O MATERIAL
VS 101 2 22.70
VS 101 1 8.30 530
VP 101 3 23.40
VP 101 1 5.25
59.65 2,982.50
VCH 17.25
CONC LOSA
TECHI 74.33 3,716.50 12.42
ESCALERA 1 1000
SOBREPISO 70 1050
fierro negativo
2.25 36 9
1.80 10 2
1.13 15 2
3.00 4 2
15
POSITIVO
9.00 10.00 10.00
2.25 4.00 1.00
7.88 7.00 6.00
3.00 4.00 2.00
19.00
8mm 48.00
8mm 76.00
8mm 67.00
34.00
1/2" 24.00
1/2" 15.00
1.48976 3/8" 8.00
1.7025 1/4" 28.00
ladrillo de techo 15 huecos Raya 530.00
cemento mochica rojo 73.00
arena gruesa 4 cubos
piedra chancada 1/2" 6 cubos
1/2" 73
3/8" 8
1/4" 28
8mm 42
. MO 7725
78 techo
cliente 7725
22.7 23.4
3500 8.3 5.25
CONCRETO VIGA 4000 31 28.65
1.99 0.51344
0.73 2.288
2.34 18 M3 1.98625
0.53 0.72625
5.58 12.41908
11.16 17.93302
VARIILLA 3/8
VP 26.00
VS 26.00
VCH 101 7.50
VCH 102 2.65
34
1/2" 26.00 34.00 60.00
3/8" 26.00 26.00
1/4" 10.15 11.00
ladillo techo 530.00 530.00
c 147.00 3307.50
a 10.50 8.00 320.00
p 14.00 12.00 1680.00
agua 5307.50
4 192 19.20
2 152 15.2 42
1 67 6.7
73 73
8 8
28 28
1,378
1,606
200
420
2044
124
196
525
6,493
6.75
7.155
8.85
1674.00
403.00
74.80
1,325
3476.80