You are on page 1of 3

Job Loss Analysis

Department: Maintenance & JLA Type: Customized JLA


Projects
Created Date: Work Type: Project Work
Last Review Date: Work Activity:

JLA Owner
Owner’s Name Position

Development Team: Petrocon Pvt Ltd.


Development Team Member Name Position

Reviewers: Chevron Lubricants Pvt Ltd.


Reviewer Name Position Date Approved

Personal Protective Equipment (PPE) Selected Comments


Safety Shoes
Hard Hat
Safety Glasses
Fire Resistant Clothing
Face Shields
Goggles
Lifeline/Body Harness
Hearing Protection
Air Purifying Respirator
Supplied Air Respirator - SCBA
Welding Hood
Welding/Pipe Clothing
Welding Mask/Goggles
Personal Floatation Device
Long pants
Long sleeve shirt
Gloves
Other
Safety Cones/Barricades
Safety Vest
Knee Pads
Caution Tape
Substantial leather footwear

1
#
Task Steps Danger / Risk Critical mitigation actions to take
1 Cleaning of joints Skilled and experienced person shall execute the job
by using oil Untrained person performing the ‫ماہر اور تجربہ کار افراد کام کو انجام دیں‬
‫جوائنٹ کی صفائی کرنی‬ job
‫ہے آئل کے سا تھ‬ ‫غیر تربیت یافتہ لوگوں سے‬
‫کام کروانے کی صورت میں نقصان‬
‫ہو سکتا ہے‬
Oil Fumes Use of Face Mask and Safety googles, safety shoes,
‫آئل کے بخارات نقصان دہ ثابت ہو سکتے ہی‬ safety helmet and nitrile gloves
‫حفاظتی ہیلمٹ اور‬،‫حفاظتی چشمہ‬،‫کام کے دوران حفاظتی فیس ماسک‬
‫حفاظتی دستانے پہنیں‬
Have MSDS available on site and follow its requirement
‫ایم ایس ڈی ایس کی ہدایات پر عمل کریں‬
Oil can cause the skin and eyes Use nitrial gloves
‫آئل جلد اور آنکھوں کو نقصان پہنچا سکتا‬ ‫نائٹرائل دستا نوں کا استعما ل کریں‬
‫ہے‬ Use of Safety goggles, safety shoes, safety helmet
‫ اور حفاظتی دستانے پہنیں‬n‫حفاظتی ہیلمٹ‬،‫حفاظتی چشمہ‬، ‫کام کے دوران‬
spilling of Oil Try use for secondary contamination
‫آئل بہہ جانے سے نقصان ہو سکتا ہے‬ ‫ٹرے کا استعما ل کریں آئل رکھنے کے لیے‬
Use of Safety goggles, safety shoes, safety helmet
‫حفاظتی ہیلمٹ اور حفاظتی دستانے‬،‫حفاظتی چشمہ‬، ‫کام کے دوران‬
‫پہنیں‬
Scaffolding Height, Slip, Trip and Fall Only authorized person to be performed the job
‫سکیفولڈنگ‬ causing injuries ‫صرف قا بل لوگ ہی کام کو انجام دیں گے‬ Area
‫بلندی پر کام کرنے کے دوران‬ to be barricading
‫ لڑکھڑانے سے گرنے کی‬،‫پھسلنے‬ ‫اس جگہ کی نا کا بندی کردیں‬ Proper
‫صورت میں زخمی ہونے کا خطرہ‬ ladder to be used for climbing
‫اونچائی پر چڑھنے کے لیے منا سب سیڑھی کا استعما ل کریں‬
Three Point contact to be used while working at
height
‫اونچائی پرکام کرتے ہوےء تھری پوائنٹ کونکٹ کا استعال کریں‬
Unfit and Untrained Workers * Inspection of scaffold from competent personnel
can construct the scaffolds ‫قابل بندوں سے فولڈنگ کا معائنہ کروائیں‬
in the wrong way * Ensure the Personnel are fit to work on the
‫غیر تربیت یافتہ اور نااہل ودکرز سے‬ elevated Platforms
‫سکیفولڈ بنوانے سے نقصان کا خدشہ‬ ‫اس بات کو یقینی بنائیں کہ عملہ بلند پلیٹ فارم پر کام کرنے کے قابل‬
‫ہے‬ ‫ہے‬
* Ensure the personnel are trained to work on the
height & aware of the safe use of safety harness
‫اس بات کو یقینی بنائیں کہ کام کرنے والے ورکرز بلندی پر کام کرنے‬
‫ رکھتے ہیں اور سیفٹی ہارنس کا استعمال جانتے ہیں‬n‫کی تربیت‬
Lack of proper / certified * Ensure the Platforms are purpose built designed,
Platform for the personnel to erected & certified by competent personnel.
work on. ، ‫اس بات کو یقینی بنائیں کہ پلیٹ فارم با مقصد ڈیزائن کیا کھڑا‬
‫مناسب اور مستند پلیٹ فارم کے نہ‬ ‫ کیا ہے‬n‫کیااورالئق اہلکاروں کی طرف سے سند یافتہ تعمیر‬
‫ہونے سے ورکرز کو نقصان ہو سکتا‬ * Hang scaffolding inspection tag indicating till when
‫ہے‬ the scaffolding can be used and then needs to be
reinspected
‫فولڈنگ پر معائینہ واال ٹیگ لگائیں جس پر درج ہو کہ کب تک قابل‬
‫استعمال ہے اور اگال معائنہ کب ہو گا‬
Lack of arrangements for * Ensure that proper Toe Boards are installed
securing the tools / items ‫اس بات کو یقینی بنائیں ٹو بورڈ لگا ہے‬
while working at height * Ensure loose items including tools are properly
which can result in their fall secured.
‫بلندی پر کام کرتے ہوئے آالت اور‬ ‫ بنائیں کہ غیر محفوظ اشیاء اور اوزار جو گر سکتی‬n‫اس بات کو یقینی‬
n‫ کے نامناسب‬n‫چیزوں کو محفوظ بنانے‬ ‫ہوں کو باندھ کر محفوظ بنائیں‬
‫انتظامات سے گرنے کا خدشہ ہے‬ * Use of Tool Tie to be ensured
‫بندھے ہوئے آالت کا استعمال یقینی بنائیں‬
* Specially while using the tools it should be tied to

2
the hand / secured to the structure.
‫خاص طور پر جب آالت کا استعمال کیارہا ہو تب وہ ہاتھ یا ڈھانچے‬
‫کے ساتھ بندھے ہوں‬
* JLA should be discussed before starting the job
‫کام شروع کرنے سے پہلے ورکرز کو جے ایل اے بتائیں‬

Hazard Analysis Tool


Instructions: Complete the JLA for the task to be conducted per the scope of the permit and work plan. Identify each individual
job step, the hazards present with each step, and then identify the safeguards to eliminate or mitigate each of the hazards.
Use the common safeguards list to help identify safeguards for each of the hazards. Put an "X" in each box that applies and
transfer those safeguards to the "specific safeguards" sections of the JLA above.

Common Safeguards List


The safeguard list below is not a complete list of safeguards for work. Each hazard from each job step in the JLA needs to be
completely evaluated for the best safeguard using the hierarchy of controls. The safeguards below are typical and are provided to
help the JLA developers with some of the most common safeguards.
C1 - Hydrocarbon / G3 - Dropped Objects Mo4 - Manual Handling
Toxic Vapors and Liquids o Barricade below o Assisted lifting >50lbs
o Verify Zero Energy o Mesh Fencing o Review Lift Techniques
o Maintain Ventilation o Netting below Mo5 - Mobile Equipt / Traffic
o Review SDS o Tool Lanyards o Traffic Watch
o Respiratory Protection o Cover and Label Floor Openings o Hard Barricades
o Continuous Monitoring (specify) o Good Housekeeping o Spotter while moving
o Liquid Containment Me1 - Power Tools o Identify Sensitive Equipment
o Know Wind Direction o Barricade Area o Secure Load
o Skin / Body Protection o Guards & handles in place o Travel Plan Pre-Approved
C2 - Fumes / Dusts / Fibers o Focus on Line of Fire Risk o Lane Closure
o Use Wet Techniques o Stable Body Position o Signs / Cones
o Adequate Ventilation o Inspect Tools & Cord / Hoses P1 - Pressure
o Barricade/Signs o Secure Loose Clothing o Verify Zero Energy
o No pressurized air for cleaning Me2 - Rotating Equipment o Proper Pressure Rated Hose
o Respiratory Protection o Verify Zero Energy o Whip Checks/Full Flow Stop Checks
E1 - Electrical Hazards o Restrain equipment o Break Containment Away
o Verify Zero Energy Mo1 - Cut/Pinch/Crush S1 - Noise
o Ensure Grounding/Bonding o Cut Resistant Gloves o Hearing Protection
o Barricades / Signs o Communication Plan o Alt. Communication Plan
o CPR Certified Standby o Guards / Barricades T1 - Heat / Cold Stress Hazards
o GFCI Required o Cap Sharp Edges/Impalement Haz o Stay Hydrated
o Review Procedure Steps o Review Potential Pinch Points o Active Heat Stress Monitoring
G1 - Fall Hazards Mo2 - Slip/Trip/Walking Surface o Break every ______ min.
o Inspect Scaffold before use o Review Tripping Hazards o Cold Weather PPE / Gloves
o Fall Protection Equipment o Flag Potential Trip Hazards T2 - Hot Cold Surfaces
o Proper Tie Off Point o Check Ground Conditions o Wrist Protection/Gauntlets
o Excavation/Open Hole Barricaded o Store tools out of walkways o Allow for cooling time
o SR Lanyard if <20 feet (6 meters) o Secure Cords/Hoses o Barricade / Barriers
o Discuss Rescue Plan Mo3 - Line of Fire T3 - Fire Hazards
G2 - Lifting / Rigging o Barricade Line of Fire Zone o Fire Watch on Duty
o Check for Load Ratings o Identify LOF Hazards o Charged Extinguishers / Fire Hose
o Certified Rigger o Focus on Hand & Body Placement o Remove Flammables and Combustibles
o Communications Plan in Place OTHER HAZARDS TO CONSIDER
o Qualified Crane Signal Person Lighting Weather
o Adequate Use of Tag-lines SIMOPS Sensitive Equipment
o Rigging/Crane Inspection Current Radiation Human Factors
o Barricade Lift Zone Biological SSE