2. WF 200 X 100 X MTR = 11 = 11 BTG 3. CNP 125 X 6 MTR = 96 = 96 BTG 4. MS PLATE 4 X 8 X 15 MM = U/TAPAK = 1 LBR 5. MS PLATE 4 X 8 X 12 MM = U/ RAFTER = 1 LBR 6. MS PLATE 4 X 8 X 8 MM = U/ STRIPNER = 1 LBR 7. MS PLATE 4 X 8 X 6 MM = U/TUPAI-TUPAI = 1 LBR 8. MS PLATE 4 X 8 X 2 MM = U/PINTU = 14 LBR 9. BESI SIKU 50 X 50 X 6 MTR = U/TULANG PINTU = 20 BTG 10. UNP 150 X 75 X 6 MTR = U.REL PINTU ATAS = 2 BTG 11. BESI SIKU 75 X 75 X 6 MTR = U/REL PINTU BAWA = 2 BTG 12. BESI BETON 16 MM X 12 MM = U/TALI ANGIN = 20 BTG 13. BESI BETON 12 MM X 12 MTR = U/SAG ROTE = 10 BTG 14. BAUT ¾ X 2 ½ = U/RAFTER = 250 BH 15. BAUT ½ X 1 ½ = U/SAG ROTE / TUPAI-TUPAI = 560 BH 16. BAUT 5/8 X 2 ½ = U/T BEAM / KANOPI = 50 BH 17. BAUT 7/8 X 500 MM = U/BAUT ANGKOR = 48 BH 18. TREKER 12 INCI = 16 BH 19. SENG EXPANDEX 0,75 X 0,4 MM X 5.300 MM = 124 LBR 20. RABUNG 0,4 MM X 3 MTR = 8 LBR 21. CAT MENI = 100 KG 22. CAT WARNA = 100 KG 23. THINER 100 KG 24. KUAS ROL/LENGKAP = 10 BH 25. KUAS 4 “ = 5 BH 26. KAWAT RB 26 3,2 MM = 100 KG 27. BATU GERENDA 4” = 5 LSN 28. BAUT SENG SKRUP =4 KTK
UPAH PABLIKASI/EREKSI DAN SIPIL UNTUK PEKERJAAN 100 %