Detailed Project Report (DPR) of Thaltu Khorh-II (5.00 MW) in Distt. Mandi of HP -
TEC thereof. Z
Ref:- Director, Himurja office letter No Himurja/SHP/ Thaltu Khorh-II (241-07/2015-
11571 dated 17.09.2018. |
Sir, . |
On the subject cited above, I am directed to convey that the DPR of Thaltu Khorb-II (5.00
MW) was received in this office through Himurja vide letter referred above for according Techno |
Economic Clearance (TEC). The above cited DPR has been examined in this office and following ||
comments / observations of this office are as under:~
1, GENERAL:
i) Utmost care be taken while planning the project components of the project in'crdér to
effectively obey the existing norms of Wildlife Sanctuary Area / Eco Sensitive Zone. |
ii) Water availability in existing or proposed kuhal if any, drinking water supply schemes, ||
watermills etc. may be ensured from the existing Thaltu Khor stream on which project is |
proposed. |
iii) Soft copy of modified DPR may be supplied to this office. |
2. SURVEYS AND INVESTIGATIONS:
i) Local area load requirement & Power evacuation survey have not been included in
Chapter-3. The same may be supplied for more clarity. '|
ii) Land requirement for each component of the project clearly indicating the Govt. /Pvt. Land ||
separately in the table be supplied in the modified DPR | |
3. HYDROLOGY & POWER PO1
i) Latest Hydrological data from year, 2013 to till date be used for optimizing / firming the | |
Power Potential studies of the project. |
aii) In Annexure 4.2, the long term discharge series has been derived by catchment area
reduction factor method by considering as 1.42 (based on measured discharges) whereas
calculated actual propionate arca factor is 1.64, which needs clarification.
iii) Power Potential studies calculated at Annexure 6.1 is incorrect. The same may be conected
& supplied.
iv) Power potential studies be carried out by considering 75% dependable year discharges after
i considering/deducting 15% of sacrificial discharges as per HP Govt. Notification No.
MPP-F(2}-16/2008 dated 29.01.09 for its optimization.
4. CIVIL ENGINEERING CABPT.
{) Hydraulic designs for sizing of different project components indicating the various
clevations of the structures be supplied, which has not appended/provided in the DPR.
ii) Net head caleulation be appended in the DPR.
iil) The forebay has been designed for peaking time of 2 minutes é peaking storage of 554.44
cumecs, The live water storage depth between FSL & MDDL has been provided as 1.5 m
which is on very lower size of peaking storage of 554.44 cumecs. The same may be looked
into and design of forebay & MDDL, Centre line of penstock level be amended accordingly.
iv) Corrected / revised salient features of project may be supplied now.
5, ENVIRONMENT AND ECOLOGY:-
i) Examination and ecology has not been appended in the DPR such as submergence, effect
on climate, Catchment Area Treattent, seismicity, water logging and salinity,
rehabilitation and other preventive measures and benefits to be discussed and incorporated
in the chapter.
6. COST ESTIMATE & FINANCIAL ANALYSIS:-
i) Calculation of levelised tariff not be provided in the DPR. Same may be supplied and
corrected,
Financial analysis be revised as per HPERC regulations dated 24.03.2019 and in view of
aforesaid changes & all the projections be given up to 40 years. Financial analysis may also
be prepared without considering the subsidy. Levellised tariff may also be worked out and
appended in the DPR.
iit) As the time gap is now more than two year, the detailed revised cost estimate at latest Price
Level, analysis of rates for major items of project components, revised financial analysis
chapter may also be submitted for examining the matter accordingly.
5, CONSTRUCTION DRAWINGS:
i) The authentic reference Benchmark preferably Survey of India (Sol) Bench Mark/ Survey
of India (Sol) approved Bench Mark be ensured and intimated from where the survey work
has been conducted and components level have been fixed.
ii) General layout plan of scheme be drawn on the appropriate Survey of India (Gol) Sheet
clearly on visible / readable scale of 1: 10000 or less if available. The upstream &
downstream projects, if any, allotted / existing should also be clearly depicted along with
required riparian distance as per Joint Secretary (NES), GoHP notification dated
21.08.2014.All other drawings of the main project components be marked on contour plan on
appropriate scale with minimum two meter contour interval. The different sections with
elevation of various components may be submitted on appropriate readable / visible scale
i.e. scale of 1:500 /1:200.
iv) The longitudinal section of the scheme may also be submitted including the upstream and
downstream scheme, if any.
v) _- All drawings should be properly signed & should be legible / readable.
6. ELECTRICAL WORKS:
i) Cost sheets are required to calculate on GST pattern as applicable at present.
ii) The connectivity with SLD (Single Line Diagram) bay 5 MW project be ensured in the
system.
7. TRANSMISSION WORKS :-
‘As per Annexure ‘A’ attached.
‘The reply to the observations made above be supplied at the carliest as addendum of the
DPR.
Yours faithfully,
Superintending Engineer (TEC),
Directorate of Energy,
er Shimla-171009
Copy of above is forwarded to the Director, Himurja, Urja Bhawan, SDA complex Kasumpti
for information and necessary action please.
Shimla-9
a ale
Superintending Engineer (TEC),
Directorate of Energy,
‘New Shimla-171009Hu. power Transmission Corporation Limited
(A state Govt. Undertaking)
ee ttimfed Bhawan, Panjari, Below Old MLA Quarters,
Shimla-171005
NO: HPPTCL/TEC-Vol-V/2018- /2/7-2 Dated: )/- 2-7 F
To
Chief Engineer (SP),
HPSEBL,
Uttam Bhawan, Dogra Lodge,
Shimla-171005.
Subject: -
Sir:
Thaltu Khor-ll SHP with an installed capacity of 5 NW is located in Distt. Mandi. Location of the
proposed power house is 31° 57°46.11" Nand 76° --53" 33.42” E. IPP has proposed to
evacuate power of the project by construction of 33 KV line of 0.7 Kms length up to 33/11 Ww
substation of HPSEBL at Tikka It is requested that IPP’s proposal to evacuate Power of Thaltu
Khor-II SHP through above arrangement may be ‘examined and confirmed to HPPTCL at the
earliest for taking further action in the matter please.
a
‘Addl. General Managef (Planning)
/
\ Lowy 10 Chief Engineer (Energy), Directorate of Energy, GOHP, shanti Bhawan, Phase
sector-Vi, New Shimla-171009 w.«-t. his Letter No, DOE/CE (Energy)/TEC/ Thattu khor-I1/2018-
€991 dated 20.9.2048-or information and necessary action please. 4
—
Addl. General Manager (Planning)
w
Yours faithfully,
| > @