Professional Documents
Culture Documents
LATEST LATEST Substructure Design Calculation P241 LATEST LATEST
LATEST LATEST Substructure Design Calculation P241 LATEST LATEST
span on right
radius of left span
radius of right span
design speed of train
rail level
pile cap top level
pier cap top level
ground level
pier height
Oblong longi
transv
Concrete density
soil backfill density
rectangular
Bearing details
Following the sign convention eccentricity of (pier CG/Load CG) from pile group CG
3m
2.1 m
2.25 m
0.8 m
6.219 m
2.5 m
4.91 m
2.3 m
1.8 m
2.5 t/m3
1.8 t/m3
2.0*10^5 N/mm2
2791654 t/m2
3015331 t/m2
3223525 t/m2
3419064 t/m2
3604010 t/m2
1.5 m
2.25 m
a1 17.4573 m2
a2 72.92852 m2
total area 90.39 m2
1.7 m
2.6 m
2.1 m
1m
0.5 m
700 m
700 m
8.8 m
0.182938 m
0.084819 m
2.25 m
4m
1.8 m
11.319 m
2.1 m
3m
6.219 m
2.1 m
15.369 m
13.569 m
13.569 m
13.569 m
13.119 m
16.619 m
Y
Y
X
X
SUPERSTRUCTURE DEAD LOAD
Moment due to difference in dead load of left span and right span
Moment due to difference in SIDL (F) of left span and right span
Moment due to difference in SIDL (V) of left span and right span
DDDT
DDST
SSDT
SSST
CENTRIFUGAL FORCE
speed
radius
DSDT
DSST
SSDT
SSST
Traction force
Bracking force
DSDT
DSST
SSDT
SSST
LWR FORCE
Nosing force
WIND FORCE
exposed area
wind load
height of parapet
170.57 t
31.34 t eccentricity of left span
eccentricity of right span
85 t
76.32 t
508.42 t
130.16 t
8 Nos.
6 Nos.
16 t
128 t
96 t
150.02 t
109.44 t
150.02 t
109.44 t
259.47 t
129.73 t
150.02 t
75.01 t
150.02 t
109.44 t
129.73 t
129.73 t
259.47 t
68.9894 (longitudional)
90 kmph
700 m
27.34 t
13.67 t
27.34 t
13.67 t
0.2 20 % of load
0.18 18 % of load
57.01 t
28.50 t
57.01 t
28.50 t
LWR longitudional 70
60
50 t 50
40
14.33 t 30
9.45 t
14.33 t
10 t
0.11 t/m2
2.5 m
8.32 m
20.80 m2
3m
2.1 m
38.2 m
25.2 m
194.82 m2
128.52 m2
292.23 m2
192.78 m2
4m
1.9 m
38.2 m
25.2 m
72.58 m2
47.88 m2
26.68 t
17.23 t
10.38 t
6.85 t
33.30 t
6.77 t
ABLE PER m 1.24 t
700 m
700 m
8.8 m
Moment due to difference in dead load of left span and right span
Moment due to difference in SIDL (F) of left span and right span
Moment due to difference in SIDL (V) of left span and right span
(+X,+Y)
(-X,+Y)
Left side (larger span)
CASE 1 : 0
CASE 2 : 1
CASE 3 : 2
CASE 4 : 3
CASE 5 : 4
CASE 6 : 1+2
CASE 7 : 1+3
CASE 8 : 1+4
all possible loading combinations
CASE 9 : 2+3
CASE 10 : 2+4
CASE 11 : 3+4
CASE 12 : 1+2+3
CASE 13 : 1+2+4
CASE 14 : 1+3+4
CASE 15 : 2+3+4
CASE 16 : 1+2+3+4
HIDE B/W
THIS RED MARK
CASE 1 : 0
CASE 2 : 1
CASE 3 : 2
CASE 4 : 3
CASE 6 : 1+2
CASE 7 : 1+3
CASE 8 : 1+4
CASE 9 : 2+3
CASE 10 : 2+4
CASE 11 : 3+4
CASE 12 : 1+2+3
total moment in longitudional direction Y
total momnent in transverse direction X
CASE 13 : 1+2+4
CASE 14 : 1+3+4
CASE 15 : 2+3+4
CASE 16 : 1+2+3+4
CENTRIFUGAL MOMENTS
CASE 1 : 0
total momnent in transverse direction X
CASE 2 : 1
total momnent in transverse direction X
CASE 3 : 2
total momnent in transverse direction X
CASE 4 : 3
total momnent in transverse direction X
CASE 5 : 4
total momnent in transverse direction X
CASE 6 : 1+2
total momnent in transverse direction X
CASE 7 : 1+3
total momnent in transverse direction X
CASE 8 : 1+4
total momnent in transverse direction X
CASE 9 : 2+3
total momnent in transverse direction X
CASE 10 : 2+4
total momnent in transverse direction X
CASE 11 : 3+4
total momnent in transverse direction X
CASE 12 : 1+2+3
total momnent in transverse direction X
CASE 13 : 1+2+4
total momnent in transverse direction X
CASE 14 : 1+3+4
total momnent in transverse direction X
CASE 15 : 2+3+4
total momnent in transverse direction X
CASE 16 : 1+2+3+4
total momnent in transverse direction X
NOTE:- As traction force is 20% and Bracking force is 18%, longer train of load will always get traction
load and smaller train of load will get breaking load.
CASE 1 : 0
total momnent in longitudional direction Y
CASE 2 : 1
total momnent in longitudional direction Y
CASE 3 : 2
total momnent in longitudional direction Y
CASE 4 : 3
total momnent in longitudional direction Y
CASE 5 : 4
total momnent in longitudional direction Y
CASE 6 : 1+2
total momnent in longitudional direction Y
CASE 7 : 1+3
total momnent in longitudional direction Y
CASE 8 : 1+4
total momnent in longitudional direction Y
CASE 9 : 2+3
total momnent in longitudional direction Y
CASE 10 : 2+4
total momnent in longitudional direction Y
CASE 11 : 3+4
total momnent in longitudional direction Y
CASE 12 : 1+2+3
total momnent in longitudional direction Y
CASE 13 : 1+2+4
total momnent in longitudional direction Y
CASE 14 : 1+3+4
total momnent in longitudional direction Y
CASE 15 : 2+3+4
total momnent in longitudional direction Y
CASE 16 : 1+2+3+4
total momnent in longitudional direction Y
LWR FORCE
CASE A: (+X,+Y)
moment in longitudional direction Y
moment in transverse direction X
CASE B: (-X,+Y)
moment in longitudional direction Y
moment in transverse direction X
CASE C: (+X,-Y)
moment in longitudional direction Y
moment in transverse direction X
CASE D: (-X,-Y)
moment in longitudional direction Y
moment in transverse direction X
CASE E: When LWR is taken as 0 t in both direction (as 0 t in single direction is not possible, if there is tem
moment in longitudional direction Y
moment in transverse direction X
NOSING FORCE
CASE A: (+Y)
moment in longitudional direction Y
CASE B: (-Y)
moment in longitudional direction Y
CASE C: When rail is not in motion / in motion but Nosing force is taken 0 t.
moment in longitudional direction Y
WIND FORCE
wind load
moment due to wind load in transverse direction (-X)
wind load on LL
moment due to wind load in transverse direction (-X)
total moment due to wind load (-X)
576.00 t
356.88 t
258.56 t
47.51 t
170.57 t
31.34 t
1m
0.5 m
576.00 t.m
356.88 t.m
258.56 t.m
47.51 t.m
170.57 t.m
31.34 t.m
1440.86 t.m
288.00 t.m
178.44 t.m
129.28 t.m
23.75 t.m
85.28 t.m
15.67 t.m
720.43 t.m
1m
0.5 m
85.00 t
76.32 t
508.42 t
130.16 t
85.00 t
76.32 t
161.32 t.m
42.50 t
38.16 t +X
80.66 t.m
3 +Y
(longitudional direction)
(-X,-Y)
Right side (smaller span)
Bearing details
2.1 m
8 Nos.
6 Nos.
16 t
128 t
96 t
150.02 t
109.44 t
150.02 t
109.44 t
0.00 t.m
0.00 t.m
202.53 t.m
208.75 t.m
202.53 t.m
-106.30 t.m
-38.30 t.m
146.92 t.m
-38.30 t.m
-82.91 t.m
405.06 t.m
102.46 t.m
164.23 t.m
355.67 t.m
164.23 t.m
125.84 t.m
164.23 t.m
40.62 t.m
164.23 t.m
-189.21 t.m
-76.61 t.m
64.00 t.m
366.76 t.m
249.37 t.m
366.76 t.m
19.54 t.m
125.92 t.m
272.76 t.m
125.92 t.m
-42.29 t.m
328.46 t.m
166.46 t.m
15.369 m
700 m
90 kmph
6.83 t
6.83 t
4.99 t
4.99 t
0.00 t.m
0.00 t.m
105.04 t.m
105.04 t.m
76.63 t.m
76.63 t.m
210.08 t.m
181.67 t.m
181.67 t.m
181.67 t.m
181.67 t.m
153.25 t.m
286.71 t.m
286.71 t.m
258.30 t.m
258.30 t.m
363.34 t.m
13.569 m
0.00 t.m
0.00 t.m
203.57 t.m
203.57 t.m
148.50 t.m
148.50 t.m
386.78 t.m
352.07 t.m
337.22 t.m
337.22 t.m
352.07 t.m
282.15 t.m
535.28 t.m
535.28 t.m
485.72 t.m
485.72 t.m
689.29 t.m
13.569 m
50 t
14.33 t
678.45 t.m
194.44 t.m
678.45 t.m
-194.44 t.m
-678.45 t.m
194.44 t.m
-678.45 t.m
-194.44 t.m
n is not possible, if there is temperature difference LWR force will be generated in both direction )
0 t.m
load combination might take care of these things
0.00 t.m
13.569 m
10.00 t
135.69 t.m
-135.69 t.m
0 t.m
load combination might take care of these things
13.119 m
16.619 m
26.68 t
349.96 t.m
-26.68 t
-349.96 t.m
26.68 t
349.96 t.m
10.38 t
172.51 t.m
522.47 t.m
-26.68 t
-349.96 t.m
-10.38 t
-172.51 t.m
-522.47 t.m
26.68 t
349.96 t.m
6.85 t
113.80 t.m
463.76 t.m
-26.68 t
-349.96 t.m
-6.85 t
-113.80 t.m
-463.76 t.m
26.68 t
349.96 t.m
17.23 t
286.32 t.m
636.27 t.m
-26.68 t
-349.96 t.m
-17.23 t
-286.32 t.m
-636.27 t.m
0.00 t
0.00 t.m
0.00 t
0.00 t.m
load combination might take care of these things
0.00 t.m
(transverse direction)
-Y
(longitudional direction)
(transverse direction)
Bearing details
se things
se things
Time period calculation
T= 2*(W/1000F)^0.5
W= weight of superstructure
= full weight of superstructure, 80% weight of substructure,appropriate ammount of LL.
W5= 80% weight of substructure (pile cap and soil above pile cap)
PIER
height of pier
PILE
1.92 m4
1.92 m4
86193.7 t/m
86193.7 t/m
19.98 m
7 Nos.
1.5 m
0.25 m4
7886.296 t/m
7225.224 t/m
7225.224 t/m
LIVE LOAD
CENTRIFUGAL FORCE
speed
radius
Traction force
Bracking force
LWR FORCE
NOSING FORCE
Nosing force
Y = Q*(L1+Lf)^3/12EI E 2950000
I (1.2 dia) 0.101788
units are in tons instead for KN
I (1.5 dia) 0.248505
nh 1200
T 3.61 m
L1 12.95 m (0.8 m below groud level)
(size of basement is 16.0m below GL)
L1/T 3.59 m
Lf/T 1.95 m (FROM GRAPH)
Lf 7.03 m
pile no. 7
resultant 102.81 t
16 t
128 t
96 t
combination 1-
150.02 t
109.44 t = centrifugal + nosing + tractio
150.02 t
109.44 t
150.02 t
109.44 t
90 kmph
700 m
20.41 t (transverse)
0.2 20 % of load
0.18 18 % of load
42.56 t (longitudional)
LWR longitudional 70
60
50 t (longitudional) 50
40
14.33 t 30
9.45 t
14.33 t (transverse)
10 t (transverse)
ead for KN