You are on page 1of 19
GTCpaswA/z0Ir ‘QATAR POWER TRANSMISSION SYSTEM EXPANSION- SUBSTATION -PACKAGE S4 PHASE 1 DOCUMENT TRANSMITTAL SHEET Ref No: PHIJ-ETA-BA-DTS-14-0042 (MOTT MACOONALD [dona Tower, 5th Floor ‘Grand Hamad Street .0 Box 22578 [Dona state of Qatar "Tel 974 4442 5145 F (Ovidiu Durlanesco, 3. Project Manager |. Mr. Abdul Rahman Alvaldah, project anager - KAHRAMAA |2. Ka ENA End User Focal Point 974 40825758 | 70.80% 47121, Doha, Qatar Tel: 1974-4665 1830/4467 7347 Fax: +974. 0465 9497 Mr. MG, Murat Project Manager eis o Evo ox feria aca Oval na rae scsrton um oa Panam recs) 7 Set coarse rag : egaee foun Komen “ca Soap oaiowy eit Fain em tem | rndg/Docamenthe. | es oescoten wot] age | fy | \ worst io | £2, |sorcnt To eenateren Jeanne proreenon ors ca cuvaion ron eae | rrosanssncess | 0 ony » . i | | | | ai ats sate rector- Qatar Operations ‘his shee fx confiration to be atacheg. “Designation “THIS SUBMISSION IS DECLARED TO BE strict waccoroance wre = PHASE — 11 | sisnsture REQUIREMENTS OF THE CONTRACT fewtall KAHRA' MAK % Shes piace Qatar General Electricity & Water Corporation QATAR POWER TRANSMISSION SYSTEM EXPANSION - PHASE11 SUBSTATION - PACKAGE S4 CONTRACT No. GTC/488A/2012 aa @ ' Mott MacDonald | coNSULTANT SUBSTATION NAME | PROJECT DOCUMENT NUMBER ‘AL MASHAAF | PH11-8A-48-74-C 465 T T Ae ° | o2-2004 {ssued for Comments AM su | *Sycu nev. [star | owe WODIFCATION PREPARED | GHEGKED | APPROVED | | SUB CONTRACTOR NAME CONTRACTOR NAME ETA STAR INTERNATIONAL LLC yg AlMatar Street, Red Tag Bldg. 3ré floor SEAR Popo ariat 2-7) Doha State of Cater Tel. +374 44651890 44677347 Fax +974 44680407 : a | MANUFACTURER DOCUMENT NO DOCUMENT TITLE EARTHING PROTECTION — DESIGN | DATE Name | SIGNATURE CALCULATION FOR EARTHING e204 | AMH | CONDUCTOR PREPARED cHecKeD | s.022014 | SMM SIZE No.of. Sheets | Rev Aa tote | 0 APPROVED | @-022014 | MGM | POWER PROJECTS DUISION CONTRAGT NO. GTC#488A12012 ‘QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE X1 - STAGE 1 SUBSTATIONS PACKAGE.S& AIRY AL-MASHAAP SUBSTATION ays (ah pn Rev- Nit EARTHING CONDUCTOR SIZING CALCULATION rg No. _EARTHING CONDUCTOR SZING CALCULATION ox vescaeTion Retwencee PAGE No. Sytolsusod EEE coe ee ooo Sete [Contacts date [ertng Conduct sng cariaion 21 iste torr 4 32 (retina 5 13 atingeorcer foro 0S 5 “tig acer Pwr Tacue 7 42, ——_Eating cerita or Staton Transformer 8 ai 15 ating andor tvs 2 45 _(atincontiar tr WAC erga roe w 47 |ermaion tem on earings attr eat gt n 48 atin anc HY Neve essere 2 {summary [aan SEE €02000 | CONTRACT NO. GTCI4B8A2012 QATAR POWER TRANSMISSION SYSTEM EXPANSION — | PHASE Xi - STAGE 1 SUBSTATIONS PACKAGE-S4 ua lt tabi. 4 hai iL ydaposl a POWER PROJECTS DIVISION, GE/VTRY AL-MASHAAF SUBSTATION Ly (ua cy Caps Rew Nil EARTHING CONDUCTOR SIZING CALCULATION rg No. | ‘OREFERENCES: 1d 60.2006 ie tor seetyn AC abstain Gourieg Teotnizel Gpescaon for Geen system and Ligcy Poesen Vlume 3 Secon 338 aisempots sen: 2) Ouran of faut cure for eating 1) ie Tempera of condor in be guns 9 Fie Tempers fearing cancer wth ead sheath 6 Teen capacity po nit vokame Then coetiient crexivty 20 donc 4) Rati efcondute a 70 deg. 9) Faecal ofthemal contin of esis a0 desc Fe curen fr earths ing Tol ea fx curont ‘SLOONTRAGTUAL DATA: «2 Shar ete pase earth curert een my 19 Sto steut core ere een thy 0 Stam Frequency 6) Duration of checker body cue te Te Tm TOP ” 315K, sgka tee Boe, soe 05e00 (CONTRACT NO. GTO/488A/2012 ‘QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 1 - STAGE 1 SUBSTATIONS PACKAGE-S¢ SeIMARV AL-MASHAAF SUBSTATION Porn PROJECTS oMSION | Rev-N EARTHING CONDUCTOR SIZING CALCULATION rg No, | ceneran Conouctor sein CALCULATION. {L1.CALOULATION FOR SE OF EARTHING CONDUCTORS FOR MAI EARTH MAT (uid in around Description \ ‘Notation ‘Unit sign inpats {Specified fault corrent iH a 7 | ka MS caret on ace . eae ties Wax. Fatt curent for net conductor sizing 1 A | MS aut cuaton ‘ . 1 isin peice oor oth ceri: Te aoe a |rierenoeaie 1. aces 0 FFnereal coeicien orcitance eteference emportne (20 de.) _ Hes deg o008es Jessy ef gcurdegcordutor at erence tempers % soo 176 [renal spat fete Tow seme) 300 eee A ae Seen m “Thezfere, Minimum cess secton ro nade = m2 Sem Clause 4.1.1 of Specican Volume 3, Getion 33.9 sale forlead sheathed ean conduct net ess han 240 Sqm shal be wed fo man gr carcass, ence conductors slacted is 240Sqinm Led Sheathed stended copper CONTRACT nO. GTOMSBAZO:2 { QATAR POWER TRANSMISSION SYSTEM EXPANSION nga PHASE X1 - STAGE 1 SUBSTATIONS PACKAGE-S4_ ih wy Gerth ALMASHAA? SUBSTATION a ile owen peowsers avi ne eae i ie | evi 'ZARTHING CONDUGTOR SIZING CALCULATION Bree. “E-EARTHING CONDUCTOR SIZNG GALOULATION. 42.GALCULATION FOR SIZE OF INDOOR EARTHING RING besstsfon Neraon ue ein eet pects cen E A ae [omen vente ; 1 Wax Fen cane retour sg i A He Fost eaten a : : joc pete exsoave cb coat Ts arue “088 |Ambient temperature a deg. Ey eee i‘ = ewe | font rosso enone onus attemnceerpere * ee v8 [ara esa ae Tee aye le eee ze fs 10! = [ee] fe ‘sq ory tes J heer “Tr, iin cos ston ae ee : 14 Sante Cause 412 of Species Valine, Secon 9:38 cal fo Bare copper apenas an 180 Sqm shal be used er indo ng. Hence condetr sine select i ‘some x Sam Bare Copper tape CONTRACT NO. GTCMg8A/2012 By 4 QATAR POWER TRANSMISSION SYSTEM EXPANSION ence conductor sae solcte is 4 aaa a 2 PHASE X1 STAGE 1 SUBSTATIONS PACKAGE.G4 ye owen ng ers onion GBrKY AL-MASHAAF SUBSTATION Lge (nlite Rev-Ni [exes conouoron saws caLcuLarion | ra Ne. eer coudcTon Sas cu aUATION 2 cALCi.ATI08 FoR SZEOF EATING CONDUCTOR £0R cl Decciion Notation | Unt Design nts ; poste tk cart ‘ * ue —— ; ls adc orca eg ‘ 1” 38 Foden ‘ 7 1 junc eben corer = ee i ntentonpeotee % ene s Hewalcooiaon cesta atria oe een 7 acne mata scsi olgeniey ott aolrenoe enpeatie » we | fa cance Tow a 2a lo wo eee mm brea rome i (. ) (B23 he Sem 28 tan J Sere | Terie, nino anes : 8 San 30 Sq.men VG sheathed stranded copper conductor CONTRACT NO. GTC/4s8A/2012 QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE Xt - STAGE 4 SUBSTATIONS PACKAGE-S4 eel dip sougnnosers ns Sire AL-ASHBAP UDOTATON La (la ro av ai SONDUSTOR SEIN CALCULATOR os He “earns caoietonaa cicamnan s:cacuano 0S FON Smo nee NSM nn nN oni Wn wt | bere Iepeciiag fait cure u ka {oats = 7 Ss 7 = ie fasartin 5 : 1 {imo oenn race ae % wee = isin era we ° a ea a eo fsrperaure (20g) ereeehe ace some | fae ery onc ac Re =o i = a ee = = mH haar i ani a te ee m tan )s(RH 1 ect un en ae : san Hence conductor size slactod fe 240 Sqn a shected sanded cooper CONTRACT NO, GTCMBA2012 ae QATAR POWER TRANSMISSION SYSTEM EXPANSION AL phal PHASE XI - STAGE 1 SUBSTATIONS PACKAGES4 pay AP ot | _vowren eno seers sion GBINTKV ALMASHAAF SUBSTATION 1d (tad aot Rev- Nil EARTANNG CONDUCTOR SANS caLcuceTIoN | rg No. “_EARTANNG CONDUGTOR STING CALCULATION. £42CALCULATION FOR S76 OF EnRTiS CONDUCTOR FOR STATION TRANSE Reing of Satin tarsfomer = sono sc (BODY EARTH LW side wage level . bats 7 loess of Staton tartar in : 565% ‘Shon ort eae tne LY se ofthe walorner 2ss775A ‘ico tis momentary pateirg, the potty ait onsrence is less, Henes current contin fone tanstomer is consiere Description Notation Unit Dean nos Soe fat sent & cs as fouert die at 1 Feu caret torte cone sling 1 {o 25 ask dan d * 1 hickmum permis temperature fhe conduscr ™ dee a lantenttenperetire t deg a [passa wo i Tel aes Reavy ofgromsirg conductor teernce emote ® ucom “ [rena canny ace Tow sflen?0) 38 kos wo dene at [Resdfemmaios a (os io) »fscze) ac Sqnm. 8 ten J CRT “Thue iru ross etn ae ed . 18 Sqn Hence conductor size elected is 180 Sqm Lend sheathed etrandd copper CONTRACT NO. GTCIMB8A2012 QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE Xt - STAGE 1 SUBSTATIONS PACKAGE-Sé POWER PROJECTS BMISION ee A ee Longe stony tap Rov Ni TARTHING CONDUCTOR SWING GALCULATION | Dig No. | “A, BARTHING CONDUCTOR SIZING CALCULATION. | AS CALCULATION £0R SIZE OF EARTENIG CONDUCTOR FOR 114V A. “The Fat cor on te 1K des eed by thet eathng esitr to 750 & “the Ful cron oorsired fr 1947 sehr 1800 Dein vest ue | rose estes ® = 5 Seas ‘ fs etcetera 1 ™ 5 [sar < een aes npr yew ate as ® ti npn & ee ® Pieetaraiaastar coe « ‘ie | pay nary cao wre » aon % Sd we | mera |e peo oe a aoa = 2s!) (Bete) Ac Seon, » tee) EFF ee ie com soon 2 ei : 2 senm Hence conductor size siete is “7 Sqn PVE Shesthed Copper CONTRACT NO. GTCIA86A7012 QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE X1 - STAGE 1 SUBSTATIONS PACKAGE-S4 G6NTkV AL-MASHAAP SUBSTATION chang ek Ge eth aCe wan ahh pill POWER PROJECTS DIVISION Rey-Nil EARTHING CONDUCTOR SIZING CALCULATION rg No. {LEARIING CONDUCTOR SIZING CALCULATION. EG CALCULATION ER SIZE OF EARTEING CONDUCTOR EOR LVAC SNITCHGEAR PANEL, Fe Comer al WAC Swehnear ae ow bescition Notation Unit Dosis Spaces nat cent 4 A 3 (cen usin fer : - 1 Ian Fat cuner fxmatcondur sting 1 ke 3 iFautoratin & . ‘ acim persiseerpertre ol tho conductor deg 160 [bier tempore a ene 2 Iona eotiaan eiesisance a levence ee cae: 5 Nomgerstie 2s dog.) tite iene festa of rouning conductor treference tarps % oem 1B [eal capacity eto Teme sien? 6) 34 koe v0 een ae Tea Wooo | ae Sqn Fe “Terfore, Mnkmam eos sactn rea needed . 3 Semen Honeo conductor size sect is 400 Samm PVC Shesthed Standed Copper Conductor CONTRACT NO. GTCIBSA2012 7 QATAR POWER TRANSMISSION SYSTEM EXPANSION nL Beplol 4 SHAE Xt “STAGE 4 SUBSTATIONS PACKAGESS [HBL SSF Ser AL-MASHAAF SUBSTATION se (ae tn PoWeR mao JecTS DISION Rov Ail EARTHING CONDUCTOR SIZING CALCULATION rg Neo. “LEARTHING CONDUCTOR SINS CALCULATION LCELEULATION FOR SZE OF EARTIING CONDUCTOR COMMECTING INDOOR EARTHING TO OUTDOOR EARTHING RNG Descxion Notaon use| origins fret ut ure » “ ae enrent givsion facto - | 1 jv Fat come retconctr sing fi “ a8 Fase & . 1 axa pedi rape the conduc T. aoe a nti tererice Ts ace 2 —— 7 yeep mess [Resistivity of grounding conductor at veference temperaione | Pe Ger 1B [real acy ce Toe Hen 3 exe 2A Z (Ba) fez) “ sane m tan) "cen Trt, Kram os set aes eee - 2 Samm ‘cease 4.1 of Speieaton Youre 3 , Seton 3.39 eal fora shestet copper cords rts than 400 Sqm for coaectons of ‘eng inside he buen to eutcoorbured i Hence conductor sie soloed is 489 Sm Lead Shasthed Stranded Coppor Conductor CONTRACT NO. GTo!486A/2012 Z ; ORTAR POWER TRANSHISSION SYSTEM EXPANSION Lyall gl PHASE XI « STAGE { SUBSTATIONS PACKAGE-S4 ankgpy Ao eee pene GBI TRV ALMASHAAF SUBSTATION es inant | Rev-Nil { TEARTHING CONDUCTOR SIZING CALCULATION rg No. | “7 EARTHNG CONDUCTOR SENG CALCHLATION SQCALOULATION FOR SRE OF EARTHNG CONTNICTOR £08 NER (BODY EARTEENG “he Future crite sie ited by the Nossal attr esi fo 760 A “he Fat ura scsi or NER 6 1500 | Desctpon Notation Uni eson ious ‘Speties tu cure % a 13 [oer ion acer 1 Ia, Fou cnet et cones 1 A 15 Fat avaton ‘ . a Madr perms tenperare ofthe conduct dene 18 hint temperate ™ dene Pi Feral codicen ceca arance = 5 ee ® eee ones Fest of grsnteg cera eens temps % orem 170 Fema cyt Tow ‘ston? 1 32 dene A pee eee ie ma 10*) so( he Seem, a ton) RR “hott, Minimum cos secon ate needed > 2 Sqaen ence conductor see selected is ‘ToSqmm PVE Shesthed Copper CONTRACT NO. GTOIEBA2012 7 : QATAR POWER TRANSMISSION SYSTEM EXPANSION FY di itu_# PHASE X1 - STAGE 1 SUBSTATIONS PACKAGE-S4 TR SSPE POWER PROJECTS BISON SE/TTRY AL-MASHAAF SUBSTATION elgg ted (ae ti a Cg Rev- il EARTHING CONDUCTOR SIZING CALCULATION Deg No | 5 SAR sno sopcion onder Strayer Speetion | Sted Condutorszeas per alenion Bd sara eadSroihodscndsd [RO amd eth ranted peer 2 foutadnoivonalgietee ise [copper enductor leonducror 150 Sa. (BOmm x Sen Bare copper | . 7 oteretiacee jesse Pm on oe Doers tins a 00 sean PE Sst sande apse > [amecion tom 6 telndor eating ine = eee ier ay epee Se Sern ad Saibed anal boar eee ‘ad z \eedundantdovn ends shall be proved bl jon opposite ends} < esracan fom poner romana SW fw ate Bd sarw WPF naan ide ence - comer avie Canseion Ws Wea Frodo Copper 6 [peso bre erg for power versformer s aso Samm tend shen nde copper news eeting onc ere Poraaone Cope beter 4 |puret ent git for povertnnstormer neta a ieee ete Jerre _ Se a cee [Sdn Led ened aed pee a fPamecion Fem best : 2 [Wedundart down lade ol be provides ov ons ers) zonalin om wasn! of ion stot 3 [emecion fom nan ots a 150 Se:mm eaesheathes sande ope aneatan Yow Teco Copp bao o to [panedearn gre nation vaetomer ret! . 10 smn testShesthes tarde oper ering n Iconnection from LIKV AIS to indoor earth ring. Ps een ee ew | Gcaccdionbenemndoorearhingingand (ase bod shen waded Ce eee 32 ies gi. levpper [oa saswm ent sheathed rand opre aigrem PE Tswana cap jon from LWAC panel to indoor earth ring Jconductoe [WG color (hecho - [connection from tvaC-panel tone ee et |connection shall be provided on opposite: enc of sn) Se sane ve sews seen es se Komen tom Renee ain ndcr enduron (eto Reena let - {Srocaton sabe prod on npoete enc of anet Tpunostontaayardcnwalwenas 02 fosgmmoucsneninee sanded |70Sqrnm PvE shetedstande oreer ia switchboard distribution board to indoor earth ring |copper conéuctor (V/G color) |conductor (¥/6 color) PHASE Xt - STAGE 4 SUBSTATIONS PACKAGE.Sé Gott kV ALMASHAAF SUBSTATION ran i POWER PROJECTS DIVISION pi Alceietieneteerer se pth Ue CONTRACT NO. GTC!98A2012 Z QATAR POWER TRANSMISSION SYSTEM EXPANSION lg iu Rev Nit EARTHING CONDUCTOR SIZING CALCULATION rg No, Tioane aaa T STosanmevcawntesuranaes Posaamrvectentes xanaateoner | 26 —_Jeavinment naving supply cable above 255a.mme | a a ee Am |p condusor (9/5 clos) lconsuerrIvfScoler nscoranenring [connection tom Metalic enclosure of LV electrical i on tom eaten ae sqm uc steted sanded [25Sanm vCal rendd et 17 —_Jonsiomant taving supply cable between SSE oper conductort/6 colt leonducr/ calor) Jand36 Samm to indoor earth ing [cormecton fom Metalic enccsure of 1 ec! Iss yy pvc shestned stranded copper 6 k-mm PVCshesthed stranded CORE 18. lecaipment having supply cablebelow 6 Sq.mmte oe a oe) indoor earthing et ect 29 [Bonding Betnean cabietray as s,m Brabed copper 135 ex.mm Grates copper se [Reena eax nara water 150 Sqn Lane Shesthew sanded cope anand eo buried earth grid 7 leonducsor cxcesnenantsetsomionanmeitrereseNes! SRST ANNEXURE - 2 IEEE Std 80-2000 Povaion of eee e005) IEEE Guide for Safety in AC Substation Grounding Sponsor Substations Committee of the IEEE Power Engineering Society ‘Approved 20 Janvary 2000 IEEE-SA Standards Board ‘Abstract: Outdoor ac substations, ether conventional or gas-insuiated, are covered in this guide. Distribution, vansmission, and generating plant subsiations are also included. With proper causion, the methods described herain are also applicable to indoor portions of such substations, oF to sub Stations that are vinoly indoors. No attempt is rade to cover the grounding prooiems peculiar to Go gudetations. A quantitative analysis of the effecs of ightning surges is also beyond the scope ct this ouide, Keywords: ground gids, grounding, substation design, substation grounding “The iste of Becizland Beronise Engines, Ie. Bar Avorn Now York, HY TOOTESEST, USA CConysght © 2000 by to insu of Elect and Eecronine Engine, ne, [Aegis esac, Pubianes & Agu! 2000, Pont in Uo Untoe States of Areca, Prog SON G7a6:-19264 SHSeaCT Por: Senoras:-1aa7x | SSSE07 io par of tie pueaon maybe reprosused! in any orn nan eestor eieval system or otherwise, mthout the per teritos parm othe ustener ose eee WW #C SUBSTATION GROUNDING 302000 Jn GIS, the use of cathodic protection may also be reoviad for atharreasors. Cathodic protection is com monly used to protect facilities that are exiemal 10 the GIS, such as pressurized pipe-type cables, lead ‘hilded cables. ete. Because ofthe complexity of GIS installations. tis essential to consider al aspects of owrosion prevention before designing the grounding system. Specific guidelines are cificut to esaolish eoouse ststation conditions ray be different due o location and application inthe alecrie power system. ve bees made and is beyond the ccope of “The subject of unvlergrouns comosion and cathodic protection is complex. Many su ‘much hs been published on tis subject A detailed discussion of these phan this guise 44.8 Conductor sizing factors 11.3.1 Symmetrical currents “The shor time temperature rise in 2 ground conductor, of the required conductor size as ¢ function of conductor Curent, can ne obtained from Equation (37) trough Eqvation (42), which are taken from Ghee vation by Sverak [B133} These equations are also included as Appendix B in IEEE Sud 837-1989. These ‘uations evaluate the ampacity of ay conductor for which the material constants aze known, or ean be Geernined by ealculation. Materiel conetaats of the commonly used grounding materials are lined in “Table 1, Equation (37) through Equtlon (42) are derive for syrmetial eurents (with no de ose : on were : ie she ne exeont in kA ‘Aga ithe conductor ees section ia mm? Tr” iste maximum allowable temperature in °C Tis te ambien tempera in °C Tithe reference temperature for maceria constants in °C eis the thermal coefficient of ressvity at O°C in 1°C fis dhethenal eoetcient of resistivity at eference temperate 7, in YC D, isthe resistivity ofthe ground condctor a reference temperassre Ta wer K,— Mayor(ie,)~T, in °C fs de duration of current in s TCAP isthe thermal capacity per unit volume fom Table 1.in JMem*-*C) (further defined in 113.11) It should be noted that 0, and p, ate both to be found atthe same reference temperature Of 7, °C. Table | provides dat for, sné p20 °C. 1 the conductor sizes given in keris (mam? 1 = kong). Equation (37) becomes 1 = 501-10" Aan PB 9 Ccopyight #2000 IEEE Al igs eserves a Sie 80-2000 | hare-craxn ! Pe j Coprenciad | 1 jSeperete go | aaosts | es | ose ao | sas a eee Sos attey ee ‘Abscins 620) coy | Sues, 1020 [saneasen 5, Ls 2 “From ASTM wanda. *Coprer-ciad sel rods based on 0.254 mm 2010 in) copper thickness, ‘Sininleecid tel rov based on 0-508 a [0020 in) Ne, 308 stainless cel thickrss over No, 2000 seco, “Equation (37) and Equation (38), in conjunction with Equation (38) (which defines TCAP), reflec two basic sssumpions. 42) Thatall heat will be retsined inthe conductor (adiabatic proces) 'b) Thar the produc: of specific heat (SH) and specific weight (SW), TCAP. is approximately constant because SH increases anc SW! decreases st shout the tame rte, For mest metal. these premiser are plicable over e reasonably wide tomperarure range, as long asthe faul: duration is within « few 2 Conrigtt © 2000 EEE, Aa ig eservec:

You might also like