufacturing of blades st Uni, Unt & Unit E} at Daman,
Responsibity:
corks Head has overall esponsiiliy for implementation of hi procedure, Head of Blade Plant ix responsible for ensuring msintonancs of
process parameters and fe vocares
Sao Tame a Pree Dee Ne
7 | Mancctuing Process = Since EI-PRO-TIE BLOWN dot ot Menace
(mr) CONTROLLED COPY WHEN IN RED {Head Blade Manufacturing)2\) eles
éL) 8 86 Lee cee
€
5 gs ||as
| ame:
4 a 33 | infusion & Aresing ‘Roleaing & Debesring
& € S
feat | [Taner Taine & Rec
satetiat LSet Ly mes Hy Tain & Aaoeing
comay os
= ted tc)
CONTROLLED COPY WHEN IN REDPreprai
Ccontralled By Approved By
(aad - lade Manutacturng)
CONTROLLED COPY WHEN IN REDEnercon india Limited
= ie Ceencntom =
Objective
To plan and caryout Generator production under controled conditions.
Scope:
‘Applicable tothe generator procuction at Unit 2 E at Daman
Responsibility:
Works Head has overall responsibilty for implementation of this procedure, Head of Generator shop has overall responsibilty for
ensuring maintenance of process parameters and its records,
[ENO [Wane of Prosar Dee Ne REFERENCES:
1. QA Protocol = Stator Ring
1 | Stator Manutacturng | EIL-PRO-401
2. QA Protoco!— Disc Rotor
2 | Rotor Manufacturing | EIL-PRO-400
Sey 7 San
eae CONTROLLED COPY WHEN IN REDpence] Setar [A nearmem —o Actnseey™” |—o, a
[eran A$ ocieanrepcepmat |) enacwenaaat |
Tecan ‘etic Spee
Conte BF Approved By
one (ead. Generate)
CONTROLLED COPY WHEN IN REDContolled BY ‘Approved By:
ue
(ood. Gonerator)
CONTROLLED COPY WHEN IN REDEnercon india Limited
=. Siena —
+ Toenaute met assembly processes are cared out as pe planned arrangements (_oxkinstructions, Checks)
1 Torepatr ine PoB recelvea Tom various polnts and issue afar ensuring compliance ih specie fe urements,
Appicabie tothe assembly of contol bo es, production of PCB at daman plant and repairing of PCB received at PCB Repair Centre Daman &
Chesaorga
Responsibly:
cit ead nos oer respons lo nplement hs pocadie, Head of Eccl Asser ebponsible ensure at Elects
— a. LA REFERENCES: REFERENCES:
a
aienecera iho ||| i
a eae er ssSerrccr
Reco strane ond neve of meteral MCE | EIL-PROTO ae
sores _—
a
a CONTROLLED COPY WHEN IN RED (and lcrelAssemby)Contvotod BY ‘Approved By
irs
(Head-Elcrcal AsserLom [envrwouenace] _/Morteiems\ /rsiteias
Licermeserens —*} sratarin woe yf Se,
besser =e mt
Pete Shou - ee
cayenne
ansvevans || gunatan “agence || “arama” ort
sony | Wat |_EESSey | Semin 4 Some
ee = AR BA Technica
=e) aoe
Teele Teed
coaTY AF
$6 On FRELEEB-6 OP WHEN AN REB |ConTea By “Approved By
(ey (eaa.clectnical Assembly)oma BY ‘Approved By
ue (Head Electrical Assembly)
CONTROLLED COPY WHEN IN REDEnercon indi Limite,
MECHANICAL ASSEMBL
1 out a pr panned acangamonis. Work atu
Ta ensure tet sssemby producto processes
Appia to Roto eas an Nacalle production at Unt IE at Daman Pant
Responstity
1 Head has over respons zo nplement te procedure, rehaige ct Mecanial ASSEMbl Ie respansibe to ensure hat MecranialASSEMy
‘SNo [Rone of Froeses peaks 4. Assent! nspecton protocol Rotor ead
ia reubrman of Ss ee
order SAP actiny
rated WES
(0)
CONTROLLED COPY WHEN IN REDDyes ote
Srdme iste
“Poteron) oeaveanns | pisenmntetere P| Senedarsemime, A
oc etae are — “cnc pea
sc ty srcteien
TontaTed By Approved By
wwe (oa. Mochanical Aesombiy)‘onto ‘pproved By
(teac.echanical Assembly)