You are on page 1of 30

LAMPIRAN BERITA ACARA EVALUASI AKHIR PEKERJAAN TAMBAH / KURANG ( CCO )

PEKERJAAN : PEMBANGUNAN JEMBATAN SUNGAI MOKOKOLARO 2


NOMOR PAKET / RUAS : 17 / LANGARA (PELABUHAN) - MATALANGARA
NO.& TANGGAL KONTRAK ASLI : 620/02.17/SP/PPPJJK-DPU/KONKEP/2016, 18 AGUSTUS 2016.
NILAI KONTRAK ASLI : Rp. 4,627,200,000.00
KONTRAKTOR : PT. TIGA SATRIA GEMILANG

KONTRAK ASLI KONTRAK REVISI / CCO NILAI REVISI


ITEM HARGA JUMLAH HARGA JUMLAH
PEMBAYA URAIAN PEKERJAAN SATUAN BOBOT BOBOT KETERANGAN
RAN NO. VOLUME SATUAN HARGA VOLUME SATUAN HARGA VOLUME NAIK (+) MENURUN ( - )
(%) (%)
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
I. UMUM
B. PERALATAN
1 Asphalt Sprayer Unit 1.00 450,000.00 450,000.00 0.010 TETAP
2 Compressor 4000-6500 L/M Unit 1.00 275,000.00 275,000.00 0.006 TETAP
3 Concrette mixer 0,3-0,6 m3 Unit 4.00 600,000.00 2,400,000.00 0.053 TETAP
4 Dump Truck 3-4 M3 Unit 4.00 1,100,000.00 4,400,000.00 0.097 TETAP
5 Excavator 80-140 HP Unit 1.00 650,000.00 650,000.00 0.014 TETAP
6 Generator Set Unit 1.00 450,000.00 450,000.00 0.010 TETAP
7 Motor Grader>100 HP Unit 1.00 6,500,000.00 6,500,000.00 0.144 TETAP
8 Wheel Loader 1.0 - 1.6 M3 Unit 1.00 6,500,000.00 6,500,000.00 0.144 TETAP
9 Tandem Roller 6-8 Ton Unit 1.00 6,500,000.00 6,500,000.00 0.144 TETAP
10 Vibratory Roller 5-8 Ton Unit 1.00 6,500,000.00 6,500,000.00 0.144 TETAP
11 Concrette Vibrator Unit 4.00 270,000.00 1,080,000.00 0.024 TETAP
12 Water Pump 70-100 Mm Unit 4.00 220,000.00 880,000.00 0.019 TETAP
13 Water Tank 3000-4500 L Unit 1.00 850,000.00 850,000.00 0.019 TETAP
14 Welding Set Unit 1.00 85,000.00 85,000.00 0.002 TETAP

C. FASILITAS KONTRAKTOR
1 Base Camp M2 50.00 450,000.00 22,500,000.00 0.497 TETAP
2 Kantor M2 35.00 60,000.00 2,100,000.00 0.046 TETAP
3 Barak/Bangsal Pekerja M2 100.00 40,000.00 4,000,000.00 0.088 TETAP

D LAIN - LAIN
1 Pengukuran/Pemasangan Bouwplank M' 16.00 635,000.00 10,160,000.00 0.225 TETAP
2 Papan Proyek dan Rambu lalulintas Ls 1.00 530,000.00 530,000.00 0.012 TETAP
3 Dokumentasi & P 3 K Ls 1.00 1,250,000.00 1,250,000.00 0.028 TETAP
4 Administrasi Bulanan Bln 4.00 1,300,000.00 5,200,000.00 0.115 TETAP
5 Asbuilt Drawing Set 1.00 4,500,000.00 4,500,000.00 0.099 TETAP
6 Pembuatan Cofferdam & Pengeringan Bh 2.00 7,000,000.00 14,000,000.00 0.309 TETAP
7 Pemeriksaan Laboratorium Ls 1.00 11,000,000.00 11,000,000.00 0.243 TETAP

E. Demobilisasi
1 Demobilisasi Ls 1.00 37,520,000.00 37,520,000.00 0.829 TETAP

III. PEKERJAAN TANAH


3.1(3) Galian Struktur dengan Kedalaman 0 - 2 meter (Talud) M3 72.00 57,200.77 4,118,455.41 0.091 TETAP
3.1(4) Galian Struktur dengan Kedalaman 2 - 4 meter (Abutmen M3 88.32 82,084.03 7,249,661.80 0.160 TETAP
3.2(1) Timbunan biasa dengan material didatangkan M3 2,000.00 84,549.52 169,099,047.68 3.738 BERKURANG
3.2(2) Timbunan Pilihan M3 368.00 98,676.69 36,313,023.25 0.803 BERKURANG

V. PERKERASAN BERBUTIR
5.1(1) Lapis Pondasi Agregat Kelas A M3 113.63 1,021,976.79 116,127,222.79 2.567 BERKURANG
5.1(2) Lapis Pondasi Agregat Kelas B M3 115.50 683,385.43 78,931,016.59 1.745 BERKURANG
KONTRAK ASLI KONTRAK REVISI / CCO NILAI REVISI
ITEM HARGA JUMLAH HARGA JUMLAH
PEMBAYA URAIAN PEKERJAAN SATUAN BOBOT BOBOT KETERANGAN
RAN NO. VOLUME SATUAN HARGA VOLUME SATUAN HARGA VOLUME NAIK (+) MENURUN ( - )
(%) (%)
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

VI. PERKERASAN ASPAL


6.1 (1)a Lapis Resap Pengikat-Aspal Cair Liter 600.00 15,125.55 9,075,327.98 0.201 BERKURANG
6.6.1 Lapis Permukaan Penetrasi Macadam M3 52.50 2,624,195.93 137,770,286.43 3.045 BERKURANG

VII. STRUKTUR
7.1 (5) Beton mutu sedang, (K-350) M3 389.68 2,082,365.76 811,456,289.98 17.938 BERKURANG
7.1 (8) Beton mutu rendah, (K-175) M3 32.50 1,976,978.58 64,251,803.70 1.420 BERKURANG
7.1 (8) Beton mutu rendah, (K-175) Beton Siklop M3 188.40 1,976,978.58 372,462,763.62 8.233 TETAP
Baja Tulangan D32 Ulir Kg 44,400.00 36,145.34 1,604,853,096.00 35.476 BERKURANG
7.7 (1) Pengadaan Dinding Sumuran Silinder, diameter 250 cm M1 60.00 10,759,967.57 645,598,053.98 14.271 TETAP
7.7 (2) Penurunan Dinding Sumuran Silinder, diameter 250 cm M1 60.00 505,659.19 30,339,551.19 0.671 TETAP
7.9 (1) Pasang Batu Untuk Talud Penahan M3 187.95 979,963.42 184,184,125.19 4.071 BERTAMBAH
7.10 (2) Pasangan Batu Kosong untuk Talud M3 24.50 415,607.50 10,182,383.75 0.225 BERTAMBAH
7.11(6) Expantion Joint Tipe Baja Bersudut M1 72.00 467,103.31 33,631,438.34 0.743 BERKURANG
7.12 (2) Perletakan Elastomerik Bearing Pad(300x350x36 Bh 8.00 712,695.83 5,701,566.65 0.126 TETAP
7.13 Sandaran Railling M1 70.40 318,001.20 22,387,284.48 0.495 TETAP
7.14 Papan nama Jembatan Bh 2.00 579,359.00 1,158,718.00 0.026 TETAP
7.15 (1) Pembongkaran Pasangan Batu M2 64.00 245,126.34 15,688,085.51 0.347 TETAP
7.15 (2) Pembongkaran Beton M3 16.70 486,424.95 8,123,296.62 0.180 TETAP
7.16 Pipa cucuran Baja M1 16.00 300,114.10 4,801,825.60 0.106 TETAP

(A) JUMLAH HARGA PEKERJAAN DILUAR PPN 4,523,784,324.54 100.00


(B) PPN 10 % x (A), ( Dipungut ) 452,378,432.45
(C) JUMLAH HARGA PEKERJAAN TERMASUK PPN ( A+B ) 4,976,162,757.00
(D) JUMLAH HARGA PEKERJAAN TERMASUK PPN ( Dibulatkan ) 4,976,160,000.00
DISANGGUPI OLEH : DIPERIKSA / DITELITI OLEH :
KONTRAKTOR
KONTRAKTOR PT.TIGA
PT. KONAWEHA
SATRIA GEMILANG
MAKMUR DIREKSI / KONSULTAN SUPERVISI : PANITIA PENELITI PELAKSANAAN KONTRAK (PPPK) :

LAODEYUSRI
1. MUH. MANDAULI,
H, SESH. 1. ……………… 1. MARHADIANTO, ST 1. ……………… 1. H A P I D,.ST ( Ketua ) 1. ………………
Direktur PPTK Bina Marga Bidang Jalan
2. MUHAMMAD ALFATIH RADHI A., A.Md.T. 2. ……………… 2. AKBAR BAHRUN, S.sos ( Sekretaris ) 2. ………………
2. Ir.
EKODARIMAN
CAHYONO 2. ……………… Direksi Teknik
Pelaksana 3. IRWAN ARMA, ST 3. ……………… 3. SARIADIN, ST. ( Anggota ) 3. ………………
Direktur

MENGETAHUI / MENYETUJUI :
KEPALA DINAS PEKERJAAN UMUM KUASA PENGGUNA ANGGARAN (KPA)
KABUPATEN KONAWE KEPULAUAN BIDANG BINA MARGA DINAS PU. DAN TATA RUANG KAB. KONAWE
#VALUE!

ISRAWAN SULPA, ST.Dipl.WRD E R O, ST. MT


Nip. 19691015 199203 1 011 NIP. 19660115 199803 1 002
LAMPIRAN EVALUASI AKHIR PEKERJAAN TAMBAH / KURANG ( CCO )
PEKERJAAN : PEMBANGUNAN JALAN
NOMOR PAKET / RUAS : 01 / PASIR PUTIH - BATUMEA
NO.& TANGGAL KONTRAK ASLI : 620/02.01/SP/PPPJJK/PUPR-KONKEP/2017, 13 APRIL 2017.
NILAI KONTRAK ASLI : Rp. 1,976,000,000.00
KONTRAKTOR : CV. CAKRAWALA PRATAMA

KONTRAK ASLI KONTRAK REVISI NILAI REVISI


ITEM HARGA JUMLAH HARGA JUMLAH
PEMBAYA URAIAN PEKERJAAN SATUAN BOBOT BOBOT KETERANGAN
RAN NO. VOLUME SATUAN HARGA VOLUME SATUAN HARGA VOLUME NAIK (+) MENURUN ( - )
(%) (%)
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
I. UMUM
B. PERALATAN

1 Bulldozer 100-150 Hp Unit 1.00 9,500,000.00 9,500,000.00 #REF! 1.00 9,500,000.00 9,500,000.00 #REF! - - - TETAP

2 Dump Truck 3-4 M3 Unit 5.00 1,200,000.00 6,000,000.00 #REF! 5.00 1,200,000.00 6,000,000.00 #REF! - - - TETAP

3 Excavator 80-140 HP Unit 1.00 9,500,000.00 9,500,000.00 #REF! 1.00 9,500,000.00 9,500,000.00 #REF! - - - TETAP

4 Motor Grader>100 HP Unit 1.00 8,000,000.00 8,000,000.00 #REF! 1.00 8,000,000.00 8,000,000.00 #REF! - - - TETAP

5 Wheel Loader 1.0 - 1.6 M3 Unit 1.00 8,000,000.00 8,000,000.00 #REF! 1.00 8,000,000.00 8,000,000.00 #REF! - - - TETAP

6 Vibratory Roller 5-8 Ton Unit 1.00 8,000,000.00 8,000,000.00 #REF! 1.00 8,000,000.00 8,000,000.00 #REF! TETAP

7 Water Tank 3000-4500 L Unit 1.00 1,200,000.00 1,200,000.00 #REF! 1.00 1,200,000.00 1,200,000.00 #REF! - - - TETAP

8 Jack Hammer Unit 1.00 700,000.00 700,000.00 #REF! - 700,000.00 - #REF! (1.00) - 700,000.00 HILANG

C. FASILITAS KONTRAKTOR

1 Base Camp M2 100.00 74,000.00 7,400,000.00 #REF! 100.00 74,000.00 7,400,000.00 #REF! - - - TETAP

2 Kantor M2 35.00 95,300.00 3,335,500.00 #REF! 35.00 95,300.00 3,335,500.00 #REF! - - - TETAP

3 Barak/Bangsal Pekerja M2 50.00 45,000.00 2,250,000.00 #REF! 50.00 45,000.00 2,250,000.00 #REF! - - - TETAP

D LAIN - LAIN

1 Pengukuran dan Pembuatan Shop Drawing Km 4.00 2,000,000.00 8,000,000.00 #REF! 1.15 2,000,000.00 2,300,000.00 #REF! (2.85) - 5,700,000.00 BERKURANG

2 Papan Proyek dan Rambu lalulintas Ls 1.00 500,000.00 500,000.00 #REF! 1.00 500,000.00 500,000.00 #REF! - - - TETAP

3 Dokumentasi & P 3 K Ls 1.00 1,480,000.00 1,480,000.00 #REF! 1.00 1,480,000.00 1,480,000.00 #REF! - - - TETAP

4 Administrasi Bulanan Bln 5.00 1,300,000.00 6,500,000.00 #REF! 5.00 1,300,000.00 6,500,000.00 #REF! - - - BERTAMBAH

5 Asbuilt Drawing Set 1.00 5,000,000.00 5,000,000.00 #REF! 1.00 5,000,000.00 5,000,000.00 #REF! - - - TETAP

6 Pembuatan Jembatan2 Kayu Darurat M1 40.00 1,500,000.00 60,000,000.00 #REF! - 1,500,000.00 - #REF! (40.00) - 60,000,000.00 HILANG

7 Pembuatan Duiker2 Kayu Darurat Bh 4.00 500,000.00 2,000,000.00 #REF! - 500,000.00 - #REF! (4.00) - 2,000,000.00 HILANG

8 Pemeriksaan Laboratorium Ls 1.00 4,000,000.00 4,000,000.00 #REF! 1.00 4,000,000.00 4,000,000.00 #REF! - - - TETAP

E. Demobilisasi

1 Demobilisasi Ls 1.00 50,900,000.00 50,900,000.00 #REF! 1.00 50,900,000.00 50,900,000.00 #REF! - - - TETAP
KONTRAK ASLI KONTRAK REVISI NILAI REVISI
ITEM HARGA JUMLAH HARGA JUMLAH
PEMBAYA URAIAN PEKERJAAN SATUAN BOBOT BOBOT KETERANGAN
RAN NO. VOLUME SATUAN HARGA VOLUME SATUAN HARGA VOLUME NAIK (+) MENURUN ( - )
(%) (%)
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

II. DRAINASE

2.1 Galian untuk Selokan Drainase dan Saluran Air M3 960.00 67,185.92 64,498,480.62 #REF! - 67,185.92 - #REF! (960.00) - 64,498,480.62 HILANG

III. PEKERJAAN TANAH

3.1(1) Galian Biasa M3 5,250.00 53,027.81 278,395,981.16 #REF! - 53,027.81 - #REF! (5,250.00) - 278,395,981.16 HILANG

3.1(2) Galian Batu M3 4,384.00 97,942.41 429,379,518.40 #REF! - 97,942.41 - #REF! (4,384.00) - 429,379,518.40 HILANG

3.2(1) Timbunan biasa dengan material didatangkan M3 - #REF! #REF! #REF! 18,168.24 #REF! #REF! #REF! 18,168.24 #REF! - BERTAMBAH

3.2(2) Timbunan biasa dengan material Hasil Galian M3 3,020.00 40,511.38 122,344,358.41 #REF! - 40,511.38 - #REF! (3,020.00) - 122,344,358.41 HILANG

3.2(3) Timbunan Pilihan M3 3,600.00 106,726.86 384,216,684.64 #REF! #REF! 106,726.86 #REF! #REF! #REF! - #REF! HILANG

3.3 Penyiapan Badan Jalan (Damija Ringan) M2 20,000.00 1,550.51 31,010,224.36 #REF! - 1,550.51 - #REF! (20,000.00) - 31,010,224.36 HILANG

3.3.2 Pembersihan Damija Berat M2 60,000.00 4,737.67 284,260,292.44 #REF! 19,880.00 4,737.67 94,184,910.23 #REF! (40,120.00) - 190,075,382.21 BERKURANG

(A) JUMLAH HARGA PEKERJAAN DILUAR PPN #REF! #REF! #REF! #REF! #REF! #REF!

(B) PPN 10 % x (A), ( Dipungut ) #REF! #REF! #REF! #REF!

(C) JUMLAH HARGA PEKERJAAN TERMASUK PPN ( A+B ) #REF! #REF! #REF! #REF!

(D) JUMLAH HARGA PEKERJAAN TERMASUK PPN ( Dibulatkan ) #REF! #REF! #REF! #REF!
DISANGGUPI OLEH : DIPERIKSA / DITELITI OLEH :
KONTRAKTOR
KONTRAKTOR PT.TIGA SATRIA GEMILANG DIREKSI / KONSULTAN SUPERVISI : PANITIA PENELITI PELAKSANAAN KONTRAK (PPPK) :

HERDIN
1. MUH. YUSRI H, SE 1. ……………… 1. UNANG SULAEMAN, ST 1. ……………… 1. H A P I D,.ST ( Ketua ) 1. ………………
Direktur PPTK Bina Marga Bidang Jalan/Jembatan
2. MUHAMMAD ALFATIH RADHI A., A.Md.T. 2. ……………… 2. SARIADIN, ST. ( Sekretaris ) 2. ………………
2. Ir.
MUSTARI
DARIMAN 2. ……………… Direksi Teknik
Pelaksana 3. Ir. HARUN GANI 3. ……………… 3. AGUSTAM, S.Si ( Anggota ) 3. ………………
Supervisi Engineer

MENGETAHUI / MENYETUJUI :

KEPALA DINAS PEKERJAAN UMUM KUASA PENGGUNA ANGGARAN (KPA)


KABUPATEN KONAWE KEPULAUAN BIDANG BINA MARGA DINAS PU. DAN TATA RUANG KAB. KONAWE
#VALUE!

ISRAWAN SULPA, ST.Dipl.WRD E R O, ST. MT


Nip. 19691015 199203 1 011 NIP. 19660115 199803 1 002
LAMPIRAN EVALUASI KEMAJUAN PEKERJAAN
PEKERJAAN : PEMBANGUNAN JALAN
NOMOR PAKET / RUAS : 01 / PASIR PUTIH - BATUMEA
NO.& TANGGAL KONTRAK ASLI : 620/02.01/SP/PPPJJK/PUPR-KONKEP/2017, 13 APRIL 2017.
NILAI KONTRAK ASLI : Rp. 1,976,000,000.00
KONTRAKTOR : CV. CAKRAWALA PRATAMA

KONTRAK ASLI KONTRAK KEMAJUAN


ITEM HARGA JUMLAH HARGA JUMLAH
PEMBAYA URAIAN PEKERJAAN SATUAN BOBOT BOBOT KETERANGAN
RAN NO. VOLUME SATUAN HARGA VOLUME SATUAN HARGA
(%) (%)
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
1 2 3 4 5 6 7 8 9 10 11 15
I. UMUM
B. PERALATAN
1 Bulldozer 100-150 Hp Unit 1.00 9,500,000.00 9,500,000.00 0.529 1.00 9,500,000.00 9,500,000.00 0.53
2 Dump Truck 3-4 M3 Unit 5.00 1,200,000.00 6,000,000.00 0.334 5.00 1,200,000.00 6,000,000.00 0.33
3 Excavator 80-140 HP Unit 1.00 9,500,000.00 9,500,000.00 0.529 1.00 9,500,000.00 9,500,000.00 0.53
4 Motor Grader>100 HP Unit 1.00 8,000,000.00 8,000,000.00 0.445 - 8,000,000.00 - -
5 Wheel Loader 1.0 - 1.6 M3 Unit 1.00 8,000,000.00 8,000,000.00 0.445 - 8,000,000.00 - -
6 Vibratory Roller 5-8 Ton Unit 1.00 8,000,000.00 8,000,000.00 0.445 - 8,000,000.00 - -
7 Water Tank 3000-4500 L Unit 1.00 1,200,000.00 1,200,000.00 0.067 - 1,200,000.00 - -
8 Jack Hammer Unit 1.00 700,000.00 700,000.00 0.039 - 700,000.00 - -

C. FASILITAS KONTRAKTOR
1 Base Camp M2 100.00 74,000.00 7,400,000.00 0.412 100.00 74,000.00 7,400,000.00 0.41
2 Kantor M2 35.00 95,300.00 3,335,500.00 0.186 35.00 95,300.00 3,335,500.00 0.19
3 Barak/Bangsal Pekerja M2 50.00 45,000.00 2,250,000.00 0.125 50.00 45,000.00 2,250,000.00 0.13

D LAIN - LAIN
1 Pengukuran dan Pembuatan Shop Drawing Km 4.00 2,000,000.00 8,000,000.00 0.445 4.00 2,000,000.00 8,000,000.00 0.45
2 Papan Proyek dan Rambu lalulintas Ls 1.00 500,000.00 500,000.00 0.028 1.00 500,000.00 500,000.00 0.03
3 Dokumentasi & P 3 K Ls 1.00 1,480,000.00 1,480,000.00 0.082 1.00 1,480,000.00 1,480,000.00 0.08
4 Administrasi Bulanan Bln 5.00 1,300,000.00 6,500,000.00 0.362 - 1,300,000.00 - -
5 Asbuilt Drawing Set 1.00 5,000,000.00 5,000,000.00 0.278 - 5,000,000.00 - -
6 Pembuatan Jembatan2 Kayu Darurat M1 40.00 1,500,000.00 60,000,000.00 3.340 - 1,500,000.00 - -
7 Pembuatan Duiker2 Kayu Darurat Bh 4.00 500,000.00 2,000,000.00 0.111 - 500,000.00 - -
8 Pemeriksaan Laboratorium Ls 1.00 4,000,000.00 4,000,000.00 0.223 - 4,000,000.00 - -

E. Demobilisasi
1 Demobilisasi Ls 1.00 50,900,000.00 50,900,000.00 2.833 - 50,900,000.00 - -

II. DRAINASE

2.1 Galian untuk Selokan Drainase dan Saluran Air M3 960.00 67,185.92 64,498,480.62 3.590 - 67,185.92 - -
2.2 Pasangan batu dengan Mortar M3 - - - - - - - -
2.3 (1) Gorong-Gorong Pipa Beton Bertulang, Dia 100 cm M3 - - - - - - - -

III. PEKERJAAN TANAH

3.1(1) Galian Biasa M3 5,250.00 53,027.81 278,395,981.16 15.498 - 53,027.81 - -


3.1(2) Galian Batu M3 4,384.00 97,942.41 429,379,518.40 23.903 - 97,942.41 - -
3.2(1) Timbunan biasa dengan material didatangkan M3 - 82,901.01 - - - 82,901.01 - -
3.2(2) Timbunan biasa dengan material Hasil Galian M3 3,020.00 40,511.38 122,344,358.41 6.811 - 40,511.38 - -
3.2(3) Timbunan Pilihan M3 3,600.00 106,726.86 384,216,684.64 21.388 - 106,726.86 - -
3.3 Penyiapan Badan Jalan (Damija Ringan) M2 20,000.00 1,550.51 31,010,224.36 1.726 - 1,550.51 - -
3.3.2 Pembersihan Damija Berat M2 60,000.00 4,737.67 284,260,292.44 15.824 10,000.00 4,737.67 47,376,715.41 2.64
KONTRAK ASLI KONTRAK KEMAJUAN
ITEM HARGA JUMLAH HARGA JUMLAH
PEMBAYA URAIAN PEKERJAAN SATUAN BOBOT BOBOT KETERANGAN
RAN NO. VOLUME SATUAN HARGA VOLUME SATUAN HARGA
(%) (%)
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
1 2 3 4 5 6 7 8 9 10 11 15
IV. PELEBARAN PERKERASAN DAN BAHU JALAN

4.1(1) Lapis Pondasi Agregat Kelas A M3 - - - - - - - -


4.1(2) Lapis Pondasi Agregat Kelas B M3 - - - - - - - -

V. PERKERASAN BERBUTIR

5.1(1) Lapis Pondasi Agregat Kelas A M3 - - - - - - - -


5.1(2) Lapis Pondasi Agregat Kelas B M3 - - - - - - - -

VI. PERKERASAN ASPAL

6.1 (1)a Lapis Resap Pengikat-Aspal Cair Liter - - - - - - - -


6.1 (2)a Lapis Perekat-Aspal Cair Liter - - - - - - - -
6.4 (2) Latasbusir Kelas A M2 - - - - - - - -
6.4 (3) Latasbusir Kelas B M2 - - - - - - - -

VII. STRUKTUR

7.1 (5) Beton mutu sedang, (K-350) M3 - - - - - - - -


7.1 (6) Beton mutu sedang, (K-300) M3 - - - - - - - -
7.1 (7) Beton mutu sedang, (K-250) untuk duiker plat M3 - - - - - - - -
7.1 (8) Beton mutu rendah, (K-175) M3 - - - - - - - -
7.3 (1) Baja Tulangan U24 Polos untuk duiker plat Kg - - - - - - - -
7.3 (2) Baja Tulangan U32 Polos Kg - - - - - - - -
7.3 (3) Baja Tulangan U32 Ulir Kg - - - - - - - -
7.5 (1) Pemasangan Jembatan Rangka Baja M3 - - - - - - - -
7.5 (2) Pengangkutan Bahan Jembatan M3 - - - - - - - -
7.9 Pasangan Batu Untuk Pondasi Duiker M3 - - - - - - - -
7.9 (1) Pasangan Batu Untuk Talud Penahan M3 - - - - - - - -
7.10 (2) Pasangan Batu Kosong M3 - - - - - - - -
7.10 (3) Bronjong M3 - - - - - - - -
7.15 (1) Pembongkaran Pasangan Batu M2 - - - - - - - -
7.15 (2) Pembongkaran Beton M3 - - - - - - - -
7.15 (3) Perkerasan Jalan Beton M3 - - - - - - - -

(A) JUMLAH HARGA PEKERJAAN DILUAR PPN 1,796,371,040.03 100.00 95,342,215.41 5.31
(B) PPN 10 % x (A), ( Dipungut ) 179,637,104.00 9,534,221.54
(C) JUMLAH HARGA PEKERJAAN TERMASUK PPN ( A+B ) 1,976,008,144.03 104,876,436.95
(D) JUMLAH HARGA PEKERJAAN TERMASUK PPN ( Dibulatkan ) 1,976,000,000.00 104,870,000.00
LAMPIRAN BERITA ACARA EVALUASI AKHIR PEKERJAAN TAMBAH / KURANG ( CCO )
PEKERJAAN : PEMBANGUNAN JEMBATAN SUNGAI MOKOKOLARO 2
NOMOR PAKET / RUAS : 17 / LANGARA (PELABUHAN) - MATALANGARA
NO.& TANGGAL KONTRAK ASLI : 620/02.17/SP/PPPJJK-DPU/KONKEP/2016, 18 AGUSTUS 2016.
NILAI KONTRAK ASLI : Rp. 4,627,200,000.00
KONTRAKTOR : PT. TIGA SATRIA GEMILANG

KONTRAK ASLI KONTRAK REVISI / CCO NILAI REVISI


ITEM HARGA JUMLAH HARGA JUMLAH
PEMBAYA URAIAN PEKERJAAN SATUAN BOBOT BOBOT KETERANGAN
RAN NO. VOLUME SATUAN HARGA VOLUME SATUAN HARGA VOLUME NAIK (+) MENURUN ( - )
(%) (%)
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
I. UMUM
B. PERALATAN
1 Asphalt Sprayer Unit 1.00 450,000.00 450,000.00 0.010 1.00 450,000.00 450,000.00 0.011 - - - TETAP
2 Compressor 4000-6500 L/M Unit 1.00 275,000.00 275,000.00 0.006 1.00 275,000.00 275,000.00 0.007 - - - TETAP
3 Concrette mixer 0,3-0,6 m3 Unit 4.00 600,000.00 2,400,000.00 0.053 4.00 600,000.00 2,400,000.00 0.057 - - - TETAP
4 Dump Truck 3-4 M3 Unit 4.00 1,100,000.00 4,400,000.00 0.097 4.00 1,100,000.00 4,400,000.00 0.105 - - - TETAP
5 Excavator 80-140 HP Unit 1.00 650,000.00 650,000.00 0.014 1.00 650,000.00 650,000.00 0.015 - - - TETAP
6 Generator Set Unit 1.00 450,000.00 450,000.00 0.010 1.00 450,000.00 450,000.00 0.011 - - - TETAP
7 Motor Grader>100 HP Unit 1.00 6,500,000.00 6,500,000.00 0.144 1.00 6,500,000.00 6,500,000.00 0.155 - - - TETAP
8 Wheel Loader 1.0 - 1.6 M3 Unit 1.00 6,500,000.00 6,500,000.00 0.144 1.00 6,500,000.00 6,500,000.00 0.155 - - - TETAP
9 Tandem Roller 6-8 Ton Unit 1.00 6,500,000.00 6,500,000.00 0.144 1.00 6,500,000.00 6,500,000.00 0.155 - - - TETAP
10 Vibratory Roller 5-8 Ton Unit 1.00 6,500,000.00 6,500,000.00 0.144 1.00 6,500,000.00 6,500,000.00 0.155 TETAP
11 Concrette Vibrator Unit 4.00 270,000.00 1,080,000.00 0.024 4.00 270,000.00 1,080,000.00 0.026 TETAP
12 Water Pump 70-100 Mm Unit 4.00 220,000.00 880,000.00 0.019 4.00 220,000.00 880,000.00 0.021 - - - TETAP
13 Water Tank 3000-4500 L Unit 1.00 850,000.00 850,000.00 0.019 1.00 850,000.00 850,000.00 0.020 - - - TETAP
14 Welding Set Unit 1.00 85,000.00 85,000.00 0.002 1.00 85,000.00 85,000.00 0.002 - - - TETAP

C. FASILITAS KONTRAKTOR
1 Base Camp M2 50.00 450,000.00 22,500,000.00 0.497 50.00 450,000.00 22,500,000.00 0.535 - - - TETAP
2 Kantor M2 35.00 60,000.00 2,100,000.00 0.046 35.00 60,000.00 2,100,000.00 0.050 - - - TETAP
3 Barak/Bangsal Pekerja M2 100.00 40,000.00 4,000,000.00 0.088 100.00 40,000.00 4,000,000.00 0.095 - - - TETAP

D LAIN - LAIN
1 Pengukuran/Pemasangan Bouwplank M' 16.00 635,000.00 10,160,000.00 0.225 16.00 635,000.00 10,160,000.00 0.242 - - - TETAP
2 Papan Proyek dan Rambu lalulintas Ls 1.00 530,000.00 530,000.00 0.012 1.00 530,000.00 530,000.00 0.013 - - - TETAP
3 Dokumentasi & P 3 K Ls 1.00 1,250,000.00 1,250,000.00 0.028 1.00 1,250,000.00 1,250,000.00 0.030 - - - TETAP
4 Administrasi Bulanan Bln 4.00 1,300,000.00 5,200,000.00 0.115 4.00 1,300,000.00 5,200,000.00 0.124 - - - TETAP
5 Asbuilt Drawing Set 1.00 4,500,000.00 4,500,000.00 0.099 1.00 4,500,000.00 4,500,000.00 0.107 - - - TETAP
6 Pembuatan Cofferdam & Pengeringan Bh 2.00 7,000,000.00 14,000,000.00 0.309 2.00 7,000,000.00 14,000,000.00 0.333 - - - TETAP
7 Pemeriksaan Laboratorium Ls 1.00 11,000,000.00 11,000,000.00 0.243 1.00 11,000,000.00 11,000,000.00 0.261 - - - TETAP

E. Demobilisasi
1 Demobilisasi Ls 1.00 37,520,000.00 37,520,000.00 0.829 1.00 37,520,000.00 37,520,000.00 0.892 - - - TETAP

III. PEKERJAAN TANAH


3.1(3) Galian Struktur dengan Kedalaman 0 - 2 meter (Talud) M3 72.00 57,200.77 4,118,455.41 0.091 72.00 57,200.77 4,118,455.41 0.098 - - - TETAP
3.1(4) Galian Struktur dengan Kedalaman 2 - 4 meter (Abutmen M3 88.32 82,084.03 7,249,661.80 0.160 88.32 82,084.03 7,249,661.80 0.172 - - - TETAP
3.2(1) Timbunan biasa dengan material didatangkan M3 2,000.00 84,549.52 169,099,047.68 3.738 1,396.73 84,549.52 118,092,539.96 2.807 (603.27) - 51,006,507.71 BERKURANG
3.2(2) Timbunan Pilihan M3 368.00 98,676.69 36,313,023.25 0.803 360.93 98,676.69 35,615,081.69 0.847 (7.07) - 697,941.56 BERKURANG
KONTRAK ASLI KONTRAK REVISI / CCO NILAI REVISI
ITEM HARGA JUMLAH HARGA JUMLAH
PEMBAYA URAIAN PEKERJAAN SATUAN BOBOT BOBOT KETERANGAN
RAN NO. VOLUME SATUAN HARGA VOLUME SATUAN HARGA VOLUME NAIK (+) MENURUN ( - )
(%) (%)
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
V. PERKERASAN BERBUTIR
5.1(1) Lapis Pondasi Agregat Kelas A M3 113.63 1,021,976.79 116,127,222.79 2.567 74.30 1,021,976.79 75,929,605.17 1.805 (39.33) - 40,197,617.61 BERKURANG
5.1(2) Lapis Pondasi Agregat Kelas B M3 115.50 683,385.43 78,931,016.59 1.745 75.52 683,385.43 51,608,884.98 1.227 (39.98) - 27,322,131.62 BERKURANG

VI. PERKERASAN ASPAL


6.1 (1)a Lapis Resap Pengikat-Aspal Cair Liter 600.00 15,125.55 9,075,327.98 0.201 448.00 15,125.55 6,776,246.40 0.161 (152.00) - 2,299,081.58 BERKURANG
6.6.1 Lapis Permukaan Penetrasi Macadam M3 52.50 2,624,195.93 137,770,286.43 3.045 39.20 2,624,195.93 102,868,480.46 2.445 (13.30) - 34,901,805.97 BERKURANG

VII. STRUKTUR
7.1 (5) Beton mutu sedang, (K-350) M3 389.68 2,082,365.76 811,456,289.98 17.938 294.27 2,082,365.76 612,774,591.24 14.567 (95.41) - 198,681,698.74 BERKURANG
7.1 (8) Beton mutu rendah, (K-175) M3 32.50 1,976,978.58 64,251,803.70 1.420 16.25 1,976,978.58 32,125,901.85 0.764 (16.25) - 32,125,901.85 BERKURANG
7.1 (8) Beton mutu rendah, (K-175) Beton Siklop M3 188.40 1,976,978.58 372,462,763.62 8.233 188.40 1,976,978.58 372,462,763.62 8.854 - - - TETAP
Baja Tulangan D32 Ulir Kg 44,400.00 36,145.34 1,604,853,096.00 35.476 43,600.00 36,145.34 1,575,936,824.00 37.462 (800.00) - 28,916,272.00 BERKURANG
7.7 (1) Pengadaan Dinding Sumuran Silinder, diameter 250 cm M1 60.00 10,759,967.57 645,598,053.98 14.271 60.00 10,759,967.57 645,598,054.20 15.347 0.00 - - TETAP
7.7 (2) Penurunan Dinding Sumuran Silinder, diameter 250 cm M1 60.00 505,659.19 30,339,551.19 0.671 60.00 505,659.19 30,339,551.40 0.721 0.00 - - TETAP
7.9 (1) Pasang Batu Untuk Talud Penahan M3 187.95 979,963.42 184,184,125.19 4.071 284.83 979,963.42 279,122,980.92 6.635 96.88 94,938,855.73 - BERTAMBAH
7.10 (2) Pasangan Batu Kosong untuk Talud M3 24.50 415,607.50 10,182,383.75 0.225 39.00 415,607.50 16,208,692.50 0.385 14.50 6,026,308.75 - BERTAMBAH
7.11(6) Expantion Joint Tipe Baja Bersudut M1 72.00 467,103.31 33,631,438.34 0.743 68.00 467,103.31 31,763,025.08 0.755 (4.00) - 1,868,413.26 BERKURANG
7.12 (2) Perletakan Elastomerik Bearing Pad(300x350x36 Bh 8.00 712,695.83 5,701,566.65 0.126 8.00 712,695.83 5,701,566.65 0.136 - - - TETAP
7.13 Sandaran Railling M1 70.40 318,001.20 22,387,284.48 0.495 70.40 318,001.20 22,387,284.48 0.532 - - - TETAP
7.14 Papan nama Jembatan Bh 2.00 579,359.00 1,158,718.00 0.026 2.00 579,359.00 1,158,718.00 0.028 - - - TETAP
7.15 (1) Pembongkaran Pasangan Batu M2 64.00 245,126.34 15,688,085.51 0.347 64.00 245,126.34 15,688,085.51 0.373 - - - TETAP
7.15 (2) Pembongkaran Beton M3 16.70 486,424.95 8,123,296.62 0.180 16.70 486,424.95 8,123,296.62 0.193 - - - TETAP
7.16 Pipa cucuran Baja M1 16.00 300,114.10 4,801,825.60 0.106 16.00 300,114.10 4,801,825.60 0.114 - - - TETAP

(A) JUMLAH HARGA PEKERJAAN DILUAR PPN 4,523,784,324.54 100.00 4,206,732,117.54 100.00 100,965,164.48 418,017,371.90
(B) PPN 10 % x (A), ( Dipungut ) 452,378,432.45 420,673,211.75 10,096,516.45 41,801,737.19
(C) JUMLAH HARGA PEKERJAAN TERMASUK PPN ( A+B ) 4,976,162,757.00 4,627,405,329.30 111,061,680.93 459,819,109.09
(D) JUMLAH HARGA PEKERJAAN TERMASUK PPN ( Dibulatkan ) 4,976,160,000.00 4,627,400,000.00 111,060,000.00 459,810,000.00
DISANGGUPI OLEH : DIPERIKSA / DITELITI OLEH :
KONTRAKTOR
KONTRAKTOR PT.TIGA
PT. KONAWEHA
SATRIA GEMILANG
MAKMUR DIREKSI / KONSULTAN SUPERVISI : PANITIA PENELITI PELAKSANAAN KONTRAK (PPPK) :

LAODEYUSRI
1. MUH. MANDAULI,
H, SESH. 1. ……………… 1. MARHADIANTO, ST 1. ……………… 1. H A P I D,.ST ( Ketua ) 1. ………………
Direktur PPTK Bina Marga Bidang Jalan/Jembatan
2. MUHAMMAD ALFATIH RADHI A., A.Md.T. 2. ……………… 2. AKBAR BAHRUN, S.sos ( Sekretaris ) 2. ………………
2. Ir.
EKODARIMAN
CAHYONO 2. ……………… Direksi Teknik
Pelaksana 3. JEFRY SIMON TAWALUYAN, ST. 3. ……………… 3. SARIADIN, ST. ( Anggota ) 3. ………………
Supervisi Engineer

MENGETAHUI / MENYETUJUI :
KEPALA DINAS PEKERJAAN UMUM KUASA PENGGUNA ANGGARAN (KPA)
KABUPATEN KONAWE KEPULAUAN BIDANG BINA MARGA DINAS PU. DAN TATA RUANG KAB. KONAWE
#VALUE!

ISRAWAN SULPA, ST.Dipl.WRD E R O, ST. MT


Nip. 19691015 199203 1 011 NIP. 19660115 199803 1 002
LAMPIRAN USULAN AKHIR PEKERJAAN TAMBAH / KURANG ( CCO )
PEKERJAAN : PEMBANGUNAN JEMBATAN SUNGAI MOKOKOLARO 2
NOMOR PAKET / RUAS : 17 / LANGARA (PELABUHAN) - MATALANGARA
NO.& TANGGAL KONTRAK ASLI : 620/02.17/SP/PPPJJK-DPU/KONKEP/2016, 18 AGUSTUS 2016.
NILAI KONTRAK ASLI : Rp. 4,627,200,000.00
KONTRAKTOR : PT. TIGA SATRIA GEMILANG

KONTRAK ASLI KONTRAK REVISI / CCO NILAI REVISI


ITEM HARGA JUMLAH HARGA JUMLAH
PEMBAYA URAIAN PEKERJAAN SATUAN BOBOT BOBOT KETERANGAN
RAN NO. VOLUME SATUAN HARGA VOLUME SATUAN HARGA VOLUME NAIK (+) MENURUN ( - )
(%) (%)
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
I. UMUM
B. PERALATAN
1 Asphalt Sprayer Unit 1.00 450,000.00 450,000.00 0.010 1.00 450,000.00 450,000.00 0.011 - - - TETAP
2 Compressor 4000-6500 L/M Unit 1.00 275,000.00 275,000.00 0.006 1.00 275,000.00 275,000.00 0.007 - - - TETAP
3 Concrette mixer 0,3-0,6 m3 Unit 4.00 600,000.00 2,400,000.00 0.053 4.00 600,000.00 2,400,000.00 0.057 - - - TETAP
4 Dump Truck 3-4 M3 Unit 4.00 1,100,000.00 4,400,000.00 0.097 4.00 1,100,000.00 4,400,000.00 0.105 - - - TETAP
5 Excavator 80-140 HP Unit 1.00 650,000.00 650,000.00 0.014 1.00 650,000.00 650,000.00 0.015 - - - TETAP
6 Generator Set Unit 1.00 450,000.00 450,000.00 0.010 1.00 450,000.00 450,000.00 0.011 - - - TETAP
7 Motor Grader>100 HP Unit 1.00 6,500,000.00 6,500,000.00 0.144 1.00 6,500,000.00 6,500,000.00 0.155 - - - TETAP
8 Wheel Loader 1.0 - 1.6 M3 Unit 1.00 6,500,000.00 6,500,000.00 0.144 1.00 6,500,000.00 6,500,000.00 0.155 - - - TETAP
9 Tandem Roller 6-8 Ton Unit 1.00 6,500,000.00 6,500,000.00 0.144 1.00 6,500,000.00 6,500,000.00 0.155 - - - TETAP
10 Vibratory Roller 5-8 Ton Unit 1.00 6,500,000.00 6,500,000.00 0.144 1.00 6,500,000.00 6,500,000.00 0.155 TETAP
11 Concrette Vibrator Unit 4.00 270,000.00 1,080,000.00 0.024 4.00 270,000.00 1,080,000.00 0.026 TETAP
12 Water Pump 70-100 Mm Unit 4.00 220,000.00 880,000.00 0.019 4.00 220,000.00 880,000.00 0.021 - - - TETAP
13 Water Tank 3000-4500 L Unit 1.00 850,000.00 850,000.00 0.019 1.00 850,000.00 850,000.00 0.020 - - - TETAP
14 Welding Set Unit 1.00 85,000.00 85,000.00 0.002 1.00 85,000.00 85,000.00 0.002 - - - TETAP

C. FASILITAS KONTRAKTOR
1 Base Camp M2 50.00 450,000.00 22,500,000.00 0.497 50.00 450,000.00 22,500,000.00 0.535 - - - TETAP
2 Kantor M2 35.00 60,000.00 2,100,000.00 0.046 35.00 60,000.00 2,100,000.00 0.050 - - - TETAP
3 Barak/Bangsal Pekerja M2 100.00 40,000.00 4,000,000.00 0.088 100.00 40,000.00 4,000,000.00 0.095 - - - TETAP

D LAIN - LAIN
1 Pengukuran/Pemasangan Bouwplank M' 16.00 635,000.00 10,160,000.00 0.225 16.00 635,000.00 10,160,000.00 0.242 - - - TETAP
2 Papan Proyek dan Rambu lalulintas Ls 1.00 530,000.00 530,000.00 0.012 1.00 530,000.00 530,000.00 0.013 - - - TETAP
3 Dokumentasi & P 3 K Ls 1.00 1,250,000.00 1,250,000.00 0.028 1.00 1,250,000.00 1,250,000.00 0.030 - - - TETAP
4 Administrasi Bulanan Bln 4.00 1,300,000.00 5,200,000.00 0.115 4.00 1,300,000.00 5,200,000.00 0.124 - - - TETAP
5 Asbuilt Drawing Set 1.00 4,500,000.00 4,500,000.00 0.099 1.00 4,500,000.00 4,500,000.00 0.107 - - - TETAP
6 Pembuatan Cofferdam & Pengeringan Bh 2.00 7,000,000.00 14,000,000.00 0.309 2.00 7,000,000.00 14,000,000.00 0.333 - - - TETAP
7 Pemeriksaan Laboratorium Ls 1.00 11,000,000.00 11,000,000.00 0.243 1.00 11,000,000.00 11,000,000.00 0.261 - - - TETAP

E. Demobilisasi
1 Demobilisasi Ls 1.00 37,520,000.00 37,520,000.00 0.829 1.00 37,520,000.00 37,520,000.00 0.892 - - - TETAP

III. PEKERJAAN TANAH


3.1(3) Galian Struktur dengan Kedalaman 0 - 2 meter (Talud) M3 72.00 57,200.77 4,118,455.41 0.091 72.00 57,200.77 4,118,455.41 0.098 - - - TETAP
3.1(4) Galian Struktur dengan Kedalaman 2 - 4 meter (Abutmen M3 88.32 82,084.03 7,249,661.80 0.160 88.32 82,084.03 7,249,661.80 0.172 - - - TETAP
3.2(1) Timbunan biasa dengan material didatangkan M3 2,000.00 84,549.52 169,099,047.68 3.738 1,396.73 84,549.52 118,092,539.96 2.807 (603.27) - 51,006,507.71 BERKURANG
3.2(2) Timbunan Pilihan M3 368.00 98,676.69 36,313,023.25 0.803 360.93 98,676.69 35,615,081.69 0.847 (7.07) - 697,941.56 BERKURANG
KONTRAK ASLI KONTRAK REVISI / CCO NILAI REVISI
ITEM HARGA JUMLAH HARGA JUMLAH
PEMBAYA URAIAN PEKERJAAN SATUAN BOBOT BOBOT KETERANGAN
RAN NO. VOLUME SATUAN HARGA VOLUME SATUAN HARGA VOLUME NAIK (+) MENURUN ( - )
(%) (%)
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
V. PERKERASAN BERBUTIR
5.1(1) Lapis Pondasi Agregat Kelas A M3 113.63 1,021,976.79 116,127,222.79 2.567 74.30 1,021,976.79 75,929,605.17 1.805 (39.33) - 40,197,617.61 BERKURANG
5.1(2) Lapis Pondasi Agregat Kelas B M3 115.50 683,385.43 78,931,016.59 1.745 75.52 683,385.43 51,608,884.98 1.227 (39.98) - 27,322,131.62 BERKURANG

VI. PERKERASAN ASPAL


6.1 (1)a Lapis Resap Pengikat-Aspal Cair Liter 600.00 15,125.55 9,075,327.98 0.201 448.00 15,125.55 6,776,246.40 0.161 (152.00) - 2,299,081.58 BERKURANG
6.6.1 Lapis Permukaan Penetrasi Macadam M3 52.50 2,624,195.93 137,770,286.43 3.045 39.20 2,624,195.93 102,868,480.46 2.445 (13.30) - 34,901,805.97 BERKURANG

VII. STRUKTUR
7.1 (5) Beton mutu sedang, (K-350) M3 389.68 2,082,365.76 811,456,289.98 17.938 294.27 2,082,365.76 612,774,591.24 14.567 (95.41) - 198,681,698.74 BERKURANG
7.1 (8) Beton mutu rendah, (K-175) M3 32.50 1,976,978.58 64,251,803.70 1.420 16.25 1,976,978.58 32,125,901.85 0.764 (16.25) - 32,125,901.85 BERKURANG
7.1 (8) Beton mutu rendah, (K-175) Beton Siklop M3 188.40 1,976,978.58 372,462,763.62 8.233 188.40 1,976,978.58 372,462,763.62 8.854 - - - TETAP
Baja Tulangan D32 Ulir Kg 44,400.00 36,145.34 1,604,853,096.00 35.476 43,600.00 36,145.34 1,575,936,824.00 37.462 (800.00) - 28,916,272.00 BERKURANG
7.7 (1) Pengadaan Dinding Sumuran Silinder, diameter 250 cm M1 60.00 10,759,967.57 645,598,053.98 14.271 60.00 10,759,967.57 645,598,054.20 15.347 0.00 - - TETAP
7.7 (2) Penurunan Dinding Sumuran Silinder, diameter 250 cm M1 60.00 505,659.19 30,339,551.19 0.671 60.00 505,659.19 30,339,551.40 0.721 0.00 - - TETAP
7.9 (1) Pasang Batu Untuk Talud Penahan M3 187.95 979,963.42 184,184,125.19 4.071 284.83 979,963.42 279,122,980.92 6.635 96.88 94,938,855.73 - BERTAMBAH
7.10 (2) Pasangan Batu Kosong untuk Talud M3 24.50 415,607.50 10,182,383.75 0.225 39.00 415,607.50 16,208,692.50 0.385 14.50 6,026,308.75 - BERTAMBAH
7.11(6) Expantion Joint Tipe Baja Bersudut M1 72.00 467,103.31 33,631,438.34 0.743 68.00 467,103.31 31,763,025.08 0.755 (4.00) - 1,868,413.26 BERKURANG
7.12 (2) Perletakan Elastomerik Bearing Pad(300x350x36 Bh 8.00 712,695.83 5,701,566.65 0.126 8.00 712,695.83 5,701,566.65 0.136 - - - TETAP
7.13 Sandaran Railling M1 70.40 318,001.20 22,387,284.48 0.495 70.40 318,001.20 22,387,284.48 0.532 - - - TETAP
7.14 Papan nama Jembatan Bh 2.00 579,359.00 1,158,718.00 0.026 2.00 579,359.00 1,158,718.00 0.028 - - - TETAP
7.15 (1) Pembongkaran Pasangan Batu M2 64.00 245,126.34 15,688,085.51 0.347 64.00 245,126.34 15,688,085.51 0.373 - - - TETAP
7.15 (2) Pembongkaran Beton M3 16.70 486,424.95 8,123,296.62 0.180 16.70 486,424.95 8,123,296.62 0.193 - - - TETAP
7.16 Pipa cucuran Baja M1 16.00 300,114.10 4,801,825.60 0.106 16.00 300,114.10 4,801,825.60 0.114 - - - TETAP

(A) JUMLAH HARGA PEKERJAAN DILUAR PPN 4,523,784,324.54 100.00 4,206,732,117.54 100.00 100,965,164.48 418,017,371.90
(B) PPN 10 % x (A), ( Dipungut ) 452,378,432.45 420,673,211.75 10,096,516.45 41,801,737.19
(C) JUMLAH HARGA PEKERJAAN TERMASUK PPN ( A+B ) 4,976,162,757.00 4,627,405,329.30 111,061,680.93 459,819,109.09
(D) JUMLAH HARGA PEKERJAAN TERMASUK PPN ( Dibulatkan ) 4,976,160,000.00 4,627,400,000.00 111,060,000.00 459,810,000.00

Langara, 17 November 2016


Diajukan Oleh :

PT. TIGA SATRIA GEMILANG


Pusat Kendari

LAODE MANDAULI, SH
Direktur
LAMPIRAN USULAN AKHIR PEKERJAAN TAMBAH / KURANG ( CCO )
PEKERJAAN : PEMBANGUNAN JEMBATAN SUNGAI MOKOKOLARO 2
NOMOR PAKET / RUAS : 17 / LANGARA (PELABUHAN) - MATALANGARA
NO.& TANGGAL KONTRAK ASLI : 620/02.17/SP/PPPJJK-DPU/KONKEP/2016, 18 AGUSTUS 2016.
NILAI KONTRAK ASLI : Rp. 4,627,200,000.00
KONTRAKTOR : PT. TIGA SATRIA GEMILANG

KONTRAK ASLI KONTRAK REVISI / CCO NILAI REVISI


ITEM HARGA JUMLAH HARGA JUMLAH
PEMBAYA URAIAN PEKERJAAN SATUAN BOBOT BOBOT KETERANGAN
RAN NO. VOLUME SATUAN HARGA VOLUME SATUAN HARGA VOLUME NAIK (+) MENURUN ( - )
(%) (%)
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
I. UMUM
B. PERALATAN
1 Asphalt Sprayer Unit 1.00 450,000.00 450,000.00 0.010 1.00 450,000.00 450,000.00 0.011 - - - TETAP
2 Compressor 4000-6500 L/M Unit 1.00 275,000.00 275,000.00 0.006 1.00 275,000.00 275,000.00 0.007 - - - TETAP
3 Concrette mixer 0,3-0,6 m3 Unit 4.00 600,000.00 2,400,000.00 0.053 4.00 600,000.00 2,400,000.00 0.057 - - - TETAP
4 Dump Truck 3-4 M3 Unit 4.00 1,100,000.00 4,400,000.00 0.097 4.00 1,100,000.00 4,400,000.00 0.105 - - - TETAP
5 Excavator 80-140 HP Unit 1.00 650,000.00 650,000.00 0.014 1.00 650,000.00 650,000.00 0.015 - - - TETAP
6 Generator Set Unit 1.00 450,000.00 450,000.00 0.010 1.00 450,000.00 450,000.00 0.011 - - - TETAP
7 Motor Grader>100 HP Unit 1.00 6,500,000.00 6,500,000.00 0.144 1.00 6,500,000.00 6,500,000.00 0.155 - - - TETAP
8 Wheel Loader 1.0 - 1.6 M3 Unit 1.00 6,500,000.00 6,500,000.00 0.144 1.00 6,500,000.00 6,500,000.00 0.155 - - - TETAP
9 Tandem Roller 6-8 Ton Unit 1.00 6,500,000.00 6,500,000.00 0.144 1.00 6,500,000.00 6,500,000.00 0.155 - - - TETAP
10 Vibratory Roller 5-8 Ton Unit 1.00 6,500,000.00 6,500,000.00 0.144 1.00 6,500,000.00 6,500,000.00 0.155 TETAP
11 Concrette Vibrator Unit 4.00 270,000.00 1,080,000.00 0.024 4.00 270,000.00 1,080,000.00 0.026 TETAP
12 Water Pump 70-100 Mm Unit 4.00 220,000.00 880,000.00 0.019 4.00 220,000.00 880,000.00 0.021 - - - TETAP
13 Water Tank 3000-4500 L Unit 1.00 850,000.00 850,000.00 0.019 1.00 850,000.00 850,000.00 0.020 - - - TETAP
14 Welding Set Unit 1.00 85,000.00 85,000.00 0.002 1.00 85,000.00 85,000.00 0.002 - - - TETAP

C. FASILITAS KONTRAKTOR
1 Base Camp M2 50.00 450,000.00 22,500,000.00 0.497 50.00 450,000.00 22,500,000.00 0.535 - - - TETAP
2 Kantor M2 35.00 60,000.00 2,100,000.00 0.046 35.00 60,000.00 2,100,000.00 0.050 - - - TETAP
3 Barak/Bangsal Pekerja M2 100.00 40,000.00 4,000,000.00 0.088 100.00 40,000.00 4,000,000.00 0.095 - - - TETAP

D LAIN - LAIN
1 Pengukuran/Pemasangan Bouwplank M' 16.00 635,000.00 10,160,000.00 0.225 16.00 635,000.00 10,160,000.00 0.242 - - - TETAP
2 Papan Proyek dan Rambu lalulintas Ls 1.00 530,000.00 530,000.00 0.012 1.00 530,000.00 530,000.00 0.013 - - - TETAP
3 Dokumentasi & P 3 K Ls 1.00 1,250,000.00 1,250,000.00 0.028 1.00 1,250,000.00 1,250,000.00 0.030 - - - TETAP
4 Administrasi Bulanan Bln 4.00 1,300,000.00 5,200,000.00 0.115 4.00 1,300,000.00 5,200,000.00 0.124 - - - TETAP
5 Asbuilt Drawing Set 1.00 4,500,000.00 4,500,000.00 0.099 1.00 4,500,000.00 4,500,000.00 0.107 - - - TETAP
6 Pembuatan Cofferdam & Pengeringan Bh 2.00 7,000,000.00 14,000,000.00 0.309 2.00 7,000,000.00 14,000,000.00 0.333 - - - TETAP
7 Pemeriksaan Laboratorium Ls 1.00 11,000,000.00 11,000,000.00 0.243 1.00 11,000,000.00 11,000,000.00 0.261 - - - TETAP

E. Demobilisasi
1 Demobilisasi Ls 1.00 37,520,000.00 37,520,000.00 0.829 1.00 37,520,000.00 37,520,000.00 0.892 - - - TETAP

III. PEKERJAAN TANAH


3.1(3) Galian Struktur dengan Kedalaman 0 - 2 meter (Talud) M3 72.00 57,200.77 4,118,455.41 0.091 72.00 57,200.77 4,118,455.41 0.098 - - - TETAP
3.1(4) Galian Struktur dengan Kedalaman 2 - 4 meter (Abutmen M3 88.32 82,084.03 7,249,661.80 0.160 88.32 82,084.03 7,249,661.80 0.172 - - - TETAP
3.2(1) Timbunan biasa dengan material didatangkan M3 2,000.00 84,549.52 169,099,047.68 3.738 1,396.73 84,549.52 118,092,539.96 2.807 (603.27) - 51,006,507.71 BERKURANG
3.2(2) Timbunan Pilihan M3 368.00 98,676.69 36,313,023.25 0.803 360.93 98,676.69 35,615,081.69 0.847 (7.07) - 697,941.56 BERKURANG
KONTRAK ASLI KONTRAK REVISI / CCO NILAI REVISI
ITEM HARGA JUMLAH HARGA JUMLAH
PEMBAYA URAIAN PEKERJAAN SATUAN BOBOT BOBOT KETERANGAN
RAN NO. VOLUME SATUAN HARGA VOLUME SATUAN HARGA VOLUME NAIK (+) MENURUN ( - )
(%) (%)
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
V. PERKERASAN BERBUTIR
5.1(1) Lapis Pondasi Agregat Kelas A M3 113.63 1,021,976.79 116,127,222.79 2.567 74.30 1,021,976.79 75,929,605.17 1.805 (39.33) - 40,197,617.61 BERKURANG
5.1(2) Lapis Pondasi Agregat Kelas B M3 115.50 683,385.43 78,931,016.59 1.745 75.52 683,385.43 51,608,884.98 1.227 (39.98) - 27,322,131.62 BERKURANG

VI. PERKERASAN ASPAL


6.1 (1)a Lapis Resap Pengikat-Aspal Cair Liter 600.00 15,125.55 9,075,327.98 0.201 448.00 15,125.55 6,776,246.40 0.161 (152.00) - 2,299,081.58 BERKURANG
6.6.1 Lapis Permukaan Penetrasi Macadam M3 52.50 2,624,195.93 137,770,286.43 3.045 39.20 2,624,195.93 102,868,480.46 2.445 (13.30) - 34,901,805.97 BERKURANG

VII. STRUKTUR
7.1 (5) Beton mutu sedang, (K-350) M3 389.68 2,082,365.76 811,456,289.98 17.938 294.27 2,082,365.76 612,774,591.24 14.567 (95.41) - 198,681,698.74 BERKURANG
7.1 (8) Beton mutu rendah, (K-175) M3 32.50 1,976,978.58 64,251,803.70 1.420 16.25 1,976,978.58 32,125,901.85 0.764 (16.25) - 32,125,901.85 BERKURANG
7.1 (8) Beton mutu rendah, (K-175) Beton Siklop M3 188.40 1,976,978.58 372,462,763.62 8.233 188.40 1,976,978.58 372,462,763.62 8.854 - - - TETAP
Baja Tulangan D32 Ulir Kg 44,400.00 36,145.34 1,604,853,096.00 35.476 43,600.00 36,145.34 1,575,936,824.00 37.462 (800.00) - 28,916,272.00 BERKURANG
7.7 (1) Pengadaan Dinding Sumuran Silinder, diameter 250 cm M1 60.00 10,759,967.57 645,598,053.98 14.271 60.00 10,759,967.57 645,598,054.20 15.347 0.00 - - TETAP
7.7 (2) Penurunan Dinding Sumuran Silinder, diameter 250 cm M1 60.00 505,659.19 30,339,551.19 0.671 60.00 505,659.19 30,339,551.40 0.721 0.00 - - TETAP
7.9 (1) Pasang Batu Untuk Talud Penahan M3 187.95 979,963.42 184,184,125.19 4.071 284.83 979,963.42 279,122,980.92 6.635 96.88 94,938,855.73 - BERTAMBAH
7.10 (2) Pasangan Batu Kosong untuk Talud M3 24.50 415,607.50 10,182,383.75 0.225 39.00 415,607.50 16,208,692.50 0.385 14.50 6,026,308.75 - BERTAMBAH
7.11(6) Expantion Joint Tipe Baja Bersudut M1 72.00 467,103.31 33,631,438.34 0.743 68.00 467,103.31 31,763,025.08 0.755 (4.00) - 1,868,413.26 BERKURANG
7.12 (2) Perletakan Elastomerik Bearing Pad(300x350x36 Bh 8.00 712,695.83 5,701,566.65 0.126 8.00 712,695.83 5,701,566.65 0.136 - - - TETAP
7.13 Sandaran Railling M1 70.40 318,001.20 22,387,284.48 0.495 70.40 318,001.20 22,387,284.48 0.532 - - - TETAP
7.14 Papan nama Jembatan Bh 2.00 579,359.00 1,158,718.00 0.026 2.00 579,359.00 1,158,718.00 0.028 - - - TETAP
7.15 (1) Pembongkaran Pasangan Batu M2 64.00 245,126.34 15,688,085.51 0.347 64.00 245,126.34 15,688,085.51 0.373 - - - TETAP
7.15 (2) Pembongkaran Beton M3 16.70 486,424.95 8,123,296.62 0.180 16.70 486,424.95 8,123,296.62 0.193 - - - TETAP
7.16 Pipa cucuran Baja M1 16.00 300,114.10 4,801,825.60 0.106 16.00 300,114.10 4,801,825.60 0.114 - - - TETAP

(A) JUMLAH HARGA PEKERJAAN DILUAR PPN 4,523,784,324.54 100.00 4,206,732,117.54 100.00 100,965,164.48 418,017,371.90
(B) PPN 10 % x (A), ( Dipungut ) 452,378,432.45 420,673,211.75 10,096,516.45 41,801,737.19
(C) JUMLAH HARGA PEKERJAAN TERMASUK PPN ( A+B ) 4,976,162,757.00 4,627,405,329.30 111,061,680.93 459,819,109.09
(D) JUMLAH HARGA PEKERJAAN TERMASUK PPN ( Dibulatkan ) 4,976,160,000.00 4,627,400,000.00 111,060,000.00 459,810,000.00

Langara, 17 November 2016


Diajukan Oleh :

PT. TIGA SATRIA GEMILANG


Pusat Kendari

LAODE MANDAULI, SH
Direktur
LAMPIRAN BERITA ACARA EVALUASI AKHIR PEKERJAAN TAMBAH / KURANG ( CCO )
PEKERJAAN : PEMBANGUNAN JEMBATAN SUNGAI MOKOKOLARO 2
NOMOR PAKET / RUAS : 17 / LANGARA (PELABUHAN) - MATALANGARA
NO.& TANGGAL KONTRAK ASLI : 620/02.17/SP/PPPJJK-DPU/KONKEP/2016, 18 AGUSTUS 2016.
NILAI KONTRAK ASLI : Rp. 4,627,200,000.00
KONTRAKTOR : PT. TIGA SATRIA GEMILANG

KONTRAK ASLI KONTRAK REVISI / CCO NILAI REVISI


ITEM HARGA JUMLAH HARGA JUMLAH
PEMBAYA URAIAN PEKERJAAN SATUAN BOBOT BOBOT KETERANGAN
RAN NO. VOLUME SATUAN HARGA VOLUME SATUAN HARGA VOLUME NAIK (+) MENURUN ( - )
(%) (%)
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
I. UMUM
B. PERALATAN
1 Asphalt Sprayer Unit 1.00 450,000.00 450,000.00 0.010 1.00 450,000.00 450,000.00 0.011 - - - TETAP
2 Compressor 4000-6500 L/M Unit 1.00 275,000.00 275,000.00 0.006 1.00 275,000.00 275,000.00 0.007 - - - TETAP
3 Concrette mixer 0,3-0,6 m3 Unit 4.00 600,000.00 2,400,000.00 0.053 4.00 600,000.00 2,400,000.00 0.057 - - - TETAP
4 Dump Truck 3-4 M3 Unit 4.00 1,100,000.00 4,400,000.00 0.097 4.00 1,100,000.00 4,400,000.00 0.105 - - - TETAP
5 Excavator 80-140 HP Unit 1.00 650,000.00 650,000.00 0.014 1.00 650,000.00 650,000.00 0.015 - - - TETAP
6 Generator Set Unit 1.00 450,000.00 450,000.00 0.010 1.00 450,000.00 450,000.00 0.011 - - - TETAP
7 Motor Grader>100 HP Unit 1.00 6,500,000.00 6,500,000.00 0.144 1.00 6,500,000.00 6,500,000.00 0.155 - - - TETAP
8 Wheel Loader 1.0 - 1.6 M3 Unit 1.00 6,500,000.00 6,500,000.00 0.144 1.00 6,500,000.00 6,500,000.00 0.155 - - - TETAP
9 Tandem Roller 6-8 Ton Unit 1.00 6,500,000.00 6,500,000.00 0.144 1.00 6,500,000.00 6,500,000.00 0.155 - - - TETAP
10 Vibratory Roller 5-8 Ton Unit 1.00 6,500,000.00 6,500,000.00 0.144 1.00 6,500,000.00 6,500,000.00 0.155 TETAP
11 Concrette Vibrator Unit 4.00 270,000.00 1,080,000.00 0.024 4.00 270,000.00 1,080,000.00 0.026 TETAP
12 Water Pump 70-100 Mm Unit 4.00 220,000.00 880,000.00 0.019 4.00 220,000.00 880,000.00 0.021 - - - TETAP
13 Water Tank 3000-4500 L Unit 1.00 850,000.00 850,000.00 0.019 1.00 850,000.00 850,000.00 0.020 - - - TETAP
14 Welding Set Unit 1.00 85,000.00 85,000.00 0.002 1.00 85,000.00 85,000.00 0.002 - - - TETAP

C. FASILITAS KONTRAKTOR
1 Base Camp M2 50.00 450,000.00 22,500,000.00 0.497 50.00 450,000.00 22,500,000.00 0.535 - - - TETAP
2 Kantor M2 35.00 60,000.00 2,100,000.00 0.046 35.00 60,000.00 2,100,000.00 0.050 - - - TETAP
3 Barak/Bangsal Pekerja M2 100.00 40,000.00 4,000,000.00 0.088 100.00 40,000.00 4,000,000.00 0.095 - - - TETAP

D LAIN - LAIN
1 Pengukuran/Pemasangan Bouwplank M' 16.00 635,000.00 10,160,000.00 0.225 16.00 635,000.00 10,160,000.00 0.242 - - - TETAP
2 Papan Proyek dan Rambu lalulintas Ls 1.00 530,000.00 530,000.00 0.012 1.00 530,000.00 530,000.00 0.013 - - - TETAP
3 Dokumentasi & P 3 K Ls 1.00 1,250,000.00 1,250,000.00 0.028 1.00 1,250,000.00 1,250,000.00 0.030 - - - TETAP
4 Administrasi Bulanan Bln 4.00 1,300,000.00 5,200,000.00 0.115 4.00 1,300,000.00 5,200,000.00 0.124 - - - TETAP
5 Asbuilt Drawing Set 1.00 4,500,000.00 4,500,000.00 0.099 1.00 4,500,000.00 4,500,000.00 0.107 - - - TETAP
6 Pembuatan Cofferdam & Pengeringan Bh 2.00 7,000,000.00 14,000,000.00 0.309 2.00 7,000,000.00 14,000,000.00 0.333 - - - TETAP
7 Pemeriksaan Laboratorium Ls 1.00 11,000,000.00 11,000,000.00 0.243 1.00 11,000,000.00 11,000,000.00 0.261 - - - TETAP

E. Demobilisasi
1 Demobilisasi Ls 1.00 37,520,000.00 37,520,000.00 0.829 1.00 37,520,000.00 37,520,000.00 0.892 - - - TETAP

III. PEKERJAAN TANAH


3.1(3) Galian Struktur dengan Kedalaman 0 - 2 meter (Talud) M3 72.00 57,200.77 4,118,455.41 0.091 72.00 57,200.77 4,118,455.41 0.098 - - - TETAP
3.1(4) Galian Struktur dengan Kedalaman 2 - 4 meter (Abutmen M3 88.32 82,084.03 7,249,661.80 0.160 88.32 82,084.03 7,249,661.80 0.172 - - - TETAP
3.2(1) Timbunan biasa dengan material didatangkan M3 2,000.00 84,549.52 169,099,047.68 3.738 1,396.73 84,549.52 118,092,539.96 2.807 (603.27) - 51,006,507.71 BERKURANG
3.2(2) Timbunan Pilihan M3 368.00 98,676.69 36,313,023.25 0.803 360.93 98,676.69 35,615,081.69 0.847 (7.07) - 697,941.56 BERKURANG
KONTRAK ASLI KONTRAK REVISI / CCO NILAI REVISI
ITEM HARGA JUMLAH HARGA JUMLAH
PEMBAYA URAIAN PEKERJAAN SATUAN BOBOT BOBOT KETERANGAN
RAN NO. VOLUME SATUAN HARGA VOLUME SATUAN HARGA VOLUME NAIK (+) MENURUN ( - )
(%) (%)
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
V. PERKERASAN BERBUTIR
5.1(1) Lapis Pondasi Agregat Kelas A M3 113.63 1,021,976.79 116,127,222.79 2.567 74.30 1,021,976.79 75,929,605.17 1.805 (39.33) - 40,197,617.61 BERKURANG
5.1(2) Lapis Pondasi Agregat Kelas B M3 115.50 683,385.43 78,931,016.59 1.745 75.52 683,385.43 51,608,884.98 1.227 (39.98) - 27,322,131.62 BERKURANG

VI. PERKERASAN ASPAL


6.1 (1)a Lapis Resap Pengikat-Aspal Cair Liter 600.00 15,125.55 9,075,327.98 0.201 448.00 15,125.55 6,776,246.40 0.161 (152.00) - 2,299,081.58 BERKURANG
6.6.1 Lapis Permukaan Penetrasi Macadam M3 52.50 2,624,195.93 137,770,286.43 3.045 39.20 2,624,195.93 102,868,480.46 2.445 (13.30) - 34,901,805.97 BERKURANG

VII. STRUKTUR
7.1 (5) Beton mutu sedang, (K-350) M3 389.68 2,082,365.76 811,456,289.98 17.938 294.27 2,082,365.76 612,774,591.24 14.567 (95.41) - 198,681,698.74 BERKURANG
7.1 (8) Beton mutu rendah, (K-175) M3 32.50 1,976,978.58 64,251,803.70 1.420 16.25 1,976,978.58 32,125,901.85 0.764 (16.25) - 32,125,901.85 BERKURANG
7.1 (8) Beton mutu rendah, (K-175) Beton Siklop M3 188.40 1,976,978.58 372,462,763.62 8.233 188.40 1,976,978.58 372,462,763.62 8.854 - - - TETAP
Baja Tulangan D32 Ulir Kg 44,400.00 36,145.34 1,604,853,096.00 35.476 43,600 36,145.34 1,575,936,824.00 37.462 (800.00) - 28,916,272.00 BERKURANG
7.7 (1) Pengadaan Dinding Sumuran Silinder, diameter 250 cm M1 60.00 10,759,967.57 645,598,053.98 14.271 60.00 10,759,967.57 645,598,054.20 15.347 0.00 - - TETAP
7.7 (2) Penurunan Dinding Sumuran Silinder, diameter 250 cm M1 60.00 505,659.19 30,339,551.19 0.671 60.00 505,659.19 30,339,551.40 0.721 0.00 - - TETAP
7.9 (1) Pasang Batu Untuk Talud Penahan M3 187.95 979,963.42 184,184,125.19 4.071 284.83 979,963.42 279,122,980.92 6.635 96.88 94,938,855.73 - BERTAMBAH
7.10 (2) Pasangan Batu Kosong untuk Talud M3 24.50 415,607.50 10,182,383.75 0.225 39.00 415,607.50 16,208,692.50 0.385 14.50 6,026,308.75 - BERTAMBAH
7.11(6) Expantion Joint Tipe Baja Bersudut M1 72.00 467,103.31 33,631,438.34 0.743 68.00 467,103.31 31,763,025.08 0.755 (4.00) - 1,868,413.26 BERKURANG
7.12 (2) Perletakan Elastomerik Bearing Pad(300x350x36 Bh 8.00 712,695.83 5,701,566.65 0.126 8.00 712,695.83 5,701,566.65 0.136 - - - TETAP
7.13 Sandaran Railling M1 70.40 318,001.20 22,387,284.48 0.495 70.40 318,001.20 22,387,284.48 0.532 - - - TETAP
7.14 Papan nama Jembatan Bh 2.00 579,359.00 1,158,718.00 0.026 2.00 579,359.00 1,158,718.00 0.028 - - - TETAP
7.15 (1) Pembongkaran Pasangan Batu M2 64.00 245,126.34 15,688,085.51 0.347 64.00 245,126.34 15,688,085.51 0.373 - - - TETAP
7.15 (2) Pembongkaran Beton M3 16.70 486,424.95 8,123,296.62 0.180 16.70 486,424.95 8,123,296.62 0.193 - - - TETAP
7.16 Pipa cucuran Baja M1 16.00 300,114.10 4,801,825.60 0.106 16.00 300,114.10 4,801,825.60 0.114 - - - TETAP

(A) JUMLAH HARGA PEKERJAAN DILUAR PPN 4,523,784,324.54 100.00 4,206,732,117.54 100.00 100,965,164.48 418,017,371.90
(B) PPN 10 % x (A), ( Dipungut ) 452,378,432.45 420,673,211.75 10,096,516.45 41,801,737.19
(C) JUMLAH HARGA PEKERJAAN TERMASUK PPN ( A+B ) 4,976,162,757.00 4,627,405,329.30 111,061,680.93 459,819,109.09
(D) JUMLAH HARGA PEKERJAAN TERMASUK PPN ( Dibulatkan ) 4,976,160,000.00 4,627,400,000.00 111,060,000.00 459,810,000.00

Langara, 30 November 2016


Diajukan Oleh :

PT. TIGA SATRIA GEMILANG


Pusat Kendari

LAODE MANDAULI, SH
Direktur
LAMPIRAN BERITA ACARA EVALUASI AKHIR PEKERJAAN TAMBAH / KURANG ( CCO )
PEKERJAAN : PEMBANGUNAN JEMBATAN SUNGAI MOKOKOLARO 2
NOMOR PAKET / RUAS : 17 / LANGARA (PELABUHAN) - MATALANGARA
NO.& TANGGAL KONTRAK ASLI : 620/02.17/SP/PPPJJK-DPU/KONKEP/2016, 18 AGUSTUS 2016.
NILAI KONTRAK ASLI : Rp. 4,976,160,000.00
KONTRAKTOR : PT. TIGA SATRIA GEMILANG

KONTRAK ASLI KONTRAK REVISI / CCO NILAI REVISI


ITEM HARGA JUMLAH HARGA JUMLAH
PEMBAYA URAIAN PEKERJAAN SATUAN BOBOT BOBOT KETERANGAN
RAN NO. VOLUME SATUAN HARGA VOLUME SATUAN HARGA VOLUME NAIK (+) MENURUN ( - )
(%) (%)
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
I. UMUM
B. PERALATAN
1 Asphalt Sprayer Unit 1.00 450,000.00 450,000.00 0.010 1.00 450,000.00 450,000.00 0.010 - - - TETAP
2 Compressor 4000-6500 L/M Unit 1.00 275,000.00 275,000.00 0.006 1.00 275,000.00 275,000.00 0.006 - - - TETAP
3 Concrette mixer 0,3-0,6 m3 Unit 4.00 600,000.00 2,400,000.00 0.053 4.00 600,000.00 2,400,000.00 0.053 - - - TETAP
4 Dump Truck 3-4 M3 Unit 4.00 1,100,000.00 4,400,000.00 0.097 4.00 1,100,000.00 4,400,000.00 0.097 - - - TETAP
5 Excavator 80-140 HP Unit 1.00 650,000.00 650,000.00 0.014 1.00 650,000.00 650,000.00 0.014 - - - TETAP
6 Generator Set Unit 1.00 450,000.00 450,000.00 0.010 1.00 450,000.00 450,000.00 0.010 - - - TETAP
7 Motor Grader>100 HP Unit 1.00 6,500,000.00 6,500,000.00 0.144 1.00 6,500,000.00 6,500,000.00 0.144 - - - TETAP
8 Wheel Loader 1.0 - 1.6 M3 Unit 1.00 6,500,000.00 6,500,000.00 0.144 1.00 6,500,000.00 6,500,000.00 0.144 - - - TETAP
9 Tandem Roller 6-8 Ton Unit 1.00 6,500,000.00 6,500,000.00 0.144 1.00 6,500,000.00 6,500,000.00 0.144 - - - TETAP
10 Vibratory Roller 5-8 Ton Unit 1.00 6,500,000.00 6,500,000.00 0.144 1.00 6,500,000.00 6,500,000.00 0.144 TETAP
11 Concrette Vibrator Unit 4.00 270,000.00 1,080,000.00 0.024 4.00 270,000.00 1,080,000.00 0.024 TETAP
12 Water Pump 70-100 Mm Unit 4.00 220,000.00 880,000.00 0.019 4.00 220,000.00 880,000.00 0.019 - - - TETAP
13 Water Tank 3000-4500 L Unit 1.00 850,000.00 850,000.00 0.019 1.00 850,000.00 850,000.00 0.019 - - - TETAP
14 Welding Set Unit 1.00 85,000.00 85,000.00 0.002 1.00 85,000.00 85,000.00 0.002 - - - TETAP

C. FASILITAS KONTRAKTOR
1 Base Camp M2 50.00 450,000.00 22,500,000.00 0.497 50.00 450,000.00 22,500,000.00 0.497 - - - TETAP
2 Kantor M2 35.00 60,000.00 2,100,000.00 0.046 35.00 60,000.00 2,100,000.00 0.046 - - - TETAP
3 Barak/Bangsal Pekerja M2 100.00 40,000.00 4,000,000.00 0.088 100.00 40,000.00 4,000,000.00 0.088 - - - TETAP

D LAIN - LAIN
1 Pengukuran/Pemasangan Bouwplank M' 16.00 635,000.00 10,160,000.00 0.225 16.00 635,000.00 10,160,000.00 0.225 - - - TETAP
2 Papan Proyek dan Rambu lalulintas Ls 1.00 530,000.00 530,000.00 0.012 1.00 530,000.00 530,000.00 0.012 - - - TETAP
3 Dokumentasi & P 3 K Ls 1.00 1,250,000.00 1,250,000.00 0.028 1.00 1,250,000.00 1,250,000.00 0.028 - - - TETAP
4 Administrasi Bulanan Bln 4.00 1,300,000.00 5,200,000.00 0.115 4.00 1,300,000.00 5,200,000.00 0.115 - - - TETAP
5 Asbuilt Drawing Set 1.00 4,500,000.00 4,500,000.00 0.099 1.00 4,500,000.00 4,500,000.00 0.099 - - - TETAP
6 Pembuatan Cofferdam & Pengeringan Bh 2.00 7,000,000.00 14,000,000.00 0.309 2.00 7,000,000.00 14,000,000.00 0.309 - - - TETAP
7 Pemeriksaan Laboratorium Ls 1.00 11,000,000.00 11,000,000.00 0.243 1.00 11,000,000.00 11,000,000.00 0.243 - - - TETAP

E. Demobilisasi
1 Demobilisasi Ls 1.00 37,520,000.00 37,520,000.00 0.829 1.00 37,520,000.00 37,520,000.00 0.829 - - - TETAP

III. PEKERJAAN TANAH


3.1(3) Galian Struktur dengan Kedalaman 0 - 2 meter (Talud) M3 72.00 57,200.77 4,118,455.41 0.091 72.00 57,200.77 4,118,455.41 0.091 - - - TETAP
3.1(4) Galian Struktur dengan Kedalaman 2 - 4 meter (Abutmen M3 88.32 82,084.03 7,249,661.80 0.160 88.32 82,084.03 7,249,661.80 0.160 - - - TETAP
3.2(1) Timbunan biasa dengan material didatangkan M3 2,000.00 84,549.52 169,099,047.68 3.738 1,396.73 84,549.52 118,092,539.96 2.610 (603.27) - 51,006,507.71 BERKURANG
3.2(2) Timbunan Pilihan M3 368.00 98,676.69 36,313,023.25 0.803 360.93 98,676.69 35,615,081.69 0.787 (7.07) - 697,941.56 BERKURANG

V. PERKERASAN BERBUTIR
5.1(1) Lapis Pondasi Agregat Kelas A M3 113.63 1,021,976.79 116,127,222.79 2.567 74.30 1,021,976.79 75,929,605.17 1.678 (39.33) - 40,197,617.61 BERKURANG
5.1(2) Lapis Pondasi Agregat Kelas B M3 115.50 683,385.43 78,931,016.59 1.745 75.52 683,385.43 51,608,884.98 1.141 (39.98) - 27,322,131.62 BERKURANG
KONTRAK ASLI KONTRAK REVISI / CCO NILAI REVISI
ITEM HARGA JUMLAH HARGA JUMLAH
PEMBAYA URAIAN PEKERJAAN SATUAN BOBOT BOBOT KETERANGAN
RAN NO. VOLUME SATUAN HARGA VOLUME SATUAN HARGA VOLUME NAIK (+) MENURUN ( - )
(%) (%)
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

VI. PERKERASAN ASPAL


6.1 (1)a Lapis Resap Pengikat-Aspal Cair Liter 600.00 15,125.55 9,075,327.98 0.201 448.00 15,125.55 6,776,246.40 0.150 (152.00) - 2,299,081.58 BERKURANG
6.6.1 Lapis Permukaan Penetrasi Macadam M3 52.50 2,624,195.93 137,770,286.43 3.045 39.20 2,624,195.93 102,868,480.46 2.274 (13.30) - 34,901,805.97 BERKURANG

VII. STRUKTUR
7.1 (5) Beton mutu sedang, (K-350) M3 389.68 2,082,365.76 811,456,289.98 17.938 294.27 2,082,365.76 612,774,591.24 13.546 (95.41) - 198,681,698.74 BERKURANG
7.1 (8) Beton mutu rendah, (K-175) M3 32.50 1,976,978.58 64,251,803.70 1.420 16.25 1,976,978.58 32,125,901.85 0.710 (16.25) - 32,125,901.85 BERKURANG
7.1 (8) Beton mutu rendah, (K-175) Beton Siklop M3 188.40 1,976,978.58 372,462,763.62 8.233 188.40 1,976,978.58 372,462,763.62 8.233 - - - TETAP
Baja Tulangan D32 Ulir Kg 44,400.00 36,145.34 1,604,853,096.00 35.476 43,600 36,145.34 1,575,936,824.00 34.837 (800.00) - 28,916,272.00 BERKURANG
7.7 (1) Pengadaan Dinding Sumuran Silinder, diameter 250 cm M1 60.00 10,759,967.57 645,598,053.98 14.271 60.00 10,759,967.57 645,598,054.20 14.271 0.00 - - TETAP
7.7 (2) Penurunan Dinding Sumuran Silinder, diameter 250 cm M1 60.00 505,659.19 30,339,551.19 0.671 60.00 505,659.19 30,339,551.40 0.671 0.00 - - TETAP
7.9 (1) Pasang Batu Untuk Talud Penahan M3 187.95 979,963.42 184,184,125.19 4.071 284.83 979,963.42 279,122,980.92 6.170 96.88 94,938,855.73 - BERTAMBAH
7.10 (2) Pasangan Batu Kosong untuk Talud M3 24.50 415,607.50 10,182,383.75 0.225 39.00 415,607.50 16,208,692.50 0.358 14.50 6,026,308.75 - BERTAMBAH
7.11(6) Expantion Joint Tipe Baja Bersudut M1 72.00 467,103.31 33,631,438.34 0.743 68.00 467,103.31 31,763,025.08 0.702 (4.00) - 1,868,413.26 BERKURANG
7.12 (2) Perletakan Elastomerik Bearing Pad(300x350x36 Bh 8.00 712,695.83 5,701,566.65 0.126 8.00 712,695.83 5,701,566.65 0.126 - - - TETAP
7.13 Sandaran Railling M1 70.40 318,001.20 22,387,284.48 0.495 70.40 318,001.20 22,387,284.48 0.495 - - - TETAP
7.14 Papan nama Jembatan Bh 2.00 579,359.00 1,158,718.00 0.026 2.00 579,359.00 1,158,718.00 0.026 - - - TETAP
7.15 (1) Pembongkaran Pasangan Batu M2 64.00 245,126.34 15,688,085.51 0.347 64.00 245,126.34 15,688,085.51 0.347 - - - TETAP
7.15 (2) Pembongkaran Beton M3 16.70 486,424.95 8,123,296.62 0.180 16.70 486,424.95 8,123,296.62 0.180 - - - TETAP
7.16 Pipa cucuran Baja M1 16.00 300,114.10 4,801,825.60 0.106 16.00 300,114.10 4,801,825.60 0.106 - - - TETAP

(A) JUMLAH HARGA PEKERJAAN DILUAR PPN 4,523,784,324.54 100.00 4,206,732,117.54 92.99 100,965,164.48 418,017,371.90
(B) PPN 10 % x (A), ( Dipungut ) 452,378,432.45 420,673,211.75 10,096,516.45 41,801,737.19
(C) JUMLAH HARGA PEKERJAAN TERMASUK PPN ( A+B ) 4,976,162,757.00 4,627,405,329.30 111,061,680.93 459,819,109.09
(D) JUMLAH HARGA PEKERJAAN TERMASUK PPN ( Dibulatkan ) 4,976,160,000.00 4,627,400,000.00 111,060,000.00 459,810,000.00

DISANGGUPI OLEH :
Penyedia Jasa
PT. TIGA SATRIA GEMILANG
Pusat Kendari

LAODE MANDAULI, SH
Direktur

MENGETAHUI / MENYETUJUI :
KEPALA DINAS PEKERJAAN UMUM PEJABAT PEMBUAT KOMITMEN (PPK)
KABUPATEN KONAWE KEPULAUAN BIDANG BINA MARGA
#VALUE! -

ISRAWAN SULPA, ST.Dipl.WRD E R O, ST., MT


Nip. 19690101 199203 1 002 NIP. 19660505 199704 1 001
LAMPIRAN BERITA ACARA EVALUASI AKHIR PEKERJAAN TAMBAH / KURANG ( CCO )
PEKERJAAN : PEMBANGUNAN JEMBATAN SUNGAI MOKOKOLARO 2
NOMOR PAKET / RUAS : 17 / LANGARA (PELABUHAN) - MATALANGARA
NO.& TANGGAL KONTRAK ASLI : 620/02.17/SP/PPPJJK-DPU/KONKEP/2016, 18 AGUSTUS 2016.
NILAI KONTRAK ASLI : Rp. 4,976,160,000.00
KONTRAKTOR : PT. TIGA SATRIA GEMILANG

KONTRAK ASLI KONTRAK REVISI / CCO NILAI REVISI


ITEM HARGA JUMLAH HARGA JUMLAH
PEMBAYA URAIAN PEKERJAAN SATUAN BOBOT BOBOT KETERANGAN
RAN NO. VOLUME SATUAN HARGA VOLUME SATUAN HARGA VOLUME NAIK (+) MENURUN ( - )
(%) (%)
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
I. UMUM
B. PERALATAN
1 Asphalt Sprayer Unit 1.00 450,000.00 450,000.00 0.010 1.00 450,000.00 450,000.00 0.010 - - - TETAP
2 Compressor 4000-6500 L/M Unit 1.00 275,000.00 275,000.00 0.006 1.00 275,000.00 275,000.00 0.006 - - - TETAP
3 Concrette mixer 0,3-0,6 m3 Unit 4.00 600,000.00 2,400,000.00 0.053 4.00 600,000.00 2,400,000.00 0.053 - - - TETAP
4 Dump Truck 3-4 M3 Unit 4.00 1,100,000.00 4,400,000.00 0.097 4.00 1,100,000.00 4,400,000.00 0.097 - - - TETAP
5 Excavator 80-140 HP Unit 1.00 650,000.00 650,000.00 0.014 1.00 650,000.00 650,000.00 0.014 - - - TETAP
6 Generator Set Unit 1.00 450,000.00 450,000.00 0.010 1.00 450,000.00 450,000.00 0.010 - - - TETAP
7 Motor Grader>100 HP Unit 1.00 6,500,000.00 6,500,000.00 0.144 1.00 6,500,000.00 6,500,000.00 0.144 - - - TETAP
8 Wheel Loader 1.0 - 1.6 M3 Unit 1.00 6,500,000.00 6,500,000.00 0.144 1.00 6,500,000.00 6,500,000.00 0.144 - - - TETAP
9 Tandem Roller 6-8 Ton Unit 1.00 6,500,000.00 6,500,000.00 0.144 1.00 6,500,000.00 6,500,000.00 0.144 - - - TETAP
10 Vibratory Roller 5-8 Ton Unit 1.00 6,500,000.00 6,500,000.00 0.144 1.00 6,500,000.00 6,500,000.00 0.144 TETAP
11 Concrette Vibrator Unit 4.00 270,000.00 1,080,000.00 0.024 4.00 270,000.00 1,080,000.00 0.024 TETAP
12 Water Pump 70-100 Mm Unit 4.00 220,000.00 880,000.00 0.019 4.00 220,000.00 880,000.00 0.019 - - - TETAP
13 Water Tank 3000-4500 L Unit 1.00 850,000.00 850,000.00 0.019 1.00 850,000.00 850,000.00 0.019 - - - TETAP
14 Welding Set Unit 1.00 85,000.00 85,000.00 0.002 1.00 85,000.00 85,000.00 0.002 - - - TETAP

C. FASILITAS KONTRAKTOR
1 Base Camp M2 50.00 450,000.00 22,500,000.00 0.497 50.00 450,000.00 22,500,000.00 0.497 - - - TETAP
2 Kantor M2 35.00 60,000.00 2,100,000.00 0.046 35.00 60,000.00 2,100,000.00 0.046 - - - TETAP
3 Barak/Bangsal Pekerja M2 100.00 40,000.00 4,000,000.00 0.088 100.00 40,000.00 4,000,000.00 0.088 - - - TETAP

D LAIN - LAIN
1 Pengukuran/Pemasangan Bouwplank M' 16.00 635,000.00 10,160,000.00 0.225 16.00 635,000.00 10,160,000.00 0.225 - - - TETAP
2 Papan Proyek dan Rambu lalulintas Ls 1.00 530,000.00 530,000.00 0.012 1.00 530,000.00 530,000.00 0.012 - - - TETAP
3 Dokumentasi & P 3 K Ls 1.00 1,250,000.00 1,250,000.00 0.028 1.00 1,250,000.00 1,250,000.00 0.028 - - - TETAP
4 Administrasi Bulanan Bln 4.00 1,300,000.00 5,200,000.00 0.115 4.00 1,300,000.00 5,200,000.00 0.115 - - - TETAP
5 Asbuilt Drawing Set 1.00 4,500,000.00 4,500,000.00 0.099 1.00 4,500,000.00 4,500,000.00 0.099 - - - TETAP
6 Pembuatan Cofferdam & Pengeringan Bh 2.00 7,000,000.00 14,000,000.00 0.309 2.00 7,000,000.00 14,000,000.00 0.309 - - - TETAP
7 Pemeriksaan Laboratorium Ls 1.00 11,000,000.00 11,000,000.00 0.243 1.00 11,000,000.00 11,000,000.00 0.243 - - - TETAP

E. Demobilisasi
1 Demobilisasi Ls 1.00 37,520,000.00 37,520,000.00 0.829 1.00 37,520,000.00 37,520,000.00 0.829 - - - TETAP

III. PEKERJAAN TANAH


3.1(3) Galian Struktur dengan Kedalaman 0 - 2 meter (Talud) M3 72.00 57,200.77 4,118,455.41 0.091 72.00 57,200.77 4,118,455.41 0.091 - - - TETAP
3.1(4) Galian Struktur dengan Kedalaman 2 - 4 meter (Abutmen M3 88.32 82,084.03 7,249,661.80 0.160 88.32 82,084.03 7,249,661.80 0.160 - - - TETAP
3.2(1) Timbunan biasa dengan material didatangkan M3 2,000.00 84,549.52 169,099,047.68 3.738 1,396.73 84,549.52 118,092,539.96 2.610 (603.27) - 51,006,507.71 BERKURANG
3.2(2) Timbunan Pilihan M3 368.00 98,676.69 36,313,023.25 0.803 360.93 98,676.69 35,615,081.69 0.787 (7.07) - 697,941.56 BERKURANG

V. PERKERASAN BERBUTIR
5.1(1) Lapis Pondasi Agregat Kelas A M3 113.63 1,021,976.79 116,127,222.79 2.567 74.30 1,021,976.79 75,929,605.17 1.678 (39.33) - 40,197,617.61 BERKURANG
5.1(2) Lapis Pondasi Agregat Kelas B M3 115.50 683,385.43 78,931,016.59 1.745 75.52 683,385.43 51,608,884.98 1.141 (39.98) - 27,322,131.62 BERKURANG
KONTRAK ASLI KONTRAK REVISI / CCO NILAI REVISI
ITEM HARGA JUMLAH HARGA JUMLAH
PEMBAYA URAIAN PEKERJAAN SATUAN BOBOT BOBOT KETERANGAN
RAN NO. VOLUME SATUAN HARGA VOLUME SATUAN HARGA VOLUME NAIK (+) MENURUN ( - )
(%) (%)
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

VI. PERKERASAN ASPAL


6.1 (1)a Lapis Resap Pengikat-Aspal Cair Liter 600.00 15,125.55 9,075,327.98 0.201 448.00 15,125.55 6,776,246.40 0.150 (152.00) - 2,299,081.58 BERKURANG
6.6.1 Lapis Permukaan Penetrasi Macadam M3 52.50 2,624,195.93 137,770,286.43 3.045 39.20 2,624,195.93 102,868,480.46 2.274 (13.30) - 34,901,805.97 BERKURANG

VII. STRUKTUR
7.1 (5) Beton mutu sedang, (K-350) M3 389.68 2,082,365.76 811,456,289.98 17.938 294.27 2,082,365.76 612,774,591.24 13.546 (95.41) - 198,681,698.74 BERKURANG
7.1 (8) Beton mutu rendah, (K-175) M3 32.50 1,976,978.58 64,251,803.70 1.420 16.25 1,976,978.58 32,125,901.85 0.710 (16.25) - 32,125,901.85 BERKURANG
7.1 (8) Beton mutu rendah, (K-175) Beton Siklop M3 188.40 1,976,978.58 372,462,763.62 8.233 188.40 1,976,978.58 372,462,763.62 8.233 - - - TETAP
Baja Tulangan D32 Ulir Kg 44,400.00 36,145.34 1,604,853,096.00 35.476 43,600 36,145.34 1,575,936,824.00 34.837 (800.00) - 28,916,272.00 BERKURANG
7.7 (1) Pengadaan Dinding Sumuran Silinder, diameter 250 cm M1 60.00 10,759,967.57 645,598,053.98 14.271 60.00 10,759,967.57 645,598,054.20 14.271 0.00 - - TETAP
7.7 (2) Penurunan Dinding Sumuran Silinder, diameter 250 cm M1 60.00 505,659.19 30,339,551.19 0.671 60.00 505,659.19 30,339,551.40 0.671 0.00 - - TETAP
7.9 (1) Pasang Batu Untuk Talud Penahan M3 187.95 979,963.42 184,184,125.19 4.071 284.83 979,963.42 279,122,980.92 6.170 96.88 94,938,855.73 - BERTAMBAH
7.10 (2) Pasangan Batu Kosong untuk Talud M3 24.50 415,607.50 10,182,383.75 0.225 39.00 415,607.50 16,208,692.50 0.358 14.50 6,026,308.75 - BERTAMBAH
7.11(6) Expantion Joint Tipe Baja Bersudut M1 72.00 467,103.31 33,631,438.34 0.743 68.00 467,103.31 31,763,025.08 0.702 (4.00) - 1,868,413.26 BERKURANG
7.12 (2) Perletakan Elastomerik Bearing Pad(300x350x36 Bh 8.00 712,695.83 5,701,566.65 0.126 8.00 712,695.83 5,701,566.65 0.126 - - - TETAP
7.13 Sandaran Railling M1 70.40 318,001.20 22,387,284.48 0.495 70.40 318,001.20 22,387,284.48 0.495 - - - TETAP
7.14 Papan nama Jembatan Bh 2.00 579,359.00 1,158,718.00 0.026 2.00 579,359.00 1,158,718.00 0.026 - - - TETAP
7.15 (1) Pembongkaran Pasangan Batu M2 64.00 245,126.34 15,688,085.51 0.347 64.00 245,126.34 15,688,085.51 0.347 - - - TETAP
7.15 (2) Pembongkaran Beton M3 16.70 486,424.95 8,123,296.62 0.180 16.70 486,424.95 8,123,296.62 0.180 - - - TETAP
7.16 Pipa cucuran Baja M1 16.00 300,114.10 4,801,825.60 0.106 16.00 300,114.10 4,801,825.60 0.106 - - - TETAP

(A) JUMLAH HARGA PEKERJAAN DILUAR PPN 4,523,784,324.54 100.00 4,206,732,117.54 92.99 100,965,164.48 418,017,371.90
(B) PPN 10 % x (A), ( Dipungut ) 452,378,432.45 420,673,211.75 10,096,516.45 41,801,737.19
(C) JUMLAH HARGA PEKERJAAN TERMASUK PPN ( A+B ) 4,976,162,757.00 4,627,405,329.30 111,061,680.93 459,819,109.09
(D) JUMLAH HARGA PEKERJAAN TERMASUK PPN ( Dibulatkan ) 4,976,160,000.00 4,627,400,000.00 111,060,000.00 459,810,000.00

DISANGGUPI OLEH :
Penyedia Jasa PEJABAT PEMBUAT KOMITMEN (PPK)
PT. TIGA SATRIA GEMILANG BIDANG BINA MARGA
Pusat Kendari

LAODE MANDAULI, SH E R O, ST., MT


Direktur NIP. 19660505 199704 1 001

-
LAMPIRAN USULAN PEKERJAAN TAMBAH / KURANG ( CCO )
KABUPATEN : KONAWE KEPULAUAN
PAKET KONTRAK : 20/PEMB.BANGUNAN BAWAH JEMBATAN S,LANSILOWO
POROS / LOKASI : KEC. WAWONII UTARA
NO.KONTRAK ASLI : 620/02.20/SP/PPPJJK-DPU/KONKEP/2015
TANGGAL : 29 JUNI 2015
NILAI KONTRAK : RP.4.902.183.000,00
KONTRAKTOR : PT.TRIPOLAR UTAMA SULTRA

ITEM KONTRAK ASLI KONTRAK REVISI / CCO NILAI REVISI


PEMBA HARGA JUMLAH HARGA JUMLAH
YARAN
URAIAN PEKERJAAN SATUAN SATUAN HARGA BOBOT SATUAN HARGA BOBOT NAIK ( MENURUN
VOLUME VOLUME VOLUME
NO. ( Rp. ) ( Rp. ) (%) ( Rp. ) ( Rp. ) (%) +) (-)
1 2 3 4 5 6 7 8 9 10 11 12 13 14
I. UMUM
A. Mobilisasi Alat
1 Bulldozer 100-150 HP Unit 1.00 6,000,000.00 6,000,000.00 0.135 1.00 6,000,000.00 6,000,000.00 0.135 - - -
2 Concrette mixer 0,20-0,3 M3 Unit 2.00 700,000.00 1,400,000.00 0.031 2.00 700,000.00 1,400,000.00 0.031 - - -
3 Dump Truck 3 - 4 M3 Unit 3.00 1,300,000.00 3,900,000.00 0.088 3.00 1,300,000.00 3,900,000.00 0.088 - - -
4 Excavator 80-140 HP Unit 1.00 6,000,000.00 6,000,000.00 0.135 1.00 6,000,000.00 6,000,000.00 0.135 - - -
5 Motor Grader > 100 HP Unit 1.00 5,000,000.00 5,000,000.00 0.112 1.00 5,000,000.00 5,000,000.00 0.112 - - -
6 Wheel Loader 1,0-1,6 M3 Unit 1.00 5,000,000.00 5,000,000.00 0.112 1.00 5,000,000.00 5,000,000.00 0.112 - - -
7 Vibrator Roller 5-8 Ton Unit 1.00 6,000,000.00 6,000,000.00 0.135 1.00 6,000,000.00 6,000,000.00 0.135 - - -
8 Concrette Vibrator Unit 2.00 300,000.00 600,000.00 0.013 2.00 300,000.00 600,000.00 0.013 - - -
9 Water tank truck 3000-4500L Unit 1.00 1,200,000.00 1,200,000.00 0.027 1.00 1,200,000.00 1,200,000.00 0.027 - - -
10 Compressor 400-6500 L/M Unit 1.00 300,000.00 300,000.00 0.007 1.00 300,000.00 300,000.00 0.007 - - -
11 Generator Set Unit 1.00 500,000.00 500,000.00 0.011 1.00 500,000.00 500,000.00 0.011 - - -
12 Water Pump 700-100 Mn Unit 1.00 300,000.00 300,000.00 0.007 1.00 300,000.00 300,000.00 0.007 - - -
13 Pile Driver + Hammer Unit 1.00 12,000,000.00 12,000,000.00 0.269 1.00 12,000,000.00 12,000,000.00 0.269 - - -
14 Crane on Track 35 Ton Unit 1.00 6,000,000.00 6,000,000.00 0.135 1.00 6,000,000.00 6,000,000.00 0.135 - - -
15 Welding Set Unit 1.00 300,000.00 300,000.00 0.007 1.00 300,000.00 300,000.00 0.007 - - -

B. Fasilitas Kontraktor
1 Base Camp M2 50.00 40,000.00 2,000,000.00 0.045 50.00 40,000.00 2,000,000.00 0.045 - - -
2 Kantor M2 35.00 50,000.00 1,750,000.00 0.039 35.00 50,000.00 1,750,000.00 0.039 - - -
3 Barak M2 100.00 40,000.00 4,000,000.00 0.090 100.00 40,000.00 4,000,000.00 0.090 - - -

C Lain-lain
1 Pengukuran, Pembuatan Shop Drawing Km' 40.00 500,000.00 20,000,000.00 0.449 40.00 500,000.00 20,000,000.00 0.449 - - -
2 Papan Proyek dan Rambu Lalin Ls 1.00 1,000,000.00 1,000,000.00 0.022 1.00 1,000,000.00 1,000,000.00 0.022 - - -
3 Dokumentasi dan P 3 K Ls 1.00 3,000,000.00 3,000,000.00 0.067 1.00 3,000,000.00 3,000,000.00 0.067 - - -
4 Administrasi Bulanan Bln 6.00 1,200,000.00 7,200,000.00 0.162 6.00 1,200,000.00 7,200,000.00 0.162 - - -
5 Pembuatan Asbuilt Drawing Set 1.00 4,000,000.00 4,000,000.00 0.090 1.00 4,000,000.00 4,000,000.00 0.090 - - -
6 Pembuatan Cofferdam dan Pengeringan Bh 2.00 5,000,000.00 10,000,000.00 0.224 2.00 5,000,000.00 10,000,000.00 0.224 - - -
7 Pemeriksaan Laboratorium Ls 1.00 24,000,000.00 24,000,000.00 0.539 1.00 24,000,000.00 24,000,000.00 0.539 - - -

Demobilisasi
E. Demobilisasi Ls 1.00 54,500,000.00 54,500,000.00 1.223 1.00 54,500,000.00 54,500,000.00 1.223 - - -
1
KONTRAK ASLI NILAI REVISI
HARGA JUMLAH HARGA JUMLAH
URAIAN PEKERJAAN SATUAN SATUAN HARGA BOBOT SATUAN HARGA BOBOT NAIK ( MENURUN
VOLUME VOLUME VOLUME
( Rp. ) ( Rp. ) (%) ( Rp. ) ( Rp. ) (%) +) (-)
II. DRAINASE
2.1 Galian untuk drainase dan saluran air M3 -
2.2 Pek. Pasangan Batu dengan Mortar M3

III. PEKERJAAN TANAH


3.1.3 Galian Struktur kedalaman 0-2 meter M3 140.00 53,346.92 7,468,568.80 0.168 140.00 53,346.92 7,468,568.80 0.168 - - -
3.1.4 Galian Struktur kedalaman 2-4 meter M3 160.00 59,576.87 9,532,299.20 0.214 160.00 59,576.87 9,532,299.20 0.214
3.2.1 Timbunan Biasa Dengan Material di datangkan M3 2,000.00 88,478.98 176,957,960.00 3.971 3,585.19 88,478.98 317,213,954.31 7.118 1,585.19 140,255,994.31 -
3.2.2 Timbunan Pilihan M3 255.00 103,512.51 26,395,690.05 0.592 255.00 103,512.51 26,395,690.05 0.592 - - -
3.3 Penyiapan Badan Jalan ringan damija ringan M2 -
3.3.1 Pembersihan Damija Sedang/Land Clearing M2 800.00 3,825.73 3,060,584.00 0.069 800.00 3,825.73 3,060,584.00 0.069 - - -
3.3.2 Pembersihan Damija Berat M2 600.00 4,680.13 2,808,078.00 0.063 600.00 4,680.13 2,808,078.00 0.063 - - -

IV. PELEB. PERKERASAN & BAHUN JALAN


4.2 Lapis Bahu Jalan Klas C M3

V. PERKERASAN BERBUTIR
5.1.2 Lapis Pondasi Agregat Klas B M3
5.2 Lapis Pondasi Agregat Klas C M3

VI. PERKERASAN ASPAL


6.1.1 Lapis resap pengikat (Prime Coat) Liter
6.3.5 Lapis Pondasi / Aspal ATB M3

VII. STRUKTUR
7.1.5 Beton mutu sedang K-350 (utk Abutment) M3 219.42 2,470,240.88 542,020,253.89 12.162 219.42 2,470,240.88 542,020,253.89 12.162 - - -
7.1.5 Beton mutu sedang K-350 (utk Sayap) M3 51.84 2,470,240.88 128,057,287.22 2.873 51.84 2,470,240.88 128,057,287.22 2.873
7.1.6 Beton mutu sedang K-300 (utk Plat injak) M3 14.00 2,406,991.73 33,697,884.22 0.756 14.00 2,406,991.73 33,697,884.22 0.756
7.1.8 Beton mutu rendah K-175 (utk Lening) M3 6.25 2,383,766.36 14,898,539.75 0.334 6.25 2,383,766.36 14,898,539.75 0.334
7.1.8 Beton mutu rendah K-175 (utk Lantai Kerja) M3 12.00 2,383,766.36 28,605,196.32 0.642 12.00 2,383,766.36 28,605,196.32 0.642
7.3.1 Baja tulangan U24 Polos Kg
7.3.3 Baja tulangan D32 Ulir (utk Abutment) Kg 21,702.00 33,158.84 719,613,145.68 16.147 21,702.00 33,158.84 719,613,145.68 16.147
7.3.3 Baja tulangan D32 Ulir (utk Sayap) Kg 3,653.00 33,158.84 121,129,242.52 2.718 3,653.00 33,158.84 121,129,242.52 2.718
7.3.3 Baja tulangan D32 Ulir (utk Plat Injak) Kg 1,200.00 33,158.84 39,790,608.00 0.893 1,200.00 33,158.84 39,790,608.00 0.893
7.6.5 Pengadaan tiang Pancang Beton Ukrn 400x400cm M3 100.80 12,263,016.54 1,236,112,067.23 27.737 80.64 12,263,016.54 988,889,653.79 22.190 20.16 247,222,413.45
7.6.11 Pemcangan tiang Pancang Beton Ukrn 400x400cm M1 630.00 346,761.83 218,459,952.90 4.902 420.00 346,761.83 145,639,968.60 3.268 210.00 72,819,984.30
7.9.1 Pasangan batu untuk talud penahan M3 600.00 1,020,657.13 612,394,278.00 13.742 600.00 1,020,657.13 612,394,278.00 13.742
7.10.2 Pasangan batu kosong M3 24.00 399,339.88 9,584,157.12 0.215 24.00 399,339.88 9,584,157.12 0.215
7.10.3 Bronjong penahan dengan kawat galvanis M3 392.00 864,358.00 338,828,336.00 7.603 600.00 864,358.00 518,614,800.00 11.637 208.00 179,786,464.00
7.14 Papan nama jembatan Bh 2.00 582,945.00 1,165,890.00 0.026 2.00 582,945.00 1,165,890.00 0.026

(A) JUMLAH HARGA PEKERJAAN DILUAR PPN 4,456,530,018.90 100.00 4,456,530,079.46 100.00 320,042,458.31 320,042,397.75
(B) PPN 10 % x (A), ( Dipungut ) 445,653,001.89 445,653,007.95 32,004,245.83 32,004,239.77
(C) JUMLAH HARGA PEKERJAAN TERMASUK PPN ( A+B ) 4,902,183,020.79 4,902,183,087.41 352,046,704.14 352,046,637.52
(D) JUMLAH HARGA PEKERJAAN TERMASUK PPN ( Dibulatkan ) 4,902,183,000.00 4,902,183,066.62 352,040,000.00 352,040,000.00

DIUSULKAN OLEH :

KONTRAKTOR
PT. TRIPOLAR UTAMA SULTRA

MUH. KASIM
Direktur
KETERANGAN

15

TETAP ###
TETAP ###
TETAP ###
TETAP ###
TETAP ###
TETAP ###
TETAP ###
TETAP ###
TETAP ###
TETAP ###
TETAP ###
TETAP ###
TETAP ###
TETAP ###
TETAP ###

T E T A P ###
T E T A P ###
T E T A P ###

TETAP ###
TETAP ###
TETAP ###
TETAP ###
TETAP ###
TETAP ###
TETAP ###

T E T A P ###
KETERANGAN

T E T A P ###
T E T A P ###
BERTAMBAH###
T E T A P ###
###
T E T A P ###
T E T A P ###

TETAP ###
TETAP ###
TETAP ###
TETAP ###
TETAP ###

T E T A P ###
T E T A P ###
T E T A P ###
BERKURANG###
BERKURANG###
T E T A P ###
T E T A P ###
BERTAMBAH###
T E T A P ###

###
LAMPIRAN EVALUASI AKHIR PEKERJAAN TAMBAH / KURANG ( CCO )

PEKERJAAN : PEMBANGUNAN DRAINASE JALAN KANTOR BUPATI


LOKASI : KOMPLEKS PERKANTORAN DESA LALINGATO KEC. TIRAWUTA KAB. KOLAKA TIMUR
NO.& TANGGAL KONTRAK ASLI : 621.5.23/KTRK/DAU-DRAINASE/PPK-CK/DPU.TR.P/IX/2019
NILAI KONTRAK ASLI : Rp. 1,453,000,000.00
KONTRAKTOR : CV. RAYYAN JAYA MANDIRI

KONTRAK ASLI KONTRAK REVISI NILAI REVISI


ITEM HARGA JUMLAH HARGA JUMLAH BOBOT
PEMBAYA URAIAN PEKERJAAN SATUAN BOBOT KETERANGAN
BOBOT BOBOT (%)
RAN NO. VOLUME SATUAN HARGA VOLUME SATUAN HARGA NAIK (+) (%) MENURUN (-)
(%) (%) MENURU
NAIK
N
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
I. PEKERJAAN PERSIAPAN

1 Mobilisasi + Demobilisasi, dan Pembersihan Lokasi Ls 1.00 3,570,000.00 3,570,000.00 0.270 1.000 3,570,000.000 3,570,000.00 0.270 - - - - TETAP
2 Pembuatan Barak Kerja / Direksi Keet Ls 1.00 3,000,000.00 3,000,000.00 0.227 1.000 3,000,000.000 3,000,000.00 0.227 - - - - TETAP

3 Pengukuran dan Pemasangan Bouwplank Ls 1.00 2,500,000.00 2,500,000.00 0.189 1.000 2,500,000.000 2,500,000.00 0.189 - - - - TETAP

4 Administrasi, Pelaporan dan Dokumentasi Ls 1.00 2,000,000.00 2,000,000.00 0.151 1.000 2,000,000.000 2,000,000.00 0.151 - - - - TETAP
5 Air Kerja, Listrik Kerja & P3K Ls 1.00 2,000,000.00 2,000,000.00 0.151 1.000 2,000,000.000 2,000,000.00 0.151 - - - - TETAP

6 Papan Nama Proyek Ls 1.00 300,000.00 300,000.00 0.023 1.000 300,000.000 300,000.00 0.023 - - - - TETAP
II. PEKERJAAN TANAH DAN PASIR

1 Pek. Galian Tanah M3 1,354.91 72,450.00 98,163,229.50 7.431 1,162.127 72,450.000 84,196,107.19 6.374 - - 13,967,122.313 1.057 BERKURANG

2 Pek. Urugan Kembali Bekas Galian M3 421.74 52,900.00 22,310,046.00 1.689 109.304 52,900.000 5,782,181.60 0.438 - - 16,527,864.400 1.251 BERKURANG
3 Pek. Pasir Urug M3 67.71 235,980.00 15,978,205.80 1.210 49.923 235,980.000 11,780,711.55 0.892 - - 4,197,494.250 0.318 BERKURANG

4 Pek. Urugan Pilihan/Tanah Opritan M3 15.00 74,750.00 1,121,250.00 0.085 - 74,750.000 - - - - 1,121,250.000 0.085 HILANG

III. PEKERJAAN PASANGAN BATU

1 Pek. Pasangan Batu Gunung 1 Sp : 4 Pp M3 861.15 946,622.50 815,183,965.88 61.714 944.689 946,622.500 894,263,910.23 67.701 79,079,944.359 5.987 - - BERTAMBAH

2 Pek. Pasangan Pipa (Filter/Suling Air) M1 810.60 37,570.50 30,454,647.30 2.306 521.325 37,570.500 19,586,440.91 1.483 - - 10,868,206.388 0.823 BERKURANG

IV. PEKERJAAN BETON

1 Pek. Beton Mutu f'c = 19.3 Mpa M3 4.86 1,244,400.49 6,047,786.37 0.458 - 1,244,400.490 - - - - 6,047,786.369 0.458 HILANG

2 Pek. Pembesian Beton (Polos/Ulir) Kg 652.21 18,922.10 12,341,182.84 0.934 - 18,922.100 - - - - 12,341,182.841 0.934 HILANG

3 Pek. Pembuatan Bekisting Untuk Lantai M2 21.12 772,673.50 16,318,864.32 1.235 - 772,673.500 - - - - 16,318,864.320 1.235 HILANG
KONTRAK ASLI KONTRAK REVISI NILAI REVISI
ITEM HARGA JUMLAH HARGA JUMLAH BOBOT
PEMBAYA URAIAN PEKERJAAN SATUAN BOBOT KETERANGAN
BOBOT BOBOT (%)
RAN NO. VOLUME SATUAN HARGA VOLUME SATUAN HARGA NAIK (+) (%) MENURUN (-)
(%) (%) MENURU
NAIK
N
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

V. PEKERJAAN PLESTERAN
1 Pek. Plesteran 1 Pc : 3 Ps Tebal 15 mm M2 2,528.75 68,050.10 172,081,690.38 13.028 2,479.170 68,050.100 168,707,766.42 12.772 - - 3,373,923.958 0.255 BERKURANG

2 Pek. Plesteran Siar Mata Sapi 1 Pc : 2 Ps M2 350.72 60,057.60 21,063,401.47 1.595 476.860 60,057.600 28,639,067.14 2.168 7,575,665.664 0.574 - - BERTAMBAH
3 Pek. Pelicinan dengan Air Semen / Acian M2 2,528.75 38,151.25 96,474,973.44 7.304 2,479.170 38,151.250 94,583,434.46 7.160 - - 1,891,538.975 0.143 BERKURANG

(A) JUMLAH HARGA PEKERJAAN DILUAR PPN 1,320,909,243.29 1,320,909,619.50 86,655,610.02 86,655,233.81

(B) PPN 10 % x (A), ( Dipungut ) 132,090,924.33 100.00 132,090,961.95 100.00 8,665,561.00 6.56 8,665,523.38 6.56
(C) JUMLAH HARGA PEKERJAAN TERMASUK PPN ( A+B ) 1,453,000,167.62 1,453,000,581.45 95,321,171.02 95,320,757.19
(D) JUMLAH HARGA PEKERJAAN TERMASUK PPN ( Dibulatkan ) 1,453,000,000.00 1,453,000,000.00 95,321,000.00 95,320,000.00

TIRAWUTA, 12 SEPTEMBER 2019


DISANGGUPI OLEH : DIPERIKSA / DITELITI OLEH :
KONTRAKTOR PELAKSANA PPTK, DIREKSI DAN KONSULTAN SUPERVISI : PANITIA CONTRACT CHANGE OF ORDER (CCO) :
CV. RAYYAN JAYA MANDIRI

1. PEDO RIANTO CODDA 1. …………………… 1. (PPTK Bidang Cipta Karya) 1. …………………… 1. AGENG DERMANTO, ST. ( Ketua ) 1. ……………………
Direktur MUHAMMAD ALFATIH RADHI ALHAFID, A.Md.T. NIP. 19901209 201504 1 001
NIP. 19940709 201903 1 007
2. (Direksi Teknik) 2. …………………… 2. HASRI, ST. ( Sekretaris ) 2. ……………………
2. PEDO RIANTO CODDA 2. …………………… REFLYAN, S.Ars NIP. 19811121 201101 1 017
Pelaksana NIP. 19931206 201003 1 005
3. (CV. WINDANI REZKI KONSULTAN) 3. …………………… 3. REFLYAN, S.Ars ( Anggota ) 3. ……………………
HERI AHYARI, ST. NIP. 19931206 201003 1 005
Supervisi Engineer

MENGETAHUI / MENYETUJUI :

KUASA PENGGUNA ANGGARAN (KPA) PEJABAT PEMBUAT KOMITMEN (PPK)


KEPALA DINAS BIDANG CIPTA KARYA
DINAS PEKERJAAN UMUM, TATA RUANG DAN PERHUBUNGAN DINAS PEKERJAAN UMUM, TATA RUANG DAN PERHUBUNGAN
KABUPATEN KOLAKA TIMUR KABUPATEN KOLAKA TIMUR

B. MANSUR, S.Pd., M.Si., M.Pd. ILHAM, ST.


19641105 198610 1 003 NIP. 19830507 201101 1 009
USULAN PEKERJAAN TAMBAH / KURANG ( CCO )

PEKERJAAN : PEMBANGUNAN DRAINASE JALAN KANTOR BUPATI


LOKASI : KOMPLEKS PERKANTORAN DESA LALINGATO KEC. TIRAWUTA KAB. KOLAKA TIMUR
NO.& TANGGAL KONTRAK ASLI : 621.5.23/KTRK/DAU-DRAINASE/PPK-CK/DPU.TR.P/IX/2019
NILAI KONTRAK ASLI : Rp. 1,453,000,000.00
KONTRAKTOR : CV. RAYYAN JAYA MANDIRI

KONTRAK ASLI KONTRAK REVISI NILAI REVISI


ITEM HARGA JUMLAH HARGA JUMLAH BOBOT
PEMBAYA URAIAN PEKERJAAN SATUAN BOBOT KETERANGAN
BOBOT BOBOT (%)
RAN NO. VOLUME SATUAN HARGA VOLUME SATUAN HARGA NAIK (+) (%) MENURUN (-)
(%) (%) MENURU
NAIK
N
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

I. PEKERJAAN PERSIAPAN

1 Mobilisasi + Demobilisasi, dan Pembersihan Lokasi Ls 1.00 3,570,000.00 3,570,000.00 0.270 1.000 3,570,000.000 3,570,000.00 0.270 - - - - TETAP

2 Pembuatan Barak Kerja / Direksi Keet Ls 1.00 3,000,000.00 3,000,000.00 0.227 1.000 3,000,000.000 3,000,000.00 0.227 - - - - TETAP

3 Pengukuran dan Pemasangan Bouwplank Ls 1.00 2,500,000.00 2,500,000.00 0.189 1.000 2,500,000.000 2,500,000.00 0.189 - - - - TETAP
4 Administrasi, Pelaporan dan Dokumentasi Ls 1.00 2,000,000.00 2,000,000.00 0.151 1.000 2,000,000.000 2,000,000.00 0.151 - - - - TETAP

5 Air Kerja, Listrik Kerja & P3K Ls 1.00 2,000,000.00 2,000,000.00 0.151 1.000 2,000,000.000 2,000,000.00 0.151 - - - - TETAP
6 Papan Nama Proyek Ls 1.00 300,000.00 300,000.00 0.023 1.000 300,000.000 300,000.00 0.023 - - - - TETAP

II. PEKERJAAN TANAH DAN PASIR

1 Pek. Galian Tanah M3 1,354.91 72,450.00 98,163,229.50 7.431 1,162.127 72,450.000 84,196,107.19 6.374 - - 13,967,122.313 1.057 BERKURANG
2 Pek. Urugan Kembali Bekas Galian M3 421.74 52,900.00 22,310,046.00 1.689 109.304 52,900.000 5,782,181.60 0.438 - - 16,527,864.400 1.251 BERKURANG

3 Pek. Pasir Urug M3 67.71 235,980.00 15,978,205.80 1.210 49.923 235,980.000 11,780,711.55 0.892 - - 4,197,494.250 0.318 BERKURANG
4 Pek. Urugan Pilihan/Tanah Opritan M3 15.00 74,750.00 1,121,250.00 0.085 - 74,750.000 - - - - 1,121,250.000 0.085 HILANG

III. PEKERJAAN PASANGAN BATU

1 Pek. Pasangan Batu Gunung 1 Sp : 4 Pp M3 861.15 946,622.50 815,183,965.88 61.714 944.689 946,622.500 894,263,910.23 67.701 79,079,944.359 5.987 - - BERTAMBAH
2 Pek. Pasangan Pipa (Filter/Suling Air) M1 810.60 37,570.50 30,454,647.30 2.306 521.325 37,570.500 19,586,440.91 1.483 - - 10,868,206.388 0.823 BERKURANG

IV. PEKERJAAN BETON


1 Pek. Beton Mutu f'c = 19.3 Mpa M3 4.86 1,244,400.49 6,047,786.37 0.458 - 1,244,400.490 - - - - 6,047,786.369 0.458 HILANG

2 Pek. Pembesian Beton (Polos/Ulir) Kg 652.21 18,922.10 12,341,182.84 0.934 - 18,922.100 - - - - 12,341,182.841 0.934 HILANG
3 Pek. Pembuatan Bekisting Untuk Lantai M2 21.12 772,673.50 16,318,864.32 1.235 - 772,673.500 - - - - 16,318,864.320 1.235 HILANG
KONTRAK ASLI KONTRAK REVISI NILAI REVISI
ITEM HARGA JUMLAH HARGA JUMLAH BOBOT
PEMBAYA URAIAN PEKERJAAN SATUAN BOBOT KETERANGAN
BOBOT BOBOT (%)
RAN NO. VOLUME SATUAN HARGA VOLUME SATUAN HARGA NAIK (+) (%) MENURUN (-)
(%) (%) MENURU
NAIK
N
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
V. PEKERJAAN PLESTERAN

1 Pek. Plesteran 1 Pc : 3 Ps Tebal 15 mm M2 2,528.75 68,050.10 172,081,690.38 13.028 2,479.170 68,050.100 168,707,766.42 12.772 - - 3,373,923.958 0.255 BERKURANG
2 Pek. Plesteran Siar Mata Sapi 1 Pc : 2 Ps M2 350.72 60,057.60 21,063,401.47 1.595 476.860 60,057.600 28,639,067.14 2.168 7,575,665.664 0.574 - - BERTAMBAH

3 Pek. Pelicinan dengan Air Semen / Acian M2 2,528.75 38,151.25 96,474,973.44 7.304 2,479.170 38,151.250 94,583,434.46 7.160 - - 1,891,538.975 0.143 BERKURANG

(A) JUMLAH HARGA PEKERJAAN DILUAR PPN 1,320,909,243.29 1,320,909,619.50 86,655,610.02 86,655,233.81
(B) PPN 10 % x (A), ( Dipungut ) 132,090,924.33 100.00 132,090,961.95 100.00 8,665,561.00 6.56 8,665,523.38 6.56
(C) JUMLAH HARGA PEKERJAAN TERMASUK PPN ( A+B ) 1,453,000,167.62 1,453,000,581.45 95,321,171.02 95,320,757.19

(D) JUMLAH HARGA PEKERJAAN TERMASUK PPN ( Dibulatkan ) 1,453,000,000.00 1,453,000,000.00 95,321,000.00 95,320,000.00

TIRAWUTA, 20 SEPTEMBER 2019

DIBUAT OLEH :
KONTRAKTOR PELAKSANA
CV. RAYYAN JAYA MANDIRI

PEDO RIANTO CODDA


Direktur
BALANCE BUDGED
PEKERJAAN : PEMBANGUNAN DRAINASE JALAN KANTOR BUPATI
LOKASI : KOMPLEKS PERKANTORAN DESA LALINGATO KEC. TIRAWUTA KAB. KOLAKA TIMUR
NO.& TANGGAL KONTRAK ASLI : 621.5.23/KTRK/DAU-DRAINASE/PPK-CK/DPU.TR.P/IX/2019 & 17 SEPTEMBER 2019
NILAI KONTRAK ASLI : Rp. 1,453,000,000.00
KONTRAKTOR : CV. RAYYAN JAYA MANDIRI MC NOL-CCO MC 01-CCO MC 02 MC 03 MC 04

KONTRAK ASLI KONTRAK CCO REALISASI BULAN SEPTEMBER REALISASI BULAN OKTOBER REALISASI BULAN NOVEMBER REALISASI BULAN DESEMBER
ITEM HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH
PEMBAYA URAIAN PEKERJAAN SATUAN BOBOT BOBOT BOBOT BOBOT BOBOT BOBOT
RAN NO. VOLUME SATUAN HARGA VOLUME SATUAN HARGA VOLUME SATUAN HARGA VOLUME SATUAN HARGA VOLUME SATUAN HARGA VOLUME SATUAN HARGA
(%) (%) (%) (%) (%) (%)
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
1 2 3 4 5 6 7 4 5 6 7 8 9 10 11 8 9 10 11 8 9 10 11 8 9 10 11
I. PEKERJAAN PERSIAPAN
1 Mobilisasi + Demobilisasi, dan Pembersihan Lokasi Ls 1.00 3,570,000.00 3,570,000.00 0.270 1.000 3,570,000.000 3,570,000.00 0.270 0.25 3,570,000.00 892,500.00 0.068 0.50 3,570,000.00 1,785,000.00 0.135 0.75 3,570,000.00 2,677,500.00 0.203 1.00 3,570,000.00 3,570,000.00 0.270
2 Pembuatan Barak Kerja / Direksi Keet Ls 1.00 3,000,000.00 3,000,000.00 0.227 1.000 3,000,000.000 3,000,000.00 0.227 1.00 3,000,000.00 3,000,000.00 0.227 1.00 3,000,000.00 3,000,000.00 0.227 1.00 3,000,000.00 3,000,000.00 0.227 1.00 3,000,000.00 3,000,000.00 0.227
3 Pengukuran dan Pemasangan Bouwplank Ls 1.00 2,500,000.00 2,500,000.00 0.189 1.000 2,500,000.000 2,500,000.00 0.189 0.25 2,500,000.00 625,000.00 0.047 0.50 2,500,000.00 1,250,000.00 0.095 1.00 2,500,000.00 2,500,000.00 0.189 1.00 2,500,000.00 2,500,000.00 0.189
4 Administrasi, Pelaporan dan Dokumentasi Ls 1.00 2,000,000.00 2,000,000.00 0.151 1.000 2,000,000.000 2,000,000.00 0.151 0.25 2,000,000.00 500,000.00 0.038 0.50 2,000,000.00 1,000,000.00 0.076 0.75 2,000,000.00 1,500,000.00 0.114 1.00 2,000,000.00 2,000,000.00 0.151
5 Air Kerja, Listrik Kerja & P3K Ls 1.00 2,000,000.00 2,000,000.00 0.151 1.000 2,000,000.000 2,000,000.00 0.151 0.25 2,000,000.00 500,000.00 0.038 0.50 2,000,000.00 1,000,000.00 0.076 0.75 2,000,000.00 1,500,000.00 0.114 1.00 2,000,000.00 2,000,000.00 0.151
6 Papan Nama Proyek Ls 1.00 300,000.00 300,000.00 0.023 1.000 300,000.000 300,000.00 0.023 1.00 300,000.00 300,000.00 0.023 1.00 300,000.00 300,000.00 0.023 1.00 300,000.00 300,000.00 0.023 1.00 300,000.00 300,000.00 0.023
II. PEKERJAAN TANAH DAN PASIR
1 Pek. Galian Tanah M3 1,354.91 72,450.00 98,163,229.50 7.431 1,162.127 72,450.000 84,196,107.19 6.374 464.85 72,450.00 33,678,442.88 2.550 1,162.13 72,450.00 84,196,107.19 6.374 1,162.13 72,450.00 84,196,107.19 6.374 1,162.13 72,450.00 84,196,107.19 6.374
2 Pek. Urugan Kembali Bekas Galian M3 421.74 52,900.00 22,310,046.00 1.689 109.304 52,900.000 5,782,181.60 0.438 27.71 52,900.00 1,465,626.24 0.111 69.26 52,900.00 3,664,065.60 0.277 81.98 52,900.00 4,336,636.20 0.328 109.30 52,900.00 5,782,181.60 0.438
3 Pek. Pasir Urug M3 67.71 235,980.00 15,978,205.80 1.210 49.921 235,980.000 11,780,335.34 0.892 12.65 235,980.00 2,986,090.92 0.226 31.64 235,980.00 7,465,227.30 0.565 37.44 235,980.00 8,835,251.50 0.669 49.92 235,980.00 11,780,335.34 0.892
4 Pek. Urugan Pilihan/Tanah Opritan M3 15.00 74,750.00 1,121,250.00 0.085 - 74,750.000 - - - 74,750.00 - -
III. PEKERJAAN PASANGAN BATU
1 Pek. Pasangan Batu Gunung 1 Sp : 4 Pp M3 861.15 946,622.50 815,183,965.88 61.714 944.689 946,622.500 894,263,910.23 67.701 138.86 946,622.50 131,448,946.97 9.951 347.15 946,622.50 328,622,367.43 24.878 708.52 946,622.50 670,697,932.68 50.775 944.69 946,622.50 894,263,910.23 67.701
2 Pek. Pasangan Pipa (Filter/Suling Air) M1 810.60 37,570.50 30,454,647.30 2.306 521.325 37,570.500 19,586,440.91 1.483 93.24 37,570.50 3,503,073.42 0.265 233.10 37,570.50 8,757,683.55 0.663 390.99 37,570.50 14,689,830.68 1.112 521.33 37,570.50 19,586,440.91 1.483
IV. PEKERJAAN BETON
1 Pek. Beton Mutu f'c = 19.3 Mpa M3 4.86 1,244,400.49 6,047,786.37 0.458 - 1,244,400.490 - - - 1,244,400.49 - - - 1,244,400.49 - - 1,244,400.49 - - 1,244,400.49 - -
2 Pek. Pembesian Beton (Polos/Ulir) Kg 652.21 18,922.10 12,341,182.84 0.934 - 18,922.100 - - - 18,922.10 - - - 18,922.10 - - 18,922.10 - - 18,922.10 - -
3 Pek. Pembuatan Bekisting Untuk Lantai M2 21.12 772,673.50 16,318,864.32 1.235 - 772,673.500 - - - 772,673.50 - - 772,673.50 - - 772,673.50 - - 772,673.50 - -
V. PEKERJAAN PLESTERAN
1 Pek. Plesteran 1 Pc : 3 Ps Tebal 15 mm M2 2,528.75 68,050.10 172,081,690.38 13.028 2,479.170 68,050.100 168,707,766.42 12.772 591.41 68,050.10 40,245,373.54 3.047 1,478.52 68,050.10 100,613,433.85 7.617 1,859.38 68,050.10 126,530,824.81 9.579 2,479.17 68,050.10 168,707,766.42 12.772
2 Pek. Plesteran Siar Mata Sapi 1 Pc : 2 Ps M2 350.72 60,057.60 21,063,401.47 1.595 476.860 60,057.600 28,639,067.14 2.168 - 60,057.60 - - - 60,057.60 - - 190.74 60,057.60 11,455,626.85 0.867 476.86 60,057.60 28,639,067.14 2.168
3 Pek. Pelicinan dengan Air Semen / Acian M2 2,528.75 38,151.25 96,474,973.44 7.304 2,479.170 38,151.250 94,583,434.46 7.160 591.41 38,151.25 22,562,954.46 1.708 1,478.52 38,151.25 56,407,386.15 4.270 1,859.38 38,151.25 70,937,575.85 5.370 2,479.17 38,151.25 94,583,434.46 7.160

(A) JUMLAH HARGA PEKERJAAN DILUAR PPN 1,320,909,243.29 100.00 1,320,909,243.29 100.00 241,708,008.43 18.299 598,061,271.07 45.276 1,003,157,285.77 75.944 1,320,909,243.29 100.000
(B) PPN 10 % x (A), ( Dipungut ) 132,090,924.33 132,090,924.33 24,170,800.84 59,806,127.11 100,315,728.58 132,090,924.33
(C) JUMLAH HARGA PEKERJAAN TERMASUK PPN ( A+B ) 1,453,000,167.62 1,453,000,167.62 265,878,809.27 657,867,398.18 1,103,473,014.34 1,453,000,167.62
(D) JUMLAH HARGA PEKERJAAN TERMASUK PPN ( Dibulatkan ) 1,453,000,000.00 1,453,000,000.00 265,878,000.00 657,867,000.00 1,103,473,000.00 1,453,000,000.00
974,974,000.00 -
478,026,000.00 Tirawuta, 2019
Diajukan Oleh :

CV. CIPTA KARYA SELARAS


Pusat Konawe

RAMADHAN, ST
Direktur
HARGA
HARGA KONTRAK VOL. MC 01-CCO VOL. MC 02 VOL. MC 03 VOL. MC 04 VOL.
NO. URAIAN PEKERJAAN SATUAN
Rp. Rp. Rp. Rp. Rp. Rp.
a b c d c d c d c d
I PEKERJAAN PERSIAPAN
1 Mobilisasi + Demobilisasi, dan Pembersihan Lokas 3,570,000.00 3,570,000.00 1.000 892,500.00 0.250 892,500.00 0.250 892,500.00 0.250 892,500.00 0.250
2 Pembuatan Barak Kerja / Direksi Keet 3,000,000.00 3,000,000.00 1.000 3,000,000.00 1.000 - - -
3 Pengukuran dan Pemasangan Bouwplank 2,500,000.00 2,500,000.00 1.000 625,000.00 0.250 625,000.00 0.250 1,250,000.00 0.500 -
4 Administrasi, Pelaporan dan Dokumentasi 2,000,000.00 2,000,000.00 1.000 500,000.00 0.250 500,000.00 0.250 500,000.00 0.250 500,000.00 0.250
5 Air Kerja, Listrik Kerja & P3K 2,000,000.00 2,000,000.00 1.000 500,000.00 0.250 500,000.00 0.250 500,000.00 0.250 500,000.00 0.250
6 Papan Nama Proyek 300,000.00 300,000.00 1.000 300,000.00 1.000 - - -
II PEKERJAAN TANAH DAN PASIR
1 Pek. Galian Tanah 72,450.00 84,196,107.19 1162.127 33,678,442.88 464.851 50,517,664.31 697.276 - -
2 Pek. Urugan Kembali Bekas Galian 52,900.00 5,782,181.60 109.304 1,465,626.24 27.706 2,198,439.36 41.558 672,570.60 12.714 1,445,545.40 27.326
3 Pek. Pasir Urug 235,980.00 11,780,335.34 49.921 2,986,090.92 12.654 4,479,136.38 18.981 1,370,024.20 5.806 2,945,083.83 12.480
4 Pek. Urugan Pilihan/Tanah Opritan 74,750.00 - 0.000 - 0.000 - 0.000 - 0.000 - 0.000
III PEKERJAAN PASANGAN BATU
1 Pek. Pasangan Batu Gunung 1 Sp : 4 Pp 946,622.50 894,263,910.23 944.689 131,448,946.97 138.861 197,173,420.46 208.292 342,075,565.24 361.364 223,565,977.56 236.172
2 Pek. Pasangan Pipa (Filter/Suling Air) 37,570.50 19,586,440.91 521.325 3,503,073.42 93.240 5,254,610.13 139.860 5,932,147.13 157.894 4,896,610.23 130.331
IV PEKERJAAN BETON
1 Pek. Beton Mutu f'c = 19.3 Mpa 1,244,400.49 - 0.000 - 0.000 - 0.000 - 0.000 - 0.000
2 Pek. Pembesian Beton (Polos/Ulir) 18,922.10 - 0.000 - 0.000 - 0.000 - 0.000 - 0.000
3 Pek. Pembuatan Bekisting Untuk Lantai 772,673.50 - 0.000 - 0.000 - 0.000 - 0.000 - 0.000
V PEKERJAAN PLESTERAN
1 Pek. Plesteran 1 Pc : 3 Ps Tebal 15 mm 68,050.10 168,707,766.42 2479.170 40,245,373.54 591.408 60,368,060.31 887.112 25,917,390.96 380.858 42,176,941.60 619.793
2 Pek. Plesteran Siar Mata Sapi 1 Pc : 2 Ps 60,057.60 28,639,067.14 476.860 - 0.000 - 0.000 11,455,626.85 190.744 17,183,440.28 286.116
3 Pek. Pelicinan dengan Air Semen / Acian 38,151.25 94,583,434.46 2479.170 22,562,954.46 591.408 33,844,431.69 887.112 14,530,189.70 380.858 23,645,858.62 619.793
1,320,909,243.29 241,708,008.43 356,353,262.64 405,096,014.69 317,751,957.52
132,090,924.33 24,170,800.84 35,635,326.26 40,509,601.47 31,775,195.75
TOTAL BOBOT 1,453,000,167.62 8228.57 265,878,809.27 1923.13 391,988,588.91 2881.19 445,605,616.16 1491.49 349,527,153.28 1932.76
BOBOT RENCANA 23.37 35.01 18.13 23.49
KOMULATIF BOBOT 100.00
WAKTU PELAKSANAAN
MASA
SEPTEMBER OKTOBER NOVEMBER DESEMBER PEMELIH KET.
ARAAN
M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 M13 M14 M15
e f g h j k
PEKERJAAN PERSIAPAN 100
Mobilisasi + Demobilisasi, dan Pembersihan Lokasi Ls 0.13 0.13 0.05 0.05 0.05 0.05 0.05 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06
Pembuatan Barak Kerja / Direksi Keet Ls 1.00
Pengukuran dan Pemasangan Bouwplank Ls 0.13 0.13 0.05 0.05 0.05 0.05 0.05 0.17 0.17 0.17
Administrasi, Pelaporan dan Dokumentasi Ls 0.13 0.13 0.05 0.05 0.05 0.05 0.05 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 80

Air Kerja, Listrik Kerja & P3K Ls 0.13 0.13 0.05 0.05 0.05 0.05 0.05 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06
Papan Nama Proyek Ls 1.00
PEKERJAAN TANAH DAN PASIR
Pek. Galian Tanah M3 232.43 232.43 232.43 232.43 232.43
60
Pek. Urugan Kembali Bekas Galian M3 13.85 13.85 20.78 20.78 4.24 4.24 4.24 6.83 6.83 6.83 6.83
Pek. Pasir Urug M4 12.65 9.49 9.49 1.45 1.45 1.45 1.45 4.16 4.16 4.16
Pek. Urugan Pilihan/Tanah Opritan M5
PEKERJAAN PASANGAN BATU
Pek. Pasangan Batu Gunung 1 Sp : 4 Pp M2 69.43 69.43 41.66 41.66 41.66 41.66 41.66 90.34 90.34 90.34 90.34 59.04 59.04 59.04 59.04 40
Pek. Pasangan Pipa (Filter/Suling Air) M2 46.62 46.62 27.97 27.97 27.97 27.97 27.97 39.47 39.47 39.47 39.47 32.58 32.58 32.58 32.58
PEKERJAAN BETON
Pek. Beton Mutu f'c = 19.3 Mpa M1
Pek. Pembesian Beton (Polos/Ulir) M3 20
Pek. Pembuatan Bekisting Untuk Lantai M3
PEKERJAAN PLESTERAN
Pek. Plesteran 1 Pc : 3 Ps Tebal 15 mm M2 295.70 295.70 177.42 177.42 177.42 177.42 177.42 95.21 95.21 95.21 95.21 154.95 154.95 154.95 154.95
Pek. Plesteran Siar Mata Sapi 1 Pc : 2 Ps M2 95.37 95.37 71.53 71.53 71.53 71.53
0
Pek. Pelicinan dengan Air Semen / Acian M2 295.70 295.70 177.42 177.42 177.42 177.42 177.42 95.21 95.21 95.21 95.21 154.95 154.95 154.95 154.95

968.9 954.2 666.6 445.5 666.6 445.5 657.1 322.0 326.3 421.7 421.5 484.2 484.2 484.2 480.1
968.9 1923.1 2589.7 3035.2 3701.8 4147.2 4804.3 5126.4 5452.7 5874.3 6295.8 6780.0 7264.3 7748.5 8228.6
PAS. PLAFOND

VOL. KONTRAK = #REF! M2


VOL. RENCANA = 672.129 M2
SELISIH = #REF! M2
VOLUME PAS. PLAFOND DALAM BANGUNAN
DR1 = 23.100 M2
DR2 = 177.248 CM2
DR2(-) = 36.823 CM2
DR2 = 140.425 M2
DR3 = 105.148 M2
DR4 = 23.523 M2
DR5 = 30.798 M2
DR6 = 30.798 M2
DR7 = 30.798 M2
DR8 = 30.798 M2
DR9 = 19.773 M2
DR10 = 11.415 M2
DR11 = 13.418 M2
DR12 = 19.426 M2
DR13 = 1.823 M2
DR14 = 21.813 M2
DR15 = 1.485 M2
DR16 = 1.485 M2
DR17 = 11.325 M2
DR18 = 17.225 M2
DR19 = 2.960 M2
DR20 = 5.273 M2
542.804 M2

VOLUME PAS. PLAFOND LUAR BANGUNAN


L1 = 19.125 M2
L2 = 33.223 M2
L2(-) = 15.403 M2
L2 = 17.820 M2
L3 = 20.655 M2
L4 = 22.905 M3
L5 = 22.905 M4
L6 = 6.300 M5
L7 = 6.300 M6
L8 = 1.559 M7
L9 = 1.559 M8
L10 = 5.099 M9
L11 = 5.099 M10
129.325 M2

PAS. KALSIPLANK

VOL. KONTRAK = #REF! M2


VOL. RENCANA = 147.795 M2
SELISIH = #REF! M2

HARGA
URAIAN PEKERJAAN SAT. VOLUME JUMLAH HARGA(Rp)
SATUAN(Rp)

0 M2 #REF! - #REF!

0 M1 #REF! - #REF!

#REF!

You might also like