You are on page 1of 14
Enercon ina Limited Ras Ewes a Obective To plan and cary out bia production under controlled conditions, Scope ‘Applicable tothe manufacturing of blades st Uni, Unt & Unit E} at Daman, Responsibity: corks Head has overall esponsiiliy for implementation of hi procedure, Head of Blade Plant ix responsible for ensuring msintonancs of process parameters and fe vocares Sao Tame a Pree Dee Ne 7 | Mancctuing Process = Since EI-PRO-TIE BLOWN dot ot Menace (mr) CONTROLLED COPY WHEN IN RED {Head Blade Manufacturing) 2\) eles éL) 8 86 Lee cee € 5 gs ||as | ame: 4 a 33 | infusion & Aresing ‘Roleaing & Debesring & € S feat | [Taner Taine & Rec satetiat LSet Ly mes Hy Tain & Aaoeing comay os = ted tc) CONTROLLED COPY WHEN IN RED Preprai Ccontralled By Approved By (aad - lade Manutacturng) CONTROLLED COPY WHEN IN RED Enercon india Limited = ie Ceencntom = Objective To plan and caryout Generator production under controled conditions. Scope: ‘Applicable tothe generator procuction at Unit 2 E at Daman Responsibility: Works Head has overall responsibilty for implementation of this procedure, Head of Generator shop has overall responsibilty for ensuring maintenance of process parameters and its records, [ENO [Wane of Prosar Dee Ne REFERENCES: 1. QA Protocol = Stator Ring 1 | Stator Manutacturng | EIL-PRO-401 2. QA Protoco!— Disc Rotor 2 | Rotor Manufacturing | EIL-PRO-400 Sey 7 San eae CONTROLLED COPY WHEN IN RED pence] Setar [A nearmem —o Actnseey™” |—o, a [eran A$ ocieanrepcepmat |) enacwenaaat | Tecan ‘etic Spee Conte BF Approved By one (ead. Generate) CONTROLLED COPY WHEN IN RED Contolled BY ‘Approved By: ue (ood. Gonerator) CONTROLLED COPY WHEN IN RED Enercon india Limited =. Siena — + Toenaute met assembly processes are cared out as pe planned arrangements (_oxkinstructions, Checks) 1 Torepatr ine PoB recelvea Tom various polnts and issue afar ensuring compliance ih specie fe urements, Appicabie tothe assembly of contol bo es, production of PCB at daman plant and repairing of PCB received at PCB Repair Centre Daman & Chesaorga Responsibly: cit ead nos oer respons lo nplement hs pocadie, Head of Eccl Asser ebponsible ensure at Elects — a. LA REFERENCES: REFERENCES: a aienecera iho ||| i a eae er ssSerrccr Reco strane ond neve of meteral MCE | EIL-PROTO ae sores _— a a CONTROLLED COPY WHEN IN RED (and lcrelAssemby) Contvotod BY ‘Approved By irs (Head-Elcrcal Asser Lom [envrwouenace] _/Morteiems\ /rsiteias Licermeserens —*} sratarin woe yf Se, besser =e mt Pete Shou - ee cayenne ansvevans || gunatan “agence || “arama” ort sony | Wat |_EESSey | Semin 4 Some ee = AR BA Technica =e) aoe Teele Teed coaTY AF $6 On FRELEEB-6 OP WHEN AN REB | ConTea By “Approved By (ey (eaa.clectnical Assembly) oma BY ‘Approved By ue (Head Electrical Assembly) CONTROLLED COPY WHEN IN RED Enercon indi Limite, MECHANICAL ASSEMBL 1 out a pr panned acangamonis. Work atu Ta ensure tet sssemby producto processes Appia to Roto eas an Nacalle production at Unt IE at Daman Pant Responstity 1 Head has over respons zo nplement te procedure, rehaige ct Mecanial ASSEMbl Ie respansibe to ensure hat MecranialASSEMy ‘SNo [Rone of Froeses peaks 4. Assent! nspecton protocol Rotor ead ia reubrman of Ss ee order SAP actiny rated WES (0) CONTROLLED COPY WHEN IN RED Dyes ote Srdme iste “Poteron) oeaveanns | pisenmntetere P| Senedarsemime, A oc etae are — “cnc pea sc ty srcteien TontaTed By Approved By wwe (oa. Mochanical Aesombiy) ‘onto ‘pproved By (teac.echanical Assembly)

You might also like