A210 Tunnel at Ch 2200 3450 # ,
A080 Construct west tunnel portal 45 04/06/2001 03/08/2001 A080 Construct west tunnel portal
" / " $ A160 Construct east tunnel portal 45 06/08/2001 12/10/2001 A160 Construct east tunnel portal
$' ()*+ A090 Drive tunnel 85 06/08/2001 07/12/2001 A090 Drive tunnel
A100 Line tunnel 85 20/08/2001 11/01/2002 A100 Line tunnel
) + ! A250 Structures ,, $ 0 ,
A150 Build bridge A 90 04/06/2001 12/10/2001 A150 Build bridge A
A170 Station buildings 140 04/06/2001 11/01/2002 A170 Station buildings
A180 Build bridge B 90 10/09/2001 08/02/2002 A180 Build bridge B
1 % & " (
A230 Linear operations
A260 Preparation
2 ( A000 Strip topsoil Ch 0000 - 1400 , 04/06/2001 29/06/2001 A000
20 Strip topsoil Ch 0000 - 1400
A270 Strip topsoil Ch 1470 - 2000 8 02/07/2001 11/07/2001 A270 Strip topsoil Ch 1470 - 2000
A010 Strip topsoil Ch 8000 - 6950 15 12/07/2001 01/08/2001 A010 Strip topsoil Ch 8000 - 6950
A280 Strip topsoil Ch 6800 - 3500 47 02/08/2001 12/10/2001 A280 Strip topsoil Ch 6800 - 3500
A020 Drainage Ch 0000 - 1400 20 18/06/2001 13/07/2001 A020 Drainage Ch 0000 - 1400
A290 Drainage Ch 1470 - 2000 8 16/07/2001 25/07/2001 A290 Drainage Ch 1470 - 2000
A030 Drainage Ch 8000 - 6950 15 26/07/2001 15/08/2001 A030 Drainage Ch 8000 - 6950
A300 Drainage Ch 6800 - 3500 47 16/08/2001 26/10/2001 A300 Drainage Ch 6800 - 3500
A040 Fill Ch 0000 - 1400 20 02/07/2001 27/07/2001 A040 Fill Ch 0000 - 1400
A310 Fill Ch 1470 - 2000 8 30/07/2001 08/08/2001 A310 Fill Ch 1470 - 2000
Construction Computer Software CCS Demonstration 15
A050 Fill Ch 8000 - 6950 Job incl Indirect
09/08/2001 29/08/2001 A050 Fill Ch 8000 - 6950
CONSTRUCTION COMPUTER SOFTWARE CASHFLOW ANALYSIS SUMMARY. A320
Code: Fill 08 Name:
Ch 6800 - 3500Foreign Currency47 30/08/2001 09/11/2001 A320 Fill Ch 6800 - 3500
A060 Sub Base Ch 0000 - 1400 20 16/07/2001 10/08/2001 A060 Sub Base Ch 0000 - 1400
OutFlow A330 Sub Base Ch 1470 - 2000 8 13/08/2001 22/08/2001 A330 Sub Base Ch 1470 - 2000
90,000,000 Inflow A070 Sub Base Ch 8000 - 6950 15 23/08/2001 12/09/2001 A070 Sub Base Ch 8000 - 6950
CashFlow
A340 Sub Base Ch 6800 - 3500 47 13/09/2001 23/11/2001 A340 Sub Base Ch 6800 - 3500
80,000,000
70,000,000
Printed 13:53:38 12 July 2002 Page 1 of 2
1.07!a7 SitePlan Construction Planning System zak 68
60,000,000
50,000,000
40,000,000
30,000,000
20,000,000
Value
0
. ,
* % &%'#% %-%
% % %-%
-10,000,000 + %
$
% %-%
-20,000,000
%# %
+
#
-40,000,000
%
-50,000,000
!
*$
%
+ $ ,% $, %+
$
!
-60,000,000
%+ %'#
% %-%
"$ %'#%
-70,000,000 ! $ %-%
%
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 %' #%
$ % $ ,$
%-%
%)
Months $ %
$ %'#% %+ %'
%-% #% %-%
%-% "$ %'#%
%'#% ! $ %-%
+ $ ,% $, %
%+ %'#%
'
%'#%
! $ %-%
$ %'#%
$ %
'
&%
%
6,800 Bridge B
Construction Computer Software www.ccssa.com Cape Town: + 27 21 465 2637 Johannesburg + 27 11 455 1342
UK +44 1505 506 118 Portugal +351 91 724 1305 Australia +61 7 5545 1857
Construction Computer Software
S o l u c i o n e s d e S o f t w a r e p a r a Pr o f e s i o n a l e s d e l a
I n d u s t r i a d e Co n s t r u c c i ó n
www.ccssa.com South Africa +27 11 4551342 UK +44 1505 506118 Portugal +351 91 7241305 Australia +61 7 55451857 UAE(Dubai) +971 50 6286952
Estimating
El Sistema de Estimación CANDY estandariza el proceso de Se dispone de dos tipos de recursos posibles: recursos simples, La previsión se puede producir para el valor y cantidad de las
estimación en la oficina de contratista y está bien establecido que reflejan el coste de compra de un elemento en cualquier partidas, recursos individuales o como resumen a nivel de códigos
a nivel mundial en el sector de la construcción. Se actualiza divisa, y recursos complejos, que están hechos de otros recursos. de coste (Plan Contable).
regularmente para cumplir tanto con los requerimientos del Los elementos pueden también ser simplemente valorados
usuario como con las nuevas condiciones de licitación. mediante una tarifa neta o con una partición en tarifas definidas Cualquier cambio tanto al programa como a la estimación se
por el usuario como mano de obra, materiales y maquinaria. refleja inmediatamente en las previsiones.
Determinación de precios Se permiten, también, múltiples niveles de partidas compuestas,
El estimador puede determinar un precio y ofertar rápidamente y que son construidas por otras partidas.
con exactitud, identificando los elementos críticos de una licitación. Previsión inmediata del flujo de caja
Las bibliotecas de precios facilitan de forma consistente, precisa y Subcontratistas Cuando la estimación y el programa han sido vinculados, se puede
bien documentada la construcción de las tarifas. Los cambios se Los Ítems relevantes de la lista de partidas se trasladan al transferir la información detallada de ambos sistemas al módulo de
pueden hacer de una manera controlada, reduciendo los errores y Adjudicador de Subcontratos para comparación de las ofertas. Las flujo de caja. Esto asegura que ningún elemento sea omitido y que
acelerando la preparación de la licitación. tarifas del subcontratista seleccionado se transfieren directamente los valores del flujo de caja cuadren con la estimación. Esta
al presupuesto. Una aplicación similar se dispone para técnica permite que las alternativas de oferta sean probadas con
Las Listas de Partidas se reproducen con capítulos/secciones, comparación de ofertas de recursos facilidad y que los últimos valores de oferta sean incluidos en la
especificaciones y descripciones en varias líneas. Las bibliotecas previsión del flujo de caja tan pronto como estén disponibles.
de precios y la importación electrónica de listas, pueden usarse Presupuesto alternativo
para reducir el tiempo de captura de la lista. Como alternativa, se Permite al estimador realizar toda la determinación de precio en Finalización de la
puede crear una lista usando partidas derivadas del módulo de una estimación mientras mantiene hasta ocho estimaciones licitación
mediciones. alternativas en las que pueden ser consideradas diferentes Cambios de última
alternativas de estimación. hora pueden
Costes indirectos realizarse con total
Los costes indirectos se reflejan en una lista separada dentro de la Margen de Beneficio confianza y la alta
estimación. La lista de Indirectos incorpora las potentes Las tarifas netas pueden recibir un margen de beneficio por velocidad de
herramientas disponibles en los sistemas de Estimación y partida, departamento, rango de página o naturaleza de recurso. cálculo permite
Planificación, ofreciendo un presupuesto que cambia a medida que Los componentes de precio, locales o extranjeros, pueden recibir rápidas
lo hace el programa de Indirectos. un margen de beneficio separadamente en varias divisas. evaluaciones de
estrategias
Informes alternativas.
C3580 C25 Concr et e i n gr ound sl abs Tot al Qt y Bi l l ed= 480. 000 m3
Hay disponible una amplia
Wor ksheet mode
variedad de informes estándar,
mientras que los Gestores de
Estimaciones analíticas basadas en recursos
Informes se usan para crear Características
1) Mat er i al s and Pl ant
Bases de datos de descripciones y precios
2) Si t e Bat chi ng
informes personalizados con una
y el en proceso posterior a la licitación tendrán un completo 3/L 20MPa concrete in foundations 260
780
260
A150
A120
A130
Fan base
Construct footings
Cable trench floor
entendimiento como fue realizada la estimación. 3/M 25MPa concrete in walls 84
84
A180
A140
Fan base walls
Cable trench walls
42 A190 Fan base beams
3/N 25MPa concrete in surface beds 70 A160 Surface bed
3/O Wood float finish 910 A160 Surface bed
www.ccssa.com South Africa +27 11 4551342 UK +44 1505 506118 Portugal +351 91 7241305 Australia +61 7 55451857 UAE(Dubai) +971 50 6286952
Valuations
Los Sistemas de Valoración ofrecen continuidad entre la completo. Todos los elementos ACTUAL QUANTI TY CALCULATI ON SHEETS
Estimación y el Controlo de Costes tras la Licitación. Toda la pueden tener tarifas internas y Page 3A E1133 Cl ear and st r i p si t e 1, 020. 00 m2
información usada para definir el precio de la oferta está externas. 2. 1
disponible inmediatamente tras la adjudicación. LI NE CALCULATI ON FACTOR % RESULT REMARKS LOCATI ON
Conciliación del Coste
Todas las funciones comerciales tras la licitación pueden ser realizadas Admisible 1 40 { GL 4/ A- E} * 80 { GL A/ 4- 12} 10 320. 00 Ar ea 2 ( Cent r al ) C
por personal de la obra usando las utilidades del módulo de Valoración Los elementos de la lista pueden Cent r al 320. 00
www.ccssa.com South Africa +27 11 4551342 UK +44 1505 506118 Portugal +351 91 7241305 Australia +61 7 55451857 UAE(Dubai) +971 50 6286952
Planning
El Sistema Candy ofrece un potente sistema de camino crítico
con red lógica diseñado específicamente para la industria de la
construcción. Puede ser usado con efectividad por un no
planificador, pero posee las características y funciones
requeridas por un profesional.
Tiene cuatro objetivos primarios:
1825 1 8152229 6132027 31017 2431 7142128 5121926 2 91623 30 714 111825 1 81522 1 81522 29
Project Completion
precedencias o cualquier combinación de estos dos métodos. La red
March
Programación de información Lay track Ch 0 - 8000 0 - 6800
puede ser introducida siguiendo un modelo de precedencias o Se ofrece la programación de elementos de
Ballast pas
t tunnel 350
st thru
red de precedencias. Plazo y de Información para el seguimiento y
Balla
Station buildings
Intuitivo registro de operaciones no contempladas en la Ballast Ch
0 - 2000
el
Build bridge B
nn nn
Los bucles de la red y la duplicación de actividades se comprueban
tu tu
Sub Ba
el
se
e
Ch 68
riv Lin
según se van introduciendo actividades, reduciendo radicalmente los cliente, trabajo de diseño y largos plazos de 00 - 35
00
e
Fill Ch
6800
D
entrega. Drainag - 3500
e Ch 68
errores de entrada y los largos chequeos manuales. Strip top
00 - 35
00
Build bridge A
6800 Ch 80
- 3500 00 - 69
Sep
50
- 2000 Fill Ch
1470
Integración de la Estimación y el Programa 8000
2001
se Ch
Detallado Sub Ba Drainag
e Ch 80
- 6950
August
- 1400 - 2000 00 - 69
July
Strip
Drainag
condiciones del centro. Esto permite que la información financiera o Strip top soil Ch
0000
- 1400
June
Las redes pueden ser separadas en un número de subredes, las cuales estimación se refleje respecto a los plazos Delay track start
May
pueden ser además desglosadas en otras subredes hasta un máximo calculados en el programa.
6,800 Bridge B
secciones lógicas y ocultada en los formatos resumen hasta que sea pueden ser también representados mediante
1,000
3,000
4,000
5,000
6,000
7,000
necesaria. histogramas Cualquier cambio tanto al
programa como a la estimación se refleja
Recursos
inmediatamente en las previsiones y/o en los
Los recursos son clasificados en simples y compuestos. Los recursos
histogramas.
se asocian sin esfuerzo a las actividades en el programa para evaluar y
gestionar los recursos requeridos para el proyecto. Los recursos son Tiempos/Ubicación
analizados usando histogramas en pantalla y en informes. La tabla de Tiempo/Ubicación es un método de
resumir y representar gráficamente un programa en unos ejes tiempo y Equilibrado de recursos
Organización
ubicación. Esta utilidad es apropiada para las actividades lineales que Control de progreso
Potentes mecanismos de filtrado son ofrecidos para visualizar las
fácilmente se encuentran en los programas de rascacielos, carreteras y
actividades por código, descripción, márgenes u otros datos Registro del según creado
líneas de ferrocarril
especificados por el usuario. Programación para elementos de largos plazos
Tablas de Tiempo/Ubicación
Planificación orientada al Contratista
Características
Progreso
Integración con la Estimación, Valoración y Flujo de Caja
Visualización del diagrama de Gantt
El progreso puede ser registrado para proporcionar un control de según
Lista de actividades definida por el usuario
creado del proyecto, mientras que la red original es guardada como un
Calendários múltiplos
programa base que se usará para las comparaciones con el progreso
Bibliotecas de redes
real.
Bibliotecas de recursos
www.ccssa.com South Africa +27 11 4551342 UK +44 1505 506118 Portugal +351 91 7241305 Australia +61 7 55451857 UAE(Dubai) +971 50 6286952
CashFlow
El Flujo de Caja modela los requerimientos financieros de un 6,000,000
proyecto de construcción de forma que se optimice el flujo de Cashflow 610,582
5,400,000 Inflow 5,329,078
caja y que éste pueda ser fácilmente evaluado y controlado. Outflow -4,718,496 5,219,157
PrePayment 0
4,800,000 Retention 0
Pagos
Valuation 5,219,157
Los retrasos en pagos de facturas a los suministradores y 4,200,000 Cost -4,586,403
subcontratistas pueden ser especificados, junto con las
proyecciones de inflación previstas en coste y valor. Los 3,600,000
porcentajes de interés, las reglas de retención, los pagos por
adelantado y otros factores pueden ser especificados para modelar 3,000,000
el flujo de caja.
2,400,000
Recibos
Los pagos por parte del cliente pueden ser certificados corrientes o 1,800,000
un plan de pagos por hitos predeterminado o certificados limitados
1,200,000
a un máximo mensual preestablecido.
600,000
Valor Actual Neto
Value
El Valor Actual Neto del flujo de caja del contrato es generado 0
desde los cálculos semanales del flujo de caja. Esto puede mirarse
desde la perspectiva del cliente o del contratista. Adicionalmente, -600,000
-1,200,000
-1,800,000
-2,400,000
-3,000,000
-3,600,000
-4,200,000
-4,586,403
-4,800,000
8 12 17 21 26 30 4 8 13 17 21 28 2 6 11 15 19
Mar Apr May Jun Jul Aug Oct Nov Dec Jan Feb Mar May Jun Jul Aug Sep
2002 2003
calcula un modelo financiero que detalla cuándo los pagos de,
entre otros, mano de obra, materiales y
Modelo financiero
Características
se producen los resultados semanales del flujo de caja y los
balances bancarios, junto a valoraciones mensuales y resultados Integración con la Estimación y la Planificación
Retrasos en pagos
instalaciones tienen lugar (salidas) y los simultáneos
de costes.
Inflación y Revisión de Precios
ingresos/pagos (entradas) son recibidos.
Planes de Pago
Divisas y tipos de cambio
www.ccssa.com South Africa +27 11 4551342 UK +44 1505 506118 Portugal +351 91 7241305 Australia +61 7 55451857 UAE(Dubai) +971 50 6286952
CONSTRUCTION COMPUTER SOFTWARE
Precios NETO
Item Descripción Unid. Cantidad Precio Un. IMPORTE
1.2 Excavación de tierras en pozos y zanjas incluso transporte a m3 7,200 5.53 39,816.00
vertedero de las tierras sobrantes a distância limite de 2Kms.
1.5 Excavación en material Class A, para zanjas, aterramiento, m3 260 15.36 3,993.60
compactación y transporte a vertedero de las tierras sobrantes.
2.1 HORMIGÓN
2.1.1 Hormigón 20Mpa en fundaciones. m3 3,000 81.95 245,850.00
ia
2.2 ENCOFRADO
2.2.1 Encofrados en fundaciones m2 4,000 6.23 24,920.00
óp
2.3 ACERO
2.3.1 Acero en fundaciones Ton 300 483.36 145,008.00
3.1 ALBAÑILERÍAS
3.1.1 Parede Simple de Albanilería de 11 cm m2 960 7.30 7,008.00
3.2 CARPINTERÍAS
3.2 Suministro y asentamiento de puertas en madera de carvallo.
Incluye remates y acabado a barniz.
SANEAMIENTO 5,059.80
!32193 Pág. 1 de 2
Candy v2.0 LC 500500
! " !"# $"
CONSTRUCTION COMPUTER SOFTWARE
1.1 Limpieza de tierra vegetal m2 3,600 0.45 0.14 0.11 0.20 47.9 22.222 0.55
1.2 Excavación de tierras en pozos y zanjas incluso m3 7,200 5.53 1.79 1.30 2.44 1,200.0 21.157 6.70
transporte a vertedero de las tierras sobrantes a
distância limite de 2Kms.
1.3 Excavación para fundaciones hasta 2m de m3 750 4.13 1.67 0.96 1.50 87.4 23.487 5.10
profundidad
1.4 Excavación en terreno de Classe A, aterramiento y m2 440 5.62 1.74 0.57 0.91 2.40 235.5 24.555 7.00
compactación a 95% AASHTO. mod.
1.5 Excavación en material Class A, para zanjas, m3 260 15.36 4.79 1.61 2.56 6.42 374.7 23.698 19.00
aterramiento, compactación y transporte a vertedero
de las tierras sobrantes.
1.6 Acrecentamiento para escavaciones en material de m3 210 13.31 3.59 2.58 4.89 2.25 70.0 20.210 16.00
Class A por material de Class B
CAP.I MOVIMIENTO DE TIERRAS 2,015.50
2.1 HORMIGÓN
2.1.1 Hormigón 20Mpa en fundaciones. m3 3,000 81.95 9.96 48.63 10.86 12.50 8,609.3 3.722 85.00
2.2 ENCOFRADO
2.2.1 Encofrados en fundaciones m2 4,000 6.23 3.26 2.97 1,214.6 39.647 8.70
2.3 ACERO
2.3.1 Acero en fundaciones Ton 300 483.36 280.00 203.36 3,873.3 13.787 550.00
CAP.II ESTRUCTURA 13,697.20
3.1 ALBAÑILERÍAS
3.1.1 Parede Simple de Albanilería de 11 cm m2 960 7.30 4.00 3.30 265.6 30.137 9.50
3.1.2 Parede Doble de Albanilería de 11+15 cm m2 1,500 16.79 9.24 7.55 957.7 25.074 21.00
3.2 CARPINTERÍAS
3.2 Suministro y asentamiento de puertas en madera de
carvallo. Incluye remates y acabado a barniz.
3.2.1 Puerta tipo P1 c/ 0.80 x 2,10m. Un 5 242.00 242.00 9.504 265.00
3.2.2 Puerta tipo P2 c/ 1.20 x 2,10m. Un 2 363.00 363.00 4.683 380.00
CAP.III ACABADOS 1,223.30
!32193 Pág. 1 de 1
Candy v2.0 LC 500500
CONSTRUCTION COMPUTER SOFTWARE CCS - TRABAJO DE DEMOSTRACIÓN
BILL TRADES-RESUMEN
Basad en Cantidad Presup usando Neto PrUn (EUROS)
ITEM CÓD. DESCRIPCIÓN UNID. CANTIDAD TOTAL MANO DE OBRA MATERIAL MAQUINARIA ENCOFRADOS SUBCONTRATOS ENC.GENERAL.
1.
1.08n01 Construction Computer Software LC 500500
CONSTRUCTION COMPUTER SOFTWARE CCS - TRABAJO DE DEMOSTRACIÓN (1.09)
SELECC. WORKSHEETS (EUROS)
L18371 Arqueta de registro de 1.00x1.20x1.50 m Total Bill Qty= 2.000 Un
de profund. (dimensiones son internas).
# HORMIGÓN
4 512113 Horm.20Mpa-fabr.+transp. 64.872/m3_______+15%waste = 54.24 108.48 4.29%
8 211216 Equipo coloc. Horm.-1+6 1210.000/día____/7m3/día = 125.68 251.36 9.94%
= APPLIED FACTOR ________________*[OW]*[OB]*[S]*2 179.92 359.84 14.22%
# ACERO
531200 Acero Corrugado 197.44/ton______*1 ton = 9.33 18.66 0.74%
221351 Oficial 1ª Ferralla 40.00/día_______*10 hombres = 18.90 37.80 1.49%
= APPLIED FACTOR _______________*2*([OW]*[OB]*[S])*.065T/m3 28.23 56.46 2.23%
ENCOFRADOS
# Horizontal
4009 Encofrado (general) 1.00PA__________*15.00 Euros por m2 = 18.00 36.00 1.42%
8 211416 Equipo de encofrad - 1+6 267.000/día_____/2.5m2/día = 128.16 256.32 10.13%
= APPLIED FACTOR ________________*[W]*[B] 146.16 292.32 11.56%
# Vertical
4010 Encofrado 150mm anchura 0.68/m__________+20% = 5.09 10.18 0.40%
8 211416 Equipo de encofrad - 1+6 267.000/día_____/15m/día = 111.07 222.14 8.78%
= APPLIED FACTOR ________________*([OW]+[OB])*2 116.16 232.32 9.18%
ALBAÑILERIA
3 900121 Albañileria en Arqueta de Registro 44.279/m2_______*2*([OW]+[B])*([D]-[S]) = 318.01 636.02 25.14%
# CALERA
4 512113 Horm.20Mpa-fabr.+transp. 64.872/m3_______*1+15%waste = 26.86 53.72 2.12%
8 211216 Equipo coloc. Horm.-1+6 1210.000/día____/4m3/día = 108.90 217.80 8.61%
22122 Albañil 50.00/día_______*0.5 = 9.00 18.00 0.71%
= APPLIED FACTOR ________________*[W]*[B]*0.3 144.76 289.52 11.44%
REVOCO DE PAREDES
3 900131 Revoco en Arqueta de Registro 17.942/m2_______*2*([W]+[B])*([D]-[S]) = 106.58 213.16 8.43%
= 106.58 213.16 8.43%
COLOCACIÓN DE TAPADERA
515311 Tapa y Aro de fundición 55.30/un________*1 = 55.30 110.60 4.37%
8 211416 Equipo de encofrad - 1+6 267.000/día_____/5un = 53.40 106.80 4.22%
= 108.70 217.40 8.59%
PELDAÑO INTERIORES
515300 Peldaño hierro galbaniz. 4.61/un_________*([D]/.3) = 23.05 46.10 1.82%
Nett Rate 1,264.90 2,529.80
L= 818.38 M= 216.37 E= 13.19 F= 23.09 G= 193.87
1.
Candy v2.0 LC 500500
CONSTRUCTION COMPUTER SOFTWARE CCS - TRABAJO DE DEMOSTRACIÓN (1.09)
SELECC. WORKSHEETS (EUROS)
M42111 Excavación para fundaciones hasta 2m Total Bill Qty= 750.000 m3
de profundidad
USAGE HOMBR.HR MANO OBRA MATERIAL MAQUINARIA ENCOFRADOS SUBCONTRATOS ENC.GENERAL. TOTAL
#
8 32511 Rectroexc. JD 410 Op+Gas 248.958/día_____*1un = 3.22 9.71 87.4 570.00 720.00 1,125.00 2,415
221421 Peón Ordinário 35.00/día_______*2 Peónes = 0.91 19.41 682.50 683
= APPLIED FACTOR ________________/85m3 por día+10% 4.13
LEVEL 8 USAGE HOMBR.HR MANO OBRA MATERIAL MAQUINARIA ENCOFRADOS SUBCONTRATOS ENC.GENERAL. TOTAL
Especificaciones:
46 kW Motor Gasoil
0.17 m3 Capacidad Balde de Rectroexcav.
0.76 m3 Capacidad Balde de Cargadora
4.8 m Máx. Profundidad de Excavación
10 Ltr/hr Consumo de Combustible (basado en 0.21 Ltr/kW)
USAGE HOMBR.HR MANO OBRA MATERIAL MAQUINARIA ENCOFRADOS SUBCONTRATOS ENC.GENERAL. TOTAL
4 512113 Horm.20Mpa-fabr.+transp. 64.872/m3_______+3%waste = 66.82 3,090.00 2,159.3 21,990.00 145,890.00 32,580.00 200,460
8 211216 Equipo coloc. Horm.-1+6 1210.000/día____/80m3 por día = 15.13 37.50 6,450.0 7,890.00 37,500.00 45,390
LEVEL 4 USAGE HOMBR.HR MANO OBRA MATERIAL MAQUINARIA ENCOFRADOS SUBCONTRATOS ENC.GENERAL. TOTAL
HORM= 0
13:07 01/05/08 1.
Candy v2.0 LC 500500
CONSTRUCTION COMPUTER SOFTWARE CCS - TRABAJO DE DEMOSTRACIÓN (1.09)
COMPARACIÓN SUBCONTRACT PARA CARPINTERIAS
PRECIOS PROMEDIO PUERTAS Y VENTANAS 1 CARPINTEX 1 MADERA Y CLAVOS,LDA 1
PAGE ITEM DESCRIPCIÓN UNID CANTIDAD PR.UN. TOTAL PR.UN. TOTAL % PR.UN. TOTAL % PR.UN. TOTAL %
3.2.1 Puerta tipo P1 c/ 0.80 x 2,10m. Un 5 195.00 975.00 200.00 1,000.00 2.50 190.00 950.00 -2.63
3.2.2 Puerta tipo P2 c/ 1.20 x 2,10m. Un 2 320.00 640.00 300.00 600.00 -6.67 320.00 640.00 0.00 340.00 680.00 5.88
1.
Candy v2.0 LC 500500
CONSTRUCTION COMPUTER SOFTWARE
G 121 Jefe de Produción /mes 5,000.00 USD 3,544.67 05 Out 07 5,000.01 2.7 9,570.61 250
G 122 Ingeniero Civil /mes 3,500.00 USD 2,481.27 05 Out 07 3,500.01 20.5 50,866.04 250
G 1271 Encargado General /mes 3,000.00 USD 2,126.80 05 Out 07 3,000.00 11.0 23,394.80 250
G 12807 Medidor-Estimador /mes 1,150.00 12 Out 02 1,622.16 11.4 13,110.00 250
G 12808 Capataz /mes 1,000.00 12 Out 02 1,410.57 61.9 61,900.00 250
G 12810 Topógrafo /mes 1,300.00 12 Out 02 1,833.74 2.2 2,860.00 250
G 12900 Escriturario /mes 550.00 12 Out 02 775.81 11.0 6,050.00 250
G 12903 Limpieza /Sem 425.00 23 Out 01 599.49 44.4 18,870.00 230
G 12904 Responsable de Almacén /Sem 425.00 23 Out 01 599.49 42.4 18,020.00 210
G 12905 Guarda /Sem 500.00 23 Out 01 705.29 46.4 23,200.00 230
G 12906 Ayudante Topógrafo /Sem 425.00 23 Out 01 599.49 9.2 3,910.00 230
G 1323 Coche 1600cc /mes 4,000.00 ZAR 409.64 05 Out 07 577.83 9.5 3,891.58 380
G 1325 Coche 2000cc /mes 4,500.00 ZAR 460.85 05 Out 07 650.06 15.9 7,327.52 380
G 1332 Pickup 2000cc D /mes 4,200.00 ZAR 430.12 05 Out 07 606.71 29.5 12,688.54 380
G 1401DP Telemóvil /mes 1.00 06 Set 02 1.41 5,601.2 5,601.20 480
G 150001 Oficinas de Obra /mes 500.00 23 Out 01 705.29 42.8 21,400.00 450
G 150003 Almacén /mes 300.00 23 Out 01 423.17 4.0 1,200.00 450
G 151000 Mobiliario de Oficina /mes 150.00 23 Out 01 211.59 42.8 6,420.00 450
G 1520 Sistema CCS /mes 100.00 30 Set 02 141.06 11.4 1,140.00 450
9 155001 Oficina Obra + Mobilia /mes 650.000 22 Mar 08 916.871 42.8 27,820.00
G 160001 Seguro Multi-Riesgos % 0.1378 23 Out 01 0.1944 75,000.0 10,335.00 460
G 160002 Seguro Responsabilidad Civil % 0.0847 23 Out 01 0.1195 75,000.0 6,352.50 460
** ENCARGOS GENERALES ** 308,107.79
8 211216 Equipo coloc. Horm.-1+6 /día 1,210.000 22 Mar 08 1,706.790 38.3 46,343.00
8 21131 Equipo Excavación Of+8p /día 1,280.000 22 Mar 08 1,805.530 2.7 3,456.00
8 211416 Equipo de encofrad - 1+6 /día 267.000 22 Mar 08 376.622 53.6 14,311.20
L 221211 Carpintero /día 53.00 31 Dez 01 74.76 53.6 2,840.80 200
L 22122 Albañil /día 50.00 31 Ago 02 70.53 164.8 8,240.00 200
L 221321 Operador /h 6.50 03 Mar 02 9.17 2,927.4 19,028.10 210
L 221331 Conductor /día 48.00 31 Dez 01 67.71 95.4 4,579.20 210
L 221341 Oficial 2ª Encofrados /día 37.00 31 Dez 01 52.19 107.1 3,962.70 200
L 221351 Oficial 1ª Ferralla /día 40.00 03 Mar 02 56.42 468.8 18,752.00 200
L 221421 Peón Ordinário /día 35.00 03 Mar 02 49.37 3,087.3 108,055.50 230
** MANO DE OBRA ** 165,458.30
E 301421 Tornillo Sin-Fin /día 6.00 31 Ago 02 8.46 136.2 817.20 311
E 311200 Mont./Desm. Planta Hormigón PA 1.00 27 Set 97 1.41 6,192.2 6,192.20 311
8 311261 Central de Hormig 21/14 /m3 11.412 01 Mai 08 16.097 3,096.1 35,332.69
E 3112611 Hormigonera 21/14 /día 55.00 31 Dez 01 77.58 137.2 7,546.00 311
E 311415 Silo de Cemento 100t /día 18.00 31 Dez 01 25.39 137.2 2,469.60 311
E 311421 Tornillo Sin-Fin /Dia 6.00 31 Dez 01 8.46 1.0 6.00 311
E 311512 Boomscraper F14 /día 42.00 31 Dez 01 59.24 137.2 5,762.40 311
8 32511 Rectroexc. JD 410 Op+Gas /día 248.958 01 Mai 08 351.173 103.5 25,767.15
E 325111 Rectroexc. JD 410 /hr 13.56 03 Mar 02 19.13 884.6 11,995.18 331
8 3342 Comp.Dynapac st60 Op+Gas /día 101.820 01 Mai 08 143.624 2.7 274.91
E 33421 Compactad.Dynapac st60 /día 120.00 PEN 28.60 05 Out 07 40.34 2.7 77.22 331
8 3351 Cm20 pan compactor OP+G /día 89.800 01 Mai 08 126.669 5.4 484.92
E 33511 Cm20 pan compact. /día 85.00 PEN 20.26 05 Out 07 28.58 5.4 109.40 331
6 371101 Transporte de Hormig. /m3 8.011 01 Mai 08 11.300 3,096.1 24,802.86
8 371315 Dumper 0.75m3 /día 129.000 01 Mai 08 181.964 136.2 17,569.80
E 3713151 Dumper 0.75m3 /día 180.00 PEN 42.90 05 Out 07 60.51 136.2 5,842.98 371
8 372231 Camión Volq.6m3 - Gas+Op /día 248.999 01 Mai 08 351.231 95.4 23,754.50
E 3722311 Camión Volq.6m3 /día 550.00 PEN 131.09 05 Out 07 184.91 95.4 12,505.99 372
E 3722312 Camión 6m3-Coste Ext./Km /km 0.50 31 Dez 01 0.71 2,168.9 1,084.45 372
** MAQUINARIA ** 54,408.62
M 511211 Gasoil /Ltr 1.3 USD 0.92 30 Abr 08 1.30 26,341.1 24,233.81 510
M 511212 Gasolina /Ltr 3.50 PLN 0.93 05 Out 07 1.31 3,377.0 3,140.61 510
4 512113 Horm.20Mpa-fabr.+transp. /m3 64.872 01 Mai 08 91.507 3,096.1 200,850.20
6 512213 Horm.20Mpa - Materiales /m3 45.449 22 Mar 08 64.109 3,096.1 140,714.65
M 512313 Hormigón Comprado 20Mpa /m3 250.00 PEN 59.59 05 Out 07 84.06 511
M 513112 Cemento Portland /saco 3.75 31 Ago 02 5.29 22,527.3 84,477.38 512
M 513211 Arena /m3 60.00 15.00 PEN 10.94 05 Out 07 15.43 1,633.2 17,867.21 513
M 513221 Arena Fina /m3 65.00 15.00 PEN 11.85 05 Out 07 16.72 510.9 6,054.17 513
M 513313 Arido 19mm /m3 70.00 15.00 PEN 12.76 05 Out 07 18.00 2,806.3 35,808.39 513
M 515300 Peldaño hierro galbaniz. /un 6.50 USD 4.61 05 Out 07 6.50 20.0 92.20 517
M 515311 Tapa y Aro de fundición /un 78.00 USD 55.30 05 Out 07 78.00 4.0 221.20 517
6 51642 Mortero 1:4 /m3 40.959 22 Mar 08 57.776 85.3 3,493.80
M 520111 Bloques /1000 866.00 20.00 ZAR 62.26 05 Out 07 87.82 3.1 193.01 520
M 520112 Bloque 11 /un 0.80 20.00 PEN 0.15 05 Out 07 0.21 41,721.6 6,258.24 520
M 520113 Bloque 15 /un 1.00 20.00 PEN 0.19 05 Out 07 0.27 25,440.0 4,833.60 520
M 531200 Acero Corrugado /ton 300.00 25.00 197.44 11 Out 03 278.50 309.3 61,068.19 531
7 601111 Paineles 1800x9000 EF /m2 2.972 01 Mai 08 4.192 4.0 11.89
M 611143 Paineles 1800x600 /Sem. 11.64 ZAR 1.19 05 Out 07 1.68 3.7 4.40 611
M 621112 B&C Grampo /Sem. 2.12 ZAR 0.22 05 Out 07 0.31 18.8 4.14 621
M 621151 Conj. Cuñas /Un 1.30 ZAR 0.13 05 Out 07 0.18 0.7 0.09 621
M 621301 Anillas Rawl /Un 1.33 ZAR 0.14 05 Out 07 0.20 1.1 0.15 621
M 621302 Tapaderas de plástico Rawl /Un 1.07 ZAR 0.11 05 Out 07 0.16 1.1 0.12 621
M 621303 Conos Rawl /Un 1.18 ZAR 0.12 05 Out 07 0.17 1.1 0.13 621
M 621305 Tornillo Rawl 127mm comp. /Un 1.86 ZAR 0.19 05 Out 07 0.27 1.1 0.21 621
M 621313 Tornilo Rawl 200mm comp. /Un 2.30 ZAR 0.24 05 Out 07 0.34 5.6 1.34 621
M 641211 Tubo de andamio /m/Sem 2.12 ZAR 0.22 05 Out 07 0.31 5.9 1.30 621
** MATERIALES ** 244,259.89
3 900121 Albañileria en Arqueta de Registro /m2 44.279 01 Mai 08 62.459 14.4 637.62
3 900131 Revoco en Arqueta de Registro /m2 17.942 01 Mai 08 25.308 11.9 213.51
S 902 Subcontrat. CARPINTERIA PA 1.00 12 Mar 99 1.41 1,600.0 1,600.00 911
S 903 Subcontrat. PINTURA PA 1.00 12 Mar 99 1.41 336.0 336.00 912
S 904 Subcontrat. ALBAÑILERIA /m2 5.00 08 Abr 06 7.05 912
S 907 Subcontrat. EXPLOSIVOS PA 1.00 27 Set 97 1.41 472.5 472.50 907
** SUBCONTRATOS ** 2,408.50
Grand Total 786,620.42
MANO OBRA
L 221421 Peón Ordinário /día 3,084.52 35.00 107,958.04 65.31 21.22
221321 Operador /h * 2,917.74 6.50 18,965.33 11.47 3.73
221351 Oficial 1ª Ferralla /día 468.56 40.00 18,742.28 11.34 3.68
22122 Albañil /día 164.81 50.00 8,240.37 4.99 1.62
221331 Conductor /día 95.42 48.00 4,580.23 2.77 0.90
221341 Oficial 2ª Encofrados /día 106.33 37.00 3,934.17 2.38 0.77
221211 Carpintero /día 53.16 53.00 2,817.72 1.71 0.55
MANO OBRA 165,238.14 32.48
MATERIAL
M 513112 Cemento Portland /saco 22,519.65 3.75 84,448.69 36.10 16.60
531200 Acero Corrugado /ton 309.19 197.44 61,046.28 26.09 12.00
513313 Arido 19mm /m3 2,805.31 12.76 35,795.73 15.30 7.04
513211 Arena /m3 1,632.67 10.94 17,861.43 7.63 3.51
511211 Gasoil /Ltr 18,566.39 0.92 17,081.08 7.30 3.36
520112 Bloque 11 /un 41,721.60 0.15 6,258.24 2.68 1.23
513221 Arena Fina /m3 510.68 11.85 6,051.50 2.59 1.19
520113 Bloque 15 /un 25,440.00 0.19 4,833.60 2.07 0.95
515311 Tapa y Aro de fundición /un 4.00 55.30 221.20 0.10 0.04
520111 Bloques /1000 3.14 62.26 195.32 0.08 0.04
515300 Peldaño hierro galbaniz. /un 20.00 4.61 92.20 0.04 0.02
MATERIAL 233,885.27 45.97
MAQUINARIA
E 3722311 Camión Volq.6m3 /día 95.42 131.09 12,508.79 23.11 2.46
325111 Rectroexc. JD 410 /hr P 876.09 13.56 11,879.72 21.94 2.34
3112611 Hormigonera 21/14 /día 136.18 55.00 7,489.90 13.83 1.47
311200 Mont./Desm. Planta Hormigón PA 6,190.00 1.00 6,190.00 11.43 1.22
3713151 Dumper 0.75m3 /día 136.18 42.90 5,842.12 10.79 1.15
311512 Boomscraper F14 /día 136.18 42.00 5,719.56 10.56 1.12
311415 Silo de Cemento 100t /día 136.18 18.00 2,451.24 4.53 0.48
3722312 Camión 6m3-Coste Ext./Km /km * 2,168.67 0.50 1,084.33 2.00 0.21
301421 Tornillo Sin-Fin /día 136.18 6.00 817.08 1.51 0.16
33511 Cm20 pan compact. /día 5.45 20.26 110.38 0.20 0.02
33421 Compactad.Dynapac st60 /día 2.72 28.60 77.91 0.14 0.02
MAQUINARIA 54,171.03 10.65
ENCOFRADOS
F 411143 Paineles 1800x600mm /sem. 3,703.70 1.19 4,407.41 36.81 0.87
421112 B&C Grapa /sem. 18,765.43 0.22 4,128.40 34.48 0.81
421313 Tornillo Rawl 200mm /un 5,555.56 0.24 1,333.33 11.14 0.26
441211 Tubo de andamio /m/sem 5,925.93 0.22 1,303.70 10.89 0.26
421305 Tornillo Rawl 127mm /un 1,111.11 0.19 211.11 1.76 0.04
421301 Anillas Rawl /un 1,111.11 0.14 155.56 1.30 0.03
421303 Cono Rawl /un 1,111.11 0.12 133.33 1.11 0.03
421302 Tapadera en plást. Rawl /un 1,111.11 0.11 122.22 1.02 0.02
421151 Conj. Cuñas /un 691.36 0.13 89.88 0.75 0.02
4009 Encofrado (general) PA 72.00 1.00 72.00 0.60 0.01
4010 Encofrado 150mm anchura /m 29.95 0.68 20.37 0.17
ENCOFRADOS 11,977.31 2.35
SUBCONTRATOS
S 902 Subcontrat. CARPINTERIA PA 1,600.00 1.00 1,600.00 66.43 0.31
PUERTAS Y VENTANAS
907 Subcontrat. EXPLOSIVOS PA 472.50 1.00 472.50 19.62 0.09
EL DETONADOR
903 Subcontrat. PINTURA PA 336.00 1.00 336.00 13.95 0.07
PINTEX, LDA.
SUBCONTRATOS 2,408.50 0.47
ENC.GENERAL.
G 12808 Capataz /mes 41.00 1,000.00 40,999.61 100.00 8.06
ENC.GENERAL. 40,999.61 8.06
1.
Candy v2.0 LC 500500
! "#$%!
& #'&$ & ()*
+ ,
Periodo de Lluvia
Montaje de las Instalaciones
Adjudicación de la Obra Adjudicación de la Obra
Montaje de las Oficinas de Obra Montaje de las Oficinas de Obra
Edifício A
Edifício B
Excavaciones Excavaciones
Estrutura de Hormigón Estrutura de Hormigón
Acabados Acabados
Desmontaje de Instalaciones Desmontaje de Instalacion
Cerramiento de la Cuenta Cerramiento de l
Edifício B
RESUMEN DEL PROGRAMA
COSTES INDIRECTOS
Dirección de Obra
Jefe de Produción 1 0.25 2.74 Meses 4,501.14 12,346.68 Jefe de Produción
Encargado General 1 10.97 Meses 3,046.54 33,426.77 Encargado General
Jefe de Obra 1 10.52 Meses 3,933.99 41,370.35 Jefe de Obra
Ingeniero Civil 1 7.93 Meses 3,262.34 25,863.69 Ingeniero Civil
Topógrafo 1 2.19 Meses 1,940.34 4,256.23 Topógrafo
Ayudante de Topógrafo 1 9.20 Semana 425.00 3,910.00 Ayudante de Topógrafo
Capataz 1 2.87 Meses 1,000.00 2,870.97 Capataz
Medidor Estimador 1 11.44 Meses 2,069.74 23,675.15 Medidor-Estimad
Capataz 1 8.74 Meses 1,000.00 8,741.94 Capataz
Capataz 1 9.13 Meses 1,000.00 9,133.33 Capataz
Escriturario 1 10.97 Meses 550.00 6,034.62 Escriturario
Limpieza 1 44.40 Semana 425.00 18,870.00 Limpieza
Responsable del Almacén 1 42.40 Semana 425.00 18,020.00 Responsable del Almacén
Guarda 1 46.40 Semana 500.00 23,200.00 Guarda
Maquinaria 369.96
Implantación de Central de Hormigón
Encofrados en Fundaciones 4 4.00 m2 29.67 118.68 Encofrados en Fundaciones
Acero en Fundaciones 0.12 0.12 ton 1,338.67 160.64 Acero en Fundaciones
Hormigonaje de las Bases del Central 1 1.00 m3 134.78 134.78 Hormigonaje de las Bases del Central
Montaje del Central de Hormigón Montaje del Central de Hormigón
Costs Indirect
45,000 450,000
Current Program
Max 21,344 Total 278,195 EUROS 40,000 400,000
Late Start
Max 0.00 Total 0.00 EUROS 35,000 350,000
Base Program
Max 0.00 Total 0.00 EUROS 30,000 300,000
Semanl Totales
20,000 200,000
15,000 150,000
10,000 100,000
5,000 50,000
21344
4863
5777
6556
6256
6622
6622
6643
6694
6126
4423
4423
4423
5653
5578
5578
5770
6027
6027
6027
5835
5578
5578
5578
5578
5718
5718
5718
5718
5618
5578
5578
5578
5618
5718
5718
5718
4952
4837
4837
4740
4611
4611
4611
4611
4104
3734
2428
1134
Semanl Totals
01/05/08 Pág. 1 de 1
Candy v2.0 LC 500500
!" # $ " %$#
CONSTRUCTION COMPUTER SOFTWARE
Edifício A
Edifício B
Excavaciones
Estrutura de Hormigón
Acabados
Desmontaje de Instalaciones
Cerramiento de la Cuenta
Edifício B
RESUMEN DEL PROGRAMA
COSTES INDIRECTOS
Dirección de Obra
Jefe de Produción Meses 4,501.14 1 12,346.68 943.79 1,125.29 1,125.29 1,125.29 1,125.29 1,052.69 1,197.88 1,125.29 1,050.27 1,200.30 1,088.99 186.34
Encargado General Meses 3,046.54 1 33,426.77 2,555.16 3,046.54 3,046.54 3,046.54 3,046.54 2,849.99 3,243.09 3,046.54 2,843.44 3,249.64 2,948.26 504.48
Jefe de Obra Meses 3,933.99 1 41,370.35 3,299.48 3,933.99 3,933.99 3,933.99 3,933.99 3,680.18 4,187.80 3,933.99 3,671.72 4,196.26 2,664.96
Ingeniero Civil Meses 3,262.34 1 25,863.69 526.18 3,262.34 3,262.34 3,262.34 3,262.34 3,051.87 3,472.81 3,262.34 2,501.13
Topógrafo Meses 1,940.34 1 4,256.23 1,627.38 1,940.34 688.51
Ayudante de Topógrafo Semana 425.00 1 3,910.00 1,530.00 1,785.00 595.00
Capataz Meses 1,000.00 1 2,870.97 612.90 1,000.00 1,000.00 258.07
Medidor Estimador Meses 2,069.74 1 23,675.15 1,735.91 2,069.74 2,069.74 2,069.74 2,069.74 1,936.21 2,203.27 2,069.74 1,931.76 2,207.72 2,002.97 1,308.60
Capataz Meses 1,000.00 1 8,741.94 161.29 1,000.00 1,000.00 1,000.00 1,000.00 935.48 1,064.52 1,000.00 933.33 647.32
Capataz Meses 1,000.00 1 9,133.33 1,000.00 1,000.00 1,000.00 935.48 1,064.52 1,000.00 933.33 1,066.67 967.74 165.59
Escriturario Meses 550.00 1 6,034.62 461.29 550.00 550.00 550.00 550.00 514.52 585.48 550.00 513.33 586.67 532.26 91.07
Limpieza Semana 425.00 1 18,870.00 1,530.00 1,785.00 850.00 1,615.00 1,700.00 1,785.00 1,870.00 1,955.00 1,700.00 1,955.00 1,870.00 255.00
Responsable del Almacén Semana 425.00 1 18,020.00 680.00 1,785.00 850.00 1,615.00 1,700.00 1,785.00 1,870.00 1,955.00 1,700.00 1,955.00 1,870.00 255.00
Guarda Semana 500.00 1 23,200.00 1,800.00 2,100.00 1,000.00 1,900.00 2,000.00 2,100.00 2,200.00 2,300.00 2,000.00 2,300.00 2,200.00 1,300.00
Dirección de Obra 17,463.38 25,383.24 20,971.41 21,375.97 21,387.90 20,626.42 22,959.37 22,197.90 19,778.31 19,364.58 16,145.18 4,066.08
Maquinaria 369.96
Implantación de Central de Hormigón
Encofrados en Fundaciones m2 29.67 4 118.68 118.68
Acero en Fundaciones ton 1,338.67 0.12 160.64 160.64
Hormigonaje de las Bases del Central m3 134.78 1 134.78 134.78
Montaje del Central de Hormigón
Implantación de Central de Hormigón 414.10
COSTES INDIRECTOS 35,888.23 28,226.91 23,687.44 24,104.42 24,111.72 23,188.68 25,863.33 24,940.29 22,324.88 22,262.23 18,780.23 4,816.17
TOTAL 35,888.23 28,226.91 23,687.44 24,104.42 24,111.72 23,188.68 25,863.33 24,940.29 22,324.88 22,262.23 18,780.23 4,816.17
Seguros 16,687.50
COSTES INDIRECTOS 278,194.52
Grand Total 278,194.52
16:06 28/11/13 1.
Candy 2.01a30 (16 1179712 26) LC
!"# $ % & '"# ( () *
CONSTRUCTION COMPUTER SOFTWARE
1.2 Excavación de tierras en pozos y zanjas incluso m3 7,200 4.04 29,088.00 4.21 30,312.00
transporte a vertedero de las tierras sobrantes a
distância limite de 2Kms.
1.3 Excavación para fundaciones hasta 2m de m3 750 4.06 3,045.00 1.70 1,275.00
profundidad
1.4 Excavación en terreno de Classe A, aterramiento y m2 440 6.22 2,736.80 1.29 567.60
compactación a 95% AASHTO. mod.
1.5 Excavación en material Class A, para zanjas, m3 260 16.88 4,388.80 3.71 964.60
aterramiento, compactación y transporte a vertedero
de las tierras sobrantes.
1.6 Acrecentamiento para escavaciones en material de m3 210 10.84 2,276.40 8.42 1,768.20
Class A por material de Class B
o
2.1
2.1.1
HORMIGÓN
Hormigón 20Mpa en fundaciones. m3
er 3,000 60.80 182,400.00 36.33 108,990.00
nj
2.2 ENCOFRADO
2.2.1 Encofrados en fundaciones m2 4,000 4.10 16,400.00 5.03 20,120.00
ra
2.3 ACERO
2.3.1 Acero en fundaciones Ton 300 547.10 164,130.00
3.1 ALBAÑILERÍAS
3.1.1 Parede Simple de Albanilería de 11 cm m2 960 5.19 4,982.40 4.32 4,147.20
3.1.2 Parede Doble de Albanilería de 11+15 cm m2 1,500 12.01 18,015.00 9.82 14,730.00
3.2 CARPINTERÍAS
3.2 Suministro y asentamiento de puertas en madera de
carvallo. Incluye remates y acabado a barniz.
!32193 Pág. 1 de 2
Candy v2.0 LC 500500
! "! !# $ % "! " & " '( ! "! ( $ ! ) "! "
( * (+ ( , (,
( - .
/(/ //00 ! ! 1 # ! "" 2 3 4 05677 89/(07 988(:: 7(77 0;4(;0 <0(<
<69(79 7(77 9;/(<8 ;/4(76
/(4 4774/ & 2 != # ! "" 1 0 :5477 44564:(<8 /45<70(77 7(77 <5:49(<8 459<9(8
1 ' ! % " " 2 " # " 445;04(<0 7(77 //5908(49 //57<9(6<
# ! "" >" #! ? !
! ! # 4@ (
/(0 94/// & 2 != " )% # ! A 4 0 :;7 450:4(9< /549:(4/ 7(77 /5/4;(48 498(;
# " )% #!# # 88:(/: 7(77 88:(/: 7(77
/(9 ;4770 & 2 != "" # 5 4 997 45/;/(90 :68(<9 7(77 046(98 /57;6(77 009(8
" != <;B , ( 978(74 7(77 07;(76 /74(<6 7(77
#(
/(; < 077/0 & 2 != "! 5 " 0 467 0599<(8: /5490(<9 7(77 ;0:(:: /5668(/6 ;09(6
1 ' 5 " 5 != 6<;(:0 7(77 ;7:(8; /8:(88 7(77
" " 2 " # " # ! ""
>" (
/(6 670 " ! " 2 ! 0 4/7 /5:<4(9: :;4(68 7(77 ;6:(4< 9:4(;7 /9;(;
"! # " "! # /50/9(94 7(77 66:(40 69:(/< 7(77
( -
4(/ -, , +
4(/(/ ,/47/ , " !3= 47 )% # ! ( 0 05777 /:45400(;/ 4<589<(;9 8/5<40(60 445<67(0; 0:5;77(77 /45977(9
/745870(69 7(77 8<54/<(;: /05;89(7: 7(77
4(4 -
4(4(/ /47/ )" # )% # ! 4 95777 /05749(0< /05749(0< 7(77 45809(/
/65:69(;9 7(77 /65:69(;9
4(0 -
4(0(/ //7/ " )% # ! 077 /9;5778(<6 895777(77 6/5778(<6 /<5066(:
7(77 7(77 7(77
( -. .
0(/ - C D
0(/(/ //7 " # ! # > ! "$ # // 4 <67 9500:(60 05897(77 9<:(60 :<6(8
05:68(77 7(77 05:68(77
0(/(4 ///; " # > # > ! "$ # //E/; 4 /5;77 /;5680(<< /05896(/; /580:(89 458:0(/
/050<0(<9 7(77 /050<0(<9
0(4 - " D
0(4 - % ! ! " ! # % "
# " # "2 ( %! "
> > " !1(
0(4(/ /7/ % " ! / F 7(87 & 45/7 ( ; /54/7(77 /54/7(77
7(77 7(77
0(4(4 /74 % " ! 4 F 7(<7 & 45/7 ( 4 6<9(;7 6<9(;7
7(77 7(77
-
0(0 - * .
0(0(/ /80:/ "G% # " 3! " # /(77&/(47&/(;7 4 45/<4(;; /5606(:: //0(9: /8(;8 06(77 08:(:9 9/7(9
# " )% #( H#! ! 9:9(8; 7(77 99<(9< /7(<< /9(06 7(77
! " I(
0(0(4 < 80:4 "G% # " 3! " # /(77&/(47&/(;7 4 45/<4(;/ /5606(:6 //0(96 /8(;8 06(77 08:(:/ 9/7(9
# " )% #( H#! ! 9:9(89 7(77 99<(9< /7(<< /9(06 7(77
! " I(
/(
/(78 7/ "% ! % " ) K " ;77;77
! " ! ! #$ !
$%! # $%! &' !%$%! #
( ) ( *( + ((
,-.-/,. ,0/-1 0 1 . --, ,2
,1.3 2 0/ / 3. 2 ., ,- 1 -3 2 /1 3 2 0 ,-3 2 /
) /-31/, 1, --3,-/ /, .3. - 2, 30,- 1.
4 5 ,2/3.,/ 1,3,-- / 0.3 2- /322. 2.
+ ,23 -- -3 ,2 - 3..2 2
2/3 . 0 2/3 . 0
3 -0 3 -0
( 6 ( -,3 .. , , 3 , 0, ,3 00 01
7 ) + /3 / 2. 23-./ 0 -0 /, -,, ,, , / 0.
5 ( 1.03.12 /, /2 31- .. . 3-0- 2, -3 2 /1 .3/. . -03 2 /1
%#$" 8, ( / /
!" #$" " !% %!& &! '$(!%
) *
%&6 #1 / /
!" #$
( # #' 1# # ( '
! ) * #' %!+,- .-* / -**0 ( ! ) * #' %!+,- .-* / -**0
! "# # $ % & #' ( % & #' ( " ! ! % $ ! & #' ( ! & #' (
* 1# #2 #' 3 3 - # ;;
" ( ;; 4 4
3 05( # ;;
' 6# ' * 3 3
7 8 3 ;
4 "# , '9 <# 3 3
4 "# " +7 : = 4
$$ &-&0*+. $$ 3 3
+7 #2# # 1 5 3 3 - # ;; 4
1# ># '( # #2 '# # " ( ;; 4 4 4
?# # # #' : 3 05( # ;; 4
' 6# ' * 3 4
7 8 3 ; 44 44
4 "# , '9 <# 3 3
4 "# " +7 : = 3
$$ &-&0*+. $$ 3 3
+7 #2# ## # ;# # @( # 3 3 - # ;; 4 4
3 05( # ;; 4
' 6# ' * 3
7 8 3 ;
$$ &-&0*+. $$ 3 3
% ! &'#( )*'#*
"# 5 # F G *"
!"#
+; "5" "" " @" " .- " 86 7 6 66 7 * " @@ >8 >8 6> 8 > @@
9:- " @@ >8 6 8 @@
8 % 0" % 4 6 8 4
8 ; < @ 8> > 8 @
## $*$94+/ ## 6 8
8 +; "5" " "% !%" 97 " " 3" C" 7 %% 7 6 7 8 >> * " @@ >8 > 8 @@
" " : " "5 %" " ! - @@ 68 @@
&" 9:- " @@ >8 8 6 @@
8 % 0" % 4 6 > 86 4
8 ; < @ 8> 8 > > 868 @
! " " : " " > A" > > 8> A"
8 ! " " A" > > 66 A"
6 !" = %, > A" 8 6 7 8 A"
6 !" > ! +; ? B 8 B
!" " "3 @@ 6 > 8> @@
## $*$94+/ ## >6 > 8
> 9 " " " ; "5" " "% !%" 9 8 7 6 * " @@ >8 8 6 8 @@
" "% !%" E ! - @@ 68 68 @@
9:- " @@ >8 >6 8 8 @@
8 % 0" % 4 8> 8 88 4
8 ; < @ 8> 8 8 8 @
6 !" = %, > A" >6 > A"
6 !" > ! +; ? B 8 6 > B
6 /-& " +)*4 ! *(+/ 0%& 8 8 0%&
## $*$94+/ ## 8 8 8
2 ! ) " " : - -" 6 > 7 >> >7 8 * " @@ >8 > > > 8> @@
! - @@ 68 66 8 @@
9:- " @@ >8 8 66 @@
8 % 0" % 4 6 8 6 4
8 ! 2 ! " ) " 8
8 ! %" " 68 6 6 6 "
8 9 " 8 88 >
8 9 "' " 8 6 8
8 9 6> > 6
$ %% / ' A" > 8 6 6 A"
) ! "% 2 ! 9 > > 8 9
> 2 " A" 88 8 6 A"
8 /% ! A" 8 6 A"
8 E " ' A" 8 6 A"
6 8 - 68 A" 8 6 A"
6 !" = %, > A" 6 6 A"
6 !" > ! +; ? B 8 8 886 B
!" " "3 @@ 6 6 @@
## $*$94+/ ## > > > 6
A110 FOUNDATIONS
A120 Construct footings 10 20/09/1999 01/10/1999 A120 Construct footings
A130 Cable trench floor 10 04/10/1999 15/10/1999 A130 Cable trench floor
A140 Cable trench walls 20 18/10/1999 12/11/1999 A140 Cable trench walls
A150 Fan base 20 18/10/1999 12/11/1999 A150 Fan base
Anticipate late decisions on the specification
for the fan base holding down bolts and fixings.
Client is out of the country until September and the
final approval must await his return.
A160 Surface bed 20 13/12/1999 21/01/2000 A160 Surface bed
A170 SUPERSTRUCTURE
A180 Fan base walls 15 15/11/1999 03/12/1999 A180 Fan base walls
A190 Fan base beams 10 29/11/1999 10/12/1999 A190 Fan base beams
A200 Cure fan base beams 20 13/12/1999 21/01/2000 A200 Cure fan base beams
A210 Cut & fit duct covers 10 24/01/2000 04/02/2000 A210 Cut & fit duct covers
A220 Joint sealing & finishes 10 07/02/2000 18/02/2000 A220 Joint sealing & finishes
A360 SUB - STATION (SECTION 3) 120 30/08/1999 25/02/2000 A360 SUB - STATION (SECTION 3)
A580 CONTRACTUAL HANDOVER
A590 Handover commissioned fan 1 28/02/2000 28/02/2000 A590 Handover Commissioned Fan
A600 Handover sub-station 1 13/03/2000 13/03/2000 A600 Handover Sub Station
CONC Concrete m3 Total A080 Excavate founds and blind 10 65 70 100 65 Excavate founds and blind
A390 Excavate founds & blind 10 65 70 100 65 Excavate founds & blind
A090 Excavate footings & blind 10 20 70 100 20 Excavate footings & blind
A400 Excavate footings & blind 10 2 70 100 2 Excavate footings & blind
A120 Construct footings 10 60 80 100 60 Construct footings
A420 Construct footings 10 60 70 100 60 Construct footings
A130 Cable trench floor 10 20 80 100 20 Cable trench floor
A150 Fan base 20 1,240 80 100 1,240 Fan base
A430 Construct transformer bases 10 20 70 100 20 Construct transformer bases
A270 Construct manhole 1 10 0.7 30 100 0.7 Construct manhole 1
A140 Cable trench walls 20 70 70 100 70 Cable trench walls
A290 Construct manhole 2 10 1 30 100 1 Construct manhole 2
A180 Fan base walls 15 140 60 100 140 Fan base walls
A470 Surface beds 10 190 80 100 190 Surface beds
A190 Fan base beams 10 20 60 100 20 Fan base beams
A160 Surface bed 20 360 80 100 360 Surface bed
EXC Excavation m3 Total A060 Clear site/Remove topsoil * 10 360 0 100 360 Clear site/Remove topsoil *
A070 Excavate in bulk 10 7,200 0 100 7,200 Excavate in bulk
A380 Clear site/Remove topsoil 10 320 0 100 320 Clear site/Remove topsoil
A080 Excavate founds and blind 10 600 0 80 600 Excavate founds and blind
A390 Excavate founds & blind 10 250 0 70 250 Excavate founds & blind
A090 Excavate footings & blind 10 150 0 80 150 Excavate footings & blind
A400 Excavate footings & blind 10 150 0 70 150 Excavate footings & blind
A240 Excavate 15 3,640 0 100 3,640 Excavate
FWK Formwork m2 Total A150 Fan base 20 1,890 0 90 1,890 Fan base
A140 Cable trench walls 20 810 0 60 810 Cable trench walls
A180 Fan base walls 15 370 0 80 370 Fan base walls
A470 Surface beds 10 40 0 60 40 Surface beds
A190 Fan base beams 10 100 0 80 100 Fan base beams
A160 Surface bed 20 90 0 60 90 Surface bed
GANG1 Formwork Gang (1+4) shift Rate A470 Surface beds 10 1 0 60 1 Surface beds
A160 Surface bed 20 1 0 60 1 Surface bed
GANG2 Concrete Gang (1+8) shift Rate A470 Surface beds 10 1 80 100 1 Surface beds
A160 Surface bed 20 1 80 100 1 Surface bed
SHOPFRONTS 4,500
SHOP
Current Program 4,000
4,228 m
Max 199.25 Total 4,228 m 3,500
3322
Late Start 3,000
Max 120.24 Total 4,228 m
2,500
Base Program 2,000
Max 93.11 Total 4,228 m Resource Shortfall = 3179
1,500
1,000
500
Daily Values 143
Float Current Start Late start Base Program
P366 EXT.FACADE-NORTH ZONE 8 Not started Behind (-38) Starts 22/10/1999 Behind (-48) -10 P366 EXT.FACADE-NORTH ZONE 8
P372 PIAZZA AREA R15 EXT.FINISHES Completed before Completed before 0 P372 PIAZZA AREA R15 EXT.FINISHES
5
1 A020 10 6 A030 15
SITE ESTABLISHMENT A620/2
Mobilise & resource Erect offices
1 10 10 6 10 15
5
A620/2
5 5 5
11 A060 20 16 A070 25 21 A080 30 31 A090 40 76 A100 95
FAN FOUNDATION A380/2
(SECTION
EARTHWORKS
2) Clear site/Remove Excavate in bulk Excavate founds and Excavate footings & Backfill to u/side of
topsoil * blind blind floor
11 10 20 24 10 33 29 10 38 39 10 48 69 20 88
5 5 5
5 10
36 A120 45 46 A130 55 56 A140 75 56 A150 75 96 A160 115
FOUNDATIONS Construct footings Cable trench floor Cable trench walls Fan base Surface bed
44 10 53 54 10 63 64 20 83 44 20 63 89 20 108
5
76 A180 90 86 A190 95 96 A200 115 116 A210 125 126 A220 135
A590/2
SUPERSTRUCTURE Fan base walls Fan base beams Cure fan base beams Cut & fit duct covers Joint sealing &
finishes
64 15 78 74 10 83 84 20 103 109 10 118 119 10 128
10
5 5 5
41 A240 55 46 A250 60 71 A260 90 56 A270 65 66 A280 70 66 A290 75
STORMWATER Excavate Bed & lay Backfill Construct manhole 1 Cure m/h 1 walls Construct manhole 2
DRAINAGE
49 15 63 69 15 83 79 20 98 64 10 73 74 5 78 79 10 88
5 10 10
76 A300 80
89 5 93
5
138 A320 147 143 A330 152 128 A340 132 159 A350 168
A590/2
FAN INSTALLATION Install & bolt down Connect up & test Grout Commission
Fin de Obra
00-8000
tro Km 35
Aplic Balas
!
500
000-3
K m2
T únel
ntro
tro de
balas
Aplic
Execução do Viaduto 2
Km 0-2000 l B
Aplic balastro ne ase
3500
Tú l Aterr - 680
o
d úne 0
6950
Aterr - 800
0
2,000 Entrada Oeste do Túnel cução da Entrada Oeste do Túnel
o 69
50 -
- 2000 Dren 8000
se 1470 agem
Sub Ba Limp 6950
20 00 eza - 800
- 1400 470 - de te
se 0000 Aterro 1 rra v 0
Sub Ba 0 000
- 2 egeta
l 695
000 - 14
00 em 147 0-8
Aterro 0 Drenag - 2000 000
400 etal 1470
ag em 0000 - 1 a d e terra veg
Dren 0p
Lim ez
- 140
etal 0000
terra veg
Lim peza de
6,800 Viaduto 2
1,000
3,000
4,000
5,000
6,000
7,000
28/11/13 Pág. 1 de 1 www.ccssa.com
2002 2003
Julho Agosto Set Outubro Nov Dez Janeiro Fev Março Abril Maio Junho Julho Agosto S
12 26 9 23 6 20 4 18 1 15 29 13 27 10 24 7 21 7 21 4 18 2 16 30 13 27 11 25 8 22 5
Fnd Abutment
28/11/13
0
Sup Deck
11.5 WEST. ABUT. Project Complete
25
ClosureDismantle gantry
Launch
Launch
50 Launch
Launch
Launch
Launch
75 Launch
Gantry Launch
Head Launch
Fnd
Pier
96.5 PIER P1
100
Launch
Launch
Launch
Launch
125
Disma
Launch
ntle g
Launch
antry
Launch
Launch
150
Launch
Closure
Launch
Launch
175
Launch
Launch
Finishes
Disma
Launch
ntle g
200 Launch
antry
Launch
Gantry Launch
Head Launch
Fnd
Pier
225
226.5 PIER P2
Launch
Launch
Launch
250 Launch
Launch
Launch
Launch
275
Launch
Launch
300
Fnd Pier
Sup
Deck
321.5 PIER P3
325
350
375
378
www.ccssa.com
Edifício CQ Centre
Diagrama Tiempo-Camino
! " # " ! " # "
'")%( %/% (
Rainy period
Original completion
110.000 Roof
) % $ '")%! 1 3 %) (
105.000 LMR
1 3 %" * %3 1 % 71% .
99.000 M3
1 3 %6 71 , 8 9 3 3 5 382 8 1 % : $2 - 3 $ 71% $ - 1 !
95.000 T20
1 3 %6 71 , 8 9 3 3 5 382 8 1 % : $2 - 3 $ 71% $ - 1 !
91.000 T19
1 3 %6 71 , 8 9 3 3 5 382 8 1 % : $2 - 3 $ 71% $ - 1 !
87.000 T18
1 3 %6 71 , 8 9 3 3 5 382 8 1 % : $2 - 3 $ 71% $ - 1 !
83.000 T17
%)
1 3 %6 71 , 8 9 3 3 5 382 8 1 % : $2 - 3 $ 71% $ - 1 !
$ % %' ( %"
79.000 T16
1 3 %6 71 , 8 9 3 3 5 382 8 1 % : $2 - 3 $ 71% $ - 1 !
75.000 T15
1 3 %6 71 , 8 9 3 3 5 382 8 1 % : $2 - 3 $ 71% $ - 1 !
71.000 T14
1 3 %6 71 , 8 9 3 3 5 382 8 1 % : $2 - 3 $ 71% $ - 1 !
67.000 T13
1 3 %6 71 , 8 9 3 3 5 382 8 1 % : $2 - 3 $ 71% $ - 1 !
63.000 T12
1 3 %6 71 , 8 9 3 3 5 382 8 1 % : $2 - 3 $ 71% $ - 1 !
%&!%0%'")
59.000 T11
*
-
%
$4 % $ 1 3 %" * % 71% + ,
1
53.000 M2
% +
%/%
%$ 2 % $%
1 3 %6 71 , 8 9 3 3 5 382 8 1 % : $2 - 3 $ 71% $ - 1 !
% ( %(
%
,
49.000 T10
(
' $
1 3 %6 71 , 8 9 3 3 5 382 8 1 % : $2 - 3 $ 71% $ - 1 !
*
45.000 T9
$
1 3 %6 71 , 8 9 3 3 5 382 8 1 % : $2 - 3 $ 71% $ - 1 !
41.000 T8
1 3 %6 71 , 8 9 3 3 5 382 8 1 % : $2 - 3 $ 71% $ - 1 !
37.000 T7
1 3 %6 71 , 8 9 3 3 5 382 8 1 % : $2 - 3 $ 71% $ - 1 !
33.000 T6
1 3 %6 71 , 8 9 3 3 5 382 8 1 % : $2 - 3 $ 71% $ - 1 !
29.000 T5
$ % %"
1 3 %6 71 , 8 9 3 3 5 382 8 1 % : $2 - 3 $ 71% $ - 1 !
25.000 T4
1 3 %6 71 , 8 9 3 3 5 382 8 1 % : $2 - 3 $ 71% $ - 1 !
21.000 T3
1 3 %6 71 , 8 9 3 3 5 382 8 1 % : $2 - 3 $ 71% $ - 1 !
17.000 T2
1 3 %6 71 , 8 9 3 3 5 382 8 1 % : $2 - 3 $ 71% $ - 1 !
13.000 T1
1 3 %" * % % $ % + ,
7.000 M1
$41 % $3 %&!
0.000 GF GF
&!
1 3 %5
% %
-3.000 B1
1 3 %5
-6.000 B2
%/%
1 3 %5 % 3 %$
$ % %&!
-9.000 B3
.%
'
% $
-15.000 Core
% ( %3 %
-19.000 Base
Exc
ava
-27,00
te
Sink &
Line
-60,00
-100,00
Equipping of Sha
Sink & Lin
-200,00
e
ft
-300,00
Lvl 10 Station
Concurrent Hor Dev 10 & 11L
-355,00 Level 10
Sink & Lin
Surface work
e
-391,00
Shaft equiping
Sinking of shaft
Sink & Li
Station
Rain season 2002
Shaft bottom construction
ne
1.2 Excavación de tierras en pozos y zanjas incluso m3 7,200 39,816.00 25,069 14,747
transporte a vertedero de las tierras sobrantes a
distância limite de 2Kms.
1.5 Excavación en material Class A, para zanjas, m3 260 3,993.60 1,597 2,396
aterramiento, compactación y transporte a vertedero
de las tierras sobrantes.
o
CAP.II ESTRUCTURA
2.1 HORMIGÓN
et
2.1.1 Hormigón 20Mpa en fundaciones. m3 3,000 245,850.00 5,122 107,559 117,803 15,366
2.2 ENCOFRADO
N
2.2.1 Encofrados en fundaciones m2 4,000 24,920.00 8,795 10,261 5,864
CAP.III ACABADOS
3.1 ALBAÑILERÍAS
Va
3.2 CARPINTERÍAS
SANEAMIENTO
3.3 ARQUETAS DE REGISTRO
Pág. 1 de 1
Forecast Quantities
Item Descripción Unid. Cantidad 31 Oct 07 30 Nov 07 31 Dec 07 31 Jan 08 29 Feb 08 31 Mar 08
Pág. 1 de 1
Recurso Resource
Item Descripción Unid. Cantidad Descripción Usage Unid. 31 Oct 07 30 Nov 07 31 Dec 07 31 Jan 08 29 Feb 08 31 Mar 08
1.2 Excavación de tierras en pozos y zanjas incluso m3 7,200 Operador 702.0 /h 442.00 260.00
transporte a vertedero de las tierras sobrantes a distância Conductor 60.0 /día 37.78 22.22
limite de 2Kms. Peón Ordinário 156.0 /día 98.22 57.78
Gasoil 10,136.2 /Ltr 6,382.04 3,754.14
Rectroexc. JD 410 666.9 /hr 419.90 247.00
Camión Volq.6m3 60.0 /día 37.78 22.22
Camión 6m3-Coste Ext./Km 1,363.6 /km 858.59 505.05
1.3 Excavación para fundaciones hasta 2m de profundidad m3 750 Operador 87.4 /h 82.76 4.60
Peón Ordinário 19.4 /día 18.39 1.02
Gasoil 786.2 /Ltr 744.80 41.38
Rectroexc. JD 410 83.0 /hr 78.62 4.37
1.4 Excavación en terreno de Classe A, aterramiento y m2 440 Operador 53.9 /h 25.34 28.51
compactación a 95% AASHTO. mod. Peón Ordinário 12.0 /día 5.63 6.34
Gasoil 270.3 /Ltr 127.22 143.12
Rectroexc. JD 410 24.1 /hr 11.33 12.75
Compactad.Dynapac st60 1.1 /día 0.50 0.56
Cm20 pan compact. 2.1 /día 0.99 1.12
Capataz 1.1 /mes 0.50 0.56
1.5 Excavación en material Class A, para zanjas, m3 260 Operador 86.7 /h 34.67 52.00
aterramiento, compactación y transporte a vertedero de las Conductor 0.1 /día 0.05 0.08
tierras sobrantes. Peón Ordinário 19.3 /día 7.70 11.56
Gasoil 450.0 /Ltr 180.02 270.02
Rectroexc. JD 410 39.5 /hr 15.82 23.73
Compactad.Dynapac st60 1.7 /día 0.67 1.00
Cm20 pan compact. 3.3 /día 1.33 2.00
Camión Volq.6m3 0.1 /día 0.05 0.08
Camión 6m3-Coste Ext./Km 3.1 /km 1.24 1.86
Capataz 1.7 /mes 0.67 1.00
1.6 Acrecentamiento para escavaciones en material de Class m3 210 Operador 41.0 /h 14.63 26.32
A por material de Class B Conductor 3.5 /día 1.25 2.25
Peón Ordinário 9.1 /día 3.25 5.85
Gasoil 591.3 /Ltr 211.17 380.11
Rectroexc. JD 410 38.9 /hr 13.89 25.01
Camión Volq.6m3 3.5 /día 1.25 2.25
Camión 6m3-Coste Ext./Km 79.5 /km 28.41 51.14
Subcontrat. EXPLOSIVOS 472.5 PA 168.75 303.75
CAP.II ESTRUCTURA
2.1 HORMIGÓN
2.1.1 Hormigón 20Mpa en fundaciones. m3 3,000 Operador 1,918.9 /h 39.98 839.51 919.47 119.93
Conductor 29.0 /día 0.60 12.67 13.88 1.81
Peón Ordinário 456.8 /día 9.52 199.83 218.86 28.55
Gasoil 5,922.3 /Ltr 123.38 2,590.99 2,837.75 370.14
Hormigón Comprado 20Mpa /m3
Cemento Portland 21,846.3 /saco 455.13 9,557.76 10,468.02 1,365.39
Arena 1,529.6 /m3 31.87 669.18 732.91 95.60
Arena Fina 509.9 /m3 10.62 223.06 244.30 31.87
Arido 19mm 2,800.8 /m3 58.35 1,225.34 1,342.04 175.05
Tornillo Sin-Fin 136.0 /día 2.83 59.48 65.15 8.50
Mont./Desm. Planta Hormigón 6,180.0 PA 128.75 2,703.75 2,961.25 386.25
Hormigonera 21/14 136.0 /día 2.83 59.48 65.15 8.50
Silo de Cemento 100t 136.0 /día 2.83 59.48 65.15 8.50
Boomscraper F14 136.0 /día 2.83 59.48 65.15 8.50
Dumper 0.75m3 136.0 /día 2.83 59.48 65.15 8.50
Camión Volq.6m3 29.0 /día 0.60 12.67 13.88 1.81
Camión 6m3-Coste Ext./Km 658.4 /km 13.72 288.04 315.47 41.15
Capataz 37.5 /mes 0.78 16.41 17.97 2.34
2.2 ENCOFRADO
2.2.1 Encofrados en fundaciones m2 4,000 Carpintero 48.8 /día 17.22 20.09 11.48
Oficial 2ª Encofrados 97.6 /día 34.43 40.17 22.96
Peón Ordinário 195.1 /día 68.87 80.34 45.91
Paineles 1800x600mm 3,703.7 /sem. 1,307.19 1,525.05 871.46
B&C Grapa 18,765.4 /sem. 6,623.09 7,726.94 4,415.40
Conj. Cuñas 691.4 /un 244.01 284.68 162.67
Anillas Rawl 1,111.1 /un 392.16 457.52 261.44
Tapadera en plást. Rawl 1,111.1 /un 392.16 457.52 261.44
Cono Rawl 1,111.1 /un 392.16 457.52 261.44
Tornillo Rawl 127mm 1,111.1 /un 392.16 457.52 261.44
Tornillo Rawl 200mm 5,555.6 /un 1,960.78 2,287.58 1,307.19
Tubo de andamio 5,925.9 /m/sem 2,091.50 2,440.09 1,394.34
2.3 ACERO
2.3.1 Acero en fundaciones Ton 300 Oficial 1ª Ferralla 466.7 /día 74.67 196.00 196.00
Peón Ordinário 1,866.7 /día 298.67 784.00 784.00
Acero Corrugado 309.0 /ton 49.44 129.78 129.78
CAP.III ACABADOS
3.1 ALBAÑILERÍAS
3.1.1 Parede Simple de Albanilería de 11 cm m2 960 Albañil 32.0 /día 11.89 19.20 0.91
Peón Ordinário 64.0 /día 23.77 38.40 1.83
Cemento Portland 132.7 /saco 49.29 79.62 3.79
Arena 20.9 /m3 7.78 12.56 0.60
Bloque 11 16,281.6 /un 6,047.45 9,768.96 465.19
Subcontrat. ALBAÑILERIA /m2
3.1.2 Parede Doble de Albanilería de 11+15 cm m2 1,500 Albañil 115.4 /día 34.62 80.77
Peón Ordinário 230.8 /día 69.23 161.54
Cemento Portland 490.1 /saco 147.03 343.06
Arena 77.3 /m3 23.19 54.12
Bloque 11 25,440.0 /un 7,632.00 17,808.00
Bloque 15 25,440.0 /un 7,632.00 17,808.00
Subcontrat. ALBAÑILERIA /m2
3.2 CARPINTERÍAS
Pág. 1 de 2
Candy v2.0 LC 500500