PROPOSALS FOR LEFT OVER HABITATION UNDER THIRTEENTH FINANCE COMMISSION RWS&S CIRCLE: ADILABAD

Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

1 2 3 4 5 6 7 8 9 10 11
1 Adilabad Adilabad Adilabad Wanwat Wanwat Wanwat 479 26 526 1031 FC 479 26 526 1031 FC
2 Adilabad Adilabad Adilabad Ankoli Ankoli Ankoli 959 147 621 1727 PC4 959 147 621 1727 PC4
3 Adilabad Adilabad Adilabad Anukunta Anukunata Anukunata 928 230 59 1217 PC4 928 230 59 1217 PC4

4 Adilabad Adilabad Adilabad Chinchughat Chinchughat Ankapur 17 0 319 336 FC 17 0 319 336 FC

5 Adilabad Adilabad Adilabad Kumbhajari Kumbhajari Shivaghat 20 0 128 148 FC 20 0 128 148 FC

Belluri (Drivers
6 Adilabad Adilabad Adilabad Arli-B Arli-B 652 70 87 809 FC 652 70 87 809 FC
Colony)

7 Adilabad Adilabad Adilabad Kumbhajari Kumbhajari Kumbhajari 182 100 98 380 PC1 182 100 98 380 PC1

8 Adilabad Adilabad Adilabad Battisawargaon Battisawargaon Dubba Shastrinagar 501 81 10 592 PC1 501 81 10 592 PC1

Pittalwada (Sc & St


9 Adilabad Adilabad Adilabad Mavala Mavala 80 80 90 250 FC 80 80 90 250 FC
Colony)

10 Adilabad Adilabad Adilabad Chanda - T Chanda-T Chanda-T 2434 326 0 2760 PC4 2434 326 0 2760 PC4
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

11 Adilabad Adilabad Adilabad Yapalguda Yapalguda Yapalguda 2037 329 5 2371 PC4 2037 329 5 2371 PC4
12 Adilabad Adilabad Adilabad Tantoli Tantoli Societyguda 0 0 155 155 PC1 0 0 155 155 PC1
13 Adilabad Adilabad Adilabad Mavala Mavala Ramnagar 0 0 175 175 FC 0 0 175 175 FC
14 Adilabad Adilabad Adilabad Mavala Mavala Subashnagar 100 0 250 350 FC 100 0 250 350 FC
15 Adilabad Adilabad Adilabad Mavala Mavala Dhobicolony 80 80 90 250 FC 80 80 90 250 FC
16 Adilabad Adilabad Adilabad Jamdhapur Jamdhapur Jamdapur 867 378 0 1245 PC4 867 378 0 1245 PC4
17 Adilabad Adilabad Adilabad Khandala Khandala Khandala 6 0 369 375 PC3 6 0 369 375 PC3
18 Adilabad Adilabad Adilabad Khandala Khandala Tippa 43 0 171 214 FC 43 0 171 214 FC
19 Adilabad Adilabad Adilabad Bhimsari Bhimsari Bheemsari 1913 343 0 2256 PC3 1913 343 0 2256 PC3
20 Adilabad Adilabad Adilabad Chinchughat Chinchughat Chinchughat 10 0 350 360 FC 10 0 350 360 FC
21 Adilabad Adilabad Adilabad Mavala Mavala Mavala 1301 618 105 2024 PC3 1301 618 105 2024 PC3
22 Adilabad Adilabad Adilabad Khanapur Khanpur Chisdhari 0 0 173 173 PC3 0 0 173 173 PC3
23 Adilabad Adilabad Adilabad Tantoli Tantoli Tantoli 1205 136 165 1506 PC4 1205 136 165 1506 PC4
24 Adilabad Adilabad Bela Sangidi Sangidi Sangdi 1077 198 181 1456 PC3 1077 198 181 1456 PC3

25 Adilabad Adilabad Bela Patan Khogdur Patan 566 0 162 728 FC 566 0 162 728 FC

26 Adilabad Adilabad Bela Palaitanda Toyaguda Palaitanda 0 0 100 100 FC 0 0 100 100 FC
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

27 Adilabad Adilabad Bela Chaprala Chaprala Chaprala 860 0 590 1450 PC3 860 0 590 1450 PC3
28 Adilabad Adilabad Bela Masala-B Badi Masala-B 378 7 34 419 FC 378 7 34 419 FC
29 Adilabad Adilabad Bela Guda Guda Guda 470 29 23 522 FC 470 29 23 522 FC
30 Adilabad Adilabad Bela Dubbaguda-S Sangvi Dubbaguda-S 0 0 220 220 FC 0 0 220 220 FC
31 Adilabad Adilabad Bela Sayeedpur Sayeedpur Sayeedpur 313 0 778 1091 FC 313 0 778 1091 FC
32 Adilabad Adilabad Bela Bela Bela Bela 3210 451 497 4158 PC4 3210 451 497 4158 PC4
33 Adilabad Adilabad Bela Sangvi -K Sangvi -G Sangvi -K 294 7 218 519 PC4 294 7 218 519 PC4
34 Adilabad Adilabad Bela Toyaguda Toyaguda Toyaguda 150 115 32 297 FC 150 115 32 297 FC
35 Adilabad Adilabad Bela Chandpally Chandpally Chandpally 111 2 288 401 FC 111 2 288 401 FC
36 Adilabad Adilabad Bela Kobbai Kobbai Kobbai 462 0 241 703 FC 462 0 241 703 FC
Sc Colony Sc Colony
37 Adilabad Adilabad Bela Sirsanna 1297 220 160 1677 PC3 1297 220 160 1677 PC3
&Anandraoguda &Anandraoguda
38 Adilabad Adilabad Bela Malkuguda Badi Malkuguda 12 0 39 51 PC1 12 0 39 51 PC1
39 Adilabad Adilabad Jainath Deepaiguda Deepaiguda Deepaiguda 1703 343 151 2197 FC 1703 343 151 2197 FC
40 Adilabad Adilabad Jainath Kowtha Kowtha Kowtha 1278 46 33 1357 FC 1278 46 33 1357 FC
Sc Colony & Other
41 Adilabad Adilabad Jainath Jainath Jainath 2741 1348 260 4349 PC2 2741 1348 260 4349 PC2
Colonies
42 Adilabad Adilabad Jainath Makoda Makoda Makoda 378 58 110 546 FC 378 58 110 546 FC
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

43 Adilabad Adilabad Jainath Bhoraj Bhoraj Sirsanna 603 74 0 677 FC 603 74 0 677 FC
44 Adilabad Adilabad Jainath Bhoraj Bhoraj Bhoraj 662 296 0 958 FC 662 296 0 958 FC

Sc Colony-
45 Adilabad Adilabad Jainath Pendalwada Pendalwada 1284 202 187 1673 PC4 1284 202 187 1673 PC4
Pendalwada

46 Adilabad Adilabad Jainath Kamta Kamta Kamta 614 101 62 777 PC2 614 101 62 777 PC2
47 Adilabad Adilabad Jainath Kapri Kapri Kapri 598 267 30 895 FC 598 267 30 895 FC
48 Adilabad Adilabad Jainath Taroda Taroda Taroda 554 6 52 612 FC 554 6 52 612 FC
49 Adilabad Adilabad Jainath Gimma Gimma Gimma 1601 553 0 2154 PC3 1601 553 0 2154 PC3
50 Adilabad Adilabad Jainath Pipparwada Pipparwada Pipparwada 1048 201 63 1312 PC4 1048 201 63 1312 PC4
51 Adilabad Adilabad Jainath Bahadoorpur Bahadoorpur Bahadoorpur 946 220 71 1237 PC4 946 220 71 1237 PC4
52 Adilabad Adilabad Jainath Karanji Karanji Karanji 509 77 36 622 FC 509 77 36 622 FC
53 Adilabad Adilabad Jainath Jamni Jamni Jamni 127 4 776 907 FC 127 4 776 907 FC
54 Adilabad Adilabad Jainath Mangurla Mangurla Mangurla 655 35 126 816 PC3 655 35 126 816 PC3

55 Adilabad Adilabad Jainath Khanpa Mediguda Khanpa Mediguda Khanpa Mediguda 1468 138 16 1622 FC 1468 138 16 1622 FC

56 Adilabad Adilabad Jainath Pardi-B Pardi-B Pardi-B 466 40 63 569 PC2 466 40 63 569 PC2
57 Adilabad Adilabad Jainath Belluri Belluri Belluri 255 33 87 375 FC 255 33 87 375 FC
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

58 Adilabad Adilabad Jainath Guda Guda Guda 906 398 0 1304 PC4 906 398 0 1304 PC4
59 Adilabad Adilabad Jainath Korta Korta Korta 371 75 66 512 PC3 371 75 66 512 PC3
60 Adilabad Adilabad Jainath Taroda Taroda Hatimpur 366 10 8 384 FC 366 10 8 384 FC
61 Adilabad Adilabad Jainath Ada Ada Mukathapur 243 0 3 246 FC 243 0 3 246 FC
62 Khanapur Adilabad Indervelly Pipree Devapur Pipre 29 0 207 236 FC 29 0 207 236 FC
63 Khanapur Adilabad Indervelly Pipree Devapur Chilatiguda 0 1 96 97 PC1 0 1 96 97 PC1
64 Khanapur Adilabad Indervelly Devapoor Devapur Devapoor 235 258 394 887 FC 235 258 394 887 FC
65 Khanapur Adilabad Indervelly Ginnera(G) Ginnera Ginnere Goundguda 0 9 309 318 FC 0 9 309 318 FC
66 Khanapur Adilabad Indervelly Ginnera(G) Ginnera Boppapur 0 0 75 75 PC1 0 0 75 75 PC1
67 Khanapur Adilabad Indervelly Ginnera(G) Ginnera Markaguda 0 0 136 136 PC4 0 0 136 136 PC4
68 Khanapur Adilabad Indervelly Ginnera(G) Ginnera Thummaguda 0 0 499 499 PC2 0 0 499 499 PC2
69 Khanapur Adilabad Indervelly Bursonpather Indervelly Navaguda 3 14 54 71 PC1 3 14 54 71 PC1
70 Khanapur Adilabad Indervelly Gattepally Dodanda Kolamguda 0 0 79 79 PC2 0 0 79 79 PC2
71 Khanapur Adilabad Indervelly Dodanda Dodanda Dodonda 4 1 309 314 PC4 4 1 309 314 PC4
72 Khanapur Adilabad Indervelly Dodanda Dodanda Kobbaiguda 0 0 62 62 PC1 0 0 62 62 PC1
73 Khanapur Adilabad Indervelly Dodanda Dodanda Chiltiguda 0 0 46 46 PC2 0 0 46 46 PC2
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

74 Khanapur Adilabad Indervelly Indervelly Indervelly Jalamtanda 50 0 273 323 PC4 50 0 273 323 PC4
75 Khanapur Adilabad Indervelly Indervelly Indervelly Leemguda 0 0 78 78 PC2 0 0 78 78 PC2
76 Khanapur Adilabad Indervelly Yemaikunta Yemaikunta Galiabaithanda 283 74 50 407 PC2 283 74 50 407 PC2
77 Khanapur Adilabad Indervelly Yemaikunta Yemaikunta Samaka 90 0 407 497 PC2 90 0 407 497 PC2
78 Khanapur Adilabad Indervelly Muthnoor Muthnoor Muthnoor 566 179 398 1143 FC 566 179 398 1143 FC
79 Khanapur Adilabad Indervelly Dhanora K Dhanora (B) Dhanora K 125 36 149 310 PC4 125 36 149 310 PC4
80 Khanapur Adilabad Indervelly Gourapur Gourapur Gourapur 351 8 318 677 PC2 351 8 318 677 PC2
81 Khanapur Adilabad Indervelly Gourapur Gourapur Durwaguda 0 0 199 199 PC3 0 0 199 199 PC3
82 Khanapur Adilabad Indervelly Gourapur Gourapur Chittabatta 0 0 108 108 PC1 0 0 108 108 PC1
83 Khanapur Adilabad Indervelly Gourapur Gourapur Bangariguda 0 0 33 33 PC1 0 0 33 33 PC1
84 Khanapur Adilabad Indervelly Gourapur Gourapur Gangapur 0 0 59 59 FC 0 0 59 59 FC
85 Khanapur Adilabad Indervelly Mandapelly Muthnoor Mandapelly 185 0 145 330 PC4 185 0 145 330 PC4
86 Khanapur Adilabad Indervelly Harkapur Keslapur Harkapur 0 24 470 494 FC 0 24 470 494 FC
87 Khanapur Adilabad Indervelly Harkapur Keslapur Kailashnagar 0 0 50 50 PC3 0 0 50 50 PC3
88 Khanapur Adilabad Indervelly Keslaguda Keslapur Gondguda 0 65 250 315 PC4 0 65 250 315 PC4
89 Khanapur Adilabad Indervelly Dharmasagar Tejapur Dharmasagar 395 72 0 467 PC2 395 72 0 467 PC2
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

90 Khanapur Adilabad Indervelly Dharmasagar Tejapur Borajguda 0 0 118 118 PC1 0 0 118 118 PC1
91 Khanapur Adilabad Indervelly Tejapur Tejapur Saleguda 81 0 240 321 FC 81 0 240 321 FC
92 Khanapur Adilabad Indervelly Lakkampur Rampur Lakkampur-I New 0 0 85 85 PC2 0 0 85 85 PC2
93 Khanapur Adilabad Indervelly Rampur Rampur Rampur 188 79 69 336 PC2 188 79 69 336 PC2
94 Khanapur Adilabad Indervelly Pochampally Pochampally Rimma 0 45 470 515 FC 0 45 470 515 FC
95 Khanapur Adilabad Indervelly Lachampur-K Pochampally Lachampur K 4 5 254 263 PC3 4 5 254 263 PC3
96 Khanapur Adilabad Indervelly Waipet Waipet Surgapet 9 0 97 106 PC1 9 0 97 106 PC1
97 Khanapur Adilabad Indervelly Waipet Waipet Bheempur 0 0 59 59 PC2 0 0 59 59 PC2
98 Khanapur Adilabad Indervelly Waipet Waipet Chinthaguda 0 0 92 92 PC1 0 0 92 92 PC1
99 Khanapur Adilabad Indervelly Waipet Waipet Ram Nagar 0 0 144 144 PC1 0 0 144 144 PC1
100 Khanapur Adilabad Indervelly Lachampur B Waipet Saath Mori 0 0 258 258 FC 0 0 258 258 FC
101 Khanapur Adilabad Indervelly Lachampur B Waipet Borin Guda 17 0 87 104 PC1 17 0 87 104 PC1
102 Khanapur Adilabad Indervelly Lachampur B Waipet Thummalpet 0 0 238 238 FC 0 0 238 238 FC
Walgonda Walgonda Walgonda(Heerapur
103 Khanapur Adilabad Indervelly 0 0 311 311 PC2 0 0 311 311 PC2
(Heerapur) (Heerapur) )
Walgonda Walgonda
104 Khanapur Adilabad Indervelly Gokulnagar 0 0 48 48 PC2 0 0 48 48 PC2
(Heerapur) (Heerapur)
Walgonda Walgonda
105 Khanapur Adilabad Indervelly Anduguda 0 0 90 90 PC1 0 0 90 90 PC1
(Heerapur) (Heerapur)
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

Walgonda Walgonda
106 Khanapur Adilabad Indervelly Nadimguda 0 0 102 102 PC1 0 0 102 102 PC1
(Heerapur) (Heerapur)
Walgonda Walgonda
107 Khanapur Adilabad Indervelly Gopalpur 0 0 100 100 PC1 0 0 100 100 PC1
(Heerapur) (Heerapur)
108 Khanapur Adilabad Indervelly Dasnapur Dasnapur Dasnapur 0 90 646 736 FC 0 90 646 736 FC
109 Khanapur Adilabad Indervelly Dasnapur Dasnapur Batteguda 0 0 74 74 PC2 0 0 74 74 PC2
110 Khanapur Adilabad Indervelly Dasnapur Dasnapur Shivaguda 0 0 39 39 PC4 0 0 39 39 PC4
111 Khanapur Adilabad Indervelly Dasnapur Dasnapur Dharmaguda 0 0 56 56 PC2 0 0 56 56 PC2
112 Khanapur Adilabad Indervelly Dasnapur Dasnapur Thatiguda 0 0 52 52 PC1 0 0 52 52 PC1
113 Khanapur Adilabad Indervelly Dasnapur Dasnapur Ananthapur 0 0 96 96 PC1 0 0 96 96 PC1
114 Khanapur Adilabad Indervelly Mamidiguda Wadgaon Gondguda 0 0 90 90 PC2 0 0 90 90 PC2
115 Khanapur Adilabad Indervelly Anji Indervelly Anji 19 10 542 571 PC2 19 10 542 571 PC2
116 Khanapur Adilabad Indervelly Wadgaon Wadgaon Wadgaon 119 0 410 529 PC4 119 0 410 529 PC4
117 Khanapur Adilabad Indervelly Wadgaon Wadgaon Kolamguda 0 0 123 123 PC1 0 0 123 123 PC1
Kolamguda
118 Khanapur Adilabad Indervelly Pochampally Pochampally 0 0 67 67 PC1 0 0 67 67 PC1
(Lendiguda)
Walgonda Walgonda
119 Khanapur Adilabad Indervelly Khairiguda 0 0 61 61 PC1 0 0 61 61 PC1
(Heerapur) (Heerapur)
120 Khanapur Adilabad Indervelly Dasnapur Dasnapur Malkuguda 0 0 79 79 PC1 0 0 79 79 PC1
121 Khanapur Adilabad Khanapur Paspula Paspula Tatiguda 26 0 393 419 FC 26 0 393 419 FC
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

Singyanayak
122 Khanapur Adilabad Khanapur Paspula Paspula 0 0 72 72 PC2 0 0 72 72 PC2
Thanda
123 Khanapur Adilabad Khanapur Paspula Paspula Patatulsipad 0 0 73 73 PC1 0 0 73 73 PC1
124 Khanapur Adilabad Khanapur Paspula Paspula Dayyalamarri 0 0 90 90 PC4 0 0 90 90 PC4
125 Khanapur Adilabad Khanapur Paspula Paspula Paspula 0 0 162 162 FC 0 0 162 162 FC
126 Khanapur Adilabad Khanapur Paspula Paspula Lobia Thanda 0 0 68 68 PC3 0 0 68 68 PC3
127 Khanapur Adilabad Khanapur Shetpally Shetpally Shetpally 115 0 20 135 PC2 115 0 20 135 PC2
128 Khanapur Adilabad Khanapur Shetpally Shetpally Yapalguda 29 0 226 255 PC4 29 0 226 255 PC4
129 Khanapur Adilabad Khanapur Pembi Pembi Naikapuguda 0 0 37 37 PC3 0 0 37 37 PC3
130 Khanapur Adilabad Khanapur V P Pad V P Pad Godmalla Kinda 0 0 119 119 PC1 0 0 119 119 PC1
Korkal Lambadi
131 Khanapur Adilabad Khanapur V P Pad V P Pad 0 0 139 139 PC1 0 0 139 139 PC1
Thanda
132 Khanapur Adilabad Khanapur Erwachintal Erwachintal Kolamguda 0 0 126 126 PC1 0 0 126 126 PC1
133 Khanapur Adilabad Khanapur Khanapur Khanapur Khanapur 1805 0 1 1806 FC 1805 0 1 1806 FC
134 Khanapur Adilabad Khanapur Khanapur Khanapur Subhashnagar 1350 100 150 1600 PC4 1350 100 150 1600 PC4
135 Khanapur Adilabad Khanapur Pembi Pembi Pembi 1680 323 0 2003 PC4 1680 323 0 2003 PC4
136 Khanapur Adilabad Khanapur Sathanpally Sathanpally Sathanpally 1066 250 41 1357 PC3 1066 250 41 1357 PC3
137 Khanapur Adilabad Kaddam Gangapur Gangapur Laxmipur 50 0 223 273 PC4 50 0 223 273 PC4
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

138 Khanapur Adilabad Kaddam Gangapur Gangapur Naikkapugudam 0 0 247 247 PC4 0 0 247 247 PC4
139 Khanapur Adilabad Kaddam Allampally Allampally Chintagudam 0 11 83 94 PC1 0 11 83 94 PC1
140 Khanapur Adilabad Kaddam Laxmisagar Chityal Laxmisagar 262 199 59 520 FC 262 199 59 520 FC
141 Khanapur Adilabad Kaddam Maddipadaga Maddipadaga Maddipadaga 285 863 34 1182 FC 285 863 34 1182 FC
142 Khanapur Adilabad Kaddam Bellal Bellal Bellal 782 150 25 957 PC4 782 150 25 957 PC4
143 Khanapur Adilabad Kaddam Maddipadaga Maddipadaga LWS Colony 0 144 0 144 PC1 0 144 0 144 PC1
144 Khanapur Adilabad Kaddam Nachanyellapur Nachanyellapur LT Nachanyellapur 55 0 25 80 PC2 55 0 25 80 PC2
145 Khanapur Adilabad Kaddam Kaddam Kaddam Kaddam 870 35 45 950 PC3 870 35 45 950 PC3
146 Khanapur Adilabad Kaddam Kaddam Kaddam Peddur/Gondguda 2870 385 44 3299 PC1 2870 385 44 3299 PC1
147 Khanapur Adilabad Kaddam Dasthurabad Dasthurabad Dasthurabad 2382 538 0 2920 PC4 2382 538 0 2920 PC4
148 Khanapur Adilabad Utnoor Narsapur B Narsapur B Gandiguda 0 0 75 75 PC2 0 0 75 75 PC2
149 Khanapur Adilabad Utnoor Narsapur B Narsapur B Bhujanagaraoguda 0 0 54 54 PC2 0 0 54 54 PC2
150 Khanapur Adilabad Utnoor Wadoni Umri Wadoni 128 128 160 416 PC3 128 128 160 416 PC3
151 Khanapur Adilabad Utnoor Wadoni Umri Dhobiguda 0 0 62 62 PC3 0 0 62 62 PC3
152 Khanapur Adilabad Utnoor Chandurni Chandurni Chandurni 570 11 165 746 FC 570 11 165 746 FC
153 Khanapur Adilabad Utnoor Chandurni Chandurni Rajulguda 0 0 156 156 FC 0 0 156 156 FC
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

154 Khanapur Adilabad Utnoor Chandurni Chandurni Neelagondi 0 0 85 85 FC 0 0 85 85 FC


155 Khanapur Adilabad Utnoor Yenka Umri Yenka 198 67 0 265 FC 198 67 0 265 FC
156 Khanapur Adilabad Utnoor Shampur Shampur Shampur 681 388 42 1111 PC4 681 388 42 1111 PC4
157 Khanapur Adilabad Utnoor Salewada B Salewada B Salewada B 0 91 257 348 FC 0 91 257 348 FC
158 Khanapur Adilabad Utnoor Salewada K Salewada K Salewada K 645 119 77 841 FC 645 119 77 841 FC
159 Khanapur Adilabad Utnoor Thandra Salewada B Babapur 0 0 100 100 PC2 0 0 100 100 PC2
160 Khanapur Adilabad Utnoor Luxettipet Luxettipet Pataguda 0 0 106 106 PC2 0 0 106 106 PC2
161 Khanapur Adilabad Utnoor Luxettipet Luxettipet Chinniguda 0 0 106 106 PC4 0 0 106 106 PC4
162 Khanapur Adilabad Utnoor Luxettipet Luxettipet Bopparithanda 0 0 180 180 PC2 0 0 180 180 PC2
163 Khanapur Adilabad Utnoor Nagapur Nagapur X Road 100 40 100 240 FC 100 40 100 240 FC
164 Khanapur Adilabad Utnoor Nagapur Nagapur Boalting 0 0 180 180 PC1 0 0 180 180 PC1
165 Khanapur Adilabad Utnoor Yenda Yenda Yenda Colony 0 0 315 315 PC4 0 0 315 315 PC4
166 Khanapur Adilabad Utnoor Umri Umri Umri 558 209 167 934 FC 558 209 167 934 FC
167 Khanapur Adilabad Utnoor Yenda Yenda Naikapuguda 0 0 59 59 PC3 0 0 59 59 PC3
168 Khanapur Adilabad Utnoor Thandra Salewada B Rajulaguda 0 0 61 61 FC 0 0 61 61 FC
169 Khanapur Adilabad Utnoor Ramlingampet Utnoor Ramlingampet 0 0 152 152 PC4 0 0 152 152 PC4
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

170 Khanapur Adilabad Utnoor Lakkaram Lakkaram Chinnasuddaoguda 0 0 106 106 PC4 0 0 106 106 PC4
171 Khanapur Adilabad Utnoor Lakkaram Lakkaram Mathadiguda 0 0 50 50 PC4 0 0 50 50 PC4
172 Khanapur Adilabad Utnoor Lakkaram Lakkaram K.B.Nagar 0 0 116 116 PC1 0 0 116 116 PC1
173 Khanapur Adilabad Utnoor Utnoor Utnoor Utnoor 8345 1449 2816 12610 PC2 8345 1449 2816 12610 PC2
174 Khanapur Adilabad Utnoor Utnoor Utnoor Rajampet 0 0 116 116 PC2 0 0 116 116 PC2
175 Khanapur Adilabad Utnoor Utnoor Utnoor Vankatumma 0 0 112 112 PC3 0 0 112 112 PC3
176 Khanapur Adilabad Utnoor Gangapur Utnoor Gangapur 292 135 307 734 FC 292 135 307 734 FC
177 Khanapur Adilabad Utnoor Gangapur Utnoor Chinthaguda 0 0 145 145 PC1 0 0 145 145 PC1
178 Khanapur Adilabad Utnoor Gangapur Utnoor Chinna Gangapur 0 0 132 132 PC3 0 0 132 132 PC3
179 Khanapur Adilabad Utnoor Danthanpally Danthanpally Danthanpally 411 140 14 565 FC 411 140 14 565 FC
Danthanpally
180 Khanapur Adilabad Utnoor Danthanpally Danthanpally 153 0 0 153 FC 153 0 0 153 FC
Colony
181 Khanapur Adilabad Utnoor Danthanpally Danthanpally Bheemguda 0 0 80 80 PC3 0 0 80 80 PC3
182 Khanapur Adilabad Utnoor Ghanpur Ghanpur Kolamguda 0 0 98 98 PC2 0 0 98 98 PC2
183 Khanapur Adilabad Utnoor Beersaipet Beersaipet Beersaipet 365 138 0 503 FC 365 138 0 503 FC
184 Khanapur Adilabad Utnoor Beersaipet Beersaipet Gondguda 0 0 50 50 PC1 0 0 50 50 PC1
185 Khanapur Adilabad Utnoor Beersaipet Beersaipet Adaguda 0 0 71 71 PC3 0 0 71 71 PC3
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

186 Khanapur Adilabad Utnoor Beersaipet Beersaipet Checkdamguda 0 0 97 97 PC1 0 0 97 97 PC1


Shambhu
187 Khanapur Adilabad Utnoor Lakkaram Lakkaram 0 0 118 118 FC 0 0 118 118 FC
Mathadiguda
188 Khanapur Adilabad Utnoor Ghanpur Ghanpur Chaprial 0 0 40 40 FC 0 0 40 40 FC
189 Khanapur Adilabad Utnoor Umri Umri Umri 558 209 167 934 FC 558 209 167 934 FC
190 Khanapur Adilabad Utnoor Utnoor Utnoor Yerragutta 0 0 60 60 PC1 0 0 60 60 PC1
191 Khanapur Adilabad Utnoor Utnoor Utnoor Shanthapur 0 0 60 60 PC2 0 0 60 60 PC2
192 Khanapur Adilabad Indervelly Danoora Danoora Dubbaguda 0 0 120 120 PC2 0 0 120 120 PC2
193 Khanapur Adilabad Jannaram Badampally Badampally Ippalpally 545 61 0 606 PC2 545 61 0 606 PC2
194 Khanapur Adilabad Jannaram Murrimadugu Murrimadugu Kommugudem 0 0 200 200 PC2 0 0 200 200 PC2
195 Khanapur Adilabad Jannaram Ponkal Ponkal Lambadi Thanda 0 0 122 122 PC2 0 0 122 122 PC2
196 Khanapur Adilabad Jannaram Kistapur Kistapur Manneguda 65 26 35 126 PC2 65 26 35 126 PC2
Narayannayakthand
197 Khanapur Adilabad Jannaram Morriguda Morriguda 0 0 146 146 PC2 0 0 146 146 PC2
a
198 Khanapur Adilabad Jannaram Badampally Badampally Narayanpally 4 31 67 102 PC2 4 31 67 102 PC2
199 Khanapur Adilabad Jannaram Rendlaguda Rendlaguda Rendlaguda 1462 681 53 2196 PC2 1462 681 53 2196 PC2
200 Khanapur Adilabad Jannaram Ponkal Ponkal Surarapuguda 34 32 26 92 PC2 34 32 26 92 PC2
201 Khanapur Adilabad Jannaram Indhanpally Indhanpally Tejyanaikthanda 0 0 59 59 PC2 0 0 59 59 PC2
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

DEVUNIGUDA(027
202 Khanapur Adilabad Jannaram DEVUNIGUDA(04) LOTHORRE-II 0 0 45 45 PC3 0 0 45 45 PC3
)
203 Khanapur Adilabad Jannaram KISTAPUR(004) DEVUNIGUDA(04) KOTHALAXMIPUR 0 0 52 52 PC4 0 0 52 52 PC4
204 Khanapur Adilabad Jannaram KISTAPUR(004) DEVUNIGUDA(04) PATHALAXMIPUR 0 0 29 29 PC4 0 0 29 29 PC4
DHARMARAM(016
205 Khanapur Adilabad Jannaram DHARMARAM(12) GONDUGUDA 0 0 68 68 PC1 0 0 68 68 PC1
)
INDHANPALLY(001 INDHANPALLY(01
206 Khanapur Adilabad Jannaram GONDUGUDA 0 0 64 64 PC3 0 0 64 64 PC3
) )
INDHANPALLY(01
207 Khanapur Adilabad Jannaram KOTHAPET(002 ) JAITHGUDEM 0 0 66 66 PC3 0 0 66 66 PC3
)
208 Khanapur Adilabad Jannaram JUVVIGUDA(012 ) JANNARAM(09) JUVVIGUDA 0 0 64 64 PC1 0 0 64 64 PC1
KALAMADUGU(01 KALAMADUGU(13
209 Khanapur Adilabad Jannaram DESAI NAIK THAN 0 0 39 39 PC3 0 0 39 39 PC3
7) )
KALAMADUGU(01 KALAMADUGU(13
210 Khanapur Adilabad Jannaram GONDUGUDA 0 0 48 48 PC3 0 0 48 48 PC3
7) )
KALAMADUGU(01 KALAMADUGU(13
211 Khanapur Adilabad Jannaram THATYA THANDA 0 0 24 24 PC4 0 0 24 24 PC4
7) )
212 Khanapur Adilabad Jannaram KAWAL(003 ) KAWAL(02) HOSTELTHANDA 0 0 219 219 PC3 0 0 219 219 PC3
SARPANCHTHAND
213 Khanapur Adilabad Jannaram KAWAL(003 ) KAWAL(02) 0 0 162 162 PC3 0 0 162 162 PC3
A
DONGAPALLY(013
214 Khanapur Adilabad Jannaram MALLIAL(10) ALLINAGAR 0 0 105 105 PC4 0 0 105 105 PC4
)
215 Khanapur Adilabad Jannaram MORRIGUDA(009 ) MORRIGUDA(07) BHANGYATHANDA 0 0 72 72 PC4 0 0 72 72 PC4
MURRIMADUGU(0 MURRIMADUGU(0
216 Khanapur Adilabad Jannaram BOJNAIKTHANDA 0 0 164 164 PC3 0 0 164 164 PC3
06 ) 6)
SINGARAIPET(024
217 Khanapur Adilabad Jannaram SINGARAIPET(17) SINGARAIPET 0 0 112 112 PC3 0 0 112 112 PC3
)
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

218 Khanapur Adilabad Jannaram Rampur Rampur Rampur 1026 245 100 1371 PC3 1026 245 100 1371 PC3
219 Khanapur Adilabad Jannaram Devuniguda Devuniguda Devuniguda 356 70 124 550 PC3 356 70 124 550 PC3
220 Khanapur Adilabad Jannaram Chinthatguda Chinthatguda Chinthatguda 3295 1113 339 4747 PC3 3295 1113 339 4747 PC3
221 Khanapur Adilabad Jannaram Timmapur Timmapur Timmapur 551 694 239 1484 FC 551 694 239 1484 FC
222 Khanapur Adilabad Jannaram Singaraipet Singaraipet Tapalpur 1799 328 303 2430 PC3 1799 328 303 2430 PC3
223 Khanapur Adilabad Jannaram Singaraipet Singaraipet Dharmaram 558 526 344 1428 PC3 558 526 344 1428 PC3
224 Khanapur Adilabad Jannaram Jannaram Jannaram Jannaram 1229 437 136 1802 PC3 1229 437 136 1802 PC3
225 Khanapur Adilabad Jannaram Ponkal Ponkal Ponkal 4887 951 173 6011 PC4 4887 951 173 6011 PC4
226 Boath Adilabad Tamsi Kamatwada Gona Kamatwada 112 4 284 400 PC3 112 4 284 400 PC3
227 Boath Adilabad Tamsi Gomutri Gomutri Gomutri 506 69 191 766 PC2 506 69 191 766 PC2
228 Boath Adilabad Tamsi Bandalnagapur Bandalnagapur Bandalnagapur 937 452 12 1401 PC4 937 452 12 1401 PC4
229 Boath Adilabad Tamsi Ghotkuri Ghotkuri Ghotkuri 780 410 71 1261 FC 780 410 71 1261 FC
230 Boath Adilabad Tamsi Ponnari Ponnari Ponnari 1475 784 48 2307 PC4 1475 784 48 2307 PC4
231 Boath Adilabad Tamsi Kapparla Kapparla Kapparla 2729 407 13 3149 PC3 2729 407 13 3149 PC3
232 Boath Adilabad Tamsi Pippalkoti Pippalkoti Pippalkoti 1819 606 15 2440 FC 1819 606 15 2440 FC
233 Boath Adilabad Tamsi Badabandra Anderband Badabandra 59 13 40 112 PC3 59 13 40 112 PC3
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

234 Boath Adilabad Tamsi Govindpur Belsarirampur Govindpur 0 0 119 119 FC 0 0 119 119 FC
235 Boath Adilabad Tamsi Tekdirampur Karanji Tekdirampur 0 0 347 347 PC3 0 0 347 347 PC3
236 Boath Adilabad Tamsi Indranagar Karanji Indranagar 0 0 59 59 PC2 0 0 59 59 PC2
237 Boath Adilabad Tamsi Burkapally Bheempur Burkapally 0 0 131 131 FC 0 0 131 131 FC
238 Boath Adilabad Tamsi Markaguda Bheempur Markaguda 0 0 99 99 FC 0 0 99 99 FC
239 Boath Adilabad Tamsi Atnamguda Girigoan Atnamguda 20 0 224 244 PC4 20 0 224 244 PC4
240 Boath Adilabad Tamsi Bethalguda Girigoan Bethalguda 0 0 33 33 FC 0 0 33 33 FC
241 Boath Adilabad Tamsi Girigoan Girigoan Girigoan 315 7 340 662 PC4 315 7 340 662 PC4
242 Boath Adilabad Tamsi Pocketguda Girigoan Pocketguda 0 0 32 32 PC3 0 0 32 32 PC3
243 Boath Adilabad Tamsi Chinthapally Wadgoan Chinthapally 2 0 122 124 FC 2 0 122 124 FC
244 Boath Adilabad Tamsi Dabbakuchi Wadgoan Dabbakuchi 31 6 350 387 PC4 31 6 350 387 PC4
245 Boath Adilabad Tamsi Hasnapur Hasnapur Hasnapur 457 249 0 706 FC 457 249 0 706 FC
246 Boath Adilabad Tamsi Tamsi Tamsi Tamsi 2169 471 285 2925 PC3 2169 471 285 2925 PC3
247 Boath Adilabad Tamsi Gubdi Gomutri Gubdi 255 27 108 390 PC3 255 27 108 390 PC3
248 Boath Adilabad Tamsi Khojjanguda Gomutri Khojjanguda 0 0 169 169 FC 0 0 169 169 FC
249 Boath Adilabad Tamsi Rajulawadi Karanji Rajulawadi 0 0 61 61 FC 0 0 61 61 FC
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

250 Boath Adilabad Tamsi Bhagwanpur Arli-T Bhagwanpur 0 0 85 85 PC2 0 0 85 85 PC2


251 Boath Adilabad Tamsi Mandapally Arli-T Mandapally 0 0 296 296 PC4 0 0 296 296 PC4
252 Boath Adilabad Tamsi Dhanora Dhanora Dhanora 740 155 79 974 FC 740 155 79 974 FC
253 Boath Adilabad Talamadugu Kappardevi Kappardevi Kappardevi 0 0 208 208 FC 0 0 208 208 FC
254 Boath Adilabad Talamadugu Degaon Umri Degaon 81 16 296 393 PC4 81 16 296 393 PC4
255 Boath Adilabad Talamadugu Tokiguda Jhari Tokiguda 0 0 269 269 PC4 0 0 269 269 PC4
256 Boath Adilabad Talamadugu Punaguda Jhari Punaguda 0 30 599 629 FC 0 30 599 629 FC
257 Boath Adilabad Talamadugu Talamadugu Talamadugu Talamadgu 1888 530 366 2784 FC 1888 530 366 2784 FC
258 Boath Adilabad Talamadugu Bararampur Bharampur Bararampur 1717 648 21 2386 PC4 1717 648 21 2386 PC4
259 Boath Adilabad Talamadugu Sakinapur Arli-K Sakinapur 60 25 173 258 FC 60 25 173 258 FC
260 Boath Adilabad Talamadugu Lalghad Kuchalapur Lalgad 22 0 291 313 FC 22 0 291 313 FC
261 Boath Adilabad Talamadugu Kuchlapur Kuchalapur Kuchlapur 2134 200 0 2334 FC 2134 200 0 2334 FC
262 Boath Adilabad Talamadugu Palsi-B Palsi-B Palsi-B 5 0 334 339 PC4 5 0 334 339 PC4
263 Boath Adilabad Talamadugu Palsi-Btanda Palsi-B Palsi-B tanda 0 0 362 362 PC4 0 0 362 362 PC4
264 Boath Adilabad Talamadugu Devapur Devapur Devapur 2113 486 11 2610 PC4 2113 486 11 2610 PC4
265 Boath Adilabad Talamadugu Sunkidi Sunkidi Sunkidi 1422 498 21 1941 PC3 1422 498 21 1941 PC3
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

266 Boath Adilabad Talamadugu Narsapur Bharampur Narsapur ST 0 0 101 101 PC1 0 0 101 101 PC1
267 Boath Adilabad Talamadugu Laxmipur Kuchalapur Laxmipur 0 0 162 162 FC 0 0 162 162 FC
268 Boath Adilabad Talamadugu Sonapur Kuchalapur Sonapur 26 0 63 89 FC 26 0 63 89 FC
269 Boath Adilabad Talamadugu Malkupally Kuchalapur Malkupally 0 0 64 64 PC1 0 0 64 64 PC1
270 Boath Adilabad Talamadugu Lingi Lingi Lingi 931 261 128 1320 FC 931 261 128 1320 FC
271 Boath Adilabad Talamadugu Umdam Umdam Umdam 763 179 0 942 FC 763 179 0 942 FC
272 Boath Adilabad Gudihathnur Vaijapoor Kamalapoor Jeedipelly 0 0 99 99 PC1 0 0 99 99 PC1
273 Boath Adilabad Gudihathnur Vaijapoor Kamalapoor Gopalpoor 51 24 11 86 PC2 51 24 11 86 PC2
274 Boath Adilabad Gudihathnur Vaijapoor Kamalapoor Rajulaguda 0 0 31 31 PC2 0 0 31 31 PC2
275 Boath Adilabad Gudihathnur Malkapoor Seethagondi China Markapoor 10 0 74 84 PC2 10 0 74 84 PC2
276 Boath Adilabad Gudihathnur Tosham Tosham Lendiguda 0 0 86 86 PC4 0 0 86 86 PC4
277 Boath Adilabad Gudihathnur Tosham Tosham Takiguda 206 0 160 366 PC3 206 0 160 366 PC3
278 Boath Adilabad Gudihathnur Lingapoor Lingapoor Lingapoor 410 167 0 577 PC2 410 167 0 577 PC2
279 Boath Adilabad Gudihathnur Lingapoor Lingapoor Ramji Guda 0 0 57 57 PC2 0 0 57 57 PC2
280 Boath Adilabad Gudihathnur Muthnur Muthnur Cherqwai 0 0 25 25 PC2 0 0 25 25 PC2
281 Boath Adilabad Gudihathnur Umri B Umri B Umri B 285 264 296 845 PC4 285 264 296 845 PC4
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

282 Boath Adilabad Gudihathnur Guraj Mannur Tekidiguda 0 0 86 86 PC2 0 0 86 86 PC2


283 Boath Adilabad Gudihathnur Belluri Shanthapoor Belluri 0 0 80 80 PC2 0 0 80 80 PC2
284 Boath Adilabad Ichoda Kamagilr Boregaon Kamagir 334 72 153 559 PC2 334 72 153 559 PC2
285 Boath Adilabad Ichoda Ponna Ponna Raiguda 0 0 446 446 PC3 0 0 446 446 PC3
286 Boath Adilabad Ichoda Soanpally Soanpally Itkerguda 0 0 37 37 PC3 0 0 37 37 PC3
287 Boath Adilabad Ichoda Ichoda Ichoda Ichoda 5865 2036 816 8717 PC3 5865 2036 816 8717 PC3
288 Boath Adilabad Ichoda Ichoda Ichoda Dhubar Pet Bc 0 0 130 130 PC1 0 0 130 130 PC1
289 Boath Adilabad Ichoda Chincholi Gerjam Chincholi 252 39 235 526 PC3 252 39 235 526 PC3
290 Boath Adilabad Ichoda Mankapur Mankapur Mediguda 0 0 448 448 PC3 0 0 448 448 PC3
291 Boath Adilabad Ichoda Narsapur Narsapur Harithanda 25 0 35 60 PC2 25 0 35 60 PC2
292 Boath Adilabad Ichoda Babjipet Keshavapatnam Somannaguda 47 4 29 80 PC2 47 4 29 80 PC2
293 Boath Adilabad Ichoda Babjipet Keshavapatnam Babjeguda 45 0 45 90 PC2 45 0 45 90 PC2
294 Boath Adilabad Ichoda Babjipet Keshavapatnam Gonduguda 0 0 93 93 PC2 0 0 93 93 PC2
295 Boath Adilabad Ichoda Neradigonda K Neradigonda K Neradigonda K 0 0 308 308 PC4 0 0 308 308 PC4
296 Boath Adilabad Ichoda Mankapur Mankapur Gaidpally 0 0 132 132 PC1 0 0 132 132 PC1
297 Boath Adilabad Ichoda Sirchalma Sirchalma Kolamguda 0 0 94 94 PC1 0 0 94 94 PC1
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

298 Boath Adilabad Bazarhathnoor Girjai Buthai-K Dedra 21 0 283 304 PC4 21 0 283 304 PC4
299 Boath Adilabad Bazarhathnoor Harkai Tembi Harkai 0 0 80 80 PC2 0 0 80 80 PC2
300 Boath Adilabad Bazarhathnoor Harkai Tembi Harkaiguda 0 0 100 100 PC2 0 0 100 100 PC2
301 Boath Adilabad Bazarhathnoor Tembi Tembi Chunnumiatanda 0 0 89 89 PC2 0 0 89 89 PC2
302 Boath Adilabad Bazarhathnoor Gokonda Gokonda Gokonda 267 65 127 459 FC 267 65 127 459 FC
303 Boath Adilabad Bazarhathnoor Buthai-K Buthai-K Buthai-K 71 9 192 272 PC4 71 9 192 272 PC4
304 Boath Adilabad Bazarhathnoor Jatharla Jatharla Jatharla 60 0 1098 1158 PC4 60 0 1098 1158 PC4
305 Boath Adilabad Bazarhathnoor Jatharla Jatharla Chinthakarra 0 0 95 95 PC1 0 0 95 95 PC1
306 Boath Adilabad Bazarhathnoor Bhutai-B Bhutai-B Chandunaiktanda 1330 34 150 1514 PC3 1330 34 150 1514 PC3
307 Boath Adilabad Bazarhathnoor  Chinttalsanghi Gokonda Chinttalsanghi 13 39 223 275 FC 13 39 223 275 FC
308 Boath Adilabad Bazarhathnoor Dahegaon Dahegaon Sarpanchguda 2 0 94 96 PC1 2 0 94 96 PC1
309 Boath Adilabad Bazarhathnoor Dharampuri Dharampri Dharampuri 0 1 275 276 PC4 0 1 275 276 PC4
310 Boath Adilabad Boath Vajjar Vajjar Lendiguda 0 0 81 81 PC3 0 0 81 81 PC3
311 Boath Adilabad Boath Gollapur Pardi-K Mathuraguda 0 0 50 50 PC2 0 0 50 50 PC2
312 Boath Adilabad Boath Ganpur Ganpur Ganpur 268 166 596 1030 PC4 268 166 596 1030 PC4
313 Boath Adilabad Boath Babera Babera Babera 27 0 269 296 PC2 27 0 269 296 PC2
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

314 Boath Adilabad Boath Babera Babera Chintaguda 0 0 226 226 PC2 0 0 226 226 PC2
315 Boath Adilabad Boath Babera Babera Gurudev Nagar 0 0 350 350 PC2 0 0 350 350 PC2
316 Boath Adilabad Boath Nigini Nigini Nigini 67 0 650 717 FC 67 0 650 717 FC
317 Boath Adilabad Boath Pippaldhari Kuchlapur Pippaldhari 206 24 188 418 PC3 206 24 188 418 PC3
318 Boath Adilabad Neredigonda Venkatapur Venkatapur Venkatapur 4 16 547 567 FC 4 16 547 567 FC
319 Boath Adilabad Neredigonda Kuntala-K Buggaram-B Motuloddi 0 0 107 107 PC1 0 0 107 107 PC1
320 Boath Adilabad Neredigonda Roalmamda Roalmamda Roalmamda 0 0 362 362 PC4 0 0 362 362 PC4
321 Boath Adilabad Neredigonda Roalmamda Roalmamda Devulatanda 8 31 250 289 PC4 8 31 250 289 PC4
322 Boath Adilabad Neredigonda Buddikonda Tejapur Rajula Tanda 0 0 115 115 PC1 0 0 115 115 PC1
323 Boath Adilabad Neredigonda Shankarapur Roalmamda Shankarapur 0 0 142 142 PC1 0 0 142 142 PC1
324 Boath Adilabad Neredigonda Ispur Rajura Peddagondguda 0 0 46 46 PC2 0 0 46 46 PC2
325 Boath Adilabad Neredigonda Bondemregadi Wankidi Pasha Tanda 0 0 99 99 PC2 0 0 99 99 PC2
326 Boath Adilabad Neredigonda Koritikal-B Koritikal-B Mathuratanda 333 0 0 333 PC2 333 0 0 333 PC2
327 Boath Adilabad Neredigonda Arepally Koritikal-B Arepally 0 0 43 43 PC4 0 0 43 43 PC4
328 Boath Adilabad Bazarhathnoor Buthai-K Girjai Baddunaiktanda 0 0 120 120 PC1 0 0 120 120 PC1
329 Boath Adilabad Bazarhathnoor Bhutai-B Bhutai-B Kolamguda 0 0 285 285 FC 0 0 285 285 FC
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

330 Boath Adilabad Bazarhathnoor Dahegaon Dahegaon Dehagoan 947 531 282 1760 FC 947 531 282 1760 FC
331 Boath Adilabad Bazarhathnoor Dahegaon Dahegaon New Dahegaon 0 0 100 100 PC1 0 0 100 100 PC1
332 Boath Adilabad Bazarhathnoor Rampur Bosra Bosra 233 160 327 720 FC 233 160 327 720 FC
333 Boath Adilabad Bazarhathnoor Rampur Bosra Soneraoguda 0 0 164 164 FC 0 0 164 164 FC
334 Boath Adilabad Bazarhathnoor Rampur Dignoor Dignoor 311 120 155 586 PC3 311 120 155 586 PC3
335 Boath Adilabad Bazarhathnoor Girnoor Girnoor Girnoor 681 270 97 1048 FC 681 270 97 1048 FC
336 Boath Adilabad Bazarhathnoor Bazarhathnoor Kolhari Kolhari 130 24 235 389 FC 130 24 235 389 FC
337 Boath Adilabad Bazarhathnoor Warthamanoor Mohda Mohda 0 0 165 165 FC 0 0 165 165 FC
338 Boath Adilabad Boath Kouta-B Kouta-B Kouta-B 2112 762 653 3527 PC3 2112 762 653 3527 PC3
339 Boath Adilabad Bazarhathnoor Rampur Rampur Rampur 224 111 405 740 FC 224 111 405 740 FC
340 Boath Adilabad Neredigonda Boregaon Boregaon Boregaon 0 0 534 534 PC1 0 0 534 534 PC1
341 Boath Adilabad Neredigonda Buggaram-B Buggaram-B Buggaram 14 204 539 757 FC 14 204 539 757 FC
342 Boath Adilabad Neredigonda Waddur Waddur Waddur-I 2154 145 7 2306 PC4 2154 145 7 2306 PC4
343 Boath Adilabad Neredigonda Waddur Waddur Waddur-II 1156 118 65 1339 PC4 1156 118 65 1339 PC4
344 Boath Adilabad Neredigonda Wankidi Wankidi Wankidi 521 48 223 792 FC 521 48 223 792 FC
345 Nirmal Adilabad Dilawarpur Anjani Kusli Anjani 1 0 316 317 PC3 1 0 316 317 PC3
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

346 Nirmal Adilabad Dilawarpur Anjani Kusli Sainagar Tanda 0 0 192 192 PC2 0 0 192 192 PC2
347 Nirmal Adilabad Dilawarpur Dilawarpur Dilawarpur Lambadi Thanda 0 0 363 363 FC 0 0 363 363 FC
348 Nirmal Adilabad Dilawarpur Cherlapally Rampur Cherlapally 33 0 95 128 PC4 33 0 95 128 PC4
349 Nirmal Adilabad Dilawarpur Sirgapur Sirgapur Sirgapur 1178 457 70 1705 PC2 1178 457 70 1705 PC2
350 Nirmal Adilabad Mamda Pulimadugu Kishanraopet Pulimadugu 0 0 194 194 FC 0 0 194 194 FC
351 Nirmal Adilabad Mamda Tandra Tandra Soanpet 0 0 108 108 FC 0 0 108 108 FC
352 Nirmal Adilabad Mamda Tandra Tandra Mondigutta 0 0 115 115 PC2 0 0 115 115 PC2
353 Nirmal Adilabad Mamda Tandra Tandra Dhanjinaik Tanda 0 0 160 160 PC2 0 0 160 160 PC2
354 Nirmal Adilabad Mamda Vastapur Tandra Vastapur 104 0 201 305 PC2 104 0 201 305 PC2
355 Nirmal Adilabad Mamda Rampur Tandra Rampur 0 0 197 197 PC2 0 0 197 197 PC2
356 Nirmal Adilabad Mamda Rampur Tandra Pochammaguda 0 0 38 38 PC3 0 0 38 38 PC3
357 Nirmal Adilabad Mamda Rasimatta Gaipally Rasimatta 0 0 298 298 FC 0 0 298 298 FC
358 Nirmal Adilabad Mamda Rasimatta Gaipally Burdapally 0 0 88 88 PC3 0 0 88 88 PC3
359 Nirmal Adilabad Mamda Gaidpally Gaipally Gaidpally 0 52 169 221 PC3 0 52 169 221 PC3
360 Nirmal Adilabad Mamda Gaidpally Gaipally Jeedipally 0 0 58 58 PC1 0 0 58 58 PC1
361 Nirmal Adilabad Mamda Gaidpally Gaipally Malkapally 0 0 73 73 FC 0 0 73 73 FC
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

362 Nirmal Adilabad Mamda Burugupally Kishanraopet Burugupally 0 0 66 66 PC2 0 0 66 66 PC2


363 Nirmal Adilabad Mamda Burugupally Kishanraopet Morrigudem 0 0 54 54 FC 0 0 54 54 FC
364 Nirmal Adilabad Mamda Kishanraopet Kishanraopet Kishanraopet 0 0 93 93 PC2 0 0 93 93 PC2
365 Nirmal Adilabad Mamda Kishanraopet Kishanraopet Jaithnaik Tanda 0 0 114 114 PC3 0 0 114 114 PC3
366 Nirmal Adilabad Mamda Kishanraopet Kishanraopet Walinaik Tanda 0 0 78 78 FC 0 0 78 78 FC
Chernvumundi
367 Nirmal Adilabad Mamda Kishanraopet Kishanraopet 0 0 54 54 FC 0 0 54 54 FC
Tanda
368 Nirmal Adilabad Mamda Kishanraopet Kishanraopet Shantinagar Tanda 11 15 28 54 PC1 11 15 28 54 PC1
369 Nirmal Adilabad Mamda Lingapur Mamda Lingapur 6 35 325 366 PC1 6 35 325 366 PC1
370 Nirmal Adilabad Mamda Raidhari Mamda Raidhari Tanda 0 0 216 216 PC3 0 0 216 216 PC3
371 Nirmal Adilabad Mamda Mamda Mamda Bheemla Tanda 0 0 208 208 FC 0 0 208 208 FC
372 Nirmal Adilabad Mamda Potharam Potharam Potharam 832 129 7 968 PC2 832 129 7 968 PC2
373 Nirmal Adilabad Mamda Ananthpet Ananthpet Ananthpet 970 128 0 1098 PC2 970 128 0 1098 PC2
374 Nirmal Adilabad Mamda Parimandal Parimandal Jayaram Tanda 0 0 349 349 PC2 0 0 349 349 PC2
375 Nirmal Adilabad Sarangapur Jewly Jewly Narayanpally 158 54 0 212 PC1 158 54 0 212 PC1
376 Nirmal Adilabad Sarangapur Potia Potia Potia 42 43 185 270 FC 42 43 185 270 FC
377 Nirmal Adilabad Sarangapur Potia Potia Ramsingh Tanda 58 0 386 444 FC 58 0 386 444 FC
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

378 Nirmal Adilabad Sarangapur Potia Potia Dupya Tanda 0 0 377 377 FC 0 0 377 377 FC
379 Nirmal Adilabad Sarangapur Potia Potia Sirpally 0 0 220 220 FC 0 0 220 220 FC
380 Nirmal Adilabad Sarangapur Potia Potia Bandrev Tanda 0 0 234 234 FC 0 0 234 234 FC
381 Nirmal Adilabad Sarangapur Potia Potia Anthalwadi Thanda 4 7 79 90 PC2 4 7 79 90 PC2
382 Nirmal Adilabad Sarangapur Kupti Potia Kupti 83 3 309 395 FC 83 3 309 395 FC
383 Nirmal Adilabad Sarangapur Kupti Potia Ippachelma 0 0 238 238 PC2 0 0 238 238 PC2
384 Nirmal Adilabad Sarangapur Kupti Potia Laxminagar 0 0 63 63 PC2 0 0 63 63 PC2
385 Nirmal Adilabad Sarangapur Ponkur Ponkur Lingapur 0 0 225 225 PC2 0 0 225 225 PC2
386 Nirmal Adilabad Sarangapur Ponkur Ponkur Lingapur Tanda 0 0 200 200 PC3 0 0 200 200 PC3
387 Nirmal Adilabad Sarangapur Pendaldhari Koutla B Pendaldhari 0 0 234 234 PC1 0 0 234 234 PC1
388 Nirmal Adilabad Sarangapur Nagapur Sarangapur Nagapur 0 0 281 281 PC3 0 0 281 281 PC3
389 Nirmal Adilabad Sarangapur Jam Jam Mahaveer Tanda 60 0 140 200 PC1 60 0 140 200 PC1
390 Nirmal Adilabad Sarangapur Jam Jam Hanman Tanda 70 21 203 294 PC1 70 21 203 294 PC1
391 Nirmal Adilabad Sarangapur Jam Jam Boring Tanda 60 0 114 174 PC4 60 0 114 174 PC4
392 Nirmal Adilabad Sarangapur Jam Jam Sevalal Tanda 0 0 70 70 PC1 0 0 70 70 PC1
Durga Bhavani
393 Nirmal Adilabad Sarangapur Jam Jam 0 0 50 50 PC1 0 0 50 50 PC1
Tanda
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

394 Nirmal Adilabad Sarangapur Jam Jam Laxmipur Tanda 0 0 50 50 PC2 0 0 50 50 PC2
395 Nirmal Adilabad Sarangapur Sarangapur Sarangapur New Ravindranagar 0 0 50 50 PC1 0 0 50 50 PC1
396 Nirmal Adilabad Sarangapur Koutla B Koutla B Shanti Nagar 339 40 377 756 FC 339 40 377 756 FC
397 Nirmal Adilabad Sarangapur Vanjar Vanjar Satyasai Nagar 100 0 0 100 PC1 100 0 0 100 PC1
Raja Rajeshwara
398 Nirmal Adilabad Sarangapur Dhani Dhani 50 0 0 50 PC1 50 0 0 50 PC1
Tanda
399 Nirmal Adilabad Sarangapur Gopalpet Gopalpet Gopalpet Tanda 0 0 74 74 FC 0 0 74 74 FC
400 Nirmal Adilabad Sarangapur Gopalpet Gopalpet Arkai Tanda 0 0 60 60 PC2 0 0 60 60 PC2
401 Nirmal Adilabad Sarangapur Gopalpet Gopalpet Sonapur Thanda 48 0 81 129 FC 48 0 81 129 FC
402 Nirmal Adilabad Sarangapur Aloor Aloor Prabath Nagar 0 0 62 62 PC1 0 0 62 62 PC1
403 Nirmal Adilabad Sarangapur Rampur Chincholi B Gopalpur Thanda 0 0 151 151 PC1 0 0 151 151 PC1
404 Nirmal Adilabad Sarangapur Rampur Chincholi B Gangapur Tanda 0 0 74 74 PC1 0 0 74 74 PC1
405 Nirmal Adilabad Sarangapur Ranapur Chincholi B Ranapur 0 0 190 190 PC4 0 0 190 190 PC4
406 Nirmal Adilabad Laxmanchanda Waddyal Waddyal Waddyal Tanda 0 0 344 344 FC 0 0 344 344 FC
407 Nirmal Adilabad Laxmanchanda Boregaon Boregaon Boregaon Thanda 0 0 241 241 FC 0 0 241 241 FC
408 Nirmal Adilabad Laxmanchanda Tirpelly Laxmanchanda Tirpelly 359 186 95 640 FC 359 186 95 640 FC
409 Nirmal Adilabad Laxmanchanda New Velmal New Velmal New Velmal 1615 401 13 2029 PC2 1615 401 13 2029 PC2
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

410 Nirmal Adilabad Nirmal Langdapur Talveda Langdapur 332 27 3 362 PC2 332 27 3 362 PC2
411 Nirmal Adilabad Nirmal Ananthapet Ananthapet Ananthapet 850 485 77 1412 PC2 850 485 77 1412 PC2
412 Nirmal Adilabad Nirmal Pakpatla Pakpatla Pakpatla 2316 301 522 3139 PC2 2316 301 522 3139 PC2
413 Mudhole Adilabad Tanoor Koloor Jaoula K Jaoula K 1302 147 0 1449 PC1 1302 147 0 1449 PC1
414 Mudhole Adilabad Tanoor Koloor Jaoula K Kalyani 164 131 111 406 PC2 164 131 111 406 PC2
415 Mudhole Adilabad Tanoor Koloor Mogoli MasalgaTanda 0 0 430 430 PC2 0 0 430 430 PC2
416 Mudhole Adilabad Tanoor Koloor Koloor Koloor Tanda 0 0 199 199 PC2 0 0 199 199 PC2
417 Mudhole Adilabad Tanoor Bember Bember Bember Colony 155 21 0 176 PC3 155 21 0 176 PC3
418 Mudhole Adilabad Tanoor Bember Bember Bember 750 208 0 958 PC3 750 208 0 958 PC3
419 Mudhole Adilabad Tanoor Bember Bember Borigoan 299 93 0 392 FC 299 93 0 392 FC
420 Mudhole Adilabad Tanoor Jhari B Bolsa Jhari Tanda 165 12 0 177 FC 165 12 0 177 FC
421 Mudhole Adilabad Tanoor Mahalingi Bolsa Wadjhari 165 12 0 177 FC 165 12 0 177 FC
422 Mudhole Adilabad Tanoor Mahalingi Mahalingi Mahalingi 1346 209 38 1593 PC2 1346 209 38 1593 PC2
423 Mudhole Adilabad Tanoor Bamini Mahalingi Bamini 858 71 0 929 PC1 858 71 0 929 PC1
424 Mudhole Adilabad Tanoor Bamini Mahalingi Bamini Tanda 0 0 169 169 PC3 0 0 169 169 PC3
425 Mudhole Adilabad Tanoor Hangirga Hangirga Hangirga 891 219 8 1118 PC1 891 219 8 1118 PC1
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

426 Mudhole Adilabad Tanoor Elvi Elvi Elvi 1616 174 66 1856 PC1 1616 174 66 1856 PC1
427 Mudhole Adilabad Tanoor Umri K Umri K Umri K 784 166 0 950 PC2 784 166 0 950 PC2
428 Mudhole Adilabad Tanoor Kaloor Kaloor Kuloor Tanda 0 0 199 199 PC2 0 0 199 199 PC2
429 Mudhole Adilabad Tanoor Kalyani Jawla K Kalyani 164 131 111 406 PC2 164 131 111 406 PC2
430 Mudhole Adilabad Tanoor Jawla K Jawla K Jawla K 1302 147 0 1449 PC1 1302 147 0 1449 PC1
431 Mudhole Adilabad Tanoor Doulatabad Doulathabad Doulathabad 521 211 15 747 PC2 521 211 15 747 PC2
432 Mudhole Adilabad Tanoor Karbala Doulathabad Karbala 597 217 17 831 PC2 597 217 17 831 PC2
433 Mudhole Adilabad Kubeer DODDARNA T-2 DODDARNA DODDARNA T-2 195 0 195 390 PC2 195 0 195 390 PC2
434 Mudhole Adilabad Kubeer DODDARNA T-2 DODDARNA DODDARNA T-3 104 0 104 208 PC3 104 0 104 208 PC3
435 Mudhole Adilabad Kubeer DODDARNA T-2 DODDARNA DODDARNA T-4 212 0 212 424 PC3 212 0 212 424 PC3
436 Mudhole Adilabad Kubeer DODDARNA T-2 DODDARNA DODDARNA T-5 184 0 184 368 PC3 184 0 184 368 PC3
437 Mudhole Adilabad Kubeer PARDI K TANDA PARDI K PARDI K TANDA 120 0 120 240 FC 120 0 120 240 FC
438 Mudhole Adilabad Kubeer KUBEER KUBEER KUBEER 5098 652 157 5907 PC4 5098 652 157 5907 PC4
439 Mudhole Adilabad Kubeer VEERGOAN MARLAGONDA VEERGOAN 6 0 167 173 PC2 6 0 167 173 PC2
440 Mudhole Adilabad Kubeer SIRPALLY T-2 SIRPALLY SIRPALLY T-2 0 0 98 98 PC3 0 0 98 98 PC3
441 Mudhole Adilabad Kubeer GODSERA GODSERA GODSERA 539 104 16 659 PC2 539 104 16 659 PC2
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

442 Mudhole Adilabad Kubeer SEVADAS NAGAR MARLAGONDA NANDiPAD 0 0 85 85 PC2 0 0 85 85 PC2
443 Mudhole Adilabad Kubeer MOULANANAGAR MARLAGONDA MOULANANAGAR 54 0 200 254 PC1 54 0 200 254 PC1
444 Mudhole Adilabad Kubeer RAJURA CHONDI RAJURA 161 168 12 341 PC2 161 168 12 341 PC2
445 Mudhole Adilabad Kubeer RANGASHIVINI CHATHA RANGASHIVINI 242 39 409 690 PC2 242 39 409 690 PC2
446 Mudhole Adilabad Kubeer WARNI KUPTI WARNI 121 52 73 246 NSS 121 52 73 246 NSS
447 Mudhole Adilabad Kubeer Bakote Pangra Bakote 142 20 0 162 PC1 142 20 0 162 PC1
448 Mudhole Adilabad Kubeer Belgaon Belgaon Belgaon Tanda-2 0 0 105 105 PC2 0 0 105 105 PC2
449 Mudhole Adilabad Mudhole Chinthakunta Chinthakunta Chinthakunta Tanda 57 0 136 193 PC4 57 0 136 193 PC4
450 Mudhole Adilabad Mudhole Ganora Ganora Ganora 850 0 0 850 PC1 850 0 0 850 PC1
451 Mudhole Adilabad Mudhole Machkal Mudgal Machkal 540 158 28 726 PC2 540 158 28 726 PC2
452 Mudhole Adilabad Mudhole Owni Owni Owni 630 133 0 763 PC2 630 133 0 763 PC2
453 Mudhole Adilabad Mudhole Ramtek Ramtek Ramtek 778 238 0 1016 PC2 778 238 0 1016 PC2
454 Mudhole Adilabad Mudhole Salapur Savargam Salapur 182 118 0 300 PC2 182 118 0 300 PC2
455 Mudhole Adilabad Mudhole Savargam Savargam Savargam 247 107 0 354 PC2 247 107 0 354 PC2
456 Mudhole Adilabad Mudhole Mudhole Mudhole Mudhole 1546 242 124 1912 PC4 1546 242 124 1912 PC4
457 Mudhole Adilabad Kuntala Turati Turati Turati 761 190 27 978 PC1 761 190 27 978 PC1
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

458 Mudhole Adilabad Kuntala Andhakur Andhakur Andhakur 876 437 10 1323 PC2 876 437 10 1323 PC2
459 Mudhole Adilabad Kuntala Downelli Downelli Downelli 613 101 70 784 PC2 613 101 70 784 PC2
460 Mudhole Adilabad Kuntala Bapurao Tanda Downelli Bapurao Tanda 0 0 300 300 PC1 0 0 300 300 PC1
461 Mudhole Adilabad Kuntala Kallur Kallur Kallur 1597 425 8 2030 PC2 1597 425 8 2030 PC2
462 Mudhole Adilabad Kuntala Vittapur Vittapur Vittapur 610 134 0 744 PC2 610 134 0 744 PC2
463 Mudhole Adilabad Kuntala Ambakanti Tanda Ambakanti Ambakanti Tanda 0 0 400 400 PC3 0 0 400 400 PC3
464 Mudhole Adilabad Kuntala Gollamada Gollamada Gollamada 3102 307 27 3436 PC2 3102 307 27 3436 PC2
465 Mudhole Adilabad Kuntala Limba K Limba K Limba k 1774 0 278 2052 PC4 1774 0 278 2052 PC4
466 Mudhole Adilabad Kuntala Kuntala Kuntala Kuntala 3708 417 25 4150 PC3 3708 417 25 4150 PC3
467 Mudhole Adilabad Kuntala Bamini B Nandan Bamini B 287 187 87 561 PC4 287 187 87 561 PC4
468 Mudhole Adilabad Kuntala Bamini.B Nandan Bamini-B Tanda 0 0 220 220 PC2 0 0 220 220 PC2
469 Mudhole Adilabad Kuntala Ambakanti Ambakanti Ambakanti 658 233 256 1147 FC 658 233 256 1147 FC
470 Mudhole Adilabad Kuntala Nandan Nandan Nandan Thanda 0 0 150 150 PC2 0 0 150 150 PC2
471 Mudhole Adilabad Kuntala Ola Ola Rajapur Tanda 0 0 200 200 PC2 0 0 200 200 PC2
472 Mudhole Adilabad Kuntala Suryapur Suryapur Suryapur 510 89 0 599 PC2 510 89 0 599 PC2
473 Mudhole Adilabad Bhainsa Pangri Pangri Pangri 734 193 58 985 PC2 734 193 58 985 PC2
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

474 Mudhole Adilabad Bhainsa Manjri Pangri Manjri 747 137 9 893 PC2 747 137 9 893 PC2
475 Mudhole Adilabad Bhainsa Kamole Kamole KOMOLE 2148 323 0 2471 PC3 2148 323 0 2471 PC3
476 Mudhole Adilabad Bhainsa Wanalpad Wanalpad WANALPAD 996 329 21 1346 PC4 996 329 21 1346 PC4
477 Mudhole Adilabad Bhainsa Walegaon Walegaon WALEGAON 866 362 221 1449 FC 866 362 221 1449 FC
478 Mudhole Adilabad Lokeshwaram Hadgoan Hadgoan Sathgaon 361 220 0 581 PC1 361 220 0 581 PC1
479 Mudhole Adilabad Lokeshwaram Lokeshwaram Lokeshwaram Kishtapur 534 67 108 709 PC1 534 67 108 709 PC1
480 Mudhole Adilabad Lokeshwaram Lokeshwaram Hawarga HAWARGA 596 93 42 731 PC3 596 93 42 731 PC3
481 Mudhole Adilabad Lokeshwaram Lokeshwaram Lokeshwaram LOKESHWARAM 2344 603 87 3034 PC3 2344 603 87 3034 PC3
482 Mudhole Adilabad Lokeshwaram Lokeshwaram Gadchanda GADCHANDHA 1796 430 76 2302 PC4 1796 430 76 2302 PC4
483 Mudhole Adilabad Lokeshwaram Lokeshwaram Raipoor Kandli RAIPOORKANDLI 1385 434 21 1840 PC3 1385 434 21 1840 PC3
484 Mudhole Adilabad Lokeshwaram Lokeshwaram Dharmura DHARMURA 840 195 81 1116 FC 840 195 81 1116 FC
485 Asifabad Mancherial Narnoor Kondi Pipri Maruthiguda 0 0 57 57 PC2 0 0 57 57 PC2
486 Asifabad Mancherial Narnoor Rampoor Khandow Anduguda 0 0 91 91 PC2 0 0 91 91 PC2
487 Asifabad Mancherial Narnoor Khandow Khandow Khandow 108 0 443 551 PC2 108 0 443 551 PC2
488 Asifabad Mancherial Narnoor Khandow Khandow Lambadithanda 0 0 212 212 PC2 0 0 212 212 PC2
489 Asifabad Mancherial Narnoor Sedwai Dongergaon Sedwai 0 0 343 343 PC2 0 0 343 343 PC2
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

490 Asifabad Mancherial Narnoor Kothapally.G Kothapally.G Kothapally.G 5 0 267 272 PC4 5 0 267 272 PC4
491 Asifabad Mancherial Narnoor Pipree Pipri Pipree 0 0 358 358 PC1 0 0 358 358 PC1
492 Asifabad Mancherial Narnoor Pipree Pipri Anduguda 86 0 5 91 PC2 86 0 5 91 PC2
493 Asifabad Mancherial Narnoor Parusuwada.K Arjuni Saruguda 0 0 98 98 PC2 0 0 98 98 PC2
494 Asifabad Mancherial Narnoor Lokari.K Lokari.K Lokari.K 60 32 572 664 PC4 60 32 572 664 PC4
495 Asifabad Mancherial Narnoor Lokari.K Lokari.K Godruguda 0 0 57 57 PC2 0 0 57 57 PC2
496 Asifabad Mancherial Narnoor Rupapoor Parusuwada.B Rupapoor 85 0 188 273 PC2 85 0 188 273 PC2
497 Asifabad Mancherial Narnoor Rupapoor Parusuwada.B Bojjuguda 0 0 102 102 PC3 0 0 102 102 PC3
498 Asifabad Mancherial Narnoor Lokari.B Sangvi Lokari.B 67 76 350 493 PC4 67 76 350 493 PC4
499 Asifabad Mancherial Narnoor Lokari.B Sangvi Bullikasa 0 0 72 72 PC4 0 0 72 72 PC4
500 Asifabad Mancherial Narnoor Khadki Lokari.K Khadki 0 0 274 274 PC4 0 0 274 274 PC4
501 Asifabad Mancherial Narnoor Sungapoor Chorgaon Gondguda 2 0 347 349 PC3 2 0 347 349 PC3
502 Asifabad Mancherial Narnoor Chorgaon Chorgaon Choregaon 333 0 362 695 PC3 333 0 362 695 PC3
503 Asifabad Mancherial Narnoor Babjhari Babjhari Babjari 2 0 283 285 PC4 2 0 283 285 PC4
504 Asifabad Mancherial Narnoor Sangvi Sangvi Sangvi 152 8 206 366 PC4 152 8 206 366 PC4
505 Asifabad Mancherial Narnoor Sangvi Sangvi Romankasa 0 0 160 160 FC 0 0 160 160 FC
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

506 Asifabad Mancherial Narnoor Sangvi Sangvi Ganeshpoor 0 0 88 88 PC2 0 0 88 88 PC2


507 Asifabad Mancherial Narnoor Sangvi Sangvi Muradiguda 0 0 40 40 PC2 0 0 40 40 PC2
508 Asifabad Mancherial Narnoor Pownoor Dhabha.B Loddiguda 0 0 72 72 PC2 0 0 72 72 PC2
Umri Lambadi
509 Asifabad Mancherial Narnoor Umri Umri 7 0 623 630 PC4 7 0 623 630 PC4
Thanda
510 Asifabad Mancherial Narnoor Narnoor Narnoor Narnoor 1202 1033 1401 3636 FC 1202 1033 1401 3636 FC
511 Asifabad Mancherial Narnoor Khairdatwa Khairdatwa Kolamguda 0 0 61 61 PC2 0 0 61 61 PC2
512 Asifabad Mancherial Narnoor Khairdatwa Khairdatwa Naddamguda 0 0 156 156 PC2 0 0 156 156 PC2
513 Asifabad Mancherial Narnoor Mankapur Mankapur Mankapur 81 106 686 873 PC3 81 106 686 873 PC3
514 Asifabad Mancherial Narnoor Nagalkonda Nagalkonda Nagalkonda 616 0 120 736 PC2 616 0 120 736 PC2
515 Asifabad Mancherial Narnoor Gangapoor Tadihadapanoor Gangapur 85 32 264 381 PC2 85 32 264 381 PC2
516 Asifabad Mancherial Narnoor Gunjala Gunjala Gunjala 161 240 334 735 PC4 161 240 334 735 PC4
517 Asifabad Mancherial Narnoor  Tadihadapanoor Tadihadapanoor Thadihadapnur 600 586 1334 2520 PC4 600 586 1334 2520 PC4
518 Asifabad Mancherial Narnoor Malangi Malangi Malangi 17 8 496 521 FC 17 8 496 521 FC
519 Asifabad Mancherial Narnoor Malangi Malangi Barikraoguda 0 0 90 90 PC3 0 0 90 90 PC3
Kolamguda
520 Asifabad Mancherial Jainoor Ushegaon Jamgaon 0 0 106 106 FC 0 0 106 106 FC
Jamgaon
521 Asifabad Mancherial Jainoor Ashapally Ashapally Ashapally 0 9 151 160 FC 0 9 151 160 FC
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

522 Asifabad Mancherial Jainoor Ashapally Ashapally Shubahsguda 7 0 41 48 FC 7 0 41 48 FC


523 Asifabad Mancherial Jainoor Ashapally Ashapally Markaguda 0 0 150 150 FC 0 0 150 150 FC
524 Asifabad Mancherial Jainoor Ashapally Ashapally Panapatar 0 0 364 364 PC3 0 0 364 364 PC3
525 Asifabad Mancherial Jainoor Ashapally Jandaguda Jamuguda 0 0 108 108 PC3 0 0 108 108 PC3
526 Asifabad Mancherial Jainoor Ashapally Jandaguda Jandaguda 79 0 257 336 FC 79 0 257 336 FC
527 Asifabad Mancherial Jainoor Ashapally Jandaguda Lachuguda 0 0 245 245 FC 0 0 245 245 FC
528 Asifabad Mancherial Jainoor Patnapur Patnapur Patnapur 311 0 305 616 FC 311 0 305 616 FC
529 Asifabad Mancherial Jainoor Patnapur Patnapur Anduguda 510 26 540 1076 PC4 510 26 540 1076 PC4
530 Asifabad Mancherial Jainoor Gudamamda Gudamamda Gudamamda 60 0 426 486 FC 60 0 426 486 FC
531 Asifabad Mancherial Jainoor Gudamamda Gudamamda Kolamguda 13 0 292 305 PC4 13 0 292 305 PC4
532 Asifabad Mancherial Jainoor Gudamamda Gudamamda Mankuguda 0 0 222 222 FC 0 0 222 222 FC
533 Asifabad Mancherial Jainoor Gudamamda Gudamamda Babulguda 0 0 169 169 FC 0 0 169 169 FC
534 Asifabad Mancherial Jainoor Gudamamda Gudamamda Anduguda 0 0 364 364 PC3 0 0 364 364 PC3
535 Asifabad Mancherial Jainoor Addesara Addesara Addesara 0 0 176 176 FC 0 0 176 176 FC
536 Asifabad Mancherial Jainoor Addesara Addesara Waddarguda 0 53 104 157 FC 0 53 104 157 FC
537 Asifabad Mancherial Jainoor Addesara Addesara Thadiguda 0 0 100 100 FC 0 0 100 100 FC
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

538 Asifabad Mancherial Jainoor Addesara Addesara Chintakarra 0 0 113 113 FC 0 0 113 113 FC
539 Asifabad Mancherial Jainoor Busimatta Rasimatta Busimatta 0 0 202 202 FC 0 0 202 202 FC
540 Asifabad Mancherial Jainoor Busimatta Rasimatta Mukkarguda 80 0 153 233 FC 80 0 153 233 FC
541 Asifabad Mancherial Jainoor Busimatta Rasimatta Sungapur 0 0 48 48 PC1 0 0 48 48 PC1
542 Asifabad Mancherial Jainoor Busimatta Rasimatta Busimatta Roadside 0 0 60 60 PC2 0 0 60 60 PC2
543 Asifabad Mancherial Jainoor Rasimatta Rasimatta Rasimatta 0 0 283 283 FC 0 0 283 283 FC
544 Asifabad Mancherial Jainoor Rasimatta Rasimatta Kodduguda 13 0 292 305 PC4 13 0 292 305 PC4
545 Asifabad Mancherial Jainoor Dhaboli Dhaboli Dhaboli 96 0 424 520 FC 96 0 424 520 FC
546 Asifabad Mancherial Jainoor Dhaboli Dhaboli Garenguda 0 0 164 164 FC 0 0 164 164 FC
547 Asifabad Mancherial Jainoor Dhaboli Dhaboli Shekuguda 0 0 315 315 FC 0 0 315 315 FC
548 Asifabad Mancherial Jainoor Dhaboli Dhaboli Wadderguda 0 0 50 50 PC3 0 0 50 50 PC3
549 Asifabad Mancherial Jainoor Dhaboli Dhaboli Loddyguda 0 0 40 40 PC3 0 0 40 40 PC3
550 Asifabad Mancherial Jainoor Lendiguda Dhaboli Kolamguda G 0 0 334 334 PC2 0 0 334 334 PC2
551 Asifabad Mancherial Jainoor Ushegaon Ushegaon Ushegaon 13 10 200 223 FC 13 10 200 223 FC
552 Asifabad Mancherial Jainoor Ushegaon Ushegaon Sukkadpally 0 0 198 198 FC 0 0 198 198 FC
553 Asifabad Mancherial Jainoor Ushegaon Ushegaon Devguda 17 0 115 132 FC 17 0 115 132 FC
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

554 Asifabad Mancherial Jainoor Ushegaon Jamgaon Ramjiguda 151 0 170 321 PC3 151 0 170 321 PC3
555 Asifabad Mancherial Jainoor Ushegaon Jamgaon Kishanthanda 0 0 92 92 FC 0 0 92 92 FC
556 Asifabad Mancherial Jainoor Ushegaon Ushegaon Gondipatar 19 16 200 235 FC 19 16 200 235 FC
557 Asifabad Mancherial Jainoor Morlawai Morlawai Morlawai 15 0 634 649 PC3 15 0 634 649 PC3
558 Asifabad Mancherial Jainoor Powerguda Jainoor Powerguda 0 27 197 224 PC2 0 27 197 224 PC2
559 Asifabad Mancherial Jainoor Powerguda Jainoor Kotha Powerguda 0 0 173 173 FC 0 0 173 173 FC
560 Asifabad Mancherial Jainoor Jamini Jamini Jamini 469 76 80 625 FC 469 76 80 625 FC
561 Asifabad Mancherial Jainoor Jamini Jamini Jaganathguda 0 0 40 40 FC 0 0 40 40 FC
562 Asifabad Mancherial Jainoor Polasa Jamini Billuthanda 0 0 142 142 FC 0 0 142 142 FC
563 Asifabad Mancherial Jainoor Polasa Jamini Vittalguda 0 0 33 33 FC 0 0 33 33 FC
564 Asifabad Mancherial Kerameri Anthapur Anthapur Jankapur 16 0 232 248 FC 16 0 232 248 FC
565 Asifabad Mancherial Kerameri Devapur Devapur Lachu Tanda 0 0 30 30 PC4 0 0 30 30 PC4
566 Asifabad Mancherial Kerameri Karanjiwada Karanjiwada Karanjiwada 30 21 103 154 FC 30 21 103 154 FC
567 Asifabad Mancherial Kerameri Karanjiwada Karanjiwada Andguda 0 0 100 100 FC 0 0 100 100 FC
568 Asifabad Mancherial Kerameri Anthapur Anthapur Indranagar 12 15 89 116 PC4 12 15 89 116 PC4
569 Asifabad Mancherial Kerameri Isapur Anthapur Padmavathi 0 21 35 56 PC2 0 21 35 56 PC2
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

570 Asifabad Mancherial Kerameri Agarwada Khairi Poonaguda 0 0 60 60 PC2 0 0 60 60 PC2


571 Asifabad Mancherial Kerameri Sangivi Sangvi Sangivi 486 6 115 607 FC 486 6 115 607 FC
572 Asifabad Mancherial Kerameri Sangivi Sangvi Karpathiguda 0 0 60 60 PC3 0 0 60 60 PC3
573 Asifabad Mancherial Kerameri Sangivi Sangvi Raojeeguda 0 0 67 67 PC3 0 0 67 67 PC3
574 Asifabad Mancherial Kerameri Parshawada Sangvi Parshawada 2 0 84 86 FC 2 0 84 86 FC
575 Asifabad Mancherial Kerameri Anarpally Karanjiwada Anarpally 155 5 226 386 FC 155 5 226 386 FC
576 Asifabad Mancherial Kerameri Anarpally Karanjiwada Bogadaguda 0 0 105 105 PC2 0 0 105 105 PC2
577 Asifabad Mancherial Kerameri Devapur Devapur Jairamguda 0 0 110 110 FC 0 0 110 110 FC
578 Asifabad Mancherial Kerameri Devapur Devapur Katteguda 0 0 96 96 FC 0 0 96 96 FC
579 Asifabad Mancherial Kerameri Devapur Devapur Kolamguda 0 0 100 100 FC 0 0 100 100 FC
580 Asifabad Mancherial Kerameri Devapur Devapur Somlaguda 0 0 85 85 PC1 0 0 85 85 PC1
581 Asifabad Mancherial Kerameri Kerameri Kerameri Keslaguda 0 0 120 120 FC 0 0 120 120 FC
582 Asifabad Mancherial Kerameri Kerameri Kerameri Devraoguda 191 0 139 330 FC 191 0 139 330 FC
583 Asifabad Mancherial Kerameri Kerameri Kerameri L.Tanda 48 0 147 195 FC 48 0 147 195 FC
584 Asifabad Mancherial Kerameri Kerameri Kerameri Kolamguda 0 0 12 12 FC 0 0 12 12 FC
585 Asifabad Mancherial Kerameri Sakada Modi Paddasakada 0 0 98 98 FC 0 0 98 98 FC
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

586 Asifabad Mancherial Kerameri Sakada Modi Chinna Sakada 1 0 131 132 FC 1 0 131 132 FC
587 Asifabad Mancherial Kerameri Sakada Modi Shyamraoguda 0 105 105 FC 0 105 105 FC
588 Asifabad Mancherial Kerameri Sakada Modi Sakada Colony 0 0 100 100 FC 0 0 100 100 FC
589 Asifabad Mancherial Kerameri Surdhapur Surdhapur Surdhapur 534 26 160 720 FC 534 26 160 720 FC
590 Asifabad Mancherial Kerameri Surdhapur Surdhapur Neemguda 100 0 80 180 FC 100 0 80 180 FC
591 Asifabad Mancherial Kerameri Surdhapur Surdhapur Sarpanchguda 0 0 60 60 PC4 0 0 60 60 PC4
592 Asifabad Mancherial Kerameri Indapur Nishani Kolamguda 0 0 46 46 PC1 0 0 46 46 PC1
593 Asifabad Mancherial Kerameri Nishani Nishani Lineguda 0 0 100 100 PC2 0 0 100 100 PC2
594 Asifabad Mancherial Kerameri Kotari Kotari Kotari 0 72 228 300 PC4 0 72 228 300 PC4
595 Asifabad Mancherial Kerameri Kotari Kotari Ringanghat 124 0 123 247 FC 124 0 123 247 FC
596 Asifabad Mancherial Kerameri Dhanora Surdhapur Dhanora 159 0 268 427 FC 159 0 268 427 FC
597 Asifabad Mancherial Kerameri Dhanora Surdhapur Shivaguda 0 0 45 45 FC 0 0 45 45 FC
598 Asifabad Mancherial Kerameri Narsapur Goyagaon Narsapur 21 0 19 40 PC2 21 0 19 40 PC2
599 Asifabad Mancherial Kerameri Narsapur Goyagaon Ankusapur 27 0 0 27 PC2 27 0 0 27 PC2
600 Asifabad Mancherial Kerameri Parda Surdhapur Parda 2 0 95 97 FC 2 0 95 97 FC
601 Asifabad Mancherial Kerameri Parda Surdhapur Dodiguda 0 0 80 80 PC2 0 0 80 80 PC2
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

602 Asifabad Mancherial Kerameri Jhari Modi Jhari 412 27 54 493 FC 412 27 54 493 FC
603 Asifabad Mancherial Kerameri Jhari Modi Kolamguda 0 0 80 80 PC2 0 0 80 80 PC2
604 Asifabad Mancherial Kerameri Hatti Modi Hatty 1 0 99 100 FC 1 0 99 100 FC
605 Asifabad Mancherial Kerameri Hatti Modi Dobraguda 0 0 76 76 FC 0 0 76 76 FC
606 Asifabad Mancherial Kerameri Chintakara Kerameri Chinthakara 1 0 109 110 FC 1 0 109 110 FC
607 Asifabad Mancherial Kerameri Chintakara Kerameri Thoyaguda 0 0 75 75 PC2 0 0 75 75 PC2
608 Asifabad Mancherial Kerameri Tokenmoved Modi Pitaguda 0 0 48 48 PC1 0 0 48 48 PC1
609 Asifabad Mancherial Kerameri Chalbadi Kerameri Chalbadi 0 0 93 93 FC 0 0 93 93 FC
610 Asifabad Mancherial Kerameri Murkilonka Goyagaon Murki Lonka 0 0 110 PC2 0 0 110 PC2
611 Asifabad Mancherial Kerameri Kahegaon Kotari Kahegaom 0 0 273 273 FC 0 0 273 273 FC
612 Asifabad Mancherial Kerameri Jodeghat Kotari Jodeghat 0 0 166 166 FC 0 0 166 166 FC
613 Asifabad Mancherial Sirpur-U Jamuldhari Lingapur Naikapuguda 0 0 72 72 PC2 0 0 72 72 PC2
614 Asifabad Mancherial Sirpur-U Raghapur Sirpoor-U Raghapur 22 22 217 261 PC3 22 22 217 261 PC3
615 Asifabad Mancherial Sirpur-U Raghapur Sirpoor-U Karnamguda 0 0 35 35 FC 0 0 35 35 FC
616 Asifabad Mancherial Sirpur-U Raghapur Sirpoor-U Bheemjiguda 0 0 187 187 FC 0 0 187 187 FC
617 Asifabad Mancherial Sirpur-U Burnoor-K Sirpoor-U Burnoor-K 0 21 243 264 FC 0 21 243 264 FC
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

618 Asifabad Mancherial Sirpur-U Burnoor-K Sirpoor-U Pendurguda 0 0 40 40 FC 0 0 40 40 FC


619 Asifabad Mancherial Sirpur-U Burnoor-K Sirpoor-U Burnoor-B 13 0 203 216 FC 13 0 203 216 FC
620 Asifabad Mancherial Sirpur-U Burnoor-K Sirpoor-U Pittaguda 0 0 102 102 FC 0 0 102 102 FC
621 Asifabad Mancherial Sirpur-U Pullara Pullara Pullara 0 18 233 251 FC 0 18 233 251 FC
622 Asifabad Mancherial Sirpur-U Pullara Pullara Sarpanchguda 0 0 94 94 FC 0 0 94 94 FC
623 Asifabad Mancherial Sirpur-U Pullara Pullara Bogdaguda 0 0 125 125 FC 0 0 125 125 FC
624 Asifabad Mancherial Sirpur-U Devudpally Pullara Devudpally 35 0 205 240 PC3 35 0 205 240 PC3
625 Asifabad Mancherial Sirpur-U Seethagondi Pangidi Soyamguda 45 0 215 260 PC4 45 0 215 260 PC4
626 Asifabad Mancherial Sirpur-U Pangidi Pangidi Kammuguda 0 0 135 135 PC2 0 0 135 135 PC2
627 Asifabad Mancherial Sirpur-U Pangidi Pangidi Chinnadoba 0 0 194 194 FC 0 0 194 194 FC
628 Asifabad Mancherial Sirpur-U Pangidi Pangidi Markaloddi 0 0 25 25 FC 0 0 25 25 FC
629 Asifabad Mancherial Sirpur-U Pangidi Pangidi Munjiguda 0 0 55 55 FC 0 0 55 55 FC
630 Asifabad Mancherial Sirpur-U Pangidi Pangidi Kakarbody 0 0 270 270 FC 0 0 270 270 FC
631 Asifabad Mancherial Sirpur-U Pangidi Pangidi Bandair 0 0 204 204 PC3 0 0 204 204 PC3
632 Asifabad Mancherial Sirpur-U Pangidi Pangidi Pangidi Guda 0 0 91 91 PC2 0 0 91 91 PC2
633 Asifabad Mancherial Sirpur-U Raghapur Chorpally Devguda 0 0 90 90 FC 0 0 90 90 FC
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

634 Asifabad Mancherial Sirpur-U Babjipet Pangidi Guttaguda 0 0 94 94 PC2 0 0 94 94 PC2


635 Asifabad Mancherial Sirpur-U Babjipet Pangidi Mathurathanda 34 0 46 80 PC2 34 0 46 80 PC2
636 Asifabad Mancherial Sirpur-U Babjipet Pangidi Kathiguda 0 0 41 41 FC 0 0 41 41 FC
637 Asifabad Mancherial Sirpur-U Babjipet Pangidi Dubbaguda 0 0 22 22 FC 0 0 22 22 FC
638 Asifabad Mancherial Sirpur-U Chorpally Chorpally Chorpally 8 0 117 125 FC 8 0 117 125 FC
639 Asifabad Mancherial Sirpur-U Chorpally Chorpally Lendiguda 0 0 110 110 FC 0 0 110 110 FC
640 Asifabad Mancherial Sirpur-U Chorpally Chorpally Polasapator 0 0 91 91 FC 0 0 91 91 FC
641 Asifabad Mancherial Sirpur-U Vankamaddi Chorpally Vankamaddi-1 0 0 195 195 FC 0 0 195 195 FC
642 Asifabad Mancherial Sirpur-U Netnur Netnur Koddyguda 0 0 195 195 FC 0 0 195 195 FC
643 Asifabad Mancherial Sirpur-U Netnur Netnur Chelkaguda 0 0 104 104 FC 0 0 104 104 FC
644 Asifabad Mancherial Sirpur-U Netnur Netnur Irpaguda 0 0 108 108 FC 0 0 108 108 FC
645 Asifabad Mancherial Sirpur-U Netnur Netnur Badiguda 38 0 127 165 FC 38 0 127 165 FC
646 Asifabad Mancherial Sirpur-U Netnur Netnur Chilatiguda 23 0 103 126 FC 23 0 103 126 FC
647 Asifabad Mancherial Sirpur-U Pamulawada Netnur Toyaguda 0 0 74 74 FC 0 0 74 74 FC
648 Asifabad Mancherial Sirpur-U Pamulawada Netnur Ramuguda 0 0 87 87 FC 0 0 87 87 FC
649 Asifabad Mancherial Sirpur-U Sirpur-U Sirpoor-U Sirpur-U 319 52 908 1279 PC2 319 52 908 1279 PC2
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

650 Asifabad Mancherial Sirpur-U Sirpur-U Sirpoor-U Presidentguda 0 0 357 357 FC 0 0 357 357 FC
651 Asifabad Mancherial Sirpur-U Kohinoor-B Settihadapnur Kohinur-B 55 0 214 269 PC3 55 0 214 269 PC3
652 Asifabad Mancherial Sirpur-U Kohinoor-B Settihadapnur Soyamguda 26 12 173 211 FC 26 12 173 211 FC
653 Asifabad Mancherial Sirpur-U Kohinoor-B Settihadapnur Bhimaguda 6 0 26 32 PC3 6 0 26 32 PC3
654 Asifabad Mancherial Sirpur-U Kohinoor-K Settihadapnur Kohinoor-K 25 0 136 161 FC 25 0 136 161 FC
655 Asifabad Mancherial Sirpur-U Kohinoor-K Settihadapnur Shaikuguda 20 0 197 217 FC 20 0 197 217 FC
656 Asifabad Mancherial Sirpur-U Kohinoor-K Settihadapnur Thatiguda 0 0 75 75 PC2 0 0 75 75 PC2
657 Asifabad Mancherial Sirpur-U Settihadpnur Settihadapnur Settihadpnur 82 12 64 158 FC 82 12 64 158 FC
658 Asifabad Mancherial Sirpur-U Settihadpnur Settihadapnur Kalluriguda 0 0 218 218 FC 0 0 218 218 FC
659 Asifabad Mancherial Sirpur-U Settihadpnur Settihadapnur Patelguda 0 0 85 85 PC3 0 0 85 85 PC3
660 Asifabad Mancherial Sirpur-U Settihadpnur Settihadapnur Bhimangutta 28 0 77 105 FC 28 0 77 105 FC
661 Asifabad Mancherial Sirpur-U Settihadpnur Settihadapnur Rajulguda 50 0 70 120 FC 50 0 70 120 FC
662 Asifabad Mancherial Sirpur-U Settihadpnur Settihadapnur Shivaguda 0 0 40 40 PC1 0 0 40 40 PC1
663 Asifabad Mancherial Sirpur-U Settihadpnur Settihadapnur Pataguda 0 0 25 25 FC 0 0 25 25 FC
664 Asifabad Mancherial Sirpur-U Chapri Settihadapnur Chapri 0 0 106 106 FC 0 0 106 106 FC
665 Asifabad Mancherial Sirpur-U Chapri Settihadapnur Somuguda 0 0 60 60 FC 0 0 60 60 FC
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

666 Asifabad Mancherial Sirpur-U Dhanora-P Mahagaon Dhanora-P 24 0 178 202 FC 24 0 178 202 FC
667 Asifabad Mancherial Sirpur-U Dhanora-P Mahagaon Lambadithanda 0 0 155 155 PC2 0 0 155 155 PC2
668 Asifabad Mancherial Sirpur-U Dhanora-P Mahagaon Soyamguda 0 0 115 115 FC 0 0 115 115 FC
669 Asifabad Mancherial Sirpur-U Dhanora-P Mahagaon Sevadasnagar 0 0 42 42 PC3 0 0 42 42 PC3
670 Asifabad Mancherial Sirpur-U Mahagoan Mahagaon Mahagoan 65 0 237 302 FC 65 0 237 302 FC
671 Asifabad Mancherial Sirpur-U Mahagoan Mahagaon Patelguda 0 0 186 186 FC 0 0 186 186 FC
672 Asifabad Mancherial Sirpur-U Mahagoan Mahagaon Buttajala 0 0 139 139 FC 0 0 139 139 FC
673 Asifabad Mancherial Sirpur-U Gumnur-K Kanchanpally Bijuriguda 2 0 40 42 FC 2 0 40 42 FC
674 Asifabad Mancherial Sirpur-U Gumnoor-B Kanchanpally Raovnur 0 0 165 165 FC 0 0 165 165 FC
675 Asifabad Mancherial Sirpur-U Gumnoor-B Kanchanpally Surpanguda 0 0 69 69 FC 0 0 69 69 FC
676 Asifabad Mancherial Sirpur-U Kanchanpally Kanchanpally Kanchanpally 0 0 290 290 PC2 0 0 290 290 PC2
677 Asifabad Mancherial Sirpur-U Kanchanpally Kanchanpally Malaguda 0 0 175 175 FC 0 0 175 175 FC
678 Asifabad Mancherial Sirpur-U Kanchanpally Kanchanpally Hamanguda 0 7 37 44 PC3 0 7 37 44 PC3
679 Asifabad Mancherial Sirpur-U Kothapally-C Kothapally-C Kothapally-C 48 0 857 905 FC 48 0 857 905 FC
680 Asifabad Mancherial Sirpur-U Kothapally-C Kothapally-C Nimmathanda 0 0 75 75 FC 0 0 75 75 FC
681 Asifabad Mancherial Sirpur-U Kothapally-C Kothapally-C Motipator 0 0 180 180 FC 0 0 180 180 FC
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

682 Asifabad Mancherial Sirpur-U Lingapur Lingapur Lingapur 4 0 40 44 FC 4 0 40 44 FC


683 Asifabad Mancherial Sirpur-U Lingapur Lingapur Mankupatelguda 0 0 90 90 FC 0 0 90 90 FC
684 Asifabad Mancherial Sirpur-U Jamuldhari Lingapur Jamuldhara 7 0 231 238 PC4 7 0 231 238 PC4
685 Asifabad Mancherial Sirpur-U Jamuldhari Lingapur Ramanayakthanda 0 0 220 220 FC 0 0 220 220 FC
686 Asifabad Mancherial Narnoor Bhemmpoor Bhemmpoor Bheempur 70 115 1348 1533 FC 70 115 1348 1533 FC
687 Asifabad Mancherial Asifabad Siyammowad Mowad Aliguda 0 0 101 101 PC2 0 0 101 101 PC2
688 Asifabad Mancherial Asifabad Balahanpur Mowad Balahanpur 0 0 91 91 PC2 0 0 91 91 PC2
689 Asifabad Mancherial Asifabad Temiranmowad Mowad Bondguda 0 0 135 135 FC 0 0 135 135 FC
690 Asifabad Mancherial Asifabad Wadigondi Mowad Chowpanguda 0 0 74 74 PC2 0 0 74 74 PC2
691 Asifabad Mancherial Asifabad Wawdam Ada Dasnapur Dhabaguda 0 0 21 21 PC2 0 0 21 21 PC2
692 Asifabad Mancherial Asifabad Chirrakunta Chirrakunta Gutta Chelma 0 0 72 72 PC2 0 0 72 72 PC2
693 Asifabad Mancherial Asifabad Kowdianmowad Adadasnapur Kowdianmowad 0 0 199 199 PC2 0 0 199 199 PC2
694 Asifabad Mancherial Asifabad Mowad Mowad Lineguda 0 0 66 66 PC2 0 0 66 66 PC2
695 Asifabad Mancherial Asifabad Balahanpur Mowad Nayakapuguda 0 0 77 77 PC2 0 0 77 77 PC2
696 Asifabad Mancherial Asifabad Samala Tumpally Samala 20 0 69 89 PC2 20 0 69 89 PC2
697 Asifabad Mancherial Asifabad Temiranmowad Mowad Tokiguda 0 0 41 41 PC2 0 0 41 41 PC2
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

698 Asifabad Mancherial Asifabad Wadigondi Mowad Wadigondi 0 0 126 126 PC2 0 0 126 126 PC2
699 Sirpur (T) Mancherial Kaghaznagar Vallakonda Vallakonda Gollagudem 167 0 0 167 PC2 167 0 0 167 PC2
700 Sirpur (T) Mancherial Kaghaznagar Malini Maredpalle Laxmipur 0 0 182 182 PC2 0 0 182 182 PC2
701 Sirpur (T) Mancherial Kaghaznagar Vanjari Vanjari Mahajanguda 96 0 0 96 PC2 96 0 0 96 PC2
702 Sirpur (T) Mancherial Kaghaznagar Malini Malini Manikpatar 0 0 145 145 PC2 0 0 145 145 PC2
703 Sirpur (T) Mancherial Kaghaznagar Malini Metindani Metindani 0 0 76 76 PC2 0 0 76 76 PC2
Nazrulnagar Camp-
704 Sirpur (T) Mancherial Kaghaznagar Nazrulnagar Nazrulnagar 491 0 0 491 PC2 491 0 0 491 PC2
7
705 Sirpur (T) Mancherial Kaghaznagar Rasapally Rasapally Perkaguda 571 0 0 571 PC2 571 0 0 571 PC2
706 Asifabad Mancherial Rebbena Gangapur Gangapur Gollagudem 174 0 37 211 PC2 174 0 37 211 PC2
New
707 Asifabad Mancherial Rebbena Tungeda Tungeda 0 0 189 189 PC2 0 0 189 189 PC2
Madhavaigudem
708 Asifabad Mancherial Rebbena Tungeda Tungeda Sanyasigudem 0 0 78 78 PC2 0 0 78 78 PC2
709 Sirpur (T) Mancherial Sirpur (T) Rudraram Chintakunta Areguda 90 57 0 147 PC2 90 57 0 147 PC2
710 Sirpur (T) Mancherial Sirpur (T) Vempalle Vempalle Dharamguda 418 0 5 423 PC2 418 0 5 423 PC2
711 Sirpur (T) Mancherial Sirpur (T) Venkatraopet Venkatraopet New Colony 463 65 0 528 PC2 463 65 0 528 PC2
712 Asifabad Mancherial Tiryani Koyatalandi Gadalpally Ameenguda 53 0 98 151 PC2 53 0 98 151 PC2
713 Asifabad Mancherial Tiryani Rompalle Rompalle Ansaguda 0 0 186 186 PC2 0 0 186 186 PC2
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

714 Asifabad Mancherial Tiryani Gundala Manikyapur Arjuguda 0 0 115 115 PC2 0 0 115 115 PC2
715 Asifabad Mancherial Tiryani Boardham Devaiguda Boardham Col. 30 0 34 64 PC4 30 0 34 64 PC4
716 Asifabad Mancherial Tiryani Devaiguda Devaiguda Devaiguda 458 0 224 682 PC2 458 0 224 682 PC2
717 Asifabad Mancherial Tiryani Goena Loddiguda Dhabaguda 0 0 33 33 PC2 0 0 33 33 PC2
718 Asifabad Mancherial Tiryani Dongargaon Gadalpally Dongargaon 0 0 37 37 PC2 0 0 37 37 PC2
719 Asifabad Mancherial Tiryani Mangi Mangi Dubbaguda 22 0 168 190 PC2 22 0 168 190 PC2
720 Asifabad Mancherial Tiryani Mangi Mangi Geesiguda 0 0 108 108 PC2 0 0 108 108 PC2
721 Asifabad Mancherial Tiryani Jewni Devaiguda Jewni 0 0 40 40 PC2 0 0 40 40 PC2
722 Asifabad Mancherial Tiryani Loddiguda Loddiguda Kolamguda 0 0 47 47 PC2 0 0 47 47 PC2
Kothaguda/Kolamgu
723 Asifabad Mancherial Tiryani Manikyapur Manikyapur 0 0 94 94 PC2 0 0 94 94 PC2
da
724 Asifabad Mancherial Tiryani Mangi Mangi Koutagaon 0 0 206 206 PC2 0 0 206 206 PC2
725 Asifabad Mancherial Tiryani Goena Pangidimadara Nayakapuguda 0 0 139 139 PC2 0 0 139 139 PC2
726 Asifabad Mancherial Tiryani Pangidimadra Pangidimadara Pangidi 0 0 71 71 PC2 0 0 71 71 PC2
727 Asifabad Mancherial Tiryani Mangi Mangi Pusugummi 0 0 29 29 PC2 0 0 29 29 PC2
728 Asifabad Mancherial Tiryani Sonapur Kannepally Sonapur 0 0 55 55 PC2 0 0 55 55 PC2
729 Asifabad Mancherial Tiryani Mangi Mangi Srirampurguda 12 0 81 93 PC2 12 0 81 93 PC2
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

730 Asifabad Mancherial Tiryani Mangi Mangi Toiret 0 0 83 83 PC2 0 0 83 83 PC2


731 Asifabad Mancherial Wankidi Sawathi Sawathi Anthapur 0 0 138 138 PC2 0 0 138 138 PC2
732 Asifabad Mancherial Wankidi Sawathi Sawathi Bandakasa 0 0 226 226 FC 0 0 226 226 FC
733 Asifabad Mancherial Wankidi Borda Bendara Borda 302 0 0 302 PC2 302 0 0 302 PC2
734 Asifabad Mancherial Wankidi Chincholi Indhani Chincholi 31 0 0 31 PC2 31 0 0 31 PC2
735 Asifabad Mancherial Wankidi Sarkepalle Velgi Chintaret 0 0 51 51 PC2 0 0 51 51 PC2
736 Asifabad Mancherial Wankidi Sawathi Sawathi Dongergaon 0 0 158 158 PC2 0 0 158 158 PC2
737 Asifabad Mancherial Wankidi Chavpanguda Chavpanguda Enoli 93 76 69 238 PC2 93 76 69 238 PC2
738 Asifabad Mancherial Wankidi Sawathi Sawathi Enugonda 0 53 113 166 PC2 0 53 113 166 PC2
739 Asifabad Mancherial Wankidi Navegaon Indhani Godemarg 24 0 0 24 PC1 24 0 0 24 PC1
740 Asifabad Mancherial Wankidi Chavpanguda Chavpanguda Gondapur 0 0 145 145 PC2 0 0 145 145 PC2
741 Asifabad Mancherial Wankidi Chavpanguda Chavpanguda Nagarigutta 0 0 129 129 PC2 0 0 129 129 PC2
742 Asifabad Mancherial Wankidi Khamana Kamana Pumaguda 0 0 98 98 PC2 0 0 98 98 PC2
743 Asifabad Mancherial Wankidi Chinchpalle Sawathi Reetaguda 0 0 53 53 PC2 0 0 53 53 PC2
744 Asifabad Mancherial Wankidi Tejapur Khirdi Tejiguda 396 0 0 396 PC2 396 0 0 396 PC2
ADADASNAPUR(0 ADADASNAPUR(0
745 Asifabad Mancherial Asifabad ADADASNAPUR 0 0 208 208 PC4 0 0 208 208 PC4
48) 8)
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

ADADASNAPUR(0 ADADASNAPUR(0
746 Asifabad Mancherial Asifabad NAGALGONDI 0 0 36 36 PC3 0 0 36 36 PC3
48) 8)
DEMMIDIGUDA(04 ADADASNAPUR(0
747 Asifabad Mancherial Asifabad DEMMIDIGUDA 0 0 27 27 PC3 0 0 27 27 PC3
2) 8)
DEVADURGAM(05 ADADASNAPUR(0
748 Asifabad Mancherial Asifabad DEVADURGAM 0 0 37 37 PC3 0 0 37 37 PC3
7) 8)
ADADASNAPUR(0
749 Asifabad Mancherial Asifabad KHAPRI(023) BANARGUNDI 0 0 96 96 PC3 0 0 96 96 PC3
8)
ADADASNAPUR(0
750 Asifabad Mancherial Asifabad KHAPRI(023) GONDGUDA 0 0 123 123 PC3 0 0 123 123 PC3
8)
ADADASNAPUR(0
751 Asifabad Mancherial Asifabad KUTODA(045) KOLAMGUDA 0 0 77 77 PC4 0 0 77 77 PC4
8)
MALANGUNDI(046 ADADASNAPUR(0
752 Asifabad Mancherial Asifabad KOLAMGUDA 0 0 81 81 PC4 0 0 81 81 PC4
) 8)
MALANGUNDI(046 ADADASNAPUR(0
753 Asifabad Mancherial Asifabad MALANGUNDI 0 0 86 86 PC3 0 0 86 86 PC3
) 8)
754 Asifabad Mancherial Asifabad GODEVELLI(028) ASIFABAD(07) GODVELLI 110 39 233 382 PC3 110 39 233 382 PC3
CHIRRAKUNTA(05 CHIRRAKUNTA(14
755 Asifabad Mancherial Asifabad KHEREGUDA 0 0 28 28 PC4 0 0 28 28 PC4
8) )
CHIRRAKUNTA(05 CHIRRAKUNTA(14
756 Asifabad Mancherial Asifabad R&R DAMPUR 0 0 60 60 PC3 0 0 60 60 PC3
8) )
CHIRRAKUNTA(05 CHIRRAKUNTA(14
757 Asifabad Mancherial Asifabad YERRAGUTTA 0 0 49 49 PC4 0 0 49 49 PC4
8) )
DHANABOINPET(0 CHIRRAKUNTA(14 DHANABOINAPET
758 Asifabad Mancherial Asifabad 0 0 27 27 PC3 0 0 27 27 PC3
60) ) A
MANDAPALLY(061 CHIRRAKUNTA(14
759 Asifabad Mancherial Asifabad MANDAPALLY-1 0 0 34 34 PC4 0 0 34 34 PC4
) )
CHIRRAKUNTA(14
760 Asifabad Mancherial Asifabad PADIBANDA(059) PADIBANDA 0 0 137 137 PC3 0 0 137 137 PC3
)
761 Asifabad Mancherial Asifabad EDULAWADA(033) EDULAWADA(11) SALPALGUDA 0 0 111 111 PC4 0 0 111 111 PC4
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

KOMMUGUDA(032
762 Asifabad Mancherial Asifabad EDULAWADA(11) KOMMUGUDA 64 0 239 303 PC4 64 0 239 303 PC4
)
BALAHANPUR(053 CHINTAGUDA/P.G
763 Asifabad Mancherial Asifabad MOWAD(13) 0 0 86 86 PC3 0 0 86 86 PC3
) UDEM
BALAHANPUR(053 SAMUTULAGUNDA
764 Asifabad Mancherial Asifabad MOWAD(13) 0 0 85 85 PC3 0 0 85 85 PC3
) M
BALAHANPUR(053
765 Asifabad Mancherial Asifabad MOWAD(13) TOYAGUDA 0 0 21 21 PC3 0 0 21 21 PC3
)
SIYAMMOWAD(05
766 Asifabad Mancherial Asifabad MOWAD(13) GOGIAN MOWAD 0 0 72 72 PC3 0 0 72 72 PC3
2)
767 Asifabad Mancherial Asifabad SUDDAGHAT(056) MOWAD(13) SUDDAGHAT 0 0 85 85 PC3 0 0 85 85 PC3
DODDIGUDA/CHEL
768 Asifabad Mancherial Asifabad WADIGONDI(050) MOWAD(13) 0 0 64 64 PC3 0 0 64 64 PC3
KAGUDA
ROUTASHANKER
769 Asifabad Mancherial Asifabad ADDAGHAT(064) ADDAGHAT 0 0 103 103 PC3 0 0 103 103 PC3
PALLY(10)
ROUTASANKEPAL ROUTASHANKER
770 Asifabad Mancherial Asifabad PATHAROUTA 0 0 67 67 PC3 0 0 67 67 PC3
LY(062) PALLY(10)
771 Asifabad Mancherial Asifabad BELGAON(041) TUMPALLY(12) GONDGUDA 0 27 119 146 PC3 0 27 119 146 PC3
772 Asifabad Mancherial Asifabad KOSARA(039) TUMPALLY(12) BAVANINAGAR 0 0 123 123 PC3 0 0 123 123 PC3
773 Asifabad Mancherial Asifabad TUMPALLY(037) TUMPALLY(12) GONDGUDA 0 27 119 146 PC3 0 27 119 146 PC3
774 Asifabad Mancherial Asifabad TUMPALLY(037) TUMPALLY(12) GUDEMGHAT 0 0 374 374 PC4 0 0 374 374 PC4
DADAPAPOOR(02
775 Asifabad Mancherial Asifabad YELLARAM(02) KOUTAGUDA 21 0 371 392 PC3 21 0 371 392 PC3
2)
776 Sirpur (T) Mancherial Bejjur BEJJUR(020) BEJJUR(05) ETIGUDA 147 6 173 326 PC3 147 6 173 326 PC3
777 Sirpur (T) Mancherial Bejjur SHIVAPALLY(009) GUDEM(01) SHIVAPALLY 0 0 190 190 PC3 0 0 190 190 PC3
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

KAMMERGAON(2
778 Sirpur (T) Mancherial Bejjur NANDIGAON(045) NANDIGAON 0 17 144 161 PC3 0 17 144 161 PC3
0)
KONDAPALLE(015
779 Sirpur (T) Mancherial Bejjur KONDAPALLE(23) JAIHINDPUR 0 8 144 152 PC3 0 8 144 152 PC3
)
780 Sirpur (T) Mancherial Bejjur AMBAGHAT(010) KUKUDA(04) AMBAGHAT 0 0 452 452 PC3 0 0 452 452 PC3
KUSHNAPALLE(03 KUSHNAPALLE(0
781 Sirpur (T) Mancherial Bejjur INDERGAON 90 68 127 285 PC4 90 68 127 285 PC4
1) 9)
782 Sirpur (T) Mancherial Bejjur MOGAVELLY(025) MOGAVELLY(07) BANDALAGUDEM 0 0 160 160 PC4 0 0 160 160 PC4
783 Sirpur (T) Mancherial Bejjur MOGAVELLY(025) MOGAVELLY(07) IPPALAGUDA 64 165 225 454 PC4 64 165 225 454 PC4
OUTSARANGAPAL OUTSARANGAPA
784 Sirpur (T) Mancherial Bejjur DUBBAGUDA 0 0 55 55 PC4 0 0 55 55 PC4
LE(014) LLE(14)
785 Sirpur (T) Mancherial Bejjur SUSHMEER(030) PAPANPET(08) SUSHMEER 5 19 207 231 PC4 5 19 207 231 PC4
786 Sirpur (T) Mancherial Bejjur KATEPALLE(011) POTHAPALLE(18) KORTHAGUDA 0 0 132 132 PC3 0 0 132 132 PC3
787 Sirpur (T) Mancherial Bejjur REBBANA(001) REBBANA(15) JAJULPET 34 65 380 479 PC3 34 65 380 479 PC3
788 Sirpur (T) Mancherial Bejjur RUDRAPUR(002) RUDRAPUR(22) HETIGUDA 71 11 314 396 PC3 71 11 314 396 PC3
789 Sirpur (T) Mancherial Bejjur YELLUR(019) YELLUR(11) GOUTHAMGUDA 0 0 65 65 PC3 0 0 65 65 PC3
790 Bellampally Mancherial Bheemini BABAPUR(007) Venkatapur BABAPUR 58 0 40 98 PC4 58 0 40 98 PC4

791 Chennur Mancherial Chennur AKKEPALLY(008 ) Chinthalapally Akkepally 148 0 300 448 PC3 148 0 300 448 PC3

792 Sirpur (T) Mancherial Dahegaon DAHEGAON(019 ) DAHEGAON(11) BOPPARAM 13 0 65 78 PC2 13 0 65 78 PC2
793 Sirpur (T) Mancherial Dahegaon ITAPALLE(032) GIRIVELLY(16) ITAPALLY 0 0 75 75 PC3 0 0 75 75 PC3
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

794 Sirpur (T) Mancherial Dahegaon KOTHIMEER(005) KOTHIMEER(02) DUBBAGUDA 79 9 98 186 PC4 79 9 98 186 PC4

795 Chennur Mancherial Jaipur MADDIKAL(029 ) Maddikal LALBAHADURPET 0 0 160 160 PC3 0 0 160 160 PC3

796 Sirpur (T) Mancherial Kaghaznagar MANDVA(021 ) GANNARAM(08) MANDVA 3 0 138 141 PC3 3 0 138 141 PC3
797 Sirpur (T) Mancherial Kaghaznagar MALINI(001) MALINI(01) MALINI 0 0 241 241 PC4 0 0 241 241 PC4
MAREDPALLE(003
798 Sirpur (T) Mancherial Kaghaznagar MALINI(01) ELLAPUR 0 0 98 98 PC3 0 0 98 98 PC3
)
MAREDPALLE(003
799 Sirpur (T) Mancherial Kaghaznagar MALINI(01) MAREPALLE 0 0 122 122 PC4 0 0 122 122 PC4
)
800 Sirpur (T) Mancherial Kaghaznagar RASAPALLY(033 ) RASAPALLY(15) MAMIDIGUDA 72 0 50 122 PC4 72 0 50 122 PC4
801 Sirpur (T) Mancherial Kaghaznagar GONDI(007 ) VANJARI(03) BEEMGUDA 0 0 120 120 PC3 0 0 120 120 PC3
802 Sirpur (T) Mancherial Kaghaznagar GONDI(007 ) VANJARI(03) DARIGAON 0 0 163 163 PC4 0 0 163 163 PC4
803 Sirpur (T) Mancherial Kaghaznagar GONDI(007 ) VANJARI(03) GONDI 0 0 98 98 PC4 0 0 98 98 PC4
804 Sirpur (T) Mancherial Kaghaznagar GONDI(007 ) VANJARI(03) PAVUGUDA 0 0 66 66 PC3 0 0 66 66 PC3
805 Sirpur (T) Mancherial Kaghaznagar METPALLE(009) VANJARI(03) METPALLE 0 0 96 96 PC4 0 0 96 96 PC4
806 Bellampally Mancherial Kasipet GURVAPUR(017) Mtyampally GURUVAPUR 0 0 217 217 PC3 0 0 217 217 PC3
PALLAMGUDA(014
807 Bellampally Mancherial Kasipet Pallamguda GANGUGUDA 0 0 135 135 PC3 0 0 135 135 PC3
)
808 Chennur Mancherial Kotapally ERRAIPET(027 ) Parpally ERRAIPET 0 0 137 137 PC4 0 0 137 137 PC4
809 Sirpur (T) Mancherial Kowtala BUREPALLE(028 ) GANGAPUR(22) BOGADAGUDEM 0 0 162 162 PC3 0 0 162 162 PC3
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

810 Sirpur (T) Mancherial Kowtala GUDLABORI(012 ) GUDLABORI(09) SAIDAPUR 26 60 210 296 PC4 26 60 210 296 PC4
811 Sirpur (T) Mancherial Kowtala GUDLABORI(012 ) GUDLABORI(09) VAIGAON 17 50 350 417 PC4 17 50 350 417 PC4
812 Sirpur (T) Mancherial Kowtala NAGAPALLY(020 ) GUDLABORI(09) GINNELAHATTI 65 40 202 307 PC3 65 40 202 307 PC3
813 Sirpur (T) Mancherial Kowtala RANVELLY(011 ) RANVELLY(08) TEKAMGUDA 0 72 258 330 PC4 0 72 258 330 PC4
814 Sirpur (T) Mancherial Kowtala THALODI(019 ) THALODI(16) CHINTALAPATI 0 0 60 60 PC4 0 0 60 60 PC4
THUMMIDIHATTI(0 THUMMIDAHATTI(
815 Sirpur (T) Mancherial Kowtala JANGAON 0 0 244 244 PC4 0 0 244 244 PC4
10 ) 07)
THUMMIDIHATTI(0 THUMMIDAHATTI(
816 Sirpur (T) Mancherial Kowtala KUDIMATHAGUDA 0 0 116 116 PC4 0 0 116 116 PC4
10 ) 07)
817 Sirpur (T) Mancherial Kowtala VEERDANDI(008 ) VEERDANDI(05) VEERDANDI 169 345 722 1236 PC4 169 345 722 1236 PC4

818 Bellampally Mancherial Nennel JANGALPET(006) Jangalpet BOGAMPALLY 62 PC4 62 PC4


0 0 62 0 0 62
819 Asifabad Mancherial Rebbena TUNGEDA(010) Tungeda JANDAGUDEM 0 0 78 78 PC4 0 0 78 78 PC4
820 Sirpur (T) Mancherial Sirpur (T) MEDPALLY(002 ) CHELAPALLY(01) RAVANPALLY 43 18 45 106 PC4 43 18 45 106 PC4
CHINTAKUNTA(08
821 Sirpur (T) Mancherial Sirpur (T) ACHELLY(016) ACHELLY 171 49 286 506 PC4 171 49 286 506 PC4
)
CHINTAKUNTA(01 CHINTAKUNTA(08
822 Sirpur (T) Mancherial Sirpur (T) CHINTAKUNTA 282 0 610 892 PC4 282 0 610 892 PC4
9) )
823 Bellampally Mancherial Tandur KISTEMPET(017 ) Kistampet KOMMUGUDA 0 0 106 106 PC3 0 0 106 106 PC3
824 Asifabad Mancherial Tiryani BOARDHAM(010) Devaiguda BOARDHAM 30 0 34 64 PC4 30 0 34 64 PC4
825 Asifabad Mancherial Tiryani BOARDHAM(010) Devaiguda KHAIRGUDA 0 0 78 78 PC3 0 0 78 78 PC3
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

826 Asifabad Mancherial Tiryani CHOPIDI(013) Devaiguda THOYOGUDA 0 0 30 30 PC3 0 0 30 30 PC3


827 Asifabad Mancherial Tiryani LINGIGUDA(006 ) Devaiguda LINGIGUDA 0 0 73 73 PC4 0 0 73 73 PC4
KOYATALANDI(01
828 Asifabad Mancherial Tiryani Gadalpally KOYATALANDI 0 28 66 94 PC3 0 28 66 94 PC3
7)
KOYATALANDI(01
829 Asifabad Mancherial Tiryani Gadalpally SOLALAGUDA 0 0 34 34 PC4 0 0 34 34 PC4
7)
RALLAKANNEPAL
830 Asifabad Mancherial Tiryani Gadalpally KOUTAGUDA 0 0 38 38 PC4 0 0 38 38 PC4
LY(019)
RALLAKANNEPAL
831 Asifabad Mancherial Tiryani Gadalpally MOTHUGUDA 0 0 33 33 PC4 0 0 33 33 PC4
LY(019)
832 Asifabad Mancherial Tiryani DONDLA(031) Gambeeraopet DONDLA 0 0 25 25 PC3 0 0 25 25 PC3

833 Asifabad Mancherial Tiryani EDULPAD(030 ) Gambeeraopet EDULPAD 0 0 270 270 PC4 0 0 270 270 PC4
834 Asifabad Mancherial Tiryani GINNEDHARI(021 ) Ginnedhari CHOWPANGUDA 0 0 60 60 PC3 0 0 60 60 PC3
835 Asifabad Mancherial Tiryani GINNEDHARI(021 ) Ginnedhari KHAIRGUDA 90 0 141 231 PC4 90 0 141 231 PC4
836 Asifabad Mancherial Tiryani GINNEDHARI(021 ) Ginnedhari SALEGUDA 30 0 44 74 PC4 30 0 44 74 PC4
Boringuda/Kodugud
837 Asifabad Mancherial Tiryani GOYAGAON(015 ) Kannepally 57 0 111 168 PC3 57 0 111 168 PC3
a
838 Asifabad Mancherial Tiryani SONAPUR(029) Kannepally Kolamguda 0 0 30 30 PC3 0 0 30 30 PC3
839 Asifabad Mancherial Tiryani SONAPUR(029) Kannepally Kothaguda 0 0 49 49 PC4 0 0 49 49 PC4
840 Asifabad Mancherial Tiryani SONAPUR(029) Kannepally Loya 0 0 30 30 PC3 0 0 30 30 PC3
841 Asifabad Mancherial Tiryani SONAPUR(029) Kannepally Molalguda 0 0 42 42 PC4 0 0 42 42 PC4
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

842 Asifabad Mancherial Tiryani LODDIGUDA(001 ) Loddiguda CHINNADHAMPUR 0 0 183 183 PC4 0 0 183 183 PC4
GONDGUDA/AMR
843 Asifabad Mancherial Tiryani LODDIGUDA(001 ) Loddiguda 0 0 57 57 PC4 0 0 57 57 PC4
UTHGUDA
844 Asifabad Mancherial Tiryani LODDIGUDA(001 ) Loddiguda KOLAMGUDA 0 0 47 47 PC2 0 0 47 47 PC2
845 Asifabad Mancherial Tiryani MANGI(036 ) Mangi BEEMRALA 0 0 100 100 PC3 0 0 100 100 PC3
846 Asifabad Mancherial Tiryani MANGI(036 ) Mangi BOGDAGUDA 0 0 52 52 PC4 0 0 52 52 PC4
847 Asifabad Mancherial Tiryani MANGI(036 ) Mangi BOJIGUDA 0 0 102 102 PC3 0 0 102 102 PC3
848 Asifabad Mancherial Tiryani MANGI(036 ) Mangi GUTTAGUDA 7 0 69 76 PC3 7 0 69 76 PC3
849 Asifabad Mancherial Tiryani MANGI(036 ) Mangi KHERGUDA 0 0 86 86 PC4 0 0 86 86 PC4
850 Asifabad Mancherial Tiryani MANGI(036 ) Mangi KOLAMGUDA 23 0 76 99 PC4 23 0 76 99 PC4
851 Asifabad Mancherial Tiryani MANGI(036 ) Mangi Kuntaguda 0 0 206 206 PC2 0 0 206 206 PC2
852 Asifabad Mancherial Tiryani MANGI(036 ) Mangi Pittaguda 0 0 54 54 PC4 0 0 54 54 PC4
853 Asifabad Mancherial Tiryani MANGI(036 ) Mangi Tatiguda 0 0 104 104 PC4 0 0 104 104 PC4
854 Asifabad Mancherial Tiryani MANGI(036 ) Mangi Thallapetaguda 28 0 79 107 PC4 28 0 79 107 PC4
855 Asifabad Mancherial Tiryani BHEEMPUR(038) Manikyapur Pathaguda 0 0 50 50 PC3 0 0 50 50 PC3
856 Asifabad Mancherial Tiryani BHEEMPUR(038) Manikyapur Somaguda 0 0 72 72 PC4 0 0 72 72 PC4
857 Asifabad Mancherial Tiryani GUNDALA(039 ) Manikyapur Doddiguda 0 0 219 219 PC3 0 0 219 219 PC3
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

858 Asifabad Mancherial Tiryani GUNDALA(039 ) Manikyapur Gudiwada/Dabagu 0 0 20 20 PC4 0 0 20 20 PC4


859 Asifabad Mancherial Tiryani GUNDALA(039 ) Manikyapur Impaguda 0 0 23 23 PC3 0 0 23 23 PC3
860 Asifabad Mancherial Tiryani MANIKYAPUR(040) Manikyapur Devaiguda 21 0 73 94 PC3 21 0 73 94 PC3
861 Asifabad Mancherial Tiryani MANIKYAPUR(040) Manikyapur Ramguda 0 0 13 13 PC4 0 0 13 13 PC4
862 Asifabad Mancherial Tiryani GOENA(002) Pangidimadara KOLAMGUDA 0 0 47 47 PC4 0 0 47 47 PC4
863 Asifabad Mancherial Tiryani GOENA(002) Pangidimadara NAYAKAPUGUDA 0 0 139 139 PC2 0 0 139 139 PC2
PANGIDIMADRA(0
864 Asifabad Mancherial Tiryani Pangidimadara Bheemjiguda 31 0 89 120 PC4 31 0 89 120 PC4
04 )
PANGIDIMADRA(0
865 Asifabad Mancherial Tiryani Pangidimadara PENDRUGUDA 0 0 204 204 PC3 0 0 204 204 PC3
04 )
PANGIDIMADRA(0
866 Asifabad Mancherial Tiryani Pangidimadara PURKAGUDA 0 0 30 30 PC4 0 0 30 30 PC4
04 )
PANGIDIMADRA(0
867 Asifabad Mancherial Tiryani Pangidimadara TATIGUDA 0 0 30 30 PC4 0 0 30 30 PC4
04 )
PANGIDIMADRA(0
868 Asifabad Mancherial Tiryani Pangidimadara WADIGUDA 0 0 216 216 PC4 0 0 216 216 PC4
04 )
869 Asifabad Mancherial Tiryani ROMPALLE(037 ) Rompalle Arjunl oddi 0 0 28 28 PC3 0 0 28 28 PC3
870 Asifabad Mancherial Tiryani ROMPALLE(037 ) Rompalle GAGURUGUDA 0 0 68 68 PC4 0 0 68 68 PC4
871 Asifabad Mancherial Tiryani ROMPALLE(037 ) Rompalle GONDGUDA 0 0 62 62 PC4 0 0 62 62 PC4
872 Asifabad Mancherial Tiryani ROMPALLE(037 ) Rompalle MARKAGUDA 0 0 220 220 PC3 0 0 220 220 PC3

873 Asifabad Mancherial Tiryani ROMPALLE(037 ) Rompalle MESRAMGUDA 0 0 41 41 PC4 0 0 41 41 PC4


Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

874 Asifabad Mancherial Tiryani ROMPALLE(037 ) Rompalle MOKASIGUDA 0 0 134 134 PC3 0 0 134 134 PC3
875 Asifabad Mancherial Tiryani ROMPALLE(037 ) Rompalle RAMJIGUDA 0 0 87 87 PC4 0 0 87 87 PC4
MAINDAGUDIPE(0
876 Asifabad Mancherial Tiryani Sungapur KOLAMGUDA 0 0 162 162 FC 0 0 162 162 FC
23 )
MAINDAGUDIPE(0
877 Asifabad Mancherial Tiryani Sungapur KORLANKA 0 0 86 86 PC4 0 0 86 86 PC4
23 )
MAINDAGUDIPE(0
878 Asifabad Mancherial Tiryani Sungapur SALPALAGUDA 0 0 26 26 PC3 0 0 26 26 PC3
23 )
879 Asifabad Mancherial Tiryani SUNGAPUR(022) Sungapur PEDDAGUDA 0 0 96 96 PC3 0 0 96 96 PC3
880 Asifabad Mancherial Tiryani SUNGAPUR(022) Sungapur THOTAGUDA 0 0 13 13 PC3 0 0 13 13 PC3
CHINTAPALLE(034
881 Asifabad Mancherial Tiryani Tiryani CHINTAPALLE 59 0 116 175 FC 59 0 116 175 FC
)
DANTANPALLE(00
882 Asifabad Mancherial Tiryani Ullipitta Dorli KOLAMCOLONY 0 0 30 30 PC4 0 0 30 30 PC4
3)

883 Asifabad Mancherial Tiryani ULLIPITTA(005 ) Ullipitta Dorli JANDAGUDA 0 0 84 84 PC3 0 0 84 84 PC3

884 Asifabad Mancherial Wankidi BAMBARA(008 ) Bambara GONDUKOSARA 0 0 167 167 PC3 0 0 167 167 PC3
CHAVPANGUDA(0
885 Asifabad Mancherial Wankidi Chavpanguda PULLURA 0 0 108 108 PC4 0 0 108 108 PC4
05)
CHAVPANGUDA(0
886 Asifabad Mancherial Wankidi Chavpanguda SADAKGUDA 0 0 129 129 PC3 0 0 129 129 PC3
05)
887 Asifabad Mancherial Wankidi GUNJADA(006 ) Chavpanguda PATAGUDA 0 0 81 81 PC4 0 0 81 81 PC4
888 Asifabad Mancherial Wankidi GUNJADA(006 ) Chavpanguda PEDDAPULLARA 4 0 18 22 PC4 4 0 18 22 PC4
JAMBULDHARI(01
889 Asifabad Mancherial Wankidi Kamana KHIRET 0 0 131 131 PC3 0 0 131 131 PC3
2)
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

890 Asifabad Mancherial Wankidi KHAMANA(025 ) Kamana BADAMKAPPI 0 0 9 9 PC3 0 0 9 9 PC3


891 Asifabad Mancherial Wankidi KHAMANA(025 ) Kamana PATAGUDA 0 0 79 79 PC4 0 0 79 79 PC4
KANNERGAON(03
892 Asifabad Mancherial Wankidi Kannergaon CHILATIGUDA 0 0 55 55 PC3 0 0 55 55 PC3
7)
KANNERGAON(03
893 Asifabad Mancherial Wankidi Kannergaon KANNERGAON 0 0 893 893 PC4 0 0 893 893 PC4
7)
KANNERGAON(03
894 Asifabad Mancherial Wankidi Kannergaon ROHINIGUDA 0 0 32 32 PC3 0 0 32 32 PC3
7)
KANNERGAON(03
895 Asifabad Mancherial Wankidi Kannergaon SALPALAGUDA 0 0 87 87 PC3 0 0 87 87 PC3
7)
CHINCHPALLE(00
896 Asifabad Mancherial Wankidi Sawathi CHINCHPALLE 0 0 259 259 PC3 0 0 259 259 PC3
4)
CHINCHPALLE(00
897 Asifabad Mancherial Wankidi Sawathi KOLAMGUDA 13 0 40 53 PC3 13 0 40 53 PC3
4)
898 Asifabad Mancherial Wankidi DHABA(001) Sawathi DHABA 62 0 230 292 PC4 62 0 230 292 PC4
899 Asifabad Mancherial Wankidi SAWATHI(002) Sawathi KOLANGUDA 0 0 114 114 PC4 0 0 114 114 PC4
900 Asifabad Mancherial Wankidi GOAGAON(003) Sonapur GOEGAON 55 0 328 383 PC3 55 0 328 383 PC3
901 Asifabad Mancherial Wankidi GOAGAON(003) Sonapur MOKASIGUDA 0 0 15 15 PC4 0 0 15 15 PC4
902 Asifabad Mancherial Wankidi MAHAGAON(010 ) Sonapur GANESHPUR 16 0 150 166 PC3 16 0 150 166 PC3
903 Asifabad Mancherial Wankidi SONAPUR(009 ) Sonapur CHINCHPALLE 12 0 254 266 PC3 12 0 254 266 PC3
904 Asifabad Mancherial Wankidi SONAPUR(009 ) Sonapur POONAGUDA 0 0 83 83 PC3 0 0 83 83 PC3
905 Asifabad Mancherial Wankidi SONAPUR(009 ) Sonapur THATIGUDA 0 0 30 30 PC3 0 0 30 30 PC3
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

906 Asifabad Mancherial Wankidi KHEDEGAON(028) Velgi KHEDEGAON 0 0 157 157 PC4 0 0 157 157 PC4
907 Asifabad Mancherial Wankidi KHEDEGAON(028) Velgi MANNEGUDA 0 0 26 26 PC3 0 0 26 26 PC3
908 Asifabad Mancherial Wankidi SARKEPALLE(027) Velgi RINGANGUDA 0 0 52 52 PC3 0 0 52 52 PC3
909 Asifabad Mancherial Wankidi SARKEPALLE(027) Velgi SARKEPALLE 0 0 95 95 PC4 0 0 95 95 PC4
910 Asifabad Mancherial Wankidi VELGI(026 ) Velgi KHILATIGUDA 0 0 13 13 PC3 0 0 13 13 PC3
911 Asifabad Mancherial Wankidi VELGI(026 ) Velgi KOPAGUDA 15 0 59 74 PC3 15 0 59 74 PC3
912 Asifabad Mancherial Wankidi VELGI(026 ) Velgi SINGERPET 0 0 19 19 PC3 0 0 19 19 PC3
913 Asifabad Mancherial Wankidi VELGI(026 ) Velgi SWAYAMGUDA 0 0 59 59 PC3 0 0 59 59 PC3
914 Asifabad Mancherial Wankidi ARLI Wankidikalan LINEGUDA 0 0 107 107 PC3 0 0 107 107 PC3
915 Asifabad Mancherial Wankidi ARLI Wankidikalan MURALIGUDA 0 0 60 60 PC3 0 0 60 60 PC3
916 Asifabad Mancherial Wankidi ARLI Wankidikalan PIVOTA 0 0 87 87 PC3 0 0 87 87 PC3
917 Asifabad Mancherial Wankidi NEEMGAON(016 ) Wankidikalan BHEEMPUR 0 0 46 46 PC4 0 0 46 46 PC4
918 Asifabad Mancherial Wankidi NEEMGAON(016 ) Wankidikalan NEEMGAON 0 0 86 86 PC4 0 0 86 86 PC4
WANKIDIKHURD(0
919 Asifabad Mancherial Wankidi Wankidikalan WANKIDIKHURD 0 0 234 234 PC4 0 0 234 234 PC4
14)
920 Asifabad Mancherial Tiryani Lambadiguda Loddiguda Lambadiguda 0 0 175 175 PC2 0 0 175 175 PC2
921 Sirpur (T) Mancherial Bejjur New Yellur Yellur New Yellur 0 0 1136 1136 PC2 0 0 1136 1136 PC2
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

922 Asifabad Mancherial Asifabad Kothaguda (G) Yellaram Koutaguda (G) 610 112 62 784 FC 610 112 62 784 FC
923 Asifabad Mancherial Asifabad Siryan Mowad Mowad Siryan Mowad 61 6 31 98 FC 61 6 31 98 FC

924 Asifabad Mancherial Asifabad Shekan Gondi Ada Dasnapur Shekan Gondi 1239 681 49 1969 FC 1239 681 49 1969 FC

925 Asifabad Mancherial Tiryani Morriguda Kannepally Morriguda 713 21 191 925 PC3 713 21 191 925 PC3
926 Asifabad Mancherial Tiryani Gudipet Sungapur Gudipet 724 202 284 1210 FC 724 202 284 1210 FC
927 Asifabad Mancherial Tiryani Rompally Rompalle Rompally 2805 301 15 3121 PC3 2805 301 15 3121 PC3

928 Asifabad Mancherial Tiryani Ontimamidi Ullipitta Dorli Ontimamidi 35 83 165 283 PC3 35 83 165 283 PC3

929 Asifabad Mancherial Rebbena Rallapet Vankulam Rallapet 42 66 176 284 FC 42 66 176 284 FC
930 Asifabad Mancherial Rebbena Dharmaram Tungeda Dharmaram 1598 120 1078 2796 PC3 1598 120 1078 2796 PC3
931 Asifabad Mancherial Rebbena Rollapad Takkallapally Rollapad 512 0 151 663 PC3 512 0 151 663 PC3
932 Asifabad Mancherial Rebbena Gondguda Golleti Gondguda 393 307 113 813 FC 393 307 113 813 FC
933 Asifabad Mancherial Rebbena Pulikunta Nambala Pulikunta 877 306 317 1500 PC3 877 306 317 1500 PC3

934 Asifabad Mancherial Wankidi Wankidi Wankidikalan Wankidikalan 1026 533 456 2015 PC3 1026 533 456 2015 PC3

935 Asifabad Mancherial Asifabad Kothaguda Yellaram Koutaguda 713 21 191 925 PC3 713 21 191 925 PC3
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

936 Asifabad Mancherial Asifabad Kotha Rahapally Rahanpally Kotha Rahapally 2100 0 0 2100 PC3 2100 0 0 2100 PC3

937 Asifabad Mancherial Asifabad Dadapur Yellaram Dadapapur 290 0 0 290 PC4 290 0 0 290 PC4
938 Asifabad Mancherial Asifabad Belgaon Tumpally Belgaon 2011 235 14 2260 PC4 2011 235 14 2260 PC4

939 Asifabad Mancherial Asifabad Ippal Navegaon Yellaram Ippal Navegaon 326 181 232 739 PC3 326 181 232 739 PC3

940 Asifabad Mancherial Asifabad Nandupally Rahapally Nandupally 276 0 0 276 FC 276 0 0 276 FC
941 Asifabad Mancherial Asifabad Tumpally Tumpally Tumpally 1 98 233 332 FC 1 98 233 332 FC
942 Asifabad Mancherial Tiryani Bheemaram Tiryani Bheemaram 755 91 178 1024 FC 755 91 178 1024 FC

943 Asifabad Mancherial Tiryani Tiryani Tiryani Tiryani 1849 670 90 2609 PC4 1849 670 90 2609 PC4

944 Asifabad Mancherial Tiryani Morliguda Kannepally Morliguda 0 0 133 133 FC 0 0 133 133 FC
945 Asifabad Mancherial Wankidi Khirdi Khirdi Khirdi 241 95 160 496 FC 241 95 160 496 FC
946 Asifabad Mancherial Wankidi Kamana Kamana Khamana 482 0 350 832 PC4 482 0 350 832 PC4
947 Asifabad Mancherial Wankidi Sonapur Sonapur Sonapur 377 150 20 547 PC4 377 150 20 547 PC4
948 Asifabad Mancherial Wankidi Enagondi Sawathi Enagondi 255 37 230 522 FC 255 37 230 522 FC
949 Asifabad Mancherial Wankidi Markaguda Wankidikalan Markaguda 70 90 250 410 FC 70 90 250 410 FC
950 Asifabad Mancherial Wankidi Piperagondi Chavpanguda Piperagondi 118 0 220 338 FC 118 0 220 338 FC
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

951 Asifabad Mancherial Wankidi Gondapur Chavpanguda Gondapur 35 83 165 283 FC 35 83 165 283 FC
952 Asifabad Mancherial Wankidi Goyagoan Sonapur Goyagoan 554 288 6 848 FC 554 288 6 848 FC
953 Asifabad Mancherial Wankidi Velgi Velgi Velgi 486 27 13 526 PC3 486 27 13 526 PC3
954 Asifabad Mancherial Wankidi Naveguda Indhani Naveguda 455 6 0 461 FC 455 6 0 461 FC

955 Asifabad Mancherial Rebbena Indiramma Colony Kistapur Indiramma Colony 1182 325 90 1597 PC3 1182 325 90 1597 PC3

956 Asifabad Mancherial Rebbena Indiranagar Rebbana Indiranagar 241 95 160 496 PC3 241 95 160 496 PC3
957 Asifabad Mancherial Rebbena Nakkalaguda Rebbana Nakkalagudem 482 0 350 832 PC3 482 0 350 832 PC3
958 Asifabad Mancherial Rebbena Punjumeraguda Rebbana Punjumeraguda 378 223 124 725 PC4 378 223 124 725 PC4
959 Asifabad Mancherial Rebbena Rebbana Rebbana Rebbana 2325 646 234 3205 PC4 2325 646 234 3205 PC4
960 Asifabad Mancherial Rebbena Goleti Golleti Goleti 1323 420 1031 2774 FC 1323 420 1031 2774 FC
961 Asifabad Mancherial Tiryani Modiguda Loddiguda Modiguda 611 171 28 810 PC3 611 171 28 810 PC3

962 Asifabad Mancherial Tiryani Dampur/modiguda Loddiguda Dampur/modiguda 0 0 143 143 FC 0 0 143 143 FC

963 Bellampally Mancherial Bellampally Laxmpur Kannal Laxmipur 0 0 57 57 PC4 0 0 57 57 PC4


964 Bellampally Mancherial Bellampally Peddadubba Akenapally Peddadubba 153 0 0 153 PC3 153 0 0 153 PC3

965 Bellampally Mancherial Bellampally Pathabellampally Pathabellampally Pathabellampally 2259 FC 2259 FC


1558 246 455 1558 246 455
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

966 Bellampally Mancherial Bellampally Kannal Kannal Kannal 274 0 12 286 FC 274 0 12 286 FC
967 Bellampally Mancherial Bellampally Thengugudem Budakalan Thengugudem 379 12 0 391 FC 379 12 0 391 FC
968 Bellampally Mancherial Bellampally Bhudakalan Budakalan Budakalan 956 710 28 1694 FC 956 710 28 1694 FC
969 Bellampally Mancherial Bheemini Khajibhimpur Kajibhimpur Kajibhimpur 403 27 204 634 FC 403 27 204 634 FC
970 Bellampally Mancherial Bheemini Jajjeravelly Jajjeravelly Jajjeravelly 807 281 39 1127 FC 807 281 39 1127 FC
971 Bellampally Mancherial Kasipet Kothavaripet Komatichenu Kothavaripet 129 16 99 244 PC4 129 16 99 244 PC4

972 Bellampally Mancherial Kasipet Naikapuguda Dharmaraopet Naikapuguda 138 FC 138 FC


0 0 138 0 0 138
973 Bellampally Mancherial Nennel Nandulapally Nandulapally Nandulapally 611 171 28 810 PC3 611 171 28 810 PC3

974 Bellampally Mancherial Nennel Ghanpur Nandulapally Ghanpur 641 PC3 641 PC3
540 71 30 540 71 30
975 Bellampally Mancherial Nennel Chittapur Chittapur Chittapur 1131 156 205 1492 PC4 1131 156 205 1492 PC4
976 Bellampally Mancherial Nennel Narvaipet Metpally Narvaipet 157 95 536 788 FC 157 95 536 788 FC
977 Bellampally Mancherial Tandur Kistampet Kistampet Kistampet 393 307 113 813 FC 393 307 113 813 FC
978 Bellampally Mancherial Tandur Madaram-3 Kothapally Madaram 877 306 317 1500 PC4 877 306 317 1500 PC4
979 Bellampally Mancherial Tandur Kothapally Kothapally Kothapally 826 433 220 1479 FC 826 433 220 1479 FC
980 Bellampally Mancherial Tandur Tandur Tandur Tandur 7521 1448 157 9126 FC 7521 1448 157 9126 FC
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

981 Bellampally Mancherial Vemanpally Dasnapur Dasnapur Dasnapur 309 20 75 404 FC 309 20 75 404 FC
982 Bellampally Mancherial Vemanpally Jillleda Jilleda Jillleda 241 95 160 496 PC4 241 95 160 496 PC4
983 Bellampally Mancherial Vemanpally Lingala Lingala Lingala 482 0 350 832 PC4 482 0 350 832 PC4
984 Bellampally Mancherial Vemanpally Sumputam Sumputam Sumputam 377 150 20 547 PC4 377 150 20 547 PC4
985 Bellampally Mancherial Vemanpally Nagaram Suraram Nagaram 255 37 230 522 FC 255 37 230 522 FC
986 Bellampally Mancherial Vemanpally Neelvai Neelvai Neelvai 1681 609 83 2373 PC4 1681 609 83 2373 PC4
987 Bellampally Mancherial Vemanpally Rajaram Dasnapur Rajaram 107 0 200 307 FC 107 0 200 307 FC
988 Bellampally Mancherial Vemanpally Badampally Chamanpelly Badampally 32 75 150 257 FC 32 75 150 257 FC
989 Bellampally Mancherial Vemanpally Bommera Chamanpelly Bommera 38 60 160 258 FC 38 60 160 258 FC
990 Bellampally Mancherial Nennel Mailaram Mailaram Mailaram 1598 120 1078 2796 PC4 1598 120 1078 2796 PC4
991 Bellampally Mancherial Bheemini Dampur Jajjeravelly Dampur 0 42 167 209 PC4 0 42 167 209 PC4
992 Bellampally Mancherial Bheemini Charlapelly Janakapur Charlapally 55 5 28 88 FC 55 5 28 88 FC
993 Bellampally Mancherial Bellampally Chakepally Chakapally Chakepally 1553 476 30 2059 FC 1553 476 30 2059 FC
994 Bellampally Mancherial Bellampally Tallagurijal Gurjal Tallagurijal 724 202 284 1210 FC 724 202 284 1210 FC

995 Bellampally Mancherial Bellampally Somagudem Pathabellampally Somagudem 3121 FC 3121 FC


2805 301 15 2805 301 15
996 Bellampally Mancherial Bheemini Gollaghat Veerapur Gollaghat 388 122 0 510 PC3 388 122 0 510 PC3
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

997 Bellampally Mancherial Vemanpally Buyyaram Jilleda Buyyaram 256 200 70 526 FC 256 200 70 526 FC
998 Chennur Mancherial Chennur Sankaram Buddaram Sankaram 56 19 212 287 PC4 56 19 212 287 PC4
999 Chennur Mancherial Mandamarry Koteshwarraopally Thimmapur Koteshwarraopally 437 68 0 505 FC 437 68 0 505 FC

1000 Chennur Mancherial Mandamarry Old Thimmapur Thimmapur Thimmapur(OLD) 554 288 6 848 PC4 554 288 6 848 PC4

1001 Chennur Mancherial Mandamarry New Thimmapur Thimmapur New Thimmapur 495 30 8 533 PC4 495 30 8 533 PC4

1002 Chennur Mancherial Mandamarry Sarangapally Sarangapally Sarangapally 58 2 192 252 FC 58 2 192 252 FC
1003 Chennur Mancherial Kotapally Arjunagutta Rapanpally Arjunagutta 127 84 125 336 FC 127 84 125 336 FC
1004 Chennur Mancherial Mandamarry Bokkalagutta Thimmapur Bokkalagutta 572 258 33 863 PC4 572 258 33 863 PC4
1005 Mancherial Mancherial Dandepally Kondapur Dwaraka Kondapur 680 340 0 1020 PC3 680 340 0 1020 PC3
1006 Mancherial Mancherial Luxettipet Gampallapally Uthkur Gampallapally 2100 0 0 2100 PC3 2100 0 0 2100 PC3

1007 Mancherial Mancherial Luxettipet Muthabuchaiahpally Dowdepally Muthabuchaiahpally 290 0 0 290 PC4 290 0 0 290 PC4

1008 Mancherial Mancherial Dandepally Velganur Velganur Velganur 2011 235 14 2260 PC4 2011 235 14 2260 PC4
1009 Mancherial Mancherial Mancherial Nagaram Gadhpur Nagaram 53 32 172 257 FC 53 32 172 257 FC
1010 Sirpur (T) Mancherial Bejjur Somini Somini Somini 19 147 422 588 PC4 19 147 422 588 PC4
1011 Sirpur (T) Mancherial Bejjur Gundepally Komergaoun Gundepally 0 0 202 202 FC 0 0 202 202 FC
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

1012 Sirpur (T) Mancherial Bejjur Agarguda Penchicalpet Agarguda 446 198 41 685 FC 446 198 41 685 FC
1013 Sirpur (T) Mancherial Bejjur Bejjur Bejjur Bejjur 1843 398 240 2481 PC4 1843 398 240 2481 PC4
1014 Sirpur (T) Mancherial Dahegaon Dahegaon Dahegaon Dahegaon 1775 199 215 2189 FC 1775 199 215 2189 FC
1015 Sirpur (T) Mancherial Dahegaon Jendaguda Kothimeer Jendaguda 133 19 0 152 FC 133 19 0 152 FC
1016 Sirpur (T) Mancherial Dahegaon Devajiguda Beebra Devajiguda 136 0 0 136 FC 136 0 0 136 FC
1017 Sirpur (T) Mancherial Kaghaznagar Dathanguda Vanjari Dathanguda 256 0 0 256 FC 256 0 0 256 FC
1018 Sirpur (T) Mancherial Kaghaznagar Mosam Vallakonda Mosam 380 100 0 480 PC2 380 100 0 480 PC2
1019 Sirpur (T) Mancherial Kowtala Thatinagar Mogaddhagad Thatinagar 0 51 400 451 FC 0 51 400 451 FC
1020 Sirpur (T) Mancherial Kowtala Gangapur Gangapur Gangapur 516 173 126 815 PC4 516 173 126 815 PC4
1021 Sirpur (T) Mancherial Kowtala Ranvelly Ranvelly Ranvelly 479 245 383 1107 FC 479 245 383 1107 FC
1022 Sirpur (T) Mancherial Kowtala Muthampet Muthampet Muthampet 2157 922 155 3234 PC4 2157 922 155 3234 PC4
1023 Sirpur (T) Mancherial Sirpur (T) Venkatraopet Venkatraopet Venkatraopet 460 30 0 490 PC4 460 30 0 490 PC4
Nazrulnagar camp-
1024 Sirpur (T) Mancherial Kaghaznagar Nazrulnagar Nazrulnagar camp-9 1204 0 0 1204 PC3 1204 0 0 1204 PC3
9
1025 Sirpur (T) Mancherial Dahegaon Beebra Beebra Beebra 469 251 176 896 PC4 469 251 176 896 PC4
1026 Sirpur (T) Mancherial Dahegaon Chandrapally Chinnaraspally Chandrapally 102 171 326 599 PC4 102 171 326 599 PC4
1027 Sirpur (T) Mancherial Dahegaon Motlaguda Motlaguda Motlaguda 446 115 20 581 PC4 446 115 20 581 PC4
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

1028 Sirpur (T) Mancherial Kowtala Kanki Kanki Kanki 253 315 292 860 PC4 253 315 292 860 PC4
1029 Sirpur (T) Mancherial Kowtala Hetti Thummidi Hetti Hetti 0 100 200 300 PC3 0 100 200 300 PC3
1030 Sirpur (T) Mancherial Kowtala Ravindernagar - 1 Ravindernagar - 1 Ravindernagar - 1 17 1150 0 1167 PC4 17 1150 0 1167 PC4
1031 Sirpur (T) Mancherial Bejjur chinnasiddapur Bejjur chinnasiddapur 410 0 33 443 PC2 410 0 33 443 PC2
1032 Sirpur (T) Mancherial Bejjur Bombaiguda Bombaiguda Bombaiguda 475 265 0 740 FC 475 265 0 740 FC
1033 Sirpur (T) Mancherial Bejjur Lambadiguda Marthadi Lambadiguda 8 34 398 440 FC 8 34 398 440 FC
1034 Sirpur (T) Mancherial Bejjur Rebbana Rebbena Rebbana 50 15 300 365 FC 50 15 300 365 FC
1035 Sirpur (T) Mancherial Sirpur (T) Bareguda Dabba Bareguda 455 6 0 461 FC 455 6 0 461 FC
1036 Sirpur (T) Mancherial Sirpur (T) Dharampally Dabba Dharampally 673 0 0 673 PC4 673 0 0 673 PC4
1037 Bellampally Mancherial Kasipet Rottepally Malkapally Thirumalapur 0 0 131 131 PC4 0 0 131 131 PC4
1038 Bellampally Mancherial Kasipet Rottepally Malkapally Chikramguda 4 12 43 59 FC 4 12 43 59 FC
1039 Bellampally Mancherial Kasipet Kasipet Kasipet Peddadharmaram 10 70 40 120 FC 10 70 40 120 FC
1040 Bellampally Mancherial Kasipet Koonuru Koonuru Kondapur 60 80 205 345 PC4 60 80 205 345 PC4
1041 Bellampally Mancherial Kasipet PALLAMGUDA Pallamguda Buggaguda 20 0 295 315 FC 20 0 295 315 FC
1042 Bellampally Mancherial Kasipet GURVAPUR Mtyampally Gurvapoor 0 0 217 217 PC3 0 0 217 217 PC3
1043 Sirpur (T) Mancherial Sirpur (T) Sirpur Sirpur Sirpur(T) 6600 457 570 7627 FC 6600 457 570 7627 FC
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

1044 Mancherial Mancherial Mancherial Padthenpalle Padthenpalle Rampur 569 107 9 685 FC 569 107 9 685 FC
1045 Mancherial Mancherial Mancherial Tallapally Thallapalle Water Tank Area 1836 54 6 1896 FC 1836 54 6 1896 FC
1046 Mancherial Mancherial Mancherial Singapoor Singapoor Singapoor 1117 352 6 1475 FC 1117 352 6 1475 FC
1047 Mancherial Mancherial Mancherial Gadhpur Gadhpur Gadhpur 110 156 132 398 FC 110 156 132 398 FC
1048 Mancherial Mancherial Mancherial Narasingapur Narsingapur Narasingapur 1064 141 13 1218 PC4 1064 141 13 1218 PC4
1049 Mancherial Mancherial Dandepally Nagasamudram Nagasamudram Nagasamudram 703 201 0 904 FC 703 201 0 904 FC
PATHABELLAMPA
1050 Bellampally Mancherial Bellampally AKENAPALLY Patha Bellampally 2259 FC 2259 FC
LLY 1558 246 455 1558 246 455
1051 Bellampally Mancherial Tandur RECHINI RECHINI Rechini 2333 467 155 2955 FC 2333 467 155 2955 FC

1052 Bellampally Mancherial Bheemini KANNEPALLY Kannepally Kannepally 2780 FC 2780 FC


1818 402 560 1818 402 560
1053 Bellampally Mancherial Bheemini BHIMINI BHEEMINI Bheemini 694 406 130 1230 FC 694 406 130 1230 FC
1054 Bellampally Mancherial Bheemini BITTURUPALLY MALLIDI Bitturpally 249 108 0 357 FC 249 108 0 357 FC
1055 Sirpur (T) Mancherial Dahegaon KESLAPUR KESLAPUR Keslapur 240 287 114 641 FC 240 287 114 641 FC
1056 Sirpur (T) Mancherial Dahegaon CHINNAGUDIPET CHINNAGUDIPET Chinnagudipet 1289 224 30 1543 PC3 1289 224 30 1543 PC3
1057 Sirpur (T) Mancherial Dahegaon HATHINI HATHINI Hathini 529 380 505 1414 FC 529 380 505 1414 FC
THANGALLAPALL
1058 Sirpur (T) Mancherial Dahegaon SALIGAON Thangellapally 65 159 8 232 FC 65 159 8 232 FC
Y
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

1059 Sirpur (T) Mancherial Dahegaon RAMPUR RAMPUR Rampur 240 172 117 529 FC 240 172 117 529 FC
1060 Sirpur (T) Mancherial Dahegaon VODDUGUDA VODDUGUDA Vodduguda 870 101 43 1014 PC4 870 101 43 1014 PC4
1061 Sirpur (T) Mancherial Dahegaon PAMBAPUR LAGGAON Pambapur 177 132 145 454 PC4 177 132 145 454 PC4
BAMANAGAR-
1062 Sirpur (T) Mancherial Dahegaon CHANDRAPALLE Bamanagar 351 87 71 509 FC 351 87 71 509 FC
KOTHUNUR
1063 Sirpur (T) Mancherial Kaghaznagar BODEPALLY BODEPALLE Bodepally 289 24 0 313 PC4 289 24 0 313 PC4
1064 Sirpur (T) Mancherial Kaghaznagar ANKUSAPUR VANJARI Ankusapur 405 172 31 608 PC4 405 172 31 608 PC4
Nazrulnagar Camp-
1065 Sirpur (T) Mancherial Kaghaznagar NAZRULNAGAR NAZRULNAGAR 805 0 0 805 PC3 805 0 0 805 PC3
II
1066 Sirpur (T) Mancherial Kowtala MUTHAMPET MUTHAMPET Sirsa 722 32 0 754 FC 722 32 0 754 FC
1067 Sirpur (T) Mancherial Kowtala GUDLABORI GUDLABORI Vijayanagaram 30 300 100 430 FC 30 300 100 430 FC
1068 Sirpur (T) Mancherial Kowtala GUNDAIPETA GUNDAIPETA Gundaipet 1311 850 0 2161 PC4 1311 850 0 2161 PC4
1069 Sirpur (T) Mancherial Kowtala BABAPUR BABAPUR LAMBADIHATTI 0 0 505 505 FC 0 0 505 505 FC
1070 Sirpur (T) Mancherial Kowtala BABASAGAR BABASAGAR Babasagar 1964 656 502 3122 FC 1964 656 502 3122 FC
1071 Bellampally Mancherial Nennel Nennel Nennel Nennel 2325 641 271 3237 PC3 2325 641 271 3237 PC3

1072 Bellampally Mancherial Nennel Gudipet Jandavenkatapur Gudipet 276 FC 276 FC


43 38 195 43 38 195
1073 Bellampally Mancherial Nennel Chittapur Chittapur Jeevapur 132 47 4 183 FC 132 47 4 183 FC
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

1074 Bellampally Mancherial Nennel Potiyal Kothur Kompally 67 0 0 67 PC3 67 0 0 67 PC3


1075 Bellampally Mancherial Nennel MANNEGUDA Jangalpet Menneguda 321 274 141 736 PC4 321 274 141 736 PC4
1076 Bellampally Mancherial Nennel Konampet Konampet Konampet 331 393 280 1004 FC 331 393 280 1004 FC
1077 Bellampally Mancherial Vemanpally Kalmalpet Neelvai Kalmalpet 366 267 200 833 PC3 366 267 200 833 PC3
1078 Bellampally Mancherial Vemanpally Mulkalpet Mulkalpet Mulkalpet 787 490 130 1407 FC 787 490 130 1407 FC
1079 Bellampally Mancherial Vemanpally Neelwai Neelvai Neelwai 1681 609 83 2373 PC4 1681 609 83 2373 PC4
1080 Bellampally Mancherial Vemanpally Vemanpally Vemanpally Vemanpally 1317 187 82 1586 FC 1317 187 82 1586 FC
1081 Bellampally Mancherial Vemanpally Kytanpally Kytanpally Kytanpally 1123 230 30 1383 FC 1123 230 30 1383 FC
1082 Bellampally Mancherial Vemanpally Suraram Suraram Mamidipally 0 0 139 139 FC 0 0 139 139 FC
1083 Asifabad Mancherial Asifabad Balahanpur Movad Venkatapur 0 0 259 259 PC3 0 0 259 259 PC3
1084 Asifabad Mancherial Asifabad Yellaram Yellaram Yellaram 663 79 0 742 FC 663 79 0 742 FC
1085 Asifabad Mancherial Asifabad Chirrakunta Chirrakunta Ringanguda 37 20 53 110 FC 37 20 53 110 FC
1086 Asifabad Mancherial Asifabad Chirrakunta Chirrakunta Yapalpatty 0 0 112 112 FC 0 0 112 112 FC
1087 Asifabad Mancherial Asifabad TUMPALLY TUMPALLY Gollaguda 1 38 135 174 FC 1 38 135 174 FC
Buruguda
1088 Asifabad Mancherial Asifabad YELLARAM YELLARAM 1782 264 0 2046 FC 1782 264 0 2046 FC
(Gajulawada)
1089 Asifabad Mancherial Asifabad Balanpur Mowad Ottghat 0 0 8 32 PC3 0 0 8 32 PC3
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

1090 Asifabad Mancherial Asifabad Kapri Ada Dasnapur Gattalaguda 0 0 63 63 PC3 0 0 63 63 PC3
1091 Asifabad Mancherial Asifabad Paibanda Chirrakunta VVP Project 0 0 367 367 FC 0 0 367 367 FC
1092 Asifabad Mancherial Asifabad Appapally Rout Sankenapally Appapally 2 288 112 0 400 PC4 288 112 0 400 PC4
1093 Asifabad Mancherial Asifabad Edulawada Edulawada Edulawada 539 73 0 612 PC4 539 73 0 612 PC4
1094 Asifabad Mancherial Asifabad Nandupa Rahapally Nandupa 276 0 0 276 FC 276 0 0 276 FC
1095 Asifabad Mancherial Asifabad Gundi Gundi Gundi 1389 343 0 1732 PC4 1389 343 0 1732 PC4
1096 Asifabad Mancherial Asifabad Yellaram Yellaram Kanchukota 135 0 51 186 PC4 135 0 51 186 PC4
1097 Asifabad Mancherial Wankidi Choupanguda Chavpanguda Chavpanguda 0 0 231 231 FC 0 0 231 231 FC
Samela (Jyothiba
1098 Asifabad Mancherial Wankidi Bendara Bendara 400 16 0 416 PC4 400 16 0 416 PC4
Nagar)
1099 Asifabad Mancherial Rebbena Golleti Golleti Khairguda 127 0 361 488 FC 127 0 361 488 FC
1100 Asifabad Mancherial Rebbena Sonapur Golleti Sonapur 0 0 100 100 FC 0 0 100 100 FC
1101 Asifabad Mancherial Rebbena Golleti Golleti Duggapur 170 281 443 894 FC 170 281 443 894 FC
1102 Asifabad Mancherial Rebbena Nambala Nambala Golemguda 193 0 0 193 FC 193 0 0 193 FC
1103 Asifabad Mancherial Rebbena Golleti Golleti Rekulagudem 1000 54 30 1084 FC 1000 54 30 1084 FC
1104 Asifabad Mancherial Rebbena Kairigaon Kairigaon Kairigaon 804 64 0 868 PC3 804 64 0 868 PC3
1105 Asifabad Mancherial Rebbena Nerpally Kondapalle Nerpally 249 0 22 271 PC4 249 0 22 271 PC4
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

1106 Asifabad Mancherial Rebbena Vankulam Vankulam Vankulam 803 209 0 1012 FC 803 209 0 1012 FC
Lethangudem(Indira
1107 Asifabad Mancherial Rebbena Rebbena Rebbana 49 0 131 180 FC 49 0 131 180 FC
nagar)
SC Colony
1108 Asifabad Mancherial Rebbena Narayanapur Narayanapur 870 323 96 1289 FC 870 323 96 1289 FC
(Narayanapur)
1109 Asifabad Mancherial Rebbena Gangapur Gangapur Gangapur 1412 289 23 1724 PC4 1412 289 23 1724 PC4

1110 Asifabad Mancherial Rebbena Narayanapur Narayanapur Naryanapur 870 323 96 1289 FC 870 323 96 1289 FC
Amruthguda/Gondu
1111 Asifabad Mancherial Tiryani Loddiguda Loddiguda 0 0 57 57 PC4 0 0 57 57 PC4
guda
Nagaguda
1112 Asifabad Mancherial Tiryani Loddiguda Loddiguda 153 0 0 153 PC3 153 0 0 153 PC3
/Loddiguda
Kolamguda
1113 Asifabad Mancherial Tiryani Loddiguda Loddiguda 0 0 47 47 PC2 0 0 47 47 PC2
(Ragavapur)
Gonduguda
1114 Asifabad Mancherial Tiryani Loddiguda Loddiguda 0 0 57 57 PC4 0 0 57 57 PC4
(Ragavapur)
Seetharamthanda
1115 Asifabad Mancherial Tiryani Loddiguda Loddiguda 0 0 57 57 PC4 0 0 57 57 PC4
(Loddiguda)
1116 Asifabad Mancherial Tiryani Mangi Mangi Bonderguda 0 0 57 57 PC4 0 0 57 57 PC4
1117 Asifabad Mancherial Tiryani Mangi Mangi Bheempur 0 0 100 100 PC3 0 0 100 100 PC3
Gonduguda
1118 Asifabad Mancherial Tiryani Sungapur Sungapur 0 0 162 162 FC 0 0 162 162 FC
(Dhanpur)
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

Kolamguda
1119 Asifabad Mancherial Tiryani Sungapur Sungapur 0 0 162 162 FC 0 0 162 162 FC
(Dhanpur)
1120 Asifabad Mancherial Tiryani Ginnedhari Ginnedhari Laxmipur 131 0 340 471 PC4 131 0 340 471 PC4

1121 Asifabad Mancherial Tiryani Pangidimadara Pangidimadara Rajaguda 0 0 188 188 FC 0 0 188 188 FC

1122 Asifabad Mancherial Tiryani Pangidimadara Pangidimadara Parchakiguda 0 0 30 30 PC4 0 0 30 30 PC4

1123 Asifabad Mancherial Tiryani Mangi Mangi Pulsingh Thanda 0 0 29 29 PC2 0 0 29 29 PC2

1124 Asifabad Mancherial Tiryani Edulapad Gambeeraopet Chinna Aredpally 9 0 233 242 FC 9 0 233 242 FC

1125 Asifabad Mancherial Tiryani Mangi Mangi Mangi 0 0 131 131 FC 0 0 131 131 FC
1126 Asifabad Mancherial Tiryani Gundala Manikyapur Gundala 0 0 354 354 PC4 0 0 354 354 PC4
1127 Asifabad Mancherial Tiryani Loddiguda Loddiguda Ragavapur 0 0 153 153 FC 0 0 153 153 FC

1128 Asifabad Mancherial Tiryani Tiryani Tiryani Tiryani (Bheempur) 326 181 232 739 PC3 326 181 232 739 PC3

1129 Bellampally Mancherial Kasipet Thirumalapur Malkapally Patha Thirumalapur 131 131
0 0 131 PC4 0 0 131 PC4
1130 Bellampally Mancherial Kasipet Sonapur Sonapur Sonapur 6 0 323 329 FC 6 0 323 329 FC
1131 Bellampally Mancherial Kasipet Peddapur Devapur PEDDAPUR 0 0 274 274 FC 0 0 274 274 FC
1132 Bellampally Mancherial Kasipet Komatichenu Komatichenu REGULAGUDA 8 0 358 366 FC 8 0 358 366 FC
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

1133 Bellampally Mancherial Kasipet Varipet Komatichenu VARIPET 72 16 37 125 FC 72 16 37 125 FC


1134 Bellampally Mancherial Kasipet Venkatapur Sonapur VENKATAPUR 117 51 146 314 FC 117 51 146 314 FC
1135 Bellampally Mancherial Kasipet Venkatapur Sonapur LAXMIPUR 0 0 210 210 FC 0 0 210 210 FC

1136 Bellampally Mancherial Bellampally Akenapally AKENAPALLY BUTCHAIAHPALLY 351 FC 351 FC


351 0 0 351 0 0

1137 Bellampally Mancherial Bellampally Akenapally AKENAPALLY LINGAPUR 534 FC 534 FC


332 36 166 332 36 166

1138 Bellampally Mancherial Bellampally Budakurd BUDHAKURD IPPAGUDEM 263 FC 263 FC


263 0 0 263 0 0

1139 Bellampally Mancherial Bellampally Budakurd BUDHAKURD KASIREDDIPALLI 538 FC 538 FC


522 16 0 522 16 0
BC HOUSING
1140 Bellampally Mancherial Bellampally Chandravelly CHANDRAVELLY 290 FC 290 FC
COLONY 249 0 41 249 0 41

1141 Bellampally Mancherial Bellampally Gujral GURJAL LAMBADITHANDA 405 FC 405 FC


280 44 81 280 44 81

1142 Bellampally Mancherial Bellampally Budhakalan GURJAL TENUGUGUDEM 183 FC 183 FC


183 0 0 183 0 0
1143 Bellampally Mancherial Bellampally Ankusam Kannal GONDUGUDA 8 0 93 101 FC 8 0 93 101 FC

PATHA
1144 Bellampally Mancherial Bellampally Akenapally PERKAPALLY 623 FC 623 FC
PERKAPALLY 555 68 0 555 68 0
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

SC HOUSING
1145 Bellampally Mancherial Bellampally Perkapally PERKAPALLY 232 FC 232 FC
COLONY 81 151 0 81 151 0
1146 Bellampally Mancherial Tandur Choutapally Choutapally Pochemapally 163 0 0 163 PC3 163 0 0 163 PC3
1147 Bellampally Mancherial Tandur Abbapur Kothapally Abbapur 0 0 163 163 FC 0 0 163 163 FC
Achulapur (SC
1148 Bellampally Mancherial Tandur Achulapur Achulapur 1789 886 224 2899 FC 1789 886 224 2899 FC
Colony)
1149 Bellampally Mancherial Tandur Tandur Tandur VenuNagar 320 40 76 436 FC 320 40 76 436 FC
1150 Bellampally Mancherial Tandur Boyapally Choutapally BARLAGUDEM 214 0 0 214 FC 214 0 0 214 FC
1151 Bellampally Mancherial Tandur Chandrapally Dwarakapur Gopalraopet 155 75 12 242 FC 155 75 12 242 FC
1152 Bellampally Mancherial Tandur Dwarakapur Dwarakapur Dwarakapur 442 52 0 494 FC 442 52 0 494 FC
1153 Bellampally Mancherial Tandur Kistampet Kistampet Thangallapally 2013 218 106 2337 FC 2013 218 106 2337 FC
1154 Bellampally Mancherial Tandur Rechini Rechini Barepally 389 0 0 389 FC 389 0 0 389 FC
1155 Bellampally Mancherial Tandur Rechini Rechini Gajjalapally 296 0 85 381 FC 296 0 85 381 FC
1156 Bellampally Mancherial Tandur Tandur Tandur Neelaiahpally 280 83 23 386 FC 280 83 23 386 FC
1157 Bellampally Mancherial Bheemini Laxmipur Laxmipur Laxmipur 343 149 0 492 PC4 343 149 0 492 PC4
1158 Bellampally Mancherial Bheemini Jankapur Janakapur Charkapally 55 5 28 88 FC 55 5 28 88 FC
Rebbana (SC
1159 Bellampally Mancherial Bheemini Rebbana Rebbana 910 FC 910 FC
Colony) 394 292 224 394 292 224
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

1160 Bellampally Mancherial Bheemini Muthapur Rebbana Anandapur 161 124 45 330 FC 161 124 45 330 FC
1161 Bellampally Mancherial Bheemini Polampally Veegaon Polampally 436 162 0 598 FC 436 162 0 598 FC
1162 Bellampally Mancherial Bheemini Veerapur Veerapur Khajipally 160 0 0 160 FC 160 0 0 160 FC
1163 Bellampally Mancherial Bheemini Surjapur Venkatapur Jangampally 16 110 210 336 FC 16 110 210 336 FC
1164 Bellampally Mancherial Bheemini Metpally Metpally Kannaigudem 118 66 230 414 FC 118 66 230 414 FC
1165 Bellampally Mancherial Bheemini Metpally Metpally Dolegudem 80 66 230 376 FC 80 66 230 376 FC
1166 Sirpur (T) Mancherial Sirpur (T) Tonkini Laxmipur Tonkini 355 148 0 503 PC4 355 148 0 503 PC4
1167 Sirpur (T) Mancherial Sirpur (T) Adapally Dabba Adapally 84 28 364 476 FC 84 28 364 476 FC
1168 Sirpur (T) Mancherial Sirpur (T) Navegaon Venkatraopet Navegaon 400 370 300 1070 PC3 400 370 300 1070 PC3
1169 Sirpur (T) Mancherial Sirpur (T) Dabba Dabba Dabba 586 444 221 1251 FC 586 444 221 1251 FC
1170 Sirpur (T) Mancherial Bejjur Elkapally (P) Elkapally (P) Sanjeev Nagar 205 239 241 685 PC4 205 239 241 685 PC4
1171 Sirpur (T) Mancherial Bejjur Rudrapur Rudrapur Rudrapur 1262 262 179 1703 PC4 1262 262 179 1703 PC4
1172 Sirpur (T) Mancherial Bejjur Rebbena Rebbena Kothaguda 477 14 19 510 FC 477 14 19 510 FC
1173 Sirpur (T) Mancherial Bejjur Katepally Pothapally Kasipet 0 0 203 203 FC 0 0 203 203 FC
1174 Sirpur (T) Mancherial Bejjur Out sarangapally Out sarangapally Andugulaguda 0 0 547 547 PC3 0 0 547 547 PC3
1175 Sirpur (T) Mancherial Bejjur Moogavally Moogavally Moogavally 11 0 446 457 FC 11 0 446 457 FC
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

1176 Sirpur (T) Mancherial Bejjur Kammargaon Kammargaon Kammargaon 40 76 278 394 FC 40 76 278 394 FC
1177 Sirpur (T) Mancherial Bejjur Koyapally Gudem Koyapally 113 30 246 389 FC 113 30 246 389 FC
1178 Sirpur (T) Mancherial Bejjur Kethini Dimda Kethini 0 0 204 204 FC 0 0 204 204 FC
1179 Sirpur (T) Mancherial Bejjur Chittam Dimda Chittam 0 48 118 166 FC 0 48 118 166 FC
1180 Sirpur (T) Mancherial Bejjur Bombaiguda Bombaiguda Motlaguda 207 0 13 220 FC 207 0 13 220 FC
1181 Sirpur (T) Mancherial Bejjur Bejjur Bejjur Rangapur 12 0 46 58 FC 12 0 46 58 FC
1182 Sirpur (T) Mancherial Bejjur Bejjur Bejjur KAILASHNAGAR 1843 398 240 2481 PC4 1843 398 240 2481 PC4
1183 Sirpur (T) Mancherial Bejjur Somini Somini Garreguda 0 0 250 250 PC4 0 0 250 250 PC4
1184 Sirpur (T) Mancherial Bejjur Ootsarangapally Ootsarangapally Sulugupally 0 251 625 876 FC 0 251 625 876 FC
1185 Sirpur (T) Mancherial Bejjur Out Sarangapally Out Sarangapally Out Sarangapally 162 286 881 1329 FC 162 286 881 1329 FC
1186 Sirpur (T) Mancherial Bejjur Out Sarangapally Ootsarangapally Kuntalamanepally 28 59 426 513 FC 28 59 426 513 FC
1187 Sirpur (T) Mancherial Bejjur Mujnampally Munjampally Kuntalamanepally 28 59 426 513 FC 28 59 426 513 FC
1188 Sirpur (T) Mancherial Bejjur Gabbai Kushnepally Gabbai 5 36 237 278 FC 5 36 237 278 FC
1189 Sirpur (T) Mancherial Bejjur Bombaiguda Bombaiguda Errakunta 0 0 193 193 FC 0 0 193 193 FC
1190 Sirpur (T) Mancherial Bejjur Karjavelly Karjavelly Karjavelly 1017 219 505 1741 FC 1017 219 505 1741 FC
1191 Sirpur (T) Mancherial Bejjur Papanpet Papanpet Papanpet 981 280 249 1510 FC 981 280 249 1510 FC
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

1192 Sirpur (T) Mancherial Kowtala Babapur Babapur Babapur 663 105 182 950 FC 663 105 182 950 FC
1193 Sirpur (T) Mancherial Kowtala Balaji Ankoda Balaji Ankoda Balaji Ankoda 1067 495 46 1608 FC 1067 495 46 1608 FC
Chintalamannepall
1194 Sirpur (T) Mancherial Kowtala Chintalamannepally Chintalamannepally 1260 706 465 2431 PC4 1260 706 465 2431 PC4
y
1195 Sirpur (T) Mancherial Kowtala Korisini Gangapur Korisini 216 101 182 499 FC 216 101 182 499 FC
1196 Sirpur (T) Mancherial Kowtala Gudlabori Gudlabori Gudlabori 80 315 1084 1479 FC 80 315 1084 1479 FC
1197 Sirpur (T) Mancherial Kowtala Nagepally Gudlabori Nagepally 0 0 451 451 FC 0 0 451 451 FC
1198 Sirpur (T) Mancherial Kowtala Gurudpet Gurudpet Gurudpet 892 101 242 1235 PC4 892 101 242 1235 PC4
1199 Sirpur (T) Mancherial Kowtala Koyagudem Gurudpet Koyagudem 0 0 234 234 FC 0 0 234 234 FC
1200 Sirpur (T) Mancherial Kowtala Kowtala Kowtala Kowtala 1070 570 200 1840 PC4 1070 570 200 1840 PC4
1201 Sirpur (T) Mancherial Kowtala Kowtala Kowtala Nadeemabad 38 165 315 518 FC 38 165 315 518 FC
1202 Sirpur (T) Mancherial Kowtala Mogaddhagad Mogaddhagad Mogaddhagad 1326 244 233 1803 PC4 1326 244 233 1803 PC4
1203 Sirpur (T) Mancherial Kowtala Sandgaon Sandgaon Kouti 362 27 0 389 FC 362 27 0 389 FC
1204 Sirpur (T) Mancherial Kowtala Thalodi Thalodi Dhanurhatti 0 80 141 221 FC 0 80 141 221 FC
1205 Sirpur (T) Mancherial Kowtala Thalodi Thalodi Thalodi 626 491 202 1319 PC4 626 491 202 1319 PC4
1206 Sirpur (T) Mancherial Kowtala Thatepalle Thatepalle Bandelhetty 615 30 53 698 FC 615 30 53 698 FC
1207 Sirpur (T) Mancherial Kowtala Thatepalle Thatepalle Bevaretti 210 46 56 312 PC3 210 46 56 312 PC3
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

1208 Sirpur (T) Mancherial Kowtala Thatepalle Thatepalle Thatepalle 339 35 55 429 FC 339 35 55 429 FC
1209 Sirpur (T) Mancherial Kowtala Babapur Babapur Goppagudem 62 0 95 157 FC 62 0 95 157 FC
1210 Sirpur (T) Mancherial Kowtala Gurudupet Gurudupet Ippalagudem 44 72 102 218 FC 44 72 102 218 FC
1211 Sirpur (T) Mancherial Kowtala Kannepally Kannepally Pathakannepally 20 20 62 102 PC3 20 20 62 102 PC3
1212 Sirpur (T) Mancherial Kowtala Thummidihetti Thummidihetti PP Rao Nagar 200 200 350 750 FC 200 200 350 750 FC
1213 Sirpur (T) Mancherial Dahegaon Madavelly Hathini Aithapally 62 36 157 255 FC 62 36 157 255 FC
1214 Sirpur (T) Mancherial Dahegaon Kalwada Kunchavelly Kalwada 197 144 532 873 FC 197 144 532 873 FC
1215 Sirpur (T) Mancherial Dahegaon Kunchavelly Kunchavelly Kunchavelly 1172 204 457 1833 PC4 1172 204 457 1833 PC4
1216 Sirpur (T) Mancherial Dahegaon Brahman Chinchal Odduguda Brahman Chinchal 265 76 101 442 FC 265 76 101 442 FC
1217 Sirpur (T) Mancherial Dahegaon Digda Rampur Digda 0 22 248 270 FC 0 22 248 270 FC
1218 Sirpur (T) Mancherial Dahegaon Teeparagaon Rampur Teeparagaon 0 0 105 105 PC3 0 0 105 105 PC3
1219 Sirpur (T) Mancherial Dahegaon Ravulapally Motlaguda Ravulapally 5 0 243 248 FC 5 0 243 248 FC
1220 Sirpur (T) Mancherial Dahegaon Chedvai Chedvai Chedvai 1309 301 90 1700 FC 1309 301 90 1700 FC
1221 Sirpur (T) Mancherial Dahegaon Chedvai Chedvai Darugupally 526 0 87 613 FC 526 0 87 613 FC
1222 Sirpur (T) Mancherial Dahegaon Chinnaraspally Chinnaraspally Chinnaraspally 626 164 40 830 FC 626 164 40 830 FC
Kalwada (RR
1223 Sirpur (T) Mancherial Dahegaon Hathini Hathini 300 250 150 700 FC 300 250 150 700 FC
Camp)
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

1224 Sirpur (T) Mancherial Dahegaon Madavelly Hathini Madavelly 200 0 51 251 FC 200 0 51 251 FC
1225 Sirpur (T) Mancherial Dahegaon Inam Inam Inam 1609 375 101 2085 PC4 1609 375 101 2085 PC4
1226 Sirpur (T) Mancherial Dahegaon Gorregutta Ityala Gorregutta 172 46 0 218 PC4 172 46 0 218 PC4
1227 Sirpur (T) Mancherial Dahegaon Ityala Ityala Ityala 990 183 87 1260 FC 990 183 87 1260 FC
1228 Sirpur (T) Mancherial Dahegaon Borlakunta Kothimeer Nadimiguda 72 0 0 72 PC4 72 0 0 72 PC4
1229 Sirpur (T) Mancherial Dahegaon Kunchavelly Kunchavelly Dubbapally 353 0 0 353 FC 353 0 0 353 FC
1230 Sirpur (T) Mancherial Dahegaon Laggaon Laggaon Laggaon 369 70 0 439 FC 369 70 0 439 FC
1231 Sirpur (T) Mancherial Dahegaon Pedda Thimmapur Saligaon Pedda Thimmapur 129 6 0 135 PC4 129 6 0 135 PC4
1232 Sirpur (T) Mancherial Kaghaznagar Narapur Vanjari Narapur 0 0 51 51 PC2 0 0 51 51 PC2
1233 Sirpur (T) Mancherial Kaghaznagar Vallakonda Valla konda Nama Nagar 136 193 166 495 PC2 136 193 166 495 PC2
1234 Sirpur (T) Mancherial Kaghaznagar Malini Malini Chinna Malini 0 0 108 108 FC 0 0 108 108 FC
1235 Sirpur (T) Mancherial Kaghaznagar Maredpalle Malini Line Guda 98 0 45 143 PC4 98 0 45 143 PC4
1236 Sirpur (T) Mancherial Kaghaznagar Maredpalle Malini Navigaon 0 0 89 89 FC 0 0 89 89 FC
1237 Sirpur (T) Mancherial Kaghaznagar Gondi Vanjari Dharigaon 0 0 163 163 PC4 0 0 163 163 PC4
1238 Sirpur (T) Mancherial Kaghaznagar Regulaguda Kosini Ootpally 0 0 161 161 FC 0 0 161 161 FC
1239 Sirpur (T) Mancherial Kaghaznagar Chinthaguda Chinthaguda Chinthaguda 1334 0 0 1334 FC 1334 0 0 1334 FC
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

1240 Sirpur (T) Mancherial Kaghaznagar Chinthaguda Chinthaguda Balgala 290 0 0 290 FC 290 0 0 290 FC
1241 Sirpur (T) Mancherial Kaghaznagar Easgaon Easgaon Tenuguguda 194 0 0 194 FC 194 0 0 194 FC
1242 Sirpur (T) Mancherial Kaghaznagar Kadamba Mosam Kadamba 244 0 318 562 FC 244 0 318 562 FC
1243 Sirpur (T) Mancherial Kaghaznagar Kosini Kosini NGO's Colony 291 0 0 291 FC 291 0 0 291 FC
1244 Sirpur (T) Mancherial Kaghaznagar Kosini Kosini Kosini 800 101 110 1011 FC 800 101 110 1011 FC
1245 Sirpur (T) Mancherial Kaghaznagar Kosini Kosini Pardanguda 98 0 20 118 FC 98 0 20 118 FC
1246 Sirpur (T) Mancherial Kaghaznagar Bareguda Bareguda Danthanguda 256 0 0 256 FC 256 0 0 256 FC
1247 Sirpur (T) Mancherial Kaghaznagar Boregaon Bodapally Boregaon 81 15 6 102 PC3 81 15 6 102 PC3
1248 Sirpur (T) Mancherial Kaghaznagar Jaganthapur Bodapally Jarvejigudem 110 0 0 110 PC4 110 0 0 110 PC4
1249 Sirpur (T) Mancherial Kaghaznagar Chinthaguda Koyawagu Koyawagu 2059 1329 0 3388 PC4 2059 1329 0 3388 PC4
Panchasheela
1250 Sirpur (T) Mancherial Kaghaznagar Easgaon Andavelly 253 0 0 253 FC 253 0 0 253 FC
Nagar
1251 Sirpur (T) Mancherial Kaghaznagar Mosam Mosam Bapu Nagar 108 0 0 108 FC 108 0 0 108 FC
1252 Sirpur (T) Mancherial Kaghaznagar Nagampet Nagampet Bogada Gudem 239 0 0 239 PC4 239 0 0 239 PC4
1253 Sirpur (T) Mancherial Kaghaznagar Nagampet Nagampet Nagampet 158 0 33 191 FC 158 0 33 191 FC
1254 Sirpur (T) Mancherial Kaghaznagar Nazrulnagar Nazrul Nagar Nazrul Nagar 696 0 0 696 PC4 696 0 0 696 PC4
Nazrul Nagar
1255 Sirpur (T) Mancherial Kaghaznagar Nazrulnagar Nazrul Nagar 962 0 0 962 PC4 962 0 0 962 PC4
Camp-10
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

Nazrul Nagar
1256 Sirpur (T) Mancherial Kaghaznagar Nazrulnagar Nazrul Nagar 399 0 0 399 PC4 399 0 0 399 PC4
Camp-11
Nazrul Nagar
1257 Sirpur (T) Mancherial Kaghaznagar Nazrulnagar Nazrul Nagar 1003 0 0 1003 PC4 1003 0 0 1003 PC4
Camp-12
Nazrul Nagar
1258 Sirpur (T) Mancherial Kaghaznagar Nazrulnagar Nazrul Nagar 776 0 0 776 PC3 776 0 0 776 PC3
Camp-4
Nazrul Nagar
1259 Sirpur (T) Mancherial Kaghaznagar Nazrulnagar Nazrul Nagar 1292 0 0 1292 PC3 1292 0 0 1292 PC3
Camp-5
Nazrul Nagar
1260 Sirpur (T) Mancherial Kaghaznagar Nazrulnagar Nazrul Nagar 538 0 0 538 PC4 538 0 0 538 PC4
Camp-8
1261 Sirpur (T) Mancherial Kaghaznagar Guntlapet Pothapalle Gundlapet 469 0 0 469 PC4 469 0 0 469 PC4
1262 Sirpur (T) Mancherial Kaghaznagar Nandiguda Vanjari Nandiguda 309 0 0 309 FC 309 0 0 309 FC

1263 Mancherial Mancherial Mancherial Nagaram Gadhpur Chinna Gopalpur 0 0 281 281 FC 0 0 281 281 FC

1264 Mancherial Mancherial Mancherial Ryali Gadhpur Morriguda (Ryalli) 186 0 83 269 FC 186 0 83 269 FC

1265 Mancherial Mancherial Mancherial Ghadpur Gadhpur New Ghadpur 0 0 59 59 FC 0 0 59 59 FC


1266 Mancherial Mancherial Mancherial Donabanda Donabanda Donabanda 1654 721 14 2389 PC4 1654 721 14 2389 PC4
1267 Mancherial Mancherial Mancherial Subbapalle Hazipur Tikkanpally 1028 464 0 1492 PC4 1028 464 0 1492 PC4
1268 Mancherial Mancherial Mancherial Rapally Rapally Rapally (SC Colony) 1197 620 0 1817 FC 1197 620 0 1817 FC
1269 Mancherial Mancherial Mancherial Mulkala Mulkala Vagoddupally 619 0 33 652 PC3 619 0 33 652 PC3
1270 Mancherial Mancherial Mancherial Vempally Vempally Vempally 1513 230 12 1755 FC 1513 230 12 1755 FC
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

1271 Mancherial Mancherial Dandepally Mutyampet Kovvichelma Mutyampet 797 209 29 1035 FC 797 209 29 1035 FC
1272 Mancherial Mancherial Dandepally Kavvichelma Kovvichelma Rajampet 356 0 12 368 PC3 356 0 12 368 PC3

1273 Mancherial Mancherial Dandepally Kavvichelma Kovvichelma Kotha Kommuguda 300 0 82 382 FC 300 0 82 382 FC

1274 Mancherial Mancherial Dandepally Venkatapur Nelki Venkatapur Yellaiahpally 411 171 0 582 FC 411 171 0 582 FC

1275 Mancherial Mancherial Dandepally Mamidipally Mamidipally Kotha Mamidipally 545 61 0 606 PC2 545 61 0 606 PC2

1276 Mancherial Mancherial Dandepally Lingapur Lingapur Lingapur 429 477 746 1652 FC 429 477 746 1652 FC
1277 Mancherial Mancherial Dandepally Allipur Gudierevu Allipur 366 128 63 557 FC 366 128 63 557 FC
1278 Mancherial Mancherial Dandepally Mamidipally Dharmaraopet Dharmaraopet 279 318 0 597 FC 279 318 0 597 FC

Narsapur (SC
1279 Mancherial Mancherial Dandepally Narsapur Narsapur 951 253 0 1204 PC2 951 253 0 1204 PC2
Colony)

1280 Mancherial Mancherial Dandepally Nambal Nambala Rasapally 374 0 48 422 FC 374 0 48 422 FC
1281 Mancherial Mancherial Dandepally Gudem Gudem Rangampally 299 0 0 299 FC 299 0 0 299 FC
1282 Mancherial Mancherial Dandepally Gudem Gudem Gudem 1638 296 0 1934 PC4 1638 296 0 1934 PC4
1283 Mancherial Mancherial Dandepally Kannepally Kannepally Kannepally 1198 266 0 1464 PC3 1198 266 0 1464 PC3
1284 Mancherial Mancherial Dandepally Kondapur Thallapet Naikapuguda 136 0 0 136 PC2 136 0 0 136 PC2
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

1285 Mancherial Mancherial Dandepally Rebbanapally Rebbanpally Chakaliguda 31 0 0 31 FC 31 0 0 31 FC


1286 Mancherial Mancherial Dandepally Rebbanapally Rebbanpally Ippalaguda 0 0 112 112 FC 0 0 112 112 FC
1287 Chennur Mancherial Chennur Asnad Asnad Othukulapally 378 136 58 572 FC 378 136 58 572 FC

1288 Chennur Mancherial Chennur Chinthalapally Chinthalapally Chinthalapally 289 76 140 505 FC 289 76 140 505 FC

1289 Chennur Mancherial Chennur Somanpally Somanpally Dubbapally 207 0 0 207 PC3 207 0 0 207 PC3

1290 Chennur Mancherial Jaipur Shivvaram Shivaram Shivaram 1074 338 7 1419 FC 1074 338 7 1419 FC
1291 Chennur Mancherial Jaipur Kundaram Kundaram Kundaram 1421 824 23 2268 FC 1421 824 23 2268 FC
1292 Chennur Mancherial Jaipur Maddikal Maddikal Elkeshwaram 305 0 35 340 FC 305 0 35 340 FC
1293 Chennur Mancherial Kotapally Shetpally Shetpally Shetpally 315 178 30 523 PC4 315 178 30 523 PC4
Brahmandlapally
1294 Chennur Mancherial Kotapally Brahmandlapally Nakkalapally 88 42 178 308 FC 88 42 178 308 FC
Nakkalapally
1295 Chennur Mancherial Kotapally Pullagaon Pullagaon Pullagaon 607 315 87 1009 FC 607 315 87 1009 FC
1296 Chennur Mancherial Kotapally Annaram Annaram Annaram 1049 611 58 1718 PC4 1049 611 58 1718 PC4
1297 Chennur Mancherial Kotapally Jangaon Jangaon Jangaon 850 30 21 901 PC4 850 30 21 901 PC4
1298 Chennur Mancherial Kotapally Sarvaipet Sarvaipet Sarvaipet 299 351 393 1043 PC3 299 351 393 1043 PC3
1299 Chennur Mancherial Mandamarry SARANGAPALLE SARANGAPALLE SANDRONIPALLE 58 2 192 252 FC 58 2 192 252 FC
Population -SE Population -MIS

Status of
Sl Constituen the Hab as Status
Division Mandal Village Gram Panchayat Habitation
No cy per Water -MIS
Plain SC ST Total Soft-SE Plain SC ST Total

1300 Chennur Mancherial Mandamarry SARANGAPALLE SARANGAPALLE THURKAPALLE 369 0 0 369 FC 369 0 0 369 FC

1301 Chennur Mancherial Mandamarry KYETHENPALLE KYETHENPALLE DUBBAPALLI 599 0 0 599 PC4 599 0 0 599 PC4

1302 Chennur Mancherial Mandamarry KYETHENPALLE KYETHENPALLE KURMAPALLI 628 23 0 651 PC3 628 23 0 651 PC3

1303 Chennur Mancherial Mandamarry PONNARAM PONNARAM ADILPET 1162 88 53 1303 FC 1162 88 53 1303 FC
1304 Chennur Mancherial Chennur Suddala Suddala Suddala 402 180 157 739 FC 402 180 157 739 FC
1305 Chennur Mancherial Kotapally Parpally Parpally Parpally 814 581 144 1539 FC 814 581 144 1539 FC
Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
40 7 5 PWS SUB-Surface Bore well - - - - 0 - FC 52 40 20 Bore well
Aug. to APRWSSP
40 22 18 pws Sub-Surface Open well - - 1 - FC 86 60 30 -
SVS (WB)
40 9 8 PWS SUB-Surface Bore well - - - - 0 - FC 61 40 20 Bore well

40 4 3 - SUB-Surface Bore well - - - - 0 - FC 17 0 20 Bore well

40 2 2 MPWS SUB-Surface Bore well - - - - 0 - FC 8 0 10 Bore well

40 4 3 PWS SUB-Surface Bore well - - -- -- 0 - FC 41 40 40 -

40 3 3 PWS SUB-Surface Bore well - - New SVS WB 10.00 PC2 PC2 19 10 10 Bore well

40 4 2 - SUB-Surface Bore well - - - - 0 - PC2 30 0 30 Bore well

40 16 10 PWS SUB-Surface Bore well - - - - 0 - FC 13 0 - -

Aug. to APRWSSP
40 20 15 PWS SUB-Surface Bore well - - 1 - FC 138 40 70 Bore well
SVS (WB)
Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

40 20 15 PWS SUB-Surface Bore well - - - - 0 - FC 119 40 60 Bore well


40 2 1 PWS SUB-Surface Bore well - - - - 0 - PC2 8 0 10 Bore well
40 6 5 PWS SUB-Surface Bore well -- -- - - 0 - FC 9 0 - Bore well
Aug. to
40 11 8 PWS SUB-Surface Bore well - - NRDWP 8.00 FC FC 18 60 20 Bore well
SVS
40 3 3 PWS SUB-Surface Bore well - - - - 0 - FC 13 0 - -
40 14 12 PWS SUB-Surface Bore well - - - - 0 - FC 62 40 20 Bore well
Aug. to
40 1 1 MPWS SUB-Surface Bore well - - NRDWP 8 PC4 PC4 19 0 20 Bore well
SVS
40 1 1 MPWS SUB-Surface Bore well - - - - 0 - FC 11 0 10 Bore well
40 14 10 PWS SUB-Surface Bore well - - - - 0 - PC4 113 40 60 Bore well
Aug. to APRWSSP
40 7 5 PWS SUB-Surface Bore well - - 1 - FC 18 40 - Bore well
SVS (WB)
40 15 10 PWS SUB-Surface Bore well - - - - 0 - PC4 101 40 40 Bore well
Aug. to
40 5 4 PWS SUB-Surface Bore well - - NRDWP 4 PC4 PC4 9 40 - Bore well
SVS
40 3 3 PWS SUB-Surface Bore well - - - - 0 - FC 75 60 20 Bore well
Augmentati
40 13 10 PWS Sub-Surface Bore well 0 0 WB 2.0 PC4 PC4 73 40 40 Bore well
on
40 3 2 PWS Sub-Surface Bore well 0 0 0 - 0 FC FC 37 40 0 Openwell

40 3 2 PWS Sub-Surface Bore well 0 0 0 - 0 FC FC 5 40 0 Bore well


Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

Augmentati
40 20 18 PWS Sub-Surface Bore well 0 0 WB 2.0 PC4 PC4 73 40 40 Bore well
on
40 4 3 PWS Sub-Surface Bore well 0 0 0 - 0 FC FC 21 40 0 Bore well
40 6 6 PWS Sub-Surface Bore well 0 0 0 - 0 FC FC 26 40 0 Bore well
40 5 3 MPWS Sub-Surface Bore well 0 0 0 - 0 FC FC 11 10 10 Bore well
40 11 9 PWS Sub-Surface Bore well 0 0 0 - 0 FC FC 55 40 20 Bore well
40 30 26 PWS Sub-Surface Bore well 0 0 0 - 0 FC FC 208 100 90 Bore well
40 4 3 MPWS Sub-Surface Bore well 0 0 0 - 0 FC FC 26 20 10 Bore well
40 7 4 MPWS Sub-Surface Bore well 0 0 0 - 0 FC FC 15 10 10 Bore well
40 5 5 PWS Sub-Surface Bore well 0 0 0 - 0 FC FC 20 40 0 Bore well
Augmentati
40 3 2 PWS Sub-Surface Bore well 0 0 WB 3.0 FC FC 36 40 0 Openwell
on
40 15 13 PWS Sub-Surface Bore well 0 0 0 - 0 PC4 PC4 84 40 50 Bore well
40 1 1 - Sub-Surface Bore well 0 0 SVS WB 11.0 PC2 PC2 3 0 0 Bore well
Augmentati
40 14 10 PWS Sub Surface Bore well -- -- WB 1 FC FC 110 60 40 Bore well
on
Augmentati
40 4 3 PWS Sub Surface Bore well -- -- -- 0 FC FC 68 80 80 Bore well
on
Augmentati
40 32 21 PWS Sub Surface Bore well -- -- -- 0 PC3 PC3 217 100 100 Bore well
on
Augmentati
40 2 1 PWS Sub Surface Bore well -- -- -- 0 FC FC 28 40 40 Bore well
on
Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

Augmentati
40 7 5 PWS Sub Surface Bore well -- -- -- 0 FC FC 34 40 40 Bore well
on
Augmentati
40 14 14 PWS Sub Surface Bore well -- -- -- 0 FC FC 48 40 40 Bore well
on
Augmentati
40 6 4 PWS Sub Surface Bore well -- -- WB 1.5 FC FC 84 100 100 Bore well
on
Augmentati
40 11 8 PWS Sub Surface Bore well -- -- -- 0 PC3 PC3 39 40 40 Bore well
on
Augmentati
40 2 1 PWS Sub Surface Bore well -- -- -- 0 FC FC 45 40 40 Bore well
on
Augmentati
40 5 4 PWS Sub Surface Bore well -- -- WB 1 FC FC 31 40 40 Bore well
on
Augmentati
40 19 12 PWS Sub Surface Bore well -- -- - 0 PC4 PC4 108 40 40 Bore well
on
Augmentati
40 2 1 PWS Sub Surface Bore well -- -- -- 0 FC FC 66 80 80 Bore well
on
Augmentati APRWSSP
40 12 6 PWS Sub Surface Bore well -- -- 2 FC FC 62 40 40 Bore well
on (WB)
Augmentati
40 3 2 PWS Sub Surface Bore well -- -- -- 0 FC FC 31 40 40 Bore well
on
Augmentati
40 12 8 PWS Sub Surface Bore well -- -- NRDWPS 3.4 FC FC 46 40 40 Bore well
on
Augmentati
40 9 6 PWS Sub Surface Bore well -- -- NRDWPS 5 PC4 PC4 41 40 40 Bore well
on
Augmentati
40 20 11 PWS Sub Surface Bore well -- -- -- 0 FC FC 81 40 40 Bore well
on
Augmentati
40 4 2 MPWS Sub Surface Bore well -- -- NRDWPS 5 PC3 PC3 29 40 40 Bore well
on
Augmentati
40 4 2 PWS Sub Surface Bore well -- -- -- 0 FC FC 19 40 40 Bore well
on
Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

Augmentati
40 13 9 PWS Sub Surface Bore well -- -- WB 1.5 FC FC 65 40 40 Bore well
on
Augmentati
40 5 3 MPWS Sub Surface Bore well -- -- NRDWPS 3 PC4 PC4 26 40 40 Bore well
on
Augmentati
40 3 1 PWS Sub Surface Bore well -- -- NRDWPS 0 FC FC 20 40 40 Bore well
on
Augmentati
40 6 3 MPWS Sub Surface Bore well -- -- -- 0 FC FC 13 20 20 Bore well
on
40 4 3 - Sub-Surface -- - - - - 0 FC FC 12 0 Bore well
40 1 1 MPWS Sub-Surface Bore well - - - - 0 PC2 PC2 5 10 Bore well
40 9 8 MPWS Sub-Surface Bore well - - - - 0 FC FC 45 10 Bore well
40 5 4 - Sub-Surface -- - - - - 0 FC FC 16 10 Bore well
40 1 1 - Sub-Surface -- - - - - 0 PC2 PC2 4 0 Bore well
40 1 1 MPWS Sub-Surface Bore well - - - - 0 FC FC 7 10 Bore well
40 8 7 - Sub-Surface -- - - - - 0 PC3 PC3 25 0 Bore well
40 1 1 MPWS Sub-Surface Bore well - - - - 0 PC2 PC2 4 10 Bore well
40 2 2 - Sub-Surface -- - - - - 0 PC3 PC3 4 0 Bore well
40 3 2 - Sub-Surface -- - - - - 0 FC FC 16 0 0 Bore well
40 1 1 - Sub-Surface -- - - - - 0 PC2 PC2 4 0 0 Bore well
40 2 2 - Sub-Surface -- - - - - 0 PC3 PC3 3 0 0 Bore well
Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

40 3 2 - Sub-Surface -- - - - - 0 FC FC 17 0 0 Bore well


40 3 2 MPWS Sub-Surface Bore well - - - - 0 PC3 PC3 4 10 Bore well
40 4 3 - Sub-Surface -- - - - - 0 PC3 PC3 21 0 0 Bore well
40 1 1 MPWS Sub-Surface Bore well - - - - 0 PC3 PC3 25 10 Bore well
40 10 9 - Sub-Surface -- - - - - 0 FC FC 57 0 0 Bore well
40 1 1 - Sub-Surface -- - - - - 0 FC FC 16 0 0 Bore well
40 8 7 - Sub-Surface -- - - - - 0 PC3 PC3 34 0 0 Bore well
40 2 2 - Sub-Surface -- - - - - 0 PC4 PC4 10 0 0 Bore well
40 2 2 - Sub-Surface -- - - - - 0 PC2 PC2 6 0 0 Bore well
40 1 1 - Sub-Surface -- - - - - 0 PC2 PC2 2 0 0 Bore well
40 1 0 - - - - - - - 0 - - 3 0 - -
40 6 5 - Sub-Surface -- - - - - 0 FC FC 17 0 0 Bore well
40 3 2 - Sub-Surface -- - - - - 0 FC FC 25 0 0 Bore well
40 3 2 - Sub-Surface -- - - - - 0 PC4 PC4 3 0 0 Bore well
40 1 1 - Sub-Surface -- - - - - 0 FC FC 16 0 0 Bore well
40 3 2 - Sub-Surface -- - - - - 0 PC3 PC3 24 0 0 Bore well
Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

40 2 2 - Sub-Surface -- - - - - 0 PC2 PC2 6 0 0 Bore well


40 3 2 MPWS Sub-Surface Bore well - - - - 0 FC FC 16 10 Bore well
40 2 2 MPWS Sub-Surface Bore well - - - - 0 PC3 PC3 5 10 Bore well
40 4 3 - Sub-Surface -- - - - - 0 PC3 PC3 17 0 0 Bore well
40 2 2 - Sub-Surface -- - - - - 0 FC FC 26 0 0 Bore well
40 3 2 - Sub-Surface -- - - - - 0 PC4 PC4 14 0 0 Bore well
40 2 2 - Sub-Surface -- - - - - 0 PC2 PC2 6 0 0 Bore well
40 2 2 - Sub-Surface -- - - - - 0 PC3 PC3 3 0 0 Bore well
40 1 1 - Sub-Surface -- - - - - 0 PC2 PC2 5 0 0 Bore well
40 2 2 - Sub-Surface -- - - - - 0 PC2 PC2 8 0 0 Bore well
40 3 2 - Sub-Surface -- - - - - 0 FC FC 13 0 0 Bore well
40 2 2 - Sub-Surface -- - - - - 0 PC2 PC2 6 0 0 Bore well
40 3 2 - Sub-Surface -- - - - - 0 FC FC 12 0 0 Bore well
40 3 2 - Sub-Surface -- - - - - 0 PC3 PC3 16 0 0 Bore well
40 2 2 - Sub-Surface -- - - - - 0 PC3 PC3 3 0 0 Bore well
40 1 1 MPWS Sub-Surface Bore well - - - - 0 PC2 PC2 5 10 Bore well
Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

40 2 2 - Sub-Surface -- - - - - 0 PC2 PC2 6 0 0 Bore well


40 2 2 - Sub-Surface -- - - - - 0 PC2 PC2 5 0 0 Bore well
40 5 4 MPWS Sub-Surface Bore well - - - - 0 FC FC 37 10 Bore well
40 3 2 MPWS Sub-Surface Bore well - - - - 0 PC3 PC3 4 10 Bore well
40 3 2 - Sub-Surface -- - - - - 0 FC FC 2 0 0 Bore well
40 2 2 MPWS Sub-Surface Bore well - - - - 0 PC3 PC3 3 10 Bore well
40 1 1 - Sub-Surface -- - - - - 0 PC2 PC2 3 0 0 Bore well
40 2 2 MPWS Sub-Surface Bore well - - - - 0 PC2 PC2 5 10 Bore well
40 2 2 MPWS Sub-Surface Bore well - - - - 0 PC3 PC3 5 10 Bore well
40 3 2 - Sub-Surface -- - - - - 0 PC3 PC3 29 0 0 Bore well
40 5 4 - Sub-Surface -- - - - - 0 FC FC 27 0 0 Bore well
40 2 2 - Sub-Surface -- - - - - 0 PC2 PC2 7 0 0 Bore well
40 1 1 MPWS Sub-Surface Bore well - - - - 0 PC2 PC2 4 10 Bore well
40 1 1 - Sub-Surface -- - - - - 0 PC2 PC2 4 0 0 Bore well
40 1 1 - Sub-Surface -- - - - - 0 PC2 PC2 4 0 0 Bore well
40 7 6 MPWS Sub-Surface Bore well - - - - 0 FC FC 21 10 Bore well
Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

40 2 2 - Sub-Surface -- - - - - 0 PC3 PC3 4 0 0 Bore well


40 1 1 - Sub-Surface -- - - - - 0 PC2 PC2 4 0 0 Bore well
40 1 1 MPWS Sub-Surface Bore well - - - - 0 FC FC 5 10 Bore well
40 2 2 - Sub-Surface -- - - - - 0 FC FC 9 0 0 Bore well
40 3 2 MPWS Sub-Surface Bore well - - - - 0 PC4 PC4 4 10 Bore well
40 3 2 - Sub-Surface -- - - - - 0 PC3 PC3 7 0 0 Bore well
40 1 1 MPWS Sub-Surface Bore well - - - - 0 FC FC 13 10 Bore well
40 2 2 - Sub-Surface -- - - - - 0 PC4 PC4 2 0 0 Bore well
40 1 1 MPWS Sub-Surface Bore well - - - - 0 PC2 PC2 6 10 Bore well
40 3 2 MPWS Sub-Surface Bore well - - - - 0 PC2 PC2 7 10 Bore well
40 2 2 - Sub-Surface -- - - - - 0 PC2 PC2 7 0 0 Bore well
40 15 9 -- Sub-Surface - - - - - 0 - - 90 0 - -
40 6 3 -- Sub-Surface - - - - - 0 - - 80 0 - -
40 10 5 -- Sub-Surface - - - - - 0 - - 100 0 - -
40 12 7 -- Sub-Surface - - - - - 0 - - 68 0 - -
40 1 1 - Sub-Surface -- - - - - 0 FC FC 14 0 0 Bore well
Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

40 1 1 - Sub-Surface -- - - - - 0 FC FC 13 0 0 Bore well


40 2 2 - Sub-Surface -- - - - - 0 PC2 PC2 5 0 0 Bore well
40 4 3 MPWS Sub-Surface Bore well - - - - 0 FC FC 26 10 Bore well
40 10 6 -- -- - - - - - 0 - - 59 0 - -
40 3 1 -- -- - - - - - 0 - - 48 0 - -
40 1 1 -- -- - - - - - 0 - - 8 0 - -
40 3 2 -- -- - - - - - 0 - - 4 0 - -
40 9 4 -- -- - - - - - 0 - - 48 0 - -
40 8 5 -- -- - - - - - 0 - - 165 0 - -
40 17 12 -- -- - - - - - 0 - - 146 0 - -
40 3 2 - Sub-Surface -- - - - - 0 PC3 PC3 4 0 0 Bore well
40 2 2 - Sub-Surface -- - - - - 0 PC3 PC3 3 0 0 Bore well
40 3 2 MPWS Sub-Surface Bore well - - - - 0 PC4 PC4 21 10 Bore well
40 2 2 MPWS Sub-Surface Bore well - - - - 0 PC4 PC4 4 10 Bore well
40 7 6 - Sub-Surface -- - - - - 0 FC FC 38 0 0 Bore well
40 4 3 - Sub-Surface -- - - - - 0 FC FC 8 0 0 Bore well
Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

40 1 1 MPWS Sub-Surface Bore well - - - - 0 FC FC 5 10 Bore well


40 4 3 MPWS Sub-Surface Bore well - - - - 0 FC FC 14 10 Bore well
40 14 13 MPWS Sub-Surface Bore well - - - - 0 FC FC 56 10 Bore well
40 2 2 MPWS Sub-Surface Bore well - - - - 0 FC FC 18 10 Bore well
40 3 2 MPWS Sub-Surface Bore well - - - - 0 FC FC 42 10 Bore well
40 2 2 - Sub-Surface -- - - - - 0 PC3 PC3 5 0 0 Bore well
40 4 3 MPWS Sub-Surface Bore well - - - - 0 PC3 PC3 6 10 Bore well
40 5 4 MPWS Sub-Surface Bore well - - - - 0 FC FC 6 10 Bore well
40 2 2 MPWS Sub-Surface Bore well - - - - 0 PC3 PC3 9 10 Bore well
40 8 7 MPWS Sub-Surface Bore well - - - - 0 FC FC 12 10 Bore well
40 3 2 - Sub-Surface -- - - - - 0 PC2 PC2 9 0 0 Bore well
40 4 3 - Sub-Surface -- - - - - 0 FC FC 16 0 0 Bore well
40 6 5 MPWS Sub-Surface Bore well - - - - 0 FC FC 47 10 Bore well
40 3 2 - Sub-Surface -- - - - - 0 PC4 PC4 3 0 0 Bore well
40 2 2 MPWS Sub-Surface Bore well - - - - 0 FC FC 4 10 Bore well
40 2 2 - Sub-Surface -- - - - - 0 FC FC 8 0 0 Bore well
Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

40 2 2 MPWS Sub-Surface Bore well - - - - 0 FC FC 6 10 Bore well


40 2 2 MPWS Sub-Surface Bore well - - - - 0 FC FC 3 10 Bore well
40 2 2 - Sub-Surface -- - - - - 0 PC2 PC2 6 0 0 Bore well
40 99 98 MPWS Sub-Surface Bore well - - - - 0 PC3 PC3 628 10 Bore well
40 2 2 MPWS Sub-Surface Bore well - - - - 0 PC3 PC3 6 10 Bore well
40 2 2 MPWS Sub-Surface Bore well - - - - 0 PC4 PC4 6 10 Bore well
40 4 3 MPWS Sub-Surface Bore well - - - - 0 FC FC 37 10 Bore well
40 2 2 - Sub-Surface -- - - - - 0 PC2 PC2 8 0 0 Bore well
40 6 5 MPWS Sub-Surface Bore well - - - - 0 PC4 PC4 7 10 Bore well
40 5 4 MPWS Sub-Surface Bore well - - - - 0 FC FC 29 10 Bore well
40 3 2 - Sub-Surface -- - - - - 0 FC FC 8 0 0 Bore well
40 2 2 - Sub-Surface -- - - - - 0 PC4 PC4 4 0 0 Bore well
40 3 2 - Sub-Surface -- - - - - 0 PC3 PC3 5 0 0 Bore well
40 8 7 - Sub-Surface -- - - - - 0 FC FC 26 0 0 Bore well
40 2 2 MPWS Sub-Surface Bore well - - - - 0 PC2 PC2 3 10 Bore well
40 4 3 - Sub-Surface -- - - - - 0 PC4 PC4 4 0 0 Bore well
Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

40 1 1 - Sub-Surface -- - - - - 0 PC2 PC2 5 0 0 Bore well


40 3 1 -- -- - - - - - 0 - - 6 0 - -
40 1 1 -- -- - - - - - 0 - - 2 0 - -
40 6 4 -- -- - - - - - 0 - - 47 0 - -
40 1 0 -- -- - - - - - 0 - - 3 0 - -
40 1 0 -- -- - - - - - 0 - - 3 0 - -
40 1 1 DP Sub-Surface - - - - - 0 - - 6 0 - -
40 3 3 - - - - - - - 0 - Covered 31 0 15 -
40 4 3 - - - - - - - 0 - Covered 10 0 5 -
40 3 2 - - - - - - - 0 - Covered 7 0 3 -
40 4 2 - - - - - - - 0 - Covered 7 0 3 -
40 4 2 - - - - - - - 0 - Covered 8 0 4 -
40 3 2 - - - - - - - 0 - Covered 6 0 2 -
40 22 20 - - - - - - - 0 - Covered 110 40 13 Bore well
40 3 3 - - - - - - - 0 - Covered 5 0 2 -
40 3 2 - - - - - - - 0 - Covered 3 0 1 -
Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

40 7 5 DP Sub Surface Bore well - - - - 54 - Un Covered 3 0 1 Bore well


40 7 5 DP Sub Surface Bore well - - - - 55 - Un Covered 3 0 1 Bore well
40 7 5 DP Sub Surface Bore well - - - - 56 - Un Covered 2 0 1 Bore well
40 7 5 DP Sub Surface Bore well - - - - 57 - Un Covered 4 0 2 Bore well
40 7 5 DP Sub Surface Bore well - - - - 59 - Un Covered 4 0 2 Bore well
40 7 5 DP Sub Surface Bore well - - - - 62 - Un Covered 4 0 2 Bore well
40 7 5 DP Sub Surface Bore well - - - - 63 - Un Covered 4 0 2 Bore well
40 7 5 DP Sub Surface Bore well - - - - 64 - Un Covered 2 0 1 Bore well
40 7 5 DP Sub Surface Bore well - - - - 65 - Un Covered 3 0 1 Bore well
40 7 5 DP Sub Surface Bore well - - - - 66 - Un Covered 2 0 1 Bore well
40 7 5 DP Sub Surface Bore well - - - - 67 - Un Covered 11 0 5 Bore well
40 7 5 DP Sub Surface Bore well - - - - 68 - Un Covered 9 0 4 Bore well
40 7 5 DP Sub Surface Bore well - - - - 70 - Un Covered 6 0 3 Bore well
40 7 5 DP Sub Surface Bore well - - - - 71 - Un Covered 4 0 2 Bore well
40 7 5 DP Sub Surface Bore well - - - - 73 - Un Covered 9 0 4 Bore well
40 7 5 DP Sub Surface Bore well - - - - 76 - Un Covered 6 0 3 Bore well
Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

40 9 9 DP Sub-Surface Openwell - - - - 0 - Covered 69 0 33 Openwell


40 9 8 DP Sub-Surface Bore well - - - - 0 - Covered 28 0 13 Bore well
40 18 18 MPWS Sub-Surface Bore well - - - - 0 - PC4 237 10 0 Bore well
40 11 11 MPWS Sub-Surface Bore well - - - - 0 - PC4 74 10 0 Bore well
40 15 15 MPWS Sub-Surface Bore well - - - - 0 - PC4 121 10 0 Bore well
40 7 7 MPWS Sub-Surface Bore well - - - - 0 - PC4 72 10 0 Bore well
40 20 20 MPWS Sub-Surface Bore well - - - - 0 - PC4 90 10 0 Bore well
40 30 30 MPWS Sub-Surface Bore well - - - - 0 - FC 300 10 0 Bore well
Augmentati
40 3 3 MPWS Sub-Surface Bore well 0 0 WB 1 PC4 PC4 20 10 20 Bore well
on
40 8 8 MPWS Sub-Surface Bore well 0 0 0 - 0 PC3 PC3 39 60 40 Bore well
40 13 13 PWS Sub-Surface Bore well 0 0 0 - 0 FC FC 70 60 40 Bore well
40 18 18 PWS Sub-Surface Bore well 0 0 0 - 0 FC FC 63 10 20 Bore well
40 14 14 PWS Sub-Surface Bore well 0 0 0 - 0 FC FC 115 10 20 Bore well
Augmentati
40 22 22 PWS Sub-Surface Bore well 0 0 WB 2 PC4 PC4 157 60 40 Bore well
on
40 20 20 PWS Sub-Surface Bore well 0 0 0 - 0 FC FC 122 10 20 Bore well
40 2 2 - Sub-Surface Bore well 0 0 0 - 0 PC4 PC4 6 10 20 Bore well
Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

Augmentati
40 4 4 MPWS Sub-Surface Bore well 0 0 WB 1 FC FC 6 10 20 Bore well
on
40 4 4 MPWS Sub-Surface Bore well 0 0 0 - 0 PC4 PC4 18 60 40 Bore well
40 3 3 - Sub-Surface Bore well 0 0 0 - 0 PC3 PC3 3 10 20 Bore well
40 2 2 MPWS Sub-Surface Bore well 0 0 0 - 0 FC FC 7 10 20 Bore well
40 5 5 MPWS Sub-Surface Bore well 0 0 0 - 0 FC FC 5 10 20 Bore well
Augmentati
40 3 3 MPWS Sub-Surface Bore well 0 0 WB 3 FC FC 13 10 20 Bore well
on
40 3 3 - Sub-Surface Bore well 0 0 0 - 0 FC FC 2 10 20 Bore well
40 2 2 PWS Sub-Surface Bore well 0 0 0 - 0 FC FC 33 60 40 Bore well
40 1 1 - Sub-Surface Bore well 0 0 0 - 0 PC4 PC4 2 10 20 Bore well
40 1 1 MPWS Sub-Surface Bore well 0 0 0 - 0 FC FC 7 10 20 Bore well
40 2 2 MPWS Sub-Surface Bore well 0 0 0 - 0 FC FC 20 60 40 Bore well
40 10 10 PWS Sub-Surface Bore well 0 0 0 - 0 FC FC 36 10 20 Bore well
40 18 18 PWS Sub-Surface Bore well 0 0 0 - 0 PC4 PC4 146 10 20 Bore well
40 4 4 MPWS Sub-Surface Bore well 0 0 0 - 0 PC4 PC4 20 60 40 Bore well
40 2 2 MPWS Sub-Surface Bore well 0 0 0 - 0 FC FC 9 10 20 Bore well
40 0 0 MPWS Sub-Surface Bore well 0 0 0 - 0 FC FC 4 10 20 Bore well
Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

40 3 3 - Sub-Surface Bore well 0 0 0 - 0 PC3 PC3 5 60 40 Bore well


40 1 1 MPWS Sub-Surface Bore well 0 0 0 - 0 FC FC 15 60 40 Bore well
40 6 6 PWS Sub-Surface Bore well 0 0 0 - 0 FC FC 49 60 40 Bore well
40 2 2 MPWS Sub-Surface Bore well 0 0 - - 0 FC FC 11 10 -- Bore well
Aug. to APRWSSP
40 6 4 MPWS Sub-Surface Bore well 0 0 1 FC FC 20 0 20 Bore well
SVS (WB)
40 3 2 MPWS Sub-Surface Bore well 0 0 - - 0 FC FC 14 0 20 Bore well
Aug. to
40 2 2 PWS Sub-Surface Bore well 0 0 NRDWP 2.5 FC FC 32 60 -- Bore well
SVS
Aug. to
40 27 23 PWS Sub-Surface Bore well 0 0 NRDWP 3.5 FC FC 139 130 10 Bore well
SVS
40 15 13 PWS Sub-Surface Bore well 0 0 - - 0 FC FC 119 80 20 Bore well
40 5 4 PWS Sub-Surface Bore well 0 0 - - 0 FC FC 13 40 -- Bore well
40 3 2 MPWS Sub-Surface Bore well 0 0 - - 0 FC FC 16 10 10 Bore well
Aug. to APRWSSP
40 14 12 PWS Sub-Surface Bore well 0 0 1.00 FC FC 117 40 40 Bore well
SVS (WB)
40 2 1 MPWS Sub-Surface Bore well 0 0 - - 0 FC FC 17 10 10 Bore well
40 1 1 MPWS Sub-Surface Bore well 0 0 - - 0 FC FC 19 10 10 Bore well
40 15 13 PWS Sub-Surface Bore well 0 0 - - 0 FC FC 130 80 20 Bore well
40 12 10 PWS Sub-Surface Bore well 0 0 - - 0 PC4 PC4 97 60 40 Bore well
Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

40 1 1 - Sub-Surface Bore well 0 0 - - 0 PC2 PC2 6 0 40 Bore well


40 3 2 PWS Sub-Surface Bore well 0 0 - - 0 FC FC 9 0 10 Bore well
40 1 1 MPWS Sub-Surface Bore well 0 0 - - 0 FC FC 5 0 10 Bore well
40 1 1 - Sub-Surface Bore well 0 0 - - 0 PC2 PC2 4 0 10 Bore well
40 10 8 PWS Sub-Surface Bore well 0 0 - - 0 FC FC 66 40 20 Bore well
40 18 15 PWS Sub-Surface Bore well 0 0 - - 0 FC FC 47 40 Bore well
40 2 2 - Sub-Surface -- - - - - 0 PC2 PC2 5 0 0 Bore well
40 2 2 MPWS Sub-Surface Bore well - - - - 0 PC3 PC3 5 0 0 Bore well
40 1 1 - Sub-Surface -- - - - - 0 PC3 PC3 2 0 0 Bore well
40 2 2 - Sub-Surface -- - - - - 0 PC3 PC3 5 0 0 Bore well
40 2 2 - Sub-Surface -- - - - - 0 FC FC 5 0 0 Bore well
40 4 3 MPWS Sub-Surface Bore well - - - - 0 PC4 PC4 19 0 0 Bore well
40 6 5 - Sub-Surface -- - - - - 0 PC3 PC3 29 0 0 Bore well
40 2 2 - Sub-Surface -- - - - - 0 PC3 PC3 3 0 0 Bore well
40 1 1 MPWS Sub-Surface Bore well - - - - 0 PC3 PC3 2 0 0 Bore well
40 4 3 - Sub-Surface -- - - - - 0 FC FC 43 0 0 Bore well
Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

40 2 2 - Sub-Surface -- - - - - 0 PC3 PC3 5 0 0 Bore well


40 3 2 - Sub-Surface -- - - - - 0 PC3 PC3 4 0 0 Bore well
40 6 5 MPWS Sub-Surface Bore well - - - - 0 PC3 PC3 28 0 0 Bore well
40 7 6 - Sub-Surface -- - - - - 0 PC4 PC4 23 0 0 Bore well
40 3 2 MPWS Sub-Surface Bore well - - - - 0 PC4 PC4 2 0 0 Bore well
40 60 59 MPWS Sub-Surface Bore well - - - - 0 PC4 PC4 435 0 0 Bore well
40 2 2 MPWS Sub-Surface Bore well - - - - 0 PC2 PC2 7 0 0 Bore well
40 8 7 MPWS Sub-Surface Bore well - - - - 0 PC4 PC4 27 0 0 Bore well
40 5 4 MPWS Sub-Surface Bore well - - - - 0 PC4 PC4 23 0 0 Bore well
40 2 2 - Sub-Surface -- - - - - 0 PC3 PC3 3 0 0 Bore well
40 3 2 - Sub-Surface -- - - - - 0 PC3 PC3 4 0 0 Bore well
40 3 2 MPWS Sub-Surface Bore well - - - - 0 PC3 PC3 5 0 0 Bore well
40 3 2 MPWS Sub-Surface Bore well - - - - 0 PC3 PC3 5 0 0 Bore well
40 2 2 - Sub-Surface -- - - - - 0 FC FC 16 0 0 Bore well
40 2 2 - Sub-Surface -- - - - - 0 PC2 PC2 7 0 0 Bore well
40 1 1 - Sub-Surface -- - - - - 0 PC2 PC2 5 0 0 Bore well
Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

40 3 2 - Sub-Surface -- - - - - 0 FC FC 16 0 0 Bore well


40 2 2 MPWS Sub-Surface Bore well - - - - 0 PC3 PC3 4 0 0 Bore well
40 4 3 - Sub-Surface -- - - - - 0 PC3 PC3 5 0 0 Bore well
40 2 2 - Sub-Surface -- - - - - 0 PC3 PC3 5 0 0 Bore well
40 4 3 MPWS Sub-Surface Bore well - - - - 0 FC FC 23 0 0 Bore well
40 3 2 MPWS Sub-Surface Bore well - - - - 0 FC FC 14 0 0 Bore well
40 16 15 - Sub-Surface -- - - - - 0 FC FC 58 0 0 Bore well
40 2 2 - Sub-Surface -- - - - - 0 PC2 PC2 5 0 0 Bore well
40 6 5 MPWS Sub-Surface Bore well - - - - 0 PC4 PC4 76 0 0 Bore well
40 6 5 - Sub-Surface -- - - - - 0 FC FC 14 0 0 Bore well
40 2 2 MPWS Sub-Surface Bore well - - - - 0 PC2 PC2 5 0 0 Bore well
40 3 2 - Sub-Surface -- - - - - 0 FC FC 14 0 0 Bore well
40 4 3 - Sub-Surface -- - - - - 0 PC4 PC4 5 0 0 Bore well
40 2 2 - Sub-Surface -- - - - - 0 PC3 PC3 3 0 0 Bore well
40 9 8 MPWS Sub-Surface Bore well - - - - 0 FC FC 52 0 0 Bore well
40 4 3 - Sub-Surface -- - - - - 0 PC3 PC3 15 0 0 Bore well
Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

40 2 2 MPWS Sub-Surface Bore well - - - - 0 PC3 PC3 12 0 0 Bore well


40 2 2 - Sub-Surface -- - - - - 0 PC3 PC3 18 0 0 Bore well
40 6 5 - Sub-Surface -- - - - - 0 FC FC 36 0 0 Bore well
40 4 3 - Sub-Surface -- - - - - 0 PC4 PC4 21 0 0 Bore well
40 4 3 - Sub-Surface -- - - - - 0 FC FC 29 0 0 Bore well
40 2 2 - Sub-Surface -- - - - - 0 PC2 PC2 6 0 0 Bore well
40 4 3 - Sub-Surface -- - - - - 0 FC FC 19 0 0 Bore well
40 4 3 - Sub-Surface -- - - - - 0 FC FC 15 0 0 Bore well
40 1 1 - Sub-Surface -- - - - - 0 PC2 PC2 6 0 0 Bore well
40 3 2 - Sub-Surface -- - - - - 0 PC2 PC2 8 0 0 Bore well
40 2 2 MPWS Sub-Surface Bore well - - - - 0 PC3 PC3 3 0 0 Bore well
40 3 2 MPWS Sub-Surface Bore well - - - - 0 PC3 PC3 5 0 0 Bore well
40 3 2 - Sub-Surface -- - - - - 0 PC3 PC3 17 0 0 Bore well
40 3 2 - Sub-Surface -- - - - - 0 FC FC 3 0 0 Bore well
40 1 1 -- Sub-Surface -- -- -- -- -- 0 PC2 PC2 6 0 0 --
40 3 3 MPWS Sub-Surface -- -- -- -- -- 0 FC FC 15 0 0 --
Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

40 7 6 PWS Sub-Surface -- -- -- -- -- 0 FC FC 88 0 0 --
40 2 2 -- Sub-Surface -- -- -- -- -- 0 PC2 PC2 5 0 0 --
40 2 2 PWS Sub-Surface -- -- -- -- -- 0 FC FC 36 0 0 --
40 1 1 MPWS Sub-Surface -- -- -- -- -- 0 FC FC 9 0 0 --
40 7 6 MPWS Sub-Surface -- -- -- -- -- 0 PC4 PC4 30 0 0 --
40 10 8 PWS Sub-Surface -- -- -- -- -- 0 FC FC 53 0 0 --
40 5 4 MPWS Sub-Surface -- -- -- -- -- 0 FC FC 20 0 0 --
40 3 3 MPWS Sub-Surface -- -- -- -- -- 0 FC FC 9 0 0 --
40 20 16 PWS Sub-Surface -- -- -- -- -- 0 PC4 PC4 176 40 --
40 3 2 MPWS Sub-Surface -- -- -- -- -- 0 FC FC 37 10 --
40 3 2 MPWS Sub-Surface -- -- -- -- -- 0 PC2 PC2 27 10 --
40 8 6 PWS Sub-Surface -- -- -- -- -- 0 FC FC 38 40 --
40 11 9 PWS Sub-Surface -- -- -- -- -- 0 FC FC 115 40 --
40 5 4 -- Sub-Surface -- -- -- -- -- 0 FC FC 67 0 0 --
40 10 8 PWS Sub-Surface -- -- -- -- -- 0 FC FC 40 10 --
40 4 2 PWS Sub Surface Bore well 0 -- -- -- 0 PC4 PC4 16 40 20 Bore well
Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

40 5 4 MPWS Sub Surface Bore well 0 -- -- -- 0 PC3 PC3 10 0 10 Bore well


40 3 3 PWS Sub Surface Bore well 0 -- -- -- 0 FC FC 19 20 0 Bore well
40 2 1 PWS Sub Surface Bore well 0 -- -- -- 0 FC FC 7 10 0 Bore well
40 14 14 PWS Sub Surface Bore well 0 -- -- -- 0 PC3 PC3 85 40 45 Bore well
40 3 3 PWS Sub Surface Bore well 0 -- -- -- 0 FC FC 10 10 0 Bore well
40 5 5 PWS Sub Surface Bore well 0 -- -- -- 0 FC FC 6 10 10 Bore well
40 3 3 PWS Sub Surface Bore well 0 -- -- -- 0 PC3 PC3 6 10 10 Bore well
40 4 2 -- -- -- 0 -- -- -- 0 PC3 PC3 8 0 8 Bore well
40 3 1 MPWS Sub Surface Bore well 0 -- -- -- 0 PC3 PC3 16 10 6 Bore well
40 4 4 MPWS Sub Surface Bore well 0 -- -- -- 0 PC3 PC3 10 0 10 Bore well
40 1 1 - - -- 0 -- -- -- 0 PC4 PC4 2 0 2 Bore well
40 2 2 PWS Sub Surface Bore well 0 -- -- -- 0 FC FC 15 40 20 Bore well
40 0 0 PWS Sub Surface Bore well 0 -- -- -- 0 PC4 PC4 5 10 5 Bore well
40 6 2 MPWS Sub Surface Bore well 0 -- -- -- 0 PC4 PC4 12 0 12 Bore well
40 1 0 - - -- 0 -- -- -- 0 PC2 PC2 3 0 3 Bore well
40 2 2 MPWS Sub Surface Bore well 0 -- -- -- 0 FC FC 4 0 4 Bore well
Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

40 5 2 MPWS Sub Surface Bore well 0 -- -- -- 0 PC3 PC3 4 0 4 Bore well


40 2 1 MPWS Sub Surface Bore well 0 -- -- -- 0 FC FC 3 10 10 Bore well
40 3 2 MPWS Sub Surface Bore well 0 -- -- -- 0 PC3 PC3 5 0 5 Bore well
40 2 2 - - -- 0 -- -- -- 0 PC4 PC4 6 0 6 Bore well
40 1 1 MPWS Sub Surface Bore well 0 -- -- -- 0 FC FC 4 0 4 Bore well
40 3 2 PWS Sub Surface Bore well 0 -- -- -- 0 FC FC 3 20 10 Bore well
40 1 1 PWS Sub Surface Bore well 0 -- -- -- 0 PC2 PC2 3 0 3 Bore well
40 6 5 PWS Sub Surface Bore well 0 -- -- -- 0 PC2 PC2 19 40 20 Bore well
40 1 1 MPWS Sub Surface Bore well 0 -- -- -- 0 PC4 PC4 11 10 1 Bore well
40 2 2 MPWS Sub Surface Bore well 0 -- -- -- 0 FC FC 11 0 11 Bore well
40 7 7 PWS Sub Surface Bore well 0 -- -- -- 0 PC3 PC3 49 40 9 Bore well
40 12 12 PWS Sub Surface Bore well 0 -- -- -- 0 PC3 PC3 55 40 15 Bore well
40 5 5 MPWS Sub Surface Bore well 0 -- -- -- 0 PC3 PC3 18 0 18 Bore well
40 4 3 - - -- 0 -- -- -- 0 FC PC2 11 0 11 --
40 3 2 MPWS Sub Surface Bore well 0 -- -- -- 0 FC FC 14 10 4 Bore well
40 7 6 MPWS Sub Surface Bore well 0 -- -- -- 0 FC FC 23 20 3 Bore well
Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

40 5 5 MPWS Sub Surface Bore well 0 -- -- -- 0 FC FC 19 10 9 Bore well


40 4 4 PWS Sub Surface Bore well 0 -- -- -- 0 FC FC 11 10 1 Bore well
40 5 5 - - -- 0 -- -- -- 0 FC FC 12 0 12 Bore well
40 2 2 - - -- 0 -- -- -- 0 FC PC3 5 0 5 Bore well
40 5 5 MPWS Sub Surface Bore well 0 -- -- -- 0 FC FC 20 20 0 Bore well
40 4 4 PWS Sub Surface Bore well 0 -- -- -- 0 FC PC3 12 40 20 Bore well
40 2 2 MPWS Sub Surface Bore well 0 -- -- -- 0 FC PC3 4 10 10 Bore well
40 3 3 MPWS Sub Surface Bore well 0 -- -- -- 0 FC PC3 12 5 7 Bore well
40 3 3 -- -- -- 0 -- -- -- 0 FC PC4 10 0 10 Bore well
40 2 2 MPWS Sub Surface Bore well 0 -- -- -- 0 FC PC2 12 5 7 Bore well
40 5 5 MPWS Sub Surface Bore well 0 -- -- -- 0 FC PC4 14 0 14 Bore well
40 5 5 PWS Sub Surface Bore well 0 -- -- -- 0 FC PC2 10 40 30 Bore well
40 4 4 PWS Sub Surface Bore well 0 -- -- -- 0 FC PC2 15 40 20 Bore well
40 3 3 -- -- -- 0 -- -- -- 0 FC FC 9 0 9 Bore well
40 1 1 - - -- 0 -- -- -- 0 FC PC2 4 0 4 --
40 1 1 - - -- 0 -- -- -- 0 FC PC2 3 0 3 --
Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

40 2 2 - - -- 0 -- -- -- 0 FC PC3 3 0 3 --
40 1 1 - - -- 0 -- -- -- 0 FC PC2 3 0 3 --
40 9 9 PWS Sub Surface Bore well 0 -- -- -- 0 FC FC 38 40 0 Bore well
40 3 3 -- -- -- 0 -- -- -- 0 FC PC2 5 0 5 --
40 1 1 - - -- 0 -- -- -- 0 FC PC2 3 0 3 --
40 3 3 MPWS Sub Surface Bore well 0 -- -- -- 0 FC FC 4 10 10 Bore well
40 2 2 - - -- 0 -- -- -- 0 FC PC3 3 0 3 --
40 3 3 MPWS Sub Surface Bore well 0 -- -- -- 0 FC FC 7 10 0 Bore well
40 3 3 - - -- 0 -- -- -- 0 FC PC2 4 0 4 --
40 2 2 - - -- 0 -- -- -- 0 FC PC2 8 0 8 --
40 4 4 - - -- 0 -- -- -- 0 FC PC2 4 0 4 --
40 3 3 MPWS Sub Surface Bore well 0 -- -- -- 0 FC FC 10 20 10 Bore well
40 5 5 PWS Sub Surface Bore well 0 -- -- -- 0 FC FC 18 40 20 Bore well
40 3 3 PWS Sub Surface Bore well 0 -- -- -- 0 FC FC 12 40 20 Bore well
40 8 8 PWS Sub Surface Bore well 0 -- -- -- 0 FC FC 32 40 10 Bore well
40 25 25 PWS Sub Surface Bore well 0 -- -- -- 0 PC3 PC3 102 100 2 Bore well
Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

40 7 7 -- -- -- 0 -- -- -- 0 PC3 PC3 19 0 19 --
40 14 14 PWS Sub Surface Bore well 0 -- -- -- 0 PC3 PC3 71 40 31 Bore well
40 29 29 PWS Sub Surface Bore well 0 -- -- -- 0 PC3 PC3 157 80 77 Bore well
40 9 6 PWS Sub Surface Bore well 0 -- -- -- 0 FC PC3 73 20 53 Bore well
40 6 4 -- -- -- 0 -- -- -- 0 FC PC3 21 0 21 Bore well
40 3 1 -- -- -- 0 -- -- -- 0 FC PC3 22 0 22 Bore well
40 4 2 -- -- -- 0 -- -- -- 0 FC PC3 10 0 10 Bore well
40 1 1 -- -- -- 0 -- -- -- 0 FC PC3 9 0 9 Bore well
40 8 5 -- -- -- 0 -- -- -- 0 FC PC3 48 0 48 Bore well
40 5 3 -- -- -- 0 -- -- -- 0 FC PC3 20 0 20 Bore well
40 1 1 -- -- -- 0 -- -- -- 0 FC PC3 9 0 9 Bore well
40 2 1 -- -- -- 0 -- -- -- 0 FC PC3 9 0 9 Bore well
40 7 5 PWS Sub Surface Bore well 0 -- -- -- 0 FC PC3 80 20 60 Bore well
40 4 3 PWS Sub Surface Bore well 0 -- -- -- 0 FC PC2 47 20 27 Bore well
40 3 2 -- -- -- 0 -- -- -- 0 FC PC4 9 0 9 Bore well
40 6 4 PWS Sub Surface Bore well 0 -- -- -- 0 FC PC2 56 20 36 Bore well
Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

40 9 6 PWS Sub Surface Bore well 0 -- -- -- 0 FC PC2 93 40 53 Bore well


40 7 5 PWS Sub Surface Bore well 0 -- -- -- 0 FC PC3 48 20 28 Bore well
40 3 2 -- -- -- 0 -- -- -- 0 FC PC3 10 0 10 Bore well
40 6 4 -- -- -- 0 -- -- -- 0 FC PC3 21 0 21 Bore well
40 9 6 PWS Sub Surface Bore well 0 -- -- -- 0 FC PC2 73 40 33 Bore well
40 4 2 -- -- -- 0 -- -- -- 0 FC PC3 38 0 38 Bore well
40 3 2 -- -- -- 0 -- -- -- 0 FC PC3 42 0 42 Bore well
40 4 1 0 0 0 0 -- -- -- 0 FC FC 20 0 20 --
40 1 1 0 -- -- 0 -- -- -- 0 FC PC4 11 0 11 --
40 6 2 0 -- -- 0 -- -- -- 0 FC PC4 22 0 22 --
40 3 1 0 -- -- 0 -- -- -- 0 FC PC3 19 0 19 --
40 2 1 0 -- -- 0 -- -- -- 0 FC PC4 12 0 12 --
40 60 42 PWS Sub Surface Bore well 0 -- -- -- 0 FC PC4 295 200 100 Bore well
40 3 1 0 -- -- 0 -- -- -- 0 FC PC4 9 0 9 --
40 3 1 - - -- 0 -- -- -- 0 FC PC2 5 0 5 --
40 7 3 0 -- -- 0 -- -- -- 0 FC FC 33 0 33 --
Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

40 3 1 0 -- -- 0 -- -- -- 0 FC PC3 5 0 5 --
40 3 1 0 -- -- 0 -- -- -- 0 FC FC 13 0 13 --
40 3 3 0 -- -- 0 -- -- -- 0 FC PC3 17 0 17 --
40 4 2 0 -- -- 0 -- -- -- 0 FC PC3 35 0 35 --
40 2 1 - - -- 0 -- -- -- 0 FC PC3 13 0 13 --
40 3 2 0 -- -- 0 -- -- -- 0 FC PC2 9 0 9 --
40 2 1 0 -- -- 0 -- -- -- 0 FC PC3 6 0 6 --
40 4 4 MPWS Sub Surface Bore well 0 -- -- -- 0 FC FC 10 0 10 --
40 5 5 PWS Sub Surface Bore well 0 -- -- -- 0 FC PC2 43 0 43 --
40 13 13 MPWS Sub Surface Bore well 0 -- -- -- 0 FC PC3 37 0 37 --
40 6 6 MPWS Sub Surface Bore well 0 -- -- -- 0 FC PC3 38 0 38 --
Sub Surface-
40 9 9 PWS Sub Surface Bore well 0 -- -- -- 0 FC PC3 51 20 31
Borewell
40 6 6 PWS Sub Surface Bore well 0 -- -- -- 0 FC PC3 15 0 15 --
Sub Surface-
40 5 5 MPWS Sub Surface Bore well 0 -- -- -- 0 FC PC3 18 0 18
Borewell
Sub Surface-
40 9 7 PWS Sub Surface Bore well 0 -- -- -- 0 FC PC4 96 90 6
Borewell
40 12 6 - Sub Surface Bore well 0 -- -- -- 0 FC PC2 49 0 49 --
Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

40 12 6 PWS Sub Surface Bore well 0 -- -- -- 0 FC PC2 66 80 10 --


40 9 5 - Sub Surface Bore well 0 -- -- -- 0 FC PC3 40 0 40 --
40 2 2 - Sub Surface Bore well 0 -- -- -- 0 FC PC2 15 0 15 --
Sub-surface
40 13 11 MPWS Sub Surface Bore well 0 -- -- -- 0 FC PC3 102 40 62
Borewell
40 8 6 - Sub Surface Bore well 0 -- -- -- 0 FC PC3 38 0 38 --
40 2 2 - Sub Surface Bore well 0 -- -- -- 0 FC PC4 20 0 20 --
Sub-surface
40 14 11 PWS Sub Surface Bore well 0 -- -- -- 0 FC PC3 172 90 82
Borewell
Sub-surface
40 6 5 PWS Sub Surface Borewell 0 -- -- -- 0 FC PC4 103 40 63
Borewell
Sub-surface
40 21 17 PWS Sub Surface Borewell 0 -- -- -- 0 FC PC3 207 120 87
Borewell
40 4 3 -- Sub Surface Borewell 0 -- -- -- 0 FC PC4 28 0 28 --
40 3 3 - Sub Surface Bore well 0 -- -- -- 0 FC PC3 11 0 11 --
Sub-surface
40 11 9 PWS Sub Surface Bore well 0 -- -- -- 0 FC FC 58 20 38
Borewell
40 2 2 - Sub Surface Bore well 0 -- -- -- 0 FC PC3 8 0 8 --
40 3 3 - Sub Surface Bore well 0 -- -- -- 0 FC PC3 10 0 10 --
40 6 6 PWS Sub Surface Bore well 0 -- -- -- 0 FC PC3 30 0 30 --
40 11 9 - -- -- 0 -- -- -- 0 FC PC3 50 20 30 Bore well
Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

40 12 10 - -- -- 0 -- -- -- 0 FC PC3 45 15 30 Bore well


40 21 11 1 - -- 0 -- -- -- 0 FC PC4 124 90 34 --
40 15 8 1 Sub Surface Borewell 0 -- -- -- 0 FC PC4 68 0 0 --
40 20 12 2 Sub Surface Borewell 0 -- -- -- 0 FC FC 73 0 0 --
40 9 7 - Sub Surface Borewell 0 -- -- -- 0 FC PC3 29 0 29 --
40 2 1 MPWS Sub Surface Borewell 0 -- -- -- 0 FC PC3 36 10 26 Bore well
40 5 2 MPWS Sub Surface Borewell 0 -- -- -- 0 FC FC 37 15 22 Bore well
40 28 19 PWS Sub Surface Borewell 0 -- -- -- 0 FC PC4 152 60 92 Bore well
40 19 18 PWS Sub Surface Borewell 0 -- -- -- 0 FC PC4 115 60 55 Bore well
40 17 6 PWS Sub Surface Borewell 0 -- -- -- 0 FC PC4 92 40 52 Bore well
40 17 11 PWS Sub Surface Borewell 0 -- -- -- 0 FC FC 56 40 16 Bore well
1 2 2 DP Sub-Surface Bore well - - - - 0 - PC3 3 0 3 Bore well
2 3 2 DP Sub-Surface Bore well - - - - 0 - PC3 5 0 5 Bore well
13 1 1 MPWS Sub-Surface Bore well - - - - 0 - PC3 28 0 28 Bore well
5 3 2 MPWS Sub-Surface Bore well - - - - 0 - PC3 11 0 11 Bore well
8 4 3 MPWS Sub-Surface Bore well - - - - 0 - PC3 18 0 18 Bore well
Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

7 1 1 MPWS Sub-Surface Bore well - - - - 0 - FC 14 0 14 Bore well


9 2 2 MPWS Sub-Surface Bore well - - - - 0 - PC2 18 0 18 Bore well
2 3 2 DP Sub-Surface Bore well - - - - 0 - PC3 5 0 5 Bore well
2 4 3 DP Sub-Surface Bore well - - - - 0 - PC3 5 0 5 Bore well
16 5 4 MPWS Sub-Surface Bore well - - - - 0 - FC 34 0 34 Bore well
1 2 2 DP Sub-Surface Bore well - - - - 0 - PC3 3 0 3 Bore well
7 3 2 MPWS Sub-Surface Bore well - - - - 0 - PC3 14 0 14 Bore well
2 3 2 MPWS Sub-Surface Bore well - - - - 0 - PC4 6 0 6 Bore well
12 1 1 MPWS Sub-Surface Bore well - - - - 0 - FC 25 0 25 Bore well
2 4 3 DP Sub-Surface Bore well - - - - 0 - FC 4 0 4 Bore well
7 1 1 MPWS Sub-Surface Bore well - - - - 0 - FC 14 0 14 Bore well
8 2 2 MPWS Sub-Surface Bore well - - - - 0 - PC4 18 0 18 Bore well
17 3 2 MPWS Sub-Surface Bore well - - - - 0 - PC4 35 0 35 Bore well
7 2 2 MPWS Sub-Surface Bore well - - - - 0 - FC 15 0 15 Bore well
9 5 4 MPWS Sub-Surface Bore well - - - - 0 - FC 19 0 19 Bore well
4 3 2 MPWS Sub-Surface Bore well - - - - 0 - FC 8 0 8 Bore well
Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

2 2 2 DP Sub-Surface Bore well - - - - 0 - PC3 5 0 5 Bore well


1 1 1 MPWS Sub-Surface Bore well - - - - 0 - PC3 2 0 2 Bore well
2 3 2 MPWS Sub-Surface Bore well - - - - 0 - PC3 4 0 4 Bore well

15 4 3 MPWS Sub-Surface Bore well - - - - 0 - FC 32 0 32 Bore well

88 29 28 PWS Sub-Surface Bore well - - - - 0 - FC 182 100 82 Bore well


1 2 2 DP Sub-Surface Bore well - - - - 0 - PC3 4 0 4 Bore well
4 5 4 MPWS Sub-Surface Bore well - - - - 0 - PC3 8 0 8 Bore well
21 5 4 PWS Sub-Surface Bore well - - - - 0 - PC4 44 40 4 Bore well
18 5 4 MPWS Sub-Surface Bore well - - - - 0 - PC4 37 0 37 Bore well
9 3 2 MPWS Sub-Surface Bore well - - - - 0 - PC3 19 0 19 Bore well
18 4 3 MPWS Sub-Surface Bore well - - - - 0 - FC 37 0 37 Bore well
61 3 2 PWS Sub-Surface Bore well - - - - 0 - FC 126 100 26 Bore well
13 4 3 MPWS Sub-Surface Bore well - - - - 0 - FC 26 0 26 Bore well
2 2 2 DP Sub-Surface Bore well - - - - 0 - PC4 5 0 5 Bore well
3 1 1 MPWS Sub-Surface Bore well - - - - 0 - FC 6 0 6 Bore well
4 2 2 MPWS Sub-Surface Bore well - - - - 0 - FC 8 0 8 Bore well
Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

1 2 2 DP Sub-Surface Bore well - - - - 0 - FC 3 0 3 Bore well


4 4 3 MPWS Sub-Surface Bore well - - - - 0 - FC 8 0 8 Bore well
9 2 2 MPWS Sub-Surface Bore well - - - - 0 - PC4 19 0 19 Bore well
3 2 2 MPWS Sub-Surface Bore well - - - - 0 - PC4 6 0 6 Bore well
8 4 3 MPWS Sub-Surface Bore well - - - - 0 - FC 17 0 17 Bore well
6 2 2 MPWS Sub-Surface Bore well - - - - 0 - FC 13 0 13 Bore well
15 4 3 MPWS Sub-Surface Bore well - - - - 0 - FC 31 0 31 Bore well
26 3 2 MPWS Sub-Surface Bore well - - - - 0 - FC 54 0 54 Bore well
12 4 3 MPWS Sub-Surface Bore well - - - - 0 - FC 25 0 25 Bore well
7 2 2 MPWS Sub-Surface Bore well - - - - 0 - FC 16 0 16 Bore well
5 7 6 MPWS Sub-Surface Bore well - - - - 0 - FC 12 0 12 Bore well
4 2 2 MPWS Sub-Surface Bore well - - - - 0 - FC 9 0 9 Bore well
9 3 2 MPWS Sub-Surface Bore well - - - - 0 - PC4 19 0 19 Bore well
4 4 3 MPWS Sub-Surface Bore well - - - - 0 - FC 9 0 9 Bore well
4 8 7 MPWS Sub-Surface Bore well - - - - 0 - FC 8 0 8 Bore well
2 1 1 MPWS Sub-Surface Bore well - - - - 0 - FC 5 0 5 Bore well
Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

3 2 2 MPWS Sub-Surface Bore well - - - - 0 - FC 6 0 6 Bore well


5 1 1 MPWS Sub-Surface Bore well - - - - 0 - FC 11 0 11 Bore well
6 1 1 MPWS Sub-Surface Bore well - - - - 0 - FC 12 0 12 Bore well
1 1 1 DP Sub-Surface Bore well - - - - 0 - PC2 3 0 3 Bore well
1 2 2 DP Sub-Surface Bore well - - - - 0 - PC3 3 0 3 Bore well
7 0 0 MPWS Sub-Surface Bore well - - - - 0 - FC 15 0 15 Bore well
7 2 2 MPWS Sub-Surface Bore well - - - - 0 - FC 16 0 16 Bore well
13 8 7 MPWS Sub-Surface Bore well - - - - 0 - FC 26 0 26 Bore well
4 2 2 MPWS Sub-Surface Bore well - - - - 0 - FC 9 0 9 Bore well
8 4 3 MPWS Sub-Surface Bore well - - - - 0 - FC 16 0 16 Bore well
1 3 2 MPWS Sub-Surface Bore well - - - - 0 - PC4 3 0 3 Bore well
1 2 2 DP Sub-Surface Bore well - - - - 0 - PC4 2 0 2 Bore well
8 2 2 MPWS Sub-Surface Bore well - - - - 0 - PC3 17 0 17 Bore well
5 2 2 MPWS Sub-Surface Bore well - - - - 0 - FC 12 0 12 Bore well
5 2 2 MPWS Sub-Surface Bore well - - - - 0 - FC 10 0 10 Bore well
3 0 0 MPWS Sub-Surface Bore well - - - - 0 - FC 7 0 7 Bore well
Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

8 5 4 MPWS Sub-Surface Bore well - - - - 0 - PC4 16 0 16 Bore well


2 2 2 DP Sub-Surface Bore well - - - - 0 - FC 5 0 5 Bore well
6 1 1 MPWS Sub-Surface Bore well - - - - 0 - FC 12 0 12 Bore well
16 6 5 MPWS Sub-Surface Bore well - - - - 0 - PC4 33 0 33 Bore well
5 1 1 MPWS Sub-Surface Bore well - - - - 0 - PC3 12 0 12 Bore well
4 1 1 MPWS Sub-Surface Bore well - - - - 0 - FC 9 0 9 Bore well
15 4 3 MPWS Sub-Surface Bore well - - - - 0 - FC 32 0 32 Bore well
1 1 1 MPWS Sub-Surface Bore well - - - - 0 - FC 2 0 2 Bore well
3 5 4 MPWS Sub-Surface Bore well - - - - 0 - FC 8 0 8 Bore well
1 1 1 DP Sub-Surface Bore well - - - - 0 - FC 2 0 2 Bore well
6 4 3 MPWS Sub-Surface Bore well - - - - 0 - FC 13 0 13 Bore well
1 2 2 DP Sub-Surface Bore well - - - - 0 - FC 2 0 2 Bore well
4 7 6 MPWS Sub-Surface Bore well - - - - 0 - FC 8 0 8 Bore well
2 3 2 DP Sub-Surface Bore well - - - - 0 - FC 5 0 5 Bore well
3 1 1 MPWS Sub-Surface Bore well - - - - 0 - FC 6 0 6 Bore well
1 2 2 DP Sub-Surface Bore well - - - - 0 - PC3 3 0 3 Bore well
Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

1 2 2 DP Sub-Surface Bore well - - - - 0 - PC3 3 0 3 Bore well


15 9 8 MPWS Sub-Surface Bore well - - - - 0 - FC 31 0 31 Bore well
1 3 2 DP Sub-Surface Bore well - - - - 0 - PC4 3 0 3 Bore well
2 4 3 DP Sub-Surface Bore well - - - - 0 - PC4 4 0 4 Bore well
2 1 1 DP Sub-Surface Bore well - - - - 0 - FC 5 0 5 Bore well
9 11 10 MPWS Sub-Surface Bore well - - - - 0 - FC 20 0 20 Bore well
3 3 2 MPWS Sub-Surface Bore well - - - - 0 - PC3 6 0 6 Bore well
3 10 9 MPWS Sub-Surface Bore well - - - - 0 - FC 6 0 6 Bore well
2 6 5 DP Sub-Surface Bore well - - - - 0 - FC 5 0 5 Bore well
2 2 2 DP Sub-Surface Bore well - - - - 0 - FC 5 0 5 Bore well
2 4 3 DP Sub-Surface Bore well - - - - 0 - PC4 5 0 5 Bore well
3 3 2 MPWS Sub-Surface Bore well - - - - 0 - FC 6 0 6 Bore well
8 5 4 MPWS Sub-Surface Bore well - - - - 0 - FC 17 0 17 Bore well
5 2 2 MPWS Sub-Surface Bore well - - - - 0 - FC 10 0 10 Bore well
0 2 2 MPWS Sub-Surface Bore well - - - - 0 - FC 1 0 1 Bore well
2 6 5 PWS Sub-Surface Bore well - - - - 0 - FC 5 10 -5 Bore well
Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

3 4 3 MPWS Sub-Surface Bore well - - - - 0 - FC 7 0 7 Bore well


3 2 2 MPWS Sub-Surface Bore well - - - - 0 - FC 6 0 6 Bore well
2 3 2 DP Sub-Surface Bore well - - - - 0 - FC 5 0 5 Bore well
17 5 4 PWS Sub-Surface Bore well - - - - 0 - FC 36 40 -4 Bore well
4 6 5 MPWS Sub-Surface Bore well - - - - 0 - FC 9 0 9 Bore well
1 5 4 DP Sub-Surface Bore well - - - - 0 - FC 3 0 3 Bore well
1 1 1 DP Sub-Surface Bore well - - - - 0 - PC2 3 0 3 Bore well
2 3 2 DP Sub-Surface Bore well - - - - 0 - PC3 5 0 5 Bore well
7 6 5 MPWS Sub-Surface Bore well - - - - 0 - FC 15 0 15 Bore well
6 5 4 PWS Sub-Surface Bore well - - - - 0 - FC 13 20 -7 Bore well
10 8 7 PWS Sub-Surface Bore well - - - - 0 - FC 22 20 2 Bore well
1 4 3 DP Sub-Surface Bore well - - - - 0 - FC 3 0 3 Bore well
1 1 1 PWS Sub-Surface Bore well - - - - 0 - PC3 2 10 -8 Bore well
1 1 1 DP Sub-Surface Bore well - - - - 0 - PC3 2 0 2 Bore well
2 4 3 DP Sub-Surface Bore well - - - - 0 - FC 5 0 5 Bore well
2 2 2 DP Sub-Surface Bore well - - - - 0 - PC3 4 0 4 Bore well
Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

12 15 14 PWS Sub-Surface Bore well - - - - 0 - FC 25 20 5 Bore well


2 3 2 DP Sub-Surface Bore well - - - - 0 - PC3 4 0 4 Bore well
2 7 6 PWS Sub-Surface Bore well - - - - 0 - FC 5 10 -5 Bore well
2 1 1 DP Sub-Surface Bore well - - - - 0 - FC 4 0 4 Bore well
3 8 7 PWS Sub-Surface Bore well - - - - 0 - FC 6 10 -4 Bore well
2 3 2 DP Sub-Surface Bore well - - - - 0 - PC3 4 0 4 Bore well
1 1 1 DP Sub-Surface Bore well - - - - 0 - PC2 3 0 3 Bore well
2 0 0 DP Sub-Surface Bore well - - - - 0 - FC 5 0 5 Bore well
3 4 3 MPWS Sub-Surface Bore well - - - - 0 - PC3 6 0 6 Bore well
7 1 1 MPWS Sub-Surface Bore well - - - - 0 - FC 14 0 14 Bore well
4 5 4 MPWS Sub-Surface Bore well - - - - 0 - FC 9 0 9 Bore well
2 2 2 DP Sub-Surface Bore well - - - - 0 - PC3 4 0 4 Bore well
6 3 2 MPWS Sub-Surface Bore well - - - - 0 - PC4 13 0 13 Bore well
1 2 2 DP Sub-Surface Bore well - - - - 0 - FC 2 0 2 Bore well
5 2 2 PWS Sub-Surface Bore well - - - - 0 - FC 10 10 0 Bore well
6 4 3 MPWS Sub-Surface Bore well - - - - 0 - FC 14 0 14 Bore well
Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

1 4 3 DP Sub-Surface Bore well - - - - 0 - FC 2 0 2 Bore well


5 2 2 PWS Sub-Surface Bore well - - - - 0 - FC 11 20 -9 Bore well
2 3 2 MPWS Sub-Surface Bore well - - - - 0 - FC 6 0 6 Bore well
6 2 2 PWS Sub-Surface Bore well - - - - 0 - FC 13 20 -7 Bore well
2 2 2 DP Sub-Surface Bore well - - - - 0 - FC 5 0 5 Bore well
3 4 3 PWS Sub-Surface Bore well - - - - 0 - FC 7 10 -3 Bore well
6 3 2 PWS Sub-Surface Bore well - - - - 0 - PC4 12 20 -8 Bore well
6 0 0 MPWS Sub-Surface Bore well - - - - 0 - FC 13 0 13 Bore well
3 2 2 MPWS Sub-Surface Bore well - - - - 0 - PC3 7 0 7 Bore well
5 3 2 PWS Sub-Surface Bore well - - - - 0 - FC 10 10 0 Bore well
1 2 2 DP Sub-Surface Bore well - - - - 0 - FC 2 0 2 Bore well
1 1 1 PWS Sub-Surface Bore well - - - - 0 - FC 3 10 -7 Bore well
7 1 1 MPWS Sub-Surface Bore well - - - - 0 - FC 14 0 14 Bore well
5 4 3 PWS Sub-Surface Bore well - - - - 0 - PC4 11 20 -9 Bore well
2 1 1 DP Sub-Surface Bore well - - - - 0 - PC3 5 0 5 Bore well
2 2 2 PWS Sub-Surface Bore well - - - - 0 - FC 5 10 -5 Bore well
Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

2 2 2 DP Sub-Surface Bore well - - - - 0 - PC3 5 0 5 Bore well


2 2 2 DP Sub-Surface Bore well - - - - 0 - PC3 4 0 4 Bore well
1 1 1 PWS Sub-Surface Bore well - - - - 0 - FC 3 10 -7 Bore well
1 1 1 DP Sub-Surface Bore well - - - - 0 - FC 2 0 2 Bore well
3 4 3 PWS Sub-Surface Bore well - - - - 0 - FC 7 10 -3 Bore well
3 1 1 PWS Sub-Surface Bore well - - - - 0 - FC 6 10 -4 Bore well
2 1 1 PWS Sub-Surface Bore well - - - - 0 - FC 5 10 -5 Bore well
5 3 2 PWS Sub-Surface Bore well - - - - 0 - FC 10 10 0 Bore well
5 1 1 PWS Sub-Surface Bore well - - - - 0 - FC 10 10 0 Bore well
3 1 1 PWS Sub-Surface Bore well - - - - 0 - FC 6 10 -4 Bore well
3 1 1 PWS Sub-Surface Bore well - - - - 0 - FC 6 10 -4 Bore well
4 4 3 PWS Sub-Surface Bore well - - - - 0 - FC 9 10 -1 Bore well
3 2 2 PWS Sub-Surface Bore well - - - - 0 - FC 7 10 -3 Bore well
2 2 2 PWS Sub-Surface Bore well - - - - 0 - FC 4 10 -6 Bore well
2 2 2 PWS Sub-Surface Bore well - - - - 0 - FC 5 10 -5 Bore well
31 10 9 PWS Sub-Surface Bore well - - - - 0 - PC3 64 60 4 Bore well
Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

9 2 2 PWS Sub-Surface Bore well - - - - 0 - FC 18 20 -2 Bore well


6 3 2 MPWS Sub-Surface Bore well - - - - 0 - PC4 14 0 14 Bore well
5 5 4 MPWS Sub-Surface Bore well - - - - 0 - FC 11 0 11 Bore well
1 1 1 DP Sub-Surface Bore well - - - - 0 - PC4 2 0 2 Bore well
4 4 3 MPWS Sub-Surface Bore well - - - - 0 - FC 9 0 9 Bore well
5 2 2 PWS Sub-Surface Bore well - - - - 0 - FC 11 20 -9 Bore well
2 2 2 DP Sub-Surface Bore well - - - - 0 - PC3 4 0 4 Bore well
4 0 0 PWS Sub-Surface Bore well - - - - 0 - FC 8 10 -2 Bore well
5 1 1 PWS Sub-Surface Bore well - - - - 0 - FC 11 20 -9 Bore well
2 1 1 DP Sub-Surface Bore well - - - - 0 - PC4 5 0 5 Bore well
3 3 2 PWS Sub-Surface Bore well - - - - 0 - FC 6 10 -4 Bore well
3 2 2 PWS Sub-Surface Bore well - - - - 0 - FC 6 10 -4 Bore well
1 1 1 DP Sub-Surface Bore well - - - - 0 - PC2 2 0 2 Bore well
1 3 2 DP Sub-Surface Bore well - - - - 0 - FC 2 0 2 Bore well
3 2 2 PWS Sub-Surface Bore well - - - - 0 - FC 6 10 -4 Bore well
1 2 2 PWS Sub-Surface Bore well - - - - 0 - FC 3 10 -7 Bore well
Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

5 4 3 PWS Sub-Surface Bore well - - - - 0 - FC 11 20 -9 Bore well


4 1 1 MPWS Sub-Surface Bore well - - - - 0 - PC3 8 0 8 Bore well
3 2 2 PWS Sub-Surface Bore well - - - - 0 - FC 6 10 -4 Bore well
1 2 2 DP Sub-Surface Bore well - - - - 0 - PC4 3 0 3 Bore well
7 2 2 PWS Sub-Surface Bore well - - - - 0 - FC 16 20 -4 Bore well
4 3 2 PWS Sub-Surface Bore well - - - - 0 - FC 10 10 0 Bore well
3 1 1 PWS Sub-Surface Bore well - - - - 0 - FC 7 10 -3 Bore well
1 0 0 DP Sub-Surface Bore well - - - - 0 - FC 3 0 3 Bore well
4 3 2 PWS Sub-Surface Bore well - - - - 0 - FC 9 10 -1 Bore well
2 1 1 DP Sub-Surface Bore well - - - - 0 - FC 4 0 4 Bore well
7 4 3 MPWS Sub-Surface Bore well - - - - 0 - PC3 15 0 15 Bore well
4 1 1 PWS Sub-Surface Bore well - - - - 0 - FC 9 10 -1 Bore well
1 2 2 DP Sub-Surface Bore well - - - - 0 - PC4 3 0 3 Bore well
22 1 1 PWS Sub-Surface Bore well - - - - 0 - FC 46 40 6 Bore well
2 2 2 DP Sub-Surface Bore well - - - - 0 - FC 4 0 4 Bore well
4 3 2 PWS Sub-Surface Bore well - - - - 0 - FC 9 10 -1 Bore well
Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

1 9 8 PWS Sub-Surface Bore well - - - - 0 - FC 3 10 -7 Bore well


2 2 2 PWS Sub-Surface Bore well - - - - 0 - FC 5 10 -5 Bore well
6 5 4 MPWS Sub-Surface Bore well - - - - 0 - FC 12 0 12 Bore well
5 2 2 PWS Sub-Surface Bore well - - - - 0 - FC 11 20 -9 Bore well
37 5 4 PWS Sub-Surface Bore well - - - - 0 - FC 77 60 17 Bore well
2 3 2 MPWS Sub-Surface Bore well - - - - 0 - Covered 2 0 2 Bore well
2 5 3 DP Sub-Surface Bore well - - - - 0 - Covered 2 0 2 Bore well
3 2 1 MPWS Sub-Surface Bore well - - - - 0 - Covered 3 0 3 Bore well
2 3 1 DP Sub-Surface Bore well - - - - 0 - Covered 2 0 2 Bore well
1 1 1 DP Sub-Surface Bore well - - - - 0 - Covered 1 0 1 Bore well
2 2 1 DP Sub-Surface Bore well - - - - 0 - Covered 2 0 2 Bore well
5 2 1 MPWS Sub-Surface Bore well - - - - 0 - Covered 5 0 5 Bore well
2 3 1 DP Sub-Surface Bore well - - - - 0 - Covered 2 0 2 Bore well
2 2 2 DP Sub-Surface Bore well - - - - 0 - Covered 2 0 2 Bore well
2 4 3 DP Sub-Surface Bore well - - - - 0 - Covered 2 0 2 Bore well
1 2 1 DP Sub-Surface Bore well - - - - 0 - Covered 1 0 1 Bore well
Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

3 2 2 MPWS Sub-Surface Bore well - - - - 0 - Covered 3 0 3 Bore well


4 3 2 DP Sub-Surface Bore well - - - - 0 - Covered 4 0 4 Bore well
4 3 2 MPWS Sub-Surface Bore well - - - - 0 - Covered 4 0 4 Bore well
2 3 3 DP Sub-Surface Bore well - - - - 0 - Covered 2 0 2 Bore well
4 2 2 DP Sub-Surface Bore well - - - - 0 - Covered 4 0 4 Bore well
2 2 2 DP Sub-Surface Bore well - - - - 0 - Covered 2 0 2 Bore well
12 6 4 MPWS Sub-Surface Bore well - - - - 0 - Covered 12 0 12 Bore well
14 4 3 MPWS Sub-Surface Bore well - - - - 0 - Covered 14 0 14 Bore well
5 1 1 MPWS Sub-Surface Bore well - - - - 0 - Covered 5 0 5 Bore well

5 3 2 MPWS Sub-Surface Bore well - - - - 0 - Covered 5 0 5 Bore well

2 2 1 DP Sub-Surface Bore well - - - - 0 - Covered 2 0 2 Bore well


4 2 1 MPWS Sub-Surface Bore well - - - - 0 - Covered 4 0 4 Bore well
10 3 1 MPWS Sub-Surface Bore well - - - - 0 - Covered 10 0 10 0
13 8 6 MPWS Sub-Surface Bore well - - - - 0 - Covered 13 0 13 Bore well
4 4 3 MPWS Sub-Surface Bore well - - - - 0 - Covered 4 0 4 Bore well
4 4 3 MPWS Sub-Surface Bore well - - - - 0 - Covered 4 0 4 Bore well
Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

3 3 2 MPWS Sub-Surface Bore well - - - - 0 - Covered 3 0 3 Bore well


2 9 8 DP Sub-Surface Bore well - - - - 0 - Covered 2 0 2 Bore well
16 7 7 MPWS Sub-Surface Bore well - - - - 0 - Covered 16 0 16 Bore well
1 2 2 DP Sub-Surface Bore well - - - - 0 - Covered 1 0 1 Bore well
1 2 2 DP Sub-Surface Bore well - - - - 0 - Covered 1 0 1 Bore well
5 3 2 MPWS Sub-Surface Bore well - - - - 0 - Covered 5 0 5 Bore well
3 5 3 MPWS Sub-Surface Bore well - - - - 0 - Covered 3 0 3 Bore well
1 2 2 DP Sub-Surface Bore well - - - - 0 - Covered 1 0 1 Bore well
1 2 2 DP Sub-Surface Bore well - - - - 0 - Covered 1 0 1 Bore well
2 3 3 DP Sub-Surface Bore well - - - - 0 - Covered 2 0 2 Bore well
5 2 2 MPWS Sub-Surface Bore well - - - - 0 - Covered 5 0 5 Bore well
3 2 2 MPWS Sub-Surface Bore well - - - - 0 - Covered 3 0 3 Bore well
2 2 2 DP Sub-Surface Bore well - - - - 0 - Covered 2 0 2 Bore well
1 3 3 DP Sub-Surface Bore well - - - - 0 - Covered 1 0 1 Bore well
1 2 2 DP Sub-Surface Bore well - - - - 0 - Covered 1 0 1 Bore well
2 4 3 DP Sub-Surface Bore well - - - - 0 - Covered 2 0 2 Bore well
Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

2 2 2 DP Sub-Surface Bore well - - - - 0 - Covered 2 0 2 Bore well


3 3 2 MPWS Sub-Surface Bore well - - - - 0 - Covered 3 0 3 Bore well
5 3 3 MPWS Sub-Surface Bore well - - - - 0 - Covered 5 0 5 Bore well
7 5 5 MPWS Sub-Surface Bore well - - - - 0 - Covered 7 0 7 0
1 2 2 DP Sub-Surface Bore well - - - - 0 - Covered 1 0 1 Bore well
1 4 4 DP Sub-Surface Bore well - - - - 0 - Covered 1 0 1 Bore well
4 5 4 MPWS Sub-Surface Bore well - - - - 0 - Covered 4 0 4 Bore well
6 5 4 MPWS Sub-Surface Bore well - - - - 0 - Covered 6 0 6 Bore well
4 3 3 MPWS Sub-Surface Bore well - - - - 0 - Covered 4 0 4 Bore well
1 3 2 DP Sub-Surface Bore well - - - - 0 - Covered 1 0 1 Bore well
4 4 4 MPWS Sub-Surface Bore well - - - - 0 - Covered 4 0 4 Bore well
3 5 4 MPWS Sub-Surface Bore well - - - - 0 - Covered 3 0 3 Bore well
2 3 2 DP Sub-Surface Bore well - - - - 0 - Covered 2 0 2 Bore well
1 3 3 DP Sub-Surface Bore well - - - - 0 - Covered 1 0 1 Bore well
10 10 8 MPWS Sub-Surface Bore well - - - - 0 - Covered 10 0 10 0
5 4 3 DP Sub-Surface Bore well - - - - 0 - Un Covered 5 0 5 Bore well
Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

1 1 1 DP Sub-Surface Bore well - - - - 0 - Un Covered 1 0 1 Bore well


1 10 8 DP Sub-Surface Bore well - - - - 0 - Un Covered 1 0 1 Bore well
1 19 16 DP Sub-Surface Bore well - - - - 0 - Un Covered 1 0 1 Bore well
2 13 10 DP Sub-Surface Bore well - - - - 0 - Un Covered 2 0 2 Bore well
3 11 8 DP Sub-Surface Bore well - - - - 0 - Un Covered 3 0 3 Bore well
2 11 6 DP Sub-Surface Bore well - - - - 0 - Un Covered 2 0 2 Bore well
2 10 7 DP Sub-Surface Bore well - - - - 0 - Un Covered 2 0 2 Bore well
2 13 9 DP Sub-Surface Bore well - - - - 0 - Un Covered 2 0 2 Bore well
9 12 11 DP Sub-Surface Bore well - - - - 0 - Un Covered 9 0 9 Bore well
1 8 6 DP Sub-Surface Bore well - - - - 0 - Un Covered 1 0 1 Bore well
1 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 1 0 1 Bore well
1 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 1 0 1 Bore well
1 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 1 0 1 Bore well
1 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 1 0 1 Bore well
3 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 3 0 3 Bore well
3 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 3 0 3 Bore well
Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

7 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 7 0 7 Bore well


2 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 2 0 2 Bore well
2 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 2 0 2 Bore well
1 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 1 0 1 Bore well
2 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 2 0 2 Bore well
2 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 2 0 2 Bore well
2 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 2 0 2 Bore well
2 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 2 0 2 Bore well
2 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 2 0 2 Bore well
4 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 4 0 4 Bore well
3 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 3 0 3 Bore well
4 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 4 0 4 Bore well
9 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 9 0 9 Bore well
9 7 5 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 9 0 9 Bore well
8 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 8 0 8 Bore well
5 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 5 0 5 Bore well
Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

4 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 4 0 4 Bore well


4 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 4 0 4 Bore well
11 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 11 0 11 Bore well
7 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 7 0 7 Bore well
4 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 4 0 4 Bore well
11 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 11 0 11 Bore well
1 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 1 0 1 Bore well
6 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 6 0 6 Bore well
3 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 3 0 3 Bore well
12 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 12 0 12 Bore well
10 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 10 0 10 Bore well
2 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 2 0 2 Bore well
2 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 2 0 2 Bore well

11 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 11 0 11 Bore well

2 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 2 0 2 Bore well


2 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 2 0 2 Bore well
Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

4 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 4 0 4 Bore well

4 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 4 0 4 Bore well

3 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 3 0 3 Bore well


6 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 6 0 6 Bore well
2 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 2 0 2 Bore well
3 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 3 0 3 Bore well
3 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 3 0 3 Bore well
3 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 3 0 3 Bore well
4 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 4 0 4 Bore well
2 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 2 0 2 Bore well
2 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 2 0 2 Bore well
2 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 2 0 2 Bore well
5 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 5 0 5 Bore well
3 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 3 0 3 Bore well
3 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 3 0 3 Bore well
4 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 4 0 4 Bore well
Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

7 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 7 0 7 Bore well


10 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 10 0 10 Bore well
7 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 7 0 7 Bore well
8 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 8 0 8 Bore well
1 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 1 0 1 Bore well
6 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 6 0 6 Bore well
3 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 3 0 3 Bore well
30 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 30 0 30 Bore well

1 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 1 0 1 Bore well

2 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 2 0 2 Bore well


3 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 3 0 3 Bore well
12 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 12 0 12 Bore well
22 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 22 0 22 Bore well
3 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 3 0 3 Bore well
2 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 2 0 2 Bore well
2 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 2 0 2 Bore well
Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

1 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 1 0 1 Bore well


2 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 2 0 2 Bore well
2 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 2 0 2 Bore well
1 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 1 0 1 Bore well
1 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 1 0 1 Bore well
1 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 1 0 1 Bore well

1 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 1 0 1 Bore well

7 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 7 0 7 Bore well


1 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 1 0 1 Bore well
6 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 6 0 6 Bore well
2 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 2 0 2 Bore well
4 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 4 0 4 Bore well
1 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 1 0 1 Bore well
1 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 1 0 1 Bore well
1 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 1 0 1 Bore well
1 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 1 0 1 Bore well
Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

4 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 4 0 4 Bore well


1 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 1 0 1 Bore well
1 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 1 0 1 Bore well
2 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 2 0 2 Bore well
1 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 1 0 1 Bore well
2 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 2 0 2 Bore well
2 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 2 0 2 Bore well
2 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 2 0 2 Bore well
2 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 2 0 2 Bore well
5 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 5 0 5 Bore well
1 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 1 0 1 Bore well
3 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 3 0 3 Bore well
3 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 3 0 3 Bore well
1 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 1 0 1 Bore well
2 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 2 0 2 Bore well
5 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 5 0 5 Bore well
Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

0 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 0 0 0 Bore well


1 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 1 0 1 Bore well
2 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 2 0 2 Bore well
0 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 0 0 0 Bore well
1 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 1 0 1 Bore well
3 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 3 0 3 Bore well
3 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 3 0 3 Bore well
5 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 5 0 5 Bore well
1 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 1 0 1 Bore well
1 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 1 0 1 Bore well
5 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 5 0 5 Bore well
1 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 1 0 1 Bore well
2 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 2 0 2 Bore well
1 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 1 0 1 Bore well
5 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 5 0 5 Bore well

1 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 1 0 1 Bore well


Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

3 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 3 0 3 Bore well


2 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 2 0 2 Bore well
4 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 4 0 4 Bore well
2 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 2 0 2 Bore well
1 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 1 0 1 Bore well
2 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 2 0 2 Bore well
0 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 0 0 0 Bore well
4 7 5 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 4 0 4 Bore well

1 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 1 0 1 Bore well

2 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 2 0 2 Bore well

4 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 4 0 4 Bore well


3 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 3 0 3 Bore well
3 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 3 0 3 Bore well
2 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 2 0 2 Bore well
1 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 1 0 1 Bore well
3 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 3 0 3 Bore well
Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

0 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 0 0 0 Bore well


2 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 2 0 2 Bore well
1 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 1 0 1 Bore well
22 7 5 PWS Sub-Surface Bore well - - - - 0 - Un Covered 22 20 2 Bore well
1 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 1 0 1 Bore well
2 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 2 0 2 Bore well
6 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 6 0 6 Bore well
1 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 1 0 1 Bore well
7 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 7 0 7 Bore well
3 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 3 0 3 Bore well
9 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 9 0 9 Bore well
0 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 0 0 0 Bore well
4 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 4 0 4 Bore well
6 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 6 0 6 Bore well
2 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 2 0 2 Bore well
1 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 1 0 1 Bore well
Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

4 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 4 0 4 Bore well


1 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 1 0 1 Bore well
1 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 1 0 1 Bore well
2 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 2 0 2 Bore well
0 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 0 0 0 Bore well
2 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 2 0 2 Bore well
0 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 0 0 0 Bore well
1 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 1 0 1 Bore well
3 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 3 0 3 Bore well
1 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 1 0 1 Bore well
2 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 2 0 2 Bore well
1 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 1 0 1 Bore well
2 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 2 0 2 Bore well

6 7 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 6 0 6 Bore well

4 2 2 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 4 0 4 Bore well


27 8 8 PWS Sub-Surface Bore well - - - - 0 - Un Covered 27 40 -13 Bore well
Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

19 4 3 DP Sub-Surface Bore well - - - - 0 - Un Covered 19 0 19 Bore well


2 10 8 DP Sub-Surface Bore well - - - - 0 - Un Covered 2 0 2 Bore well

48 13 10 DP Sub-Surface Bore well - - - - 0 - Un Covered 48 0 48 Bore well

22 11 8 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 22 0 22 Bore well


29 10 8 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 29 0 29 Bore well
75 11 6 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 75 0 75 Bore well

7 10 7 DP Sub-Surface Bore well - - - - 0 - Un Covered 7 0 7 Bore well

7 13 9 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 7 0 7 Bore well


68 11 9 DP Sub-Surface Bore well - - - - 0 - Un Covered 68 0 68 Bore well
16 12 11 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 16 0 16 Bore well
20 4 3 DP Sub-Surface Bore well - - - - 0 - Un Covered 20 0 20 Bore well
36 8 6 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 36 0 36 Bore well

49 7 5 PWS Sub-Surface Bore well - - - - 0 - Un Covered 49 40 9 Bore well

22 15 11 PWS Sub-Surface Bore well - - - - 0 - Covered 22 20 2 Bore well


Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

51 2 2 PWS Sub-Surface Bore well - - - - 0 - Covered 51 60 -9 Bore well

7 7 5 PWS Sub-Surface Bore well - - - - 0 - Covered 7 10 -3 Bore well


55 25 20 PWS Sub-Surface Bore well - - - - 0 - Covered 55 60 -5 Bore well

18 15 11 PWS Sub-Surface Bore well - - - - 0 - Covered 18 20 -2 Bore well

7 7 5 MPWS Sub-Surface Bore well - - - - 0 - Covered 7 0 7 Bore well


8 6 4 MPWS Sub-Surface Bore well - - - - 0 - Covered 8 0 8 Bore well
25 6 5 MPWS Sub-Surface Bore well - - - - 0 - Covered 25 0 25 Bore well

63 2 2 MPWS Sub-Surface Bore well - - - - 0 - Covered 63 0 63 Bore well

3 1 1 MPWS Sub-Surface Bore well - - - - 0 - Covered 3 0 3 Bore well


12 7 5 MPWS Sub-Surface Bore well - - - - 0 - Covered 12 0 12 Bore well
20 25 20 PWS Sub-Surface Bore well - - - - 0 - Covered 20 20 0 Bore well
13 11 8 PWS Sub-Surface Bore well - - - - 0 - Covered 13 20 -7 Bore well
13 12 9 PWS Sub-Surface Bore well - - - - 0 - Covered 13 20 -7 Bore well
10 19 16 PWS Sub-Surface Bore well - - - - 0 - Covered 10 10 0 Bore well
8 99 90 PWS Sub-Surface Bore well - - - - 0 - Covered 8 10 -2 Bore well
Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

7 11 8 PWS Sub-Surface Bore well - - - - 0 - Covered 7 10 -3 Bore well


20 11 6 PWS Sub-Surface Bore well - - - - 0 - Covered 20 20 0 Bore well
13 4 3 PWS Sub-Surface Bore well - - - - 0 - Covered 13 20 -7 Bore well
11 2 2 PWS Sub-Surface Bore well - - - - 0 - Covered 11 20 -9 Bore well

39 10 7 MPWS Sub-Surface Bore well - - - - 0 - Covered 39 0 39 Bore well

12 13 9 PWS Sub-Surface Bore well - - - - 0 - Covered 12 20 -8 Bore well


20 4 3 PWS Sub-Surface Bore well - - - - 0 - Covered 20 20 0 Bore well
18 3 3 PWS Sub-Surface Bore well - - - - 0 - Covered 18 20 -2 Bore well
77 19 16 PWS Sub-Surface Bore well - - - - 0 - Covered 77 60 17 Bore well
67 80 74 PWS Sub-Surface Bore well - - - - 0 - Covered 67 60 7 Bore well
20 11 8 PWS Sub-Surface Bore well - - - - 0 - Covered 20 20 0 Bore well

3 2 2 PWS Sub-Surface Bore well - - - - 0 - Covered 3 10 -7 Bore well

1 8 6 PWS Sub-Surface Bore well - - - - 0 - Covered 1 10 -9 Bore well


4 8 6 PWS Sub-Surface Bore well - - - - 0 - Covered 4 10 -6 Bore well

55 38 35 PWS Sub-Surface Bore well - - - - 0 - Covered 55 60 -5 Bore well


Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

7 11 9 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 7 0 7 Bore well


9 8 7 PWS Sub-Surface Bore well - - - - 0 - Covered 9 10 -1 Bore well
41 11 8 MPWS Sub-Surface Bore well - - - - 0 - Covered 41 0 41 Bore well
15 12 11 PWS Sub-Surface Bore well - - - - 0 - Covered 15 20 -5 Bore well
27 5 5 PWS Sub-Surface Bore well - - - - 0 - Covered 27 40 -13 Bore well
6 4 3 MPWS Sub-Surface Bore well - - - - 0 - Covered 6 0 6 Bore well

3 4 2 MPWS Sub-Surface Bore well - - - - 0 - Covered 3 0 3 Bore well

20 11 8 MPWS Sub-Surface Bore well - - - - 0 - Covered 20 0 20 Bore well

15 7 5 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 15 0 15 Bore well

36 25 20 PWS Sub-Surface Bore well - - - - 0 - Un Covered 36 40 -4 Bore well


19 12 9 PWS Sub-Surface Bore well - - - - 0 - Covered 19 20 -1 Bore well
20 19 16 PWS Sub-Surface Bore well - - - - 0 - Covered 20 20 0 Bore well
36 13 10 PWS Sub-Surface Bore well - - - - 0 - Covered 36 40 -4 Bore well
36 11 8 PWS Sub-Surface Bore well - - - - 0 - Covered 36 40 -4 Bore well
221 99 90 PWS Sub-Surface Bore well - - - - 0 - Covered 221 200 21 Bore well
Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

10 11 8 PWS Sub-Surface Bore well - - - - 0 - Covered 10 10 0 Bore well


12 10 8 MPWS Sub-Surface Bore well - - - - 0 - Covered 12 0 12 Bore well
20 11 6 MPWS Sub-Surface Bore well - - - - 0 - Covered 20 0 20 Bore well
13 10 7 MPWS Sub-Surface Bore well - - - - 0 - Covered 13 0 13 Bore well
13 13 9 MPWS Sub-Surface Bore well - - - - 0 - Covered 13 0 13 Bore well
57 2 2 MPWS Sub-Surface Bore well - - - - 0 - Covered 57 0 57 Bore well
7 1 1 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 7 0 7 Bore well
6 1 1 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 6 0 6 Bore well
6 1 1 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 6 0 6 Bore well
68 23 20 PWS Sub-Surface Bore well - - - - 0 - Covered 68 60 8 Bore well
5 2 2 PWS Sub-Surface Bore well - - - - 0 - Covered 5 10 -5 Bore well
2 11 10 DP Sub-Surface Bore well - - - - 0 - Un Covered 2 0 2 Bore well
50 14 10 PWS Sub-Surface Bore well - - - - 0 - Covered 50 40 10 Bore well
29 13 10 PWS Sub-Surface Bore well - - - - 0 - Covered 29 40 -11 Bore well

75 17 15 PWS Sub-Surface Bore well - - - - 0 - Covered 75 60 15 Bore well

12 1 1 PWS Sub-Surface Bore well - - - - 0 - Covered 12 20 -8 Bore well


Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

13 10 8 MPWS Sub-Surface Bore well - - - - 0 - Covered 13 0 13 Bore well


7 5 4 MPWS Sub-Surface Bore well - - - - 0 - Covered 7 0 7 Bore well
12 6 5 MPWS Sub-Surface Bore well - - - - 0 - Covered 12 0 12 Bore well

20 7 7 MPWS Sub-Surface Bore well - - - - 0 - Covered 20 0 20 Bore well

13 7 7 MPWS Sub-Surface Bore well - - - - 0 - Covered 13 0 13 Bore well

6 9 9 MPWS Sub-Surface Bore well - - - - 0 - Covered 6 0 6 Bore well


8 10 8 PWS Sub-Surface Bore well - - - - 0 - Covered 8 10 -2 Bore well
21 10 7 MPWS Sub-Surface Bore well - - - - 0 - Covered 21 0 21 Bore well
25 8 8 PWS Sub-Surface Bore well - - - - 0 - Covered 25 20 5 Bore well
51 11 10 PWS Sub-Surface Bore well - - - - 0 - Un Covered 51 60 -9 Bore well

7 1 1 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 7 0 7 Bore well

55 22 20 PWS Sub-Surface Bore well - - - - 0 - Covered 55 60 -5 Bore well


6 4 4 MPWS Sub-Surface Bore well - - - - 0 - Covered 6 0 6 Bore well
14 10 9 MPWS Sub-Surface Bore well - - - - 0 - Covered 14 0 14 Bore well
5 12 10 PWS Sub-Surface Bore well - - - - 0 - Covered 5 10 -5 Bore well
Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

17 12 8 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 17 0 17 Bore well


60 2 2 PWS Sub-Surface Bore well - - - - 0 - Covered 60 60 0 Bore well
53 17 15 PWS Sub-Surface Bore well - - - - 0 - Covered 53 60 -7 Bore well
4 3 3 MPWS Sub-Surface Bore well - - - - 0 - Covered 4 0 4 Bore well
3 3 3 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 3 0 3 Bore well
6 2 2 MPWS Sub-Surface Bore well - - - - 0 - Covered 6 0 6 Bore well
12 2 2 MPWS Sub-Surface Bore well - - - - 0 - Covered 12 0 12 Bore well
11 4 4 PWS Sub-Surface Bore well - - - - 0 - Covered 11 20 -9 Bore well
20 8 8 MPWS Sub-Surface Bore well - - - - 0 - Covered 20 0 20 Bore well
27 8 8 PWS Sub-Surface Bore well - - - - 0 - Covered 27 40 -13 Bore well
78 16 15 PWS Sub-Surface Bore well - - - - 0 - Covered 78 60 18 Bore well
12 6 5 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 12 0 12 Bore well
29 2 2 MPWS Sub-Surface Bore well - - - - 0 - Covered 29 0 29 Bore well
22 10 8 PWS Sub-Surface Bore well - - - - 0 - Covered 22 20 2 Bore well
14 5 5 MPWS Sub-Surface Bore well - - - - 0 - Covered 14 0 14 Bore well
14 7 7 PWS Sub-Surface Bore well - - - - 0 - Covered 14 20 -6 Bore well
Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

21 5 5 PWS Sub-Surface Bore well - - - - 0 - Un Covered 21 20 1 Bore well


7 3 3 PWS Sub-Surface Bore well - - - - 0 - Covered 7 10 -3 Bore well
28 13 12 MPWS Sub-Surface Bore well - - - - 0 - Covered 28 0 28 Bore well
11 4 2 PWS Sub-Surface Bore well - - - - 0 - Covered 11 20 -9 Bore well
18 8 8 MPWS Sub-Surface Bore well - - - - 0 - Covered 18 0 18 Bore well
11 12 10 PWS Sub-Surface Bore well - - - - 0 - Covered 11 20 -9 Bore well
9 4 3 PWS Sub-Surface Bore well - - - - 0 - Covered 9 10 -1 Bore well
11 4 3 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 11 0 11 Bore well
16 6 5 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 16 0 16 Bore well
3 2 1 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 3 0 3 Bore well
1 2 2 DP Sub-Surface Bore well - - - - 0 - Un Covered 1 0 1 Bore well
3 4 3 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 3 0 3 Bore well
8 4 3 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 8 0 8 Bore well
8 9 7 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 8 0 8 Bore well
5 6 5 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 5 0 5 Bore well
184 52 48 PWS Sub-Surface Bore well - - - - 0 - Covered 184 150 34 Bore well
Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

17 8 5 PWS Sub-Surface Bore well - - - - 0 - Covered 17 20 -3 Bore well


46 1 1 MPWS Sub-Surface Bore well - - - - 0 - Covered 46 0 46 Bore well
36 30 25 4 MPWS Sub-Surface Bore well - - - - 0 - Covered 36 0 36 Bore well
10 20 17 PWS Sub-Surface Bore well - - - - 0 - Covered 10 10 0 Bore well
MPWS &
29 18 14 Sub-Surface Bore well - - - - 0 - Covered 29 0 29 Bore well
DP
22 15 13 PWS Sub-Surface Bore well - - - - 0 - Covered 22 20 2 Bore well

55 39 35 PWS Sub-Surface Bore well - - - - 0 - Covered 55 60 -5 Bore well

71 17 14 PWS Sub-Surface Bore well - - - - 0 - Covered 71 60 11 Bore well

67 11 9 PWS Sub-Surface Bore well - - - - 0 - Covered 67 60 7 Bore well

30 17 15 PWS Sub-Surface Bore well - - - - 0 - Covered 30 40 -10 Bore well


9 8 5 PWS Sub-Surface Bore well - - - - 0 - Covered 9 10 -1 Bore well
15 11 9 PWS Sub-Surface Bore well - - - - 0 - Covered 15 20 -5 Bore well
37 10 7 PWS Sub-Surface Bore well - - - - 0 - Covered 37 40 -3 Bore well
34 17 15 PWS Sub-Surface Bore well - - - - 0 - Covered 34 40 -6 Bore well
6 2 2 DP Sub-Surface Bore well - - - - 0 - Covered 6 0 6 Bore well
Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

13 15 12 PWS Sub-Surface Bore well - - - - 0 - Covered 13 20 -7 Bore well


25 11 9 PWS Sub-Surface Bore well - - - - 0 - Covered 25 20 5 Bore well
11 6 4 DP Sub-Surface Bore well - - - - 0 - Covered 11 0 11 Bore well
12 6 4 PWS Sub-Surface Bore well - - - - 0 - Covered 12 20 -8 Bore well
8 8 6 DP Sub-Surface Bore well - - - - 0 - Covered 8 0 8 Bore well
15 7 5 DP Sub-Surface Bore well - - - - 0 - Covered 15 0 15 Bore well
19 7 5 DP Sub-Surface Bore well - - - - 0 - Covered 19 0 19 Bore well
18 5 4 PWS Sub-Surface Bore well - - - - 0 - Covered 18 20 -2 Bore well
10 6 4 PWS Sub-Surface Bore well - - - - 0 - Covered 10 10 0 Bore well
52 10 7 PWS Sub-Surface Bore well - - - - 0 - Covered 52 60 -8 Bore well
12 8 5 PWS Sub-Surface Bore well - - - - 0 - Covered 12 20 -8 Bore well
75 24 20 PWS Sub-Surface Bore well - - - - 0 - Covered 75 60 15 Bore well
78 10 7 PWS Sub-Surface Bore well - - - - 0 - Un Covered 78 60 18 Bore well

7 19 16 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 7 0 7 Bore well

4 13 10 PWS Sub-Surface Bore well - - - - 0 - Un Covered 4 10 -6 Bore well


Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

2 10 8 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 2 0 2 Bore well


18 11 9 PWS Sub-Surface Bore well - - - - 0 - Un Covered 18 20 -2 Bore well
24 12 11 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 24 0 24 Bore well
20 13 10 PWS Sub-Surface Bore well - - - - 0 - Un Covered 20 20 0 Bore well
34 10 8 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 34 0 34 Bore well
57 10 7 PWS Sub-Surface Bore well - - - - 0 - Un Covered 57 60 -3 Bore well
38 13 9 PWS Sub-Surface Bore well - - - - 0 - Un Covered 38 40 -2 Bore well
33 4 3 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 33 0 33 Bore well
3 1 1 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 3 0 3 Bore well
6 11 8 DP Sub-Surface Bore well - - - - 0 - Un Covered 6 0 6 Bore well
18 11 6 DP Sub-Surface Bore well - - - - 0 - Un Covered 18 0 18 Bore well
3 13 9 DP Sub-Surface Bore well - - - - 0 - Un Covered 3 0 3 Bore well
3 11 9 DP Sub-Surface Bore well - - - - 0 - Un Covered 3 0 3 Bore well
4 4 3 DP Sub-Surface Bore well - - - - 0 - Un Covered 4 0 4 Bore well
49 11 8 DP Sub-Surface Bore well - - - - 0 - Un Covered 49 0 49 Bore well
1 10 8 DP Sub-Surface Bore well - - - - 0 - Un Covered 1 0 1 Bore well
Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

2 10 7 DP Sub-Surface Bore well - - - - 0 - Un Covered 2 0 2 Bore well


9 12 11 PWS Sub-Surface Bore well - - - - 0 - Un Covered 9 10 -1 Bore well
10 19 16 PWS Sub-Surface Bore well - - - - 0 - Un Covered 10 10 0 Bore well
15 13 10 DP Sub-Surface Bore well - - - - 0 - Un Covered 15 0 15 Bore well
7 11 8 DP Sub-Surface Bore well - - - - 0 - Un Covered 7 0 7 Bore well
42 11 6 PWS Sub-Surface Bore well - - - - 0 - Un Covered 42 40 2 Bore well
4 10 7 DP Sub-Surface Bore well - - - - 0 - Un Covered 4 0 4 Bore well
6 13 9 DP Sub-Surface Bore well - - - - 0 - Un Covered 6 0 6 Bore well

10 11 9 DP Sub-Surface Bore well - - - - 0 - Un Covered 10 0 10 Bore well

12 4 3 DP Sub-Surface Bore well - - - - 0 - Un Covered 12 0 12 Bore well


2 1 1 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 2 0 2 Bore well
22 10 8 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 22 0 22 Bore well
5 10 8 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 5 0 5 Bore well
26 13 9 DP Sub-Surface Bore well - - - - 0 - Un Covered 26 0 26 Bore well
21 12 11 DP Sub-Surface Bore well - - - - 0 - Un Covered 21 0 21 Bore well
7 4 3 DP Sub-Surface Bore well - - - - 0 - Un Covered 7 0 7 Bore well
Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

24 1 1 PWS Sub-Surface Bore well - - - - 0 - Un Covered 24 20 4 Bore well

4 19 16 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 4 0 4 Bore well

31 11 8 DP Sub-Surface Bore well - - - - 0 - Un Covered 31 0 31 Bore well

42 10 7 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 42 0 42 Bore well

31 13 9 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 31 0 31 Bore well

1 12 11 DP Sub-Surface Bore well - - - - 0 - Un Covered 1 0 1 Bore well

4 4 3 DP Sub-Surface Bore well - - - - 0 - Un Covered 4 0 4 Bore well

1 4 3 DP Sub-Surface Bore well - - - - 0 - Un Covered 1 0 1 Bore well

1 1 1 DP Sub-Surface Bore well - - - - 0 - Un Covered 1 0 1 Bore well

1 10 8 DP Sub-Surface Bore well - - - - 0 - Un Covered 1 0 1 Bore well

1 12 11 DP Sub-Surface Bore well - - - - 0 - Un Covered 1 0 1 Bore well


2 4 3 DP Sub-Surface Bore well - - - - 0 - Un Covered 2 0 2 Bore well

4 4 3 DP Sub-Surface Bore well - - - - 0 - Un Covered 4 0 4 Bore well


Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

4 1 1 DP Sub-Surface Bore well - - - - 0 - Un Covered 4 0 4 Bore well

11 13 10 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 11 0 11 Bore well

5 12 11 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 5 0 5 Bore well

1 4 3 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 1 0 1 Bore well

1 10 8 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 1 0 1 Bore well

6 13 10 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 6 0 6 Bore well

3 10 8 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 3 0 3 Bore well


9 12 11 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 9 0 9 Bore well
4 4 3 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 4 0 4 Bore well

18 1 1 DP Sub-Surface Bore well - - - - 0 - Un Covered 18 0 18 Bore well

3 5 4 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 3 0 3 Bore well

8 8 7 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 8 0 8 Bore well


7 6 5 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 7 0 7
9 6 5 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 9 0 9 Bore well
Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

3 2 2 DP Sub-Surface Bore well - - - - 0 - Un Covered 3 0 3 Bore well


8 8 7 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 8 0 8 Bore well
5 11 10 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 5 0 5 Bore well

8 8 8 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 8 0 8

13 9 8 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 13 0 13

6 2 2 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 6 0 6

13 7 6 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 13 0 13

7 6 5 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 7 0 7

10 10 9 DP Sub-Surface Bore well - - - - 0 - Un Covered 10 0 10 Bore well

4 2 2 PWS Sub-Surface Bore well - - - - 0 - Un Covered 4 10 -6 Bore well

2 3 3 DP Sub-Surface Bore well - - - - 0 - Un Covered 2 0 2 Bore well

15 39 36 PWS Sub-Surface Bore well - - - - 0 - Un Covered 15 20 -5 Bore well


Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

6 18 17 PWS Sub-Surface Bore well - - - - 0 - Un Covered 6 10 -4 Bore well

4 1 1 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 4 0 4


4 5 4 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 4 0 4
70 21 19 PWS Sub-Surface Bore well - - - - 0 - Un Covered 70 60 10 Bore well
11 1 1 DP Sub-Surface Bore well - - - - 0 - Un Covered 11 0 11 Bore well
5 2 2 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 5 0 5
6 4 4 DP Sub-Surface Bore well - - - - 0 - Un Covered 6 0 6 Bore well
12 8 7 DP Sub-Surface Bore well - - - - 0 - Un Covered 12 0 12 Bore well
56 21 19 DP Sub-Surface Bore well - - - - 0 - Un Covered 56 0 56 Bore well
9 3 3 DP Sub-Surface Bore well - - - - 0 - Un Covered 9 0 9 Bore well
9 3 3 DP Sub-Surface Bore well - - - - 0 - Un Covered 9 0 9 Bore well
9 3 3 DP Sub-Surface Bore well - - - - 0 - Un Covered 9 0 9 Bore well
12 1 1 PWS Sub-Surface Bore well - - - - 0 - Un Covered 12 20 -8 Bore well
2 30 28 PWS Sub-Surface Bore well - - - - 0 - Un Covered 2 10 -8 Bore well

22 11 10 PWS Sub-Surface Bore well - - - - 0 - Un Covered 22 20 2 Bore well


Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

8 4 4 DP Sub-Surface Bore well - - - - 0 - Un Covered 8 0 8 Bore well


14 14 13 DP Sub-Surface Bore well - - - - 0 - Un Covered 14 0 14 Bore well
4 3 3 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 4 0 4
8 5 4 DP Sub-Surface Bore well - - - - 0 - Un Covered 8 0 8 Bore well
10 - - DP Sub-Surface Bore well - - - - 0 - Un Covered 10 0 10 Bore well
9 5 4 DP Sub-Surface Bore well - - - - 0 - Un Covered 9 0 9 Bore well
12 8 7 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 12 0 12 Bore well
12 7 6 DP Sub-Surface Bore well - - - - 0 - Un Covered 12 0 12 Bore well
26 9 8 PWS Sub-Surface Bore well - - - - 0 - Un Covered 26 40 -14 Bore well
30 22 20 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 30 0 30 Bore well
17 2 2 DP Sub-Surface Bore well - - - - 0 - Un Covered 17 0 17 Bore well
41 13 12 PWS Sub-Surface Bore well - - - - 0 - Un Covered 41 40 1 Bore well
12 12 11 DP Sub-Surface Bore well - - - - 0 - Un Covered 12 0 12 Bore well
5 3 3 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 5 0 5
13 7 6 DP Sub-Surface Bore well - - - - 0 - Un Covered 13 0 13 Bore well
11 13 12 DP Sub-Surface Bore well - - - - 0 - Un Covered 11 0 11 Bore well
Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

10 8 7 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 10 0 10 Bore well


9 6 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 9 0 9 Bore well
5 6 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 5 0 5 Bore well
4 4 4 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 4 0 4
5 5 5 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 5 0 5 Bore well
1 4 4 DP Sub-Surface Bore well - - - - 0 - Un Covered 1 0 1
60 7 6 DP Sub-Surface Bore well - - - - 0 - Un Covered 60 0 60 Bore well
6 1 1 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 6 0 6
21 12 11 PWS Sub-Surface Bore well - - - - 0 - Un Covered 21 20 1 Bore well
32 14 12 PWS Sub-Surface Bore well - - - - 0 - Un Covered 32 40 -8 Bore well
12 10 9 PWS Sub-Surface Bore well - - - - 0 - Un Covered 12 20 -8 Bore well
12 16 14 PWS Sub-Surface Bore well - - - - 0 - Un Covered 12 20 -8 Bore well
7 6 6 PWS Sub-Surface Bore well - - - - 0 - Un Covered 7 10 -3 Bore well
5 0 0 DP Sub-Surface Bore well - - - - 0 - Un Covered 5 0 5 Bore well
42 21 19 PWS Sub-Surface Bore well - - - - 0 - Un Covered 42 40 2 Bore well
36 22 20 PWS Sub-Surface Bore well - - - - 0 - Un Covered 36 40 -4 Bore well
Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

23 16 15 PWS Sub-Surface Bore well - - - - 0 - Un Covered 23 20 3 Bore well


39 26 23 PWS Sub-Surface Bore well - - - - 0 - Un Covered 39 40 -1 Bore well
59 22 20 PWS Sub-Surface Bore well - - - - 0 - Un Covered 59 60 -1 Bore well
12 8 7 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 12 0 12 Bore well
36 13 12 PWS Sub-Surface Bore well - - - - 0 - Un Covered 36 40 -4 Bore well
11 4 4 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 11 0 11 Bore well
30 10 9 DP Sub-Surface Bore well - - - - 0 - Un Covered 30 0 30 Bore well
6 3 3 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 6 0 6 Bore well
44 34 31 PWS Sub-Surface Bore well - - - - 0 - Un Covered 44 40 4 Bore well
13 8 7 PWS Sub-Surface Bore well - - - - 0 - Un Covered 13 20 -7 Bore well
44 19 17 DP Sub-Surface Bore well - - - - 0 - Un Covered 44 0 44 Bore well
9 5 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 9 0 9 Bore well
5 5 5 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 5 0 5
32 13 12 PWS Sub-Surface Bore well - - - - 0 - Un Covered 32 40 -8 Bore well
17 7 7 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 17 0 17
8 2 2 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 8 0 8
Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

10 7 6 PWS Sub-Surface Bore well - - - - 0 - Un Covered 10 10 0 Bore well


4 4 4 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 4 0 4
5 3 3 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 5 0 5
2 2 2 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 2 0 2
18 4 4 PWS Sub-Surface Bore well - - - - 0 - Un Covered 18 20 -2 Bore well
6 1 1 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 6 0 6
21 10 9 PWS Sub-Surface Bore well - - - - 0 - Un Covered 21 20 1 Bore well
44 14 12 PWS Sub-Surface Bore well - - - - 0 - Un Covered 44 40 4 Bore well
11 15 14 DP Sub-Surface Bore well - - - - 0 - Un Covered 11 0 11 Bore well
7 4 4 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 7 0 7 Bore well
3 1 1 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 3 0 3 Bore well
6 4 4 PWS Sub-Surface Bore well - - - - 0 - Un Covered 6 10 -4 Bore well
41 22 20 PWS Sub-Surface Bore well - - - - 0 - Un Covered 41 40 1 Bore well
15 8 7 PWS Sub-Surface Bore well - - - - 0 - Un Covered 15 20 -5 Bore well
20 13 12 PWS Sub-Surface Bore well - - - - 0 - Un Covered 20 20 0 Bore well
17 10 9 PWS Sub-Surface Bore well - - - - 0 - Un Covered 17 20 -3 Bore well
Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

6 6 6 PWS Sub-Surface Bore well - - - - 0 - Un Covered 6 10 -4 Bore well


50 5 5 PWS Sub-Surface Bore well - - - - 0 - Un Covered 50 40 10 Bore well
5 1 1 DP Sub-Surface Bore well - - - - 0 - Un Covered 5 0 5 Bore well
30 14 13 PWS Sub-Surface Bore well - - - - 0 - Un Covered 30 40 -10 Bore well
2 1 1 DP Sub-Surface Bore well - - - - 0 - Un Covered 2 0 2 Bore well
9 3 3 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 9 0 9
11 6 6 PWS Sub-Surface Bore well - - - - 0 - Un Covered 11 20 -9 Bore well
3 2 2 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 3 0 3 Bore well
1 0 0 DP Sub-Surface Bore well - - - - 0 - Un Covered 1 0 1 Bore well
12 8 7 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 12 0 12
3 3 3 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 3 0 3 Bore well
3 4 4 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 3 0 3 Bore well
2 6 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 2 0 2 Bore well
4 4 4 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 4 0 4
4 7 6 DP Sub-Surface Bore well - - - - 0 - Un Covered 4 0 4 Bore well
32 14 13 PWS Sub-Surface Bore well - - - - 0 - Un Covered 32 40 -8 Bore well
Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

7 8 7 PWS Sub-Surface Bore well - - - - 0 - Un Covered 7 10 -3 Bore well


5 4 4 DP Sub-Surface Bore well - - - - 0 - Un Covered 5 0 5 Bore well
14 10 9 PWS Sub-Surface Bore well - - - - 0 - Un Covered 14 20 -6 Bore well
7 3 3 DP Sub-Surface Bore well - - - - 0 - Un Covered 7 0 7 Bore well
24 16 15 PWS Sub-Surface Bore well - - - - 0 - Un Covered 24 20 4 Bore well
3 4 4 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 3 0 3 Bore well
6 3 3 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 6 0 6
2 2 2 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 2 0 2 Bore well
3 2 2 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 3 0 3 Bore well
82 42 38 PWS Sub-Surface Bore well - - - - 0 - Un Covered 82 90 -8 Bore well
6 5 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 6 0 6 Bore well
3 1 1 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 3 0 3
6 6 5 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 6 0 6
5 10 9 DP Sub-Surface Bore well - - - - 0 - Un Covered 5 0 5 Bore well
17 9 8 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 17 0 17
23 13 11 DP Sub-Surface Bore well - - - - 0 - Un Covered 23 0 23 Bore well
Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

10 5 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 10 0 10 Bore well


24 11 10 DP Sub-Surface Bore well - - - - 0 - Un Covered 24 0 24 Bore well
19 7 6 PWS Sub-Surface Bore well - - - - 0 - Un Covered 19 20 -1
31 10 9 DP Sub-Surface Bore well - - - - 0 - Un Covered 31 0 31 Bore well
13 8 7 DP Sub-Surface Bore well - - - - 0 - Un Covered 13 0 13 Bore well
11 3 3 DP Sub-Surface Bore well - - - - 0 - Un Covered 11 0 11 Bore well
7 9 8 DP Sub-Surface Bore well - - - - 0 - Un Covered 7 0 7 Bore well

7 5 5 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 7 0 7

6 7 6 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 6 0 6 Bore well

1 3 3 DP Sub-Surface Bore well - - - - 0 - Un Covered 1 0 1 Bore well


58 18 16 PWS Sub-Surface Bore well - - - - 0 - Un Covered 58 60 -2 Bore well
36 11 10 PWS Sub-Surface Bore well - - - - 0 - Un Covered 36 40 -4 Bore well
44 18 16 PWS Sub-Surface Bore well - - - - 0 - Un Covered 44 40 4 Bore well
16 4 4 DP Sub-Surface Bore well - - - - 0 - Un Covered 16 0 16 Bore well
42 11 10 PWS Sub-Surface Bore well - - - - 0 - Un Covered 42 40 2 Bore well
Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

25 12 11 PWS Sub-Surface Bore well - - - - 0 - Un Covered 25 20 5 Bore well


9 2 2 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 9 0 9

9 2 2 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 9 0 9 Bore well

14 0 0 PWS Sub-Surface Bore well - - - - 0 - Un Covered 14 20 -6 Bore well

15 4 4 DP Sub-Surface Bore well - - - - 0 - Un Covered 15 0 15 Bore well

40 24 22 PWS Sub-Surface Bore well - - - - 0 - Un Covered 40 40 0 Bore well


13 5 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 13 0 13 Bore well
14 3 3 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 14 0 14 Bore well

29 17 15 PWS Sub-Surface Bore well - - - - 0 - Un Covered 29 40 -11 Bore well

10 4 4 DP Sub-Surface Bore well - - - - 0 - Un Covered 10 0 10 Bore well


7 12 11 DP Sub-Surface Bore well - - - - 0 - Un Covered 7 0 7 Bore well
47 21 19 PWS Sub-Surface Bore well - - - - 0 - Un Covered 47 40 7 Bore well
35 21 19 PWS Sub-Surface Bore well - - - - 0 - Un Covered 35 40 -5 Bore well
3 2 2 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 3 0 3 Bore well
Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

1 1 1 DP Sub-Surface Bore well - - - - 0 - Un Covered 1 0 1 Bore well


3 2 2 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 3 0 3 Bore well
14 10 9 DP Sub-Surface Bore well - - - - 0 - Un Covered 14 0 14 Bore well

12 6 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 12 0 12 Bore well

5 4 4 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 5 0 5

34 24 21 PWS Sub-Surface Bore well - - - - 0 - Un Covered 34 40 -6 Bore well


55 28 25 PWS Sub-Surface Bore well - - - - 0 - Un Covered 55 60 -5 Bore well
8 5 4 DP Sub-Surface Bore well - - - - 0 - Un Covered 8 0 8 Bore well
13 17 15 PWS Sub-Surface Bore well - - - - 0 - Un Covered 13 20 -7 Bore well
7 6 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 7 0 7 Bore well
24 10 9 DP Sub-Surface Bore well - - - - 0 - Un Covered 24 0 24 Bore well
42 32 29 PWS Sub-Surface Bore well - - - - 0 - Un Covered 42 40 2 Bore well
22 11 10 PWS Sub-Surface Bore well - - - - 0 - Un Covered 22 20 2 Bore well
25 25 23 PWS Sub-Surface Bore well - - - - 0 - Un Covered 25 20 5 Bore well
6 2 2 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 6 0 6 Bore well
Existing facilities Ongoing work Exisitng Source su

Designed
Available
storage
source Expected storage
capacity in Balance
details status of capacity
Required No of Bore No of Bore KL as per storage
hab after Status as per considering
LPCD wells wells Type population( capacity Name of
PWS/ Name of Est. cost completion NRDWP norms existing
supply level existing functioning (surface /sub source name CPWS Grant Pop2001(1 required source
MPWS work (lakhs) of ongoing and
surface ) +1/100)^21 (col.20021) existing
works ongoing
*40*0.5/100
schemes
Name of 0)
the source

9 6 5 DP Sub-Surface Bore well - - - - 0 - Un Covered 9 0 9 Bore well

14 4 4 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 14 0 14 Bore well

16 3 3 MPWS Sub-Surface Bore well - - - - 0 - Un Covered 16 0 16 Bore well

31 17 16 PWS Sub-Surface Bore well - - - - 0 - Un Covered 31 40 -9 Bore well


18 7 6 PWS Sub-Surface Bore well - - - - 0 - Un Covered 18 20 -2 Bore well
37 18 16 PWS Sub-Surface Bore well - - - - 0 - Un Covered 37 40 -3 Bore well
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

29 30 31 33 34 35 36 37 38 39 40 41 42 43 44
6Kg/Cm2
Not Check dam 4.00 Aug - 3 Continous -- 0.00 - Bore well 0.50 75 mm 650 300.36
HDPE
6Kg/Cm2
Not Check dam 4.00 Aug - 3 Continous -- 0.00 - Bore well 0.50 75 mm 650 300.36
HDPE
6Kg/Cm2
Not BW 0.00 Aug - 4 Continous -- 0.00 - Bore well 0.50 75 mm 600 300.36
HDPE
6Kg/Cm2
Not BW 0.00 Aug - 3 seasonal 2 months 0.00 - Bore well 0.50 75 mm 600 300.36
HDPE
6Kg/Cm2
Not Check dam 5.00 Aug - 4 Continous -- 0.00 - Bore well 0.50 75 mm 150 300.36
HDPE

6Kg/Cm2
- - 0.00 Aug - 3 seasonal 2 months 0.00 - Bore well 0.50 75 mm 150 300.36
HDPE

6Kg/Cm2
- - 0.00 New SVS Bore well 3 seasonal -- 0.50 - Bore well 0.50 75 mm 650 300.36
HDPE
6Kg/Cm2
- - 0.00 Aug Bore well 3 seasonal -- 0.50 - Bore well 0.50 75 mm 150 300.36
HDPE

6Kg/Cm2
- - 0.00 Aug - 3 seasonal 2 months 0.00 - Bore well 1.50 75 mm 450 300.36
HDPE
6Kg/Cm2
Not BW 0.00 Aug - 3 seasonal 2 months 0.00 - Bore well 0.50 75 mm 300 300.36
HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

6Kg/Cm2
Not BW 0.00 Aug - 3 seasonal -- 0.00 - Bore well 0.50 75 mm 300 300.36
HDPE
6Kg/Cm2
Not BW 0.00 Aug - 3 seasonal 2 months 0.00 - Bore well 0.50 75 mm 200 300.36
HDPE
6Kg/Cm2
- - 0.00 New SVS Bore well 3 seasonal 2 months 0.50 - Bore well 0.50 75 mm 650 300.36
HDPE
6Kg/Cm2
Not BW 0.00 Aug - 3 seasonal 2 months 0.00 - Bore well 1.50 75 mm 600 300.36
HDPE
6Kg/Cm2
- - 0.00 Aug Bore well 4 Continous -- 0.50 -- Bore well 0.50 75 mm 1200 300.36
HDPE
6Kg/Cm2
Not BW 0.00 Aug - 3 seasonal -- 0.00 - Bore well 1.00 75 mm 400 300.36
HDPE
6Kg/Cm2
Not BW 0.00 Aug - 3 seasonal 2 months 0.00 - Bore well 1.00 75 mm 800 300.36
HDPE
6Kg/Cm2
Not BW 0.00 Aug Bore well 4 Continous -- 0.50 -- Bore well 0.50 75 mm 1200 300.36
HDPE
6Kg/Cm2
Not BW 0.00 Aug Bore well 4 Continous -- 0.50 - Bore well 0.50 75 mm 500 300.36
HDPE
6Kg/Cm2
Not BW 0.00 Aug - 3 seasonal 2 months 0.00 - Bore well 0.50 75 mm 600 300.36
HDPE
6Kg/Cm2
Not BW 0.00 Aug - 3 seasonal 2 months 0.00 - Bore well 0.50 75 mm 600 300.36
HDPE
6Kg/Cm2
Not BW 0.00 Aug - 3 seasonal 2 months 0.00 - Bore well 0.50 75 mm 600 300.36
HDPE
6Kg/Cm2
Not BW 0.00 Aug - 3 seasonal 2 months 0.00 - Bore well 0.50 75 mm 600 300.36
HDPE
Sub 6Kg/Cm2
Not check dam 5.00 New SVS 3 Seasonal 2 months 0.40 -- Check dam 5.00 75 mm 1000 300.36
surface HDPE
Sub 6Kg/Cm2
Not check dam 4.00 Aug 3 Seasonal 2 months 0.40 -- Check dam 4.00 75 mm 1000 300.36
surface HDPE
Sub 6Kg/Cm2
Not new BW 0.40 Aug 3 Seasonal 2 months 0.40 -- Bore well 0.40 75 mm 400 300.36
surface HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

Sub 6Kg/Cm2
Not check dam 5.00 Aug 3 Seasonal 2 months 0.40 -- Check dam 5.00 75 mm 1000 300.36
surface HDPE
Sub 6Kg/Cm2
Not check dam 5.00 Aug 3 Seasonal 2 months 0.40 -- Check dam 5.00 75 mm 1500 300.36
surface HDPE
Sub 6Kg/Cm2
Not new BW 0.40 Aug 3 Continous -- 0.40 -- Bore well 0.40 75 mm 600 300.36
surface HDPE
Sub 6Kg/Cm2
Not new BW 0.40 Aug 3 Continous -- 0.40 -- Bore well 0.40 75 mm 1000 300.36
surface HDPE
Sub 6Kg/Cm2
Not new BW 0.40 Aug 3 Continous -- 0.40 -- Bore well 0.40 75 mm 600 300.36
surface HDPE
Sub 6Kg/Cm2
Not new BW 0.40 Aug 3 Continous -- 0.40 -- Bore well 0.40 75 mm 600 300.36
surface HDPE
Sub 6Kg/Cm2
Not new BW 0.40 Aug 3 Continous -- 0.40 -- Bore well 0.40 75 mm 1200 300.36
surface HDPE
Sub 6Kg/Cm2
Not new BW 0.40 Aug 3 Continous -- 0.40 -- Bore well 0.40 75 mm 1000 300.36
surface HDPE
Sub 6Kg/Cm2
Not new BW 0.40 Aug 3 Continous -- 0.40 -- Bore well 0.40 75 mm 1000 300.36
surface HDPE
Sub 6Kg/Cm2
Not check dam 6.00 Aug 3 Seasonal 3 months 0.40 -- Check dam 6.00 75 mm 1000 300.36
surface HDPE
Sub 6Kg/Cm2
Not new BW 0.40 Aug 3 Continous -- 0.40 -- Bore well 0.40 75 mm 1000 300.36
surface HDPE
Sub 6Kg/Cm2
Not new BW 0.40 Aug 3 Continous -- 0.40 -- Bore well 0.40 75 mm 1000 300.36
surface HDPE
6Kg/Cm2
Not BW 0.00 New SVS - 3 seasonal 2 months 0.50 - Bore well 0.50 75 mm 600 300.36
HDPE
6Kg/Cm2
Not BW 0.00 Aug - 3 seasonal 2 months 0.50 - Bore well 0.50 75 mm 600 300.36
HDPE
6Kg/Cm2
Not BW 0.00 Aug - 3 seasonal 2 months 0.50 - Bore well 0.50 75 mm 1500 300.36
HDPE
6Kg/Cm2
Not BW 0.00 Aug - 3 seasonal 2 months 0.50 - Bore well 0.50 75 mm 300 300.36
HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

6Kg/Cm2
Not BW 0.00 Aug - 3 seasonal 2 months 0.50 - Bore well 0.50 75 mm 200 300.36
HDPE
6Kg/Cm2
Not BW 0.00 Aug - 3 seasonal 2 months 0.50 - Bore well 0.50 75 mm 200 300.36
HDPE
6Kg/Cm2
Not BW 0.00 Aug - 3 seasonal 2 months 0.50 - Bore well 0.50 75 mm 500 300.36
HDPE
6Kg/Cm2
Not BW 0.00 Aug - 3 seasonal 2 months 0.50 - Bore well 0.50 75 mm 600 300.36
HDPE
6Kg/Cm2
Not BW 0.00 Aug - 3 seasonal 2 months 0.50 - Bore well 0.50 75 mm 300 300.36
HDPE
6Kg/Cm2
Not BW 0.00 Aug - 3 seasonal 2 months 0.50 - Bore well 0.50 75 mm 500 300.36
HDPE
6Kg/Cm2
Not BW 0.00 Aug - 3 seasonal 2 months 0.50 - Bore well 0.50 75 mm 500 300.36
HDPE
6Kg/Cm2
Not BW 0.00 Aug - 3 seasonal 2 months 0.50 - Bore well 0.50 75 mm 500 300.36
HDPE
6Kg/Cm2
Not BW 0.00 Aug - 3 seasonal 2 months 0.50 - Bore well 0.50 75 mm 500 300.36
HDPE
6Kg/Cm2
Not BW 0.00 Aug - 3 seasonal 2 months 0.50 - Bore well 0.50 75 mm 500 300.36
HDPE
6Kg/Cm2
Not BW 0.00 Aug - 3 seasonal 2 months 0.50 - Bore well 0.50 75 mm 500 300.36
HDPE
6Kg/Cm2
Not BW 0.00 Aug - 3 seasonal 2 months 0.50 - Bore well 0.50 75 mm 500 300.36
HDPE
6Kg/Cm2
Not BW 0.00 Aug - 3 seasonal 2 months 0.50 - Bore well 0.50 75 mm 500 300.36
HDPE
6Kg/Cm2
Not BW 0.00 Aug - 3 seasonal 2 months 0.50 - Bore well 0.50 75 mm 500 300.36
HDPE
6Kg/Cm2
Not BW 0.00 Aug - 3 seasonal 2 months 0.50 - Bore well 0.50 75 mm 500 300.36
HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

6Kg/Cm2
Not BW 0.00 Aug - 3 seasonal 2 months 0.50 - Bore well 0.50 75 mm 500 300.36
HDPE
6Kg/Cm2
Not BW 0.00 Aug - 3 seasonal 2 months 0.50 - Bore well 0.50 75 mm 500 300.36
HDPE
6Kg/Cm2
Not BW 0.00 Aug - 3 seasonal 2 months 0.50 - Bore well 0.50 75 mm 200 300.36
HDPE
6Kg/Cm2
Not BW 0.00 Aug - 3 seasonal 2 months 0.50 - Bore well 0.50 75 mm 600 300.36
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Seasonal 9 months 0.00 Not required Bore well 0.50 63mm 300 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Seasonal 9 months 0.00 Not required Bore well 0.50 63mm 300 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Seasonal 9 months 0.00 Not required Bore well 0.50 63mm 300 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Seasonal 9 months 0.00 Not required Bore well 0.50 63mm 300 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Seasonal 9 months 0.00 Not required Bore well 0.50 63mm 300 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Seasonal 9 months 0.00 Not required Bore well 0.50 63mm 300 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
- - 0.00 -- - -- -- -- 0.00 -- Bore well 1.20 63mm 800 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Seasonal 9 months 0.00 Not required Bore well 0.50 63mm 300 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Seasonal 9 months 0.00 Not required Bore well 0.50 63mm 300 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.70 63mm 700 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.70 63mm 700 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 1.20 63mm 700 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Seasonal 9 months 0.00 Not required Bore well 0.50 63mm 300 262.63
HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Seasonal 9 months 0.00 Not required Bore well 0.50 63mm 300 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Seasonal 9 months 0.00 Not required Bore well 0.50 63mm 300 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Seasonal 9 months 0.00 Not required Bore well 0.50 63mm 300 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Seasonal 9 months 0.00 Not required Bore well 0.50 63mm 300 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Seasonal 9 months 0.00 Not required Bore well 0.50 63mm 300 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Seasonal 9 months 0.00 Not required Bore well 0.50 63mm 300 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Seasonal 9 months 0.00 Not required Bore well 0.50 63mm 300 262.63
HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Seasonal 9 months 0.00 Not required Bore well 0.50 63mm 300 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Seasonal 9 months 0.00 Not required Bore well 0.50 63mm 300 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Seasonal 9 months 0.00 Not required Bore well 0.50 63mm 300 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Seasonal 9 months 0.00 Not required Bore well 0.50 63mm 300 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Seasonal 9 months 0.00 Not required Bore well 0.50 63mm 300 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
- - 0.00 -- Bore well 3 Seasonal -- 0.00 -- Bore well 0.00 0 0 0 355.43
6Kg/Cm2
- - 0.00 -- Bore well 3 Seasonal -- 0.00 -- Bore well 1.20 63mm 500 262.63
HDPE
6Kg/Cm2
- - 0.00 -- Bore well 3 Seasonal -- 0.00 -- Bore well 1.20 63mm 1000 262.63
HDPE
6Kg/Cm2
- - 0.00 -- Bore well 3 Seasonal -- 0.00 -- Bore well 1.80 63mm 500 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Seasonal 9 months 0.00 Not required Bore well 0.50 63mm 300 262.63
HDPE
6Kg/Cm2
- - 0.00 -- Bore well 3 Seasonal -- 0.00 -- Bore well 1.20 63mm 500 262.63
HDPE
6Kg/Cm2
- - 0.00 -- Bore well 3 Seasonal -- 0.00 -- Bore well 1.20 63mm 500 262.63
HDPE
6Kg/Cm2
- - 0.00 -- Bore well 3 Seasonal -- 0.00 -- Bore well 1.20 63mm 600 262.63
HDPE
6Kg/Cm2
- - 0.00 -- Bore well 3 Seasonal -- 0.00 -- Bore well 1.20 63mm 500 262.63
HDPE
6Kg/Cm2
- - 0.00 -- Bore well 3 Seasonal -- 0.00 -- Bore well 1.20 63mm 1000 262.63
HDPE
6Kg/Cm2
- - 0.00 -- Bore well 3 Seasonal -- 0.00 -- Bore well 1.20 63mm 800 262.63
HDPE
6Kg/Cm2
- - 0.00 -- Bore well 3 Seasonal -- 0.00 -- Bore well 1.20 63mm 500 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Seasonal 9 months 0.00 Not required Bore well 0.50 63mm 300 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Seasonal 9 months 0.00 Not required Bore well 0.50 63mm 300 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Seasonal 9 months 0.00 Not required Bore well 0.50 63mm 300 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Seasonal 9 months 0.00 Not required Bore well 0.50 63mm 300 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Seasonal 9 months 0.00 Not required Bore well 0.50 63mm 300 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Seasonal 9 months 0.00 Not required Bore well 0.50 63mm 300 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Seasonal 9 months 0.00 Not required Bore well 0.50 63mm 300 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Seasonal 9 months 0.00 Not required Bore well 0.50 63mm 300 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Seasonal 9 months 0.00 Not required Bore well 0.50 63mm 300 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Seasonal 9 months 0.00 Not required Bore well 0.50 63mm 300 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Seasonal 9 months 0.00 Not required Bore well 0.50 63mm 300 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Seasonal 9 months 0.00 Not required Bore well 0.50 63mm 300 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Seasonal 9 months 0.00 Not required Bore well 0.50 63mm 300 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Seasonal 9 months 0.00 Not required Bore well 0.50 63mm 300 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Seasonal 9 months 0.00 Not required Bore well 0.50 63mm 300 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Seasonal 9 months 0.00 Not required Bore well 0.50 63mm 300 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Seasonal 9 months 0.00 Not required Bore well 0.50 63mm 300 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Seasonal 9 months 0.00 Not required Bore well 0.50 63mm 300 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Seasonal 9 months 0.00 Not required Bore well 0.50 63mm 300 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Seasonal 9 months 0.00 Not required Bore well 0.50 63mm 300 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Seasonal 9 months 0.00 Not required Bore well 0.50 63mm 300 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Seasonal 9 months 0.00 Not required Bore well 0.50 63mm 300 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
- - 0.00 -- - -- -- -- 0.00 -- Bore well 0.70 63mm 500 262.63
HDPE
6Kg/Cm2
- - 0.00 -- - -- -- -- 0.00 -- Bore well 0.70 63mm 800 262.63
HDPE
6Kg/Cm2
- - 0.00 -- - -- -- -- 0.00 -- Bore well 1.20 63mm 500 262.63
HDPE
6Kg/Cm2
- - 0.00 -- - -- -- -- 0.00 -- Bore well 0.70 63mm 500 262.63
HDPE
6Kg/Cm2
- - 0.00 -- - -- -- -- 0.00 -- Bore well 0.70 63mm 500 262.63
HDPE
6Kg/Cm2
- - 0.00 New SVS Bore well 3 Continous -- 0.60 Not required Bore well 0.50 63mm 450 262.63
HDPE
MPWS 6Kg/Cm2
0 - 0.00 Bore well 3 Seasonal 6 months 1.00 Not required - 0.00 90mm 500 355.43
Scheme HDPE
MPWS 6Kg/Cm2
0 - 0.00 Bore well 3 Seasonal 6 months 1.00 Not required - 0.00 90mm 500 355.43
Scheme HDPE
MPWS 6Kg/Cm2
0 - 0.00 Bore well 3 Seasonal 6 months 1.00 Not required - 0.00 90mm 500 355.43
Scheme HDPE
MPWS 6Kg/Cm2
0 - 0.00 Bore well 3 Seasonal 6 months 1.00 Not required - 0.00 90mm 500 355.43
Scheme HDPE
MPWS 6Kg/Cm2
0 - 0.00 Bore well 3 Seasonal 6 months 1.00 Not required - 0.00 90mm 500 355.43
Scheme HDPE
MPWS 6Kg/Cm2
0 - 0.00 Bore well 3 Seasonal 6 months 1.00 Not required - 0.00 90mm 500 355.43
Scheme HDPE
New SVS 6Kg/Cm2
Sustainable - 0.00 Bore well 3 Seasonal 9 months 1.00 Not required - 0.00 90mm 600 355.43
Scheme HDPE
MPWS 6Kg/Cm2
0 - 0.00 Bore well 3 Seasonal 6 months 1.00 Not required - 0.00 90mm 500 355.43
Scheme HDPE
MPWS 6Kg/Cm2
0 - 0.00 Bore well 3 Seasonal 6 months 1.00 Not required - 0.00 90mm 500 355.43
Scheme HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

C/o 20 KL 6Kg/Cm2
Sustainable - 0.00 Bore well 3 Seasonal 9 months 1.00 Not required - 0.00 90mm 500 355.43
OHSR HDPE
C/o 20 KL 6Kg/Cm2
Sustainable - 0.00 Bore well 3 Seasonal 9 months 1.00 Not required - 0.00 90mm 500 355.43
OHSR HDPE
C/o 20 KL 6Kg/Cm2
Sustainable - 0.00 Bore well 3 Seasonal 9 months 1.00 Not required - 0.00 90mm 500 355.43
OHSR HDPE
C/o 20 KL 6Kg/Cm2
Sustainable - 0.00 Bore well 3 Seasonal 9 months 1.00 Not required - 0.00 90mm 500 355.43
OHSR HDPE
C/o 20 KL 6Kg/Cm2
Sustainable - 0.00 Bore well 3 Seasonal 9 months 1.00 Not required - 0.00 90mm 500 355.43
OHSR HDPE
C/o 20 KL 6Kg/Cm2
Sustainable - 0.00 Bore well 3 Seasonal 9 months 1.00 Not required - 0.00 90mm 500 355.43
OHSR HDPE
C/o 20 KL 6Kg/Cm2
Sustainable - 0.00 Bore well 3 Seasonal 9 months 1.00 Not required - 0.00 90mm 500 355.43
OHSR HDPE
C/o 20 KL 6Kg/Cm2
Sustainable - 0.00 Bore well 3 Seasonal 9 months 1.00 Not required - 0.00 90mm 500 355.43
OHSR HDPE
C/o 20 KL 6Kg/Cm2
Sustainable - 0.00 Bore well 3 Seasonal 9 months 1.00 Not required - 0.00 90mm 500 355.43
OHSR HDPE
C/o 20 KL 6Kg/Cm2
Sustainable - 0.00 Bore well 3 Seasonal 9 months 1.00 Not required - 0.00 90mm 500 355.43
OHSR HDPE
C/o 20 KL 6Kg/Cm2
Sustainable - 0.00 Bore well 3 Seasonal 9 months 1.00 Not required - 0.00 90mm 500 355.43
OHSR HDPE
C/o 20 KL 6Kg/Cm2
Sustainable - 0.00 Bore well 3 Seasonal 9 months 1.00 Not required - 0.00 90mm 500 355.43
OHSR HDPE
C/o 20 KL 6Kg/Cm2
Sustainable - 0.00 Bore well 3 Seasonal 9 months 1.00 Not required - 0.00 90mm 500 355.43
OHSR HDPE
C/o 20 KL 6Kg/Cm2
Sustainable - 0.00 Bore well 3 Seasonal 9 months 1.00 Not required - 0.00 90mm 500 355.43
OHSR HDPE
C/o 20 KL 6Kg/Cm2
Sustainable - 0.00 Bore well 3 Seasonal 9 months 1.00 Not required - 0.00 90mm 500 355.43
OHSR HDPE
C/o 20 KL 6Kg/Cm2
Sustainable - 0.00 Bore well 3 Seasonal 9 months 1.00 Not required - 0.00 90mm 500 355.43
OHSR HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

New SVS 6Kg/Cm2


Sustainable - 0.00 Bore well 3 Seasonal 9 months 0.60 Not required - 0.00 90mm 1000 355.43
Scheme HDPE
New SVS 6Kg/Cm2
Sustainable - 0.00 Bore well 3 Seasonal 9 months 0.60 Not required - 0.00 90mm 500 355.43
Scheme HDPE
Aug to SVS 6Kg/Cm2
Not Source Borewell 0.00 - 3 Seasonal 9 months 0.00 Not required Bore well 1.80 63mm 800 262.63
Scheme HDPE
Aug to SVS 6Kg/Cm2
Not Source Borewell 0.00 - 3 Seasonal 9 months 0.00 Not required Bore well 1.20 63mm 800 262.63
Scheme HDPE
Aug to SVS 6Kg/Cm2
Not Source Borewell 0.00 - 3 Seasonal 9 months 0.00 Not required Bore well 1.20 63mm 800 262.63
Scheme HDPE
Aug to SVS 6Kg/Cm2
Not Source Borewell 0.00 - 3 Seasonal 9 months 0.00 Not required Bore well 1.20 63mm 800 262.63
Scheme HDPE
Aug to SVS 6Kg/Cm2
Not Source Borewell 0.00 - 3 Seasonal 9 months 0.00 Not required Bore well 1.20 63mm 800 262.63
Scheme HDPE
Aug to SVS 6Kg/Cm2
Not Source Borewell 0.00 - 3 Seasonal 9 months 0.00 Not required Bore well 1.20 63mm 800 262.63
Scheme HDPE
6Kg/Cm2
Not BW 0.00 New SVS BW 3 seasonal 2 months 0.50 - Bore well 0.50 75 mm 500 300.36
HDPE
6Kg/Cm2
Not BW 0.00 New SVS BW 3 seasonal 2 months 0.50 - Bore well 0.50 75 mm 650 300.36
HDPE
6Kg/Cm2
Not BW 0.00 New SVS BW 3 seasonal 2 months 0.50 - Bore well 0.50 75 mm 650 300.36
HDPE
6Kg/Cm2
Not BW 0.00 New SVS BW 3 seasonal 2 months 0.50 - Bore well 0.50 75 mm 500 300.36
HDPE
6Kg/Cm2
Not BW 0.00 New SVS BW 3 seasonal 2 months 0.50 - Bore well 0.50 75 mm 500 300.36
HDPE
6Kg/Cm2
Not BW 0.00 New SVS BW 3 seasonal 2 months 0.50 - Bore well 0.50 75 mm 400 300.36
HDPE
6Kg/Cm2
Not BW 0.00 New SVS BW 3 seasonal 2 months 0.50 - Bore well 0.50 75 mm 500 300.36
HDPE
6Kg/Cm2
Not BW 0.00 New SVS BW 3 seasonal 2 months 0.50 - Bore well 0.50 75 mm 500 300.36
HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

6Kg/Cm2
Not BW 0.00 New SVS BW 3 seasonal 2 months 0.50 - Bore well 0.50 75 mm 500 300.36
HDPE
6Kg/Cm2
Not BW 0.00 New SVS BW 3 seasonal 2 months 0.50 - Bore well 0.50 75 mm 500 300.36
HDPE
6Kg/Cm2
Not BW 0.00 New SVS BW 3 seasonal 2 months 0.50 - Bore well 0.50 75 mm 500 300.36
HDPE
6Kg/Cm2
Not BW 0.00 New SVS BW 3 seasonal 2 months 0.50 - Bore well 0.50 75 mm 500 300.36
HDPE
6Kg/Cm2
Not BW 0.00 New SVS BW 3 seasonal 2 months 0.50 - Bore well 0.50 75 mm 500 300.36
HDPE
6Kg/Cm2
Not BW 0.00 New SVS BW 3 seasonal 2 months 0.50 - Bore well 0.50 75 mm 500 300.36
HDPE
6Kg/Cm2
Not BW 0.00 New SVS BW 3 seasonal 2 months 0.50 - Bore well 0.50 75 mm 500 300.36
HDPE
6Kg/Cm2
Not BW 0.00 New SVS BW 3 seasonal 2 months 0.50 - Bore well 0.50 75 mm 500 300.36
HDPE
6Kg/Cm2
Not BW 0.00 New SVS BW 3 seasonal 2 months 0.50 - Bore well 0.50 75 mm 500 300.36
HDPE
6Kg/Cm2
Not BW 0.00 New SVS BW 3 seasonal 2 months 0.50 - Bore well 0.50 75 mm 500 300.36
HDPE
6Kg/Cm2
Not BW 0.00 New SVS BW 3 seasonal 2 months 0.50 - Bore well 0.50 75 mm 500 300.36
HDPE
6Kg/Cm2
Not BW 0.00 New SVS BW 3 seasonal 2 months 0.50 - Bore well 0.50 75 mm 500 300.36
HDPE
6Kg/Cm2
Not BW 0.00 New SVS BW 3 seasonal 2 months 0.50 - Bore well 0.50 75 mm 500 300.36
HDPE
6Kg/Cm2
Not BW 0.00 New SVS BW 3 seasonal 2 months 0.50 - Bore well 0.50 75 mm 500 300.36
HDPE
6Kg/Cm2
Not BW 0.00 New SVS BW 3 seasonal 2 months 0.50 - Bore well 0.50 75 mm 500 300.36
HDPE
6Kg/Cm2
Not BW 0.00 New SVS BW 3 seasonal 2 months 0.50 - Bore well 0.50 75 mm 500 300.36
HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

6Kg/Cm2
Not BW 0.00 New SVS BW 3 seasonal 2 months 0.50 - Bore well 0.50 75 mm 500 300.36
HDPE
6Kg/Cm2
Not BW 0.00 New SVS BW 3 seasonal 2 months 0.50 - Bore well 0.50 75 mm 500 300.36
HDPE
6Kg/Cm2
Not BW 0.00 New SVS BW 3 seasonal 2 months 0.50 - Bore well 0.50 75 mm 500 300.36
HDPE
6Kg/Cm2
Not BW 0.00 New SVS BW 3 seasonal 2 months 0.50 - Bore well 0.50 75 mm 500 300.36
HDPE
6Kg/Cm2
Not BW 0.00 New SVS BW 3 seasonal 2 months 0.50 - Bore well 0.50 75 mm 500 300.36
HDPE
6Kg/Cm2
Not BW 0.00 New SVS BW 3 seasonal 2 months 0.50 - Bore well 0.50 75 mm 500 300.36
HDPE
6Kg/Cm2
Not BW 0.00 Aug. to SVS BW 3 seasonal 2 months 0.50 - Bore well 0.50 75 mm 450 300.36
HDPE
6Kg/Cm2
Not BW 0.00 New SVS BW 3 seasonal 2 months 0.50 - Bore well 0.50 75 mm 650 300.36
HDPE
6Kg/Cm2
Not BW 0.00 New SVS BW 3 seasonal 2 months 0.50 - Bore well 0.50 75 mm 500 300.36
HDPE
6Kg/Cm2
Not BW 0.00 Aug. to SVS BW 3 seasonal 2 months 0.50 - - 0 75 mm 300 300.36
HDPE
6Kg/Cm2
Not BW 0.00 New SVS BW 3 seasonal 2 months 0.50 - Bore well 0.50 75 mm 400 300.36
HDPE
6Kg/Cm2
Not BW 0.00 New SVS BW 3 seasonal 2 months 0.50 - Bore well 0.50 75 mm 500 300.36
HDPE
6Kg/Cm2
Not BW 0.00 New SVS BW 3 seasonal 2 months 0.50 - Bore well 0.50 75 mm 400 300.36
HDPE
6Kg/Cm2
Not BW 0.00 New SVS BW 3 seasonal 2 months 0.50 - Bore well 0.50 75 mm 350 300.36
HDPE
6Kg/Cm2
Not BW 0.00 New SVS BW 3 seasonal 2 months 0.50 - Bore well 0.50 75 mm 650 300.36
HDPE
6Kg/Cm2
Not BW 0.00 New SVS BW 3 seasonal 2 months 0.50 - Bore well 0.50 75 mm 650 300.36
HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

6Kg/Cm2
Not BW 0.00 New SVS BW 3 seasonal 2 months 0.50 - Bore well 0.50 75 mm 300 300.36
HDPE
6Kg/Cm2
Not BW 0.00 New SVS BW 3 seasonal 2 months 0.50 - Bore well 0.50 75 mm 300 300.36
HDPE
6Kg/Cm2
Not BW 0.00 New SVS BW 3 seasonal 2 months 0.50 - Bore well 0.50 75 mm 300 300.36
HDPE
6Kg/Cm2
Not BW 0.00 New SVS BW 3 seasonal 2 months 0.50 - Bore well 0.50 75 mm 300 300.36
HDPE
6Kg/Cm2
Not BW 0.00 New SVS BW 3 seasonal 2 months 0.50 - Bore well 0.50 75 mm 500 300.36
HDPE
6Kg/Cm2
Not BW 0.00 New SVS BW 3 seasonal 2 months 0.50 - Bore well 0.50 75 mm 500 300.36
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Seasonal 9 months 0.00 Not required Bore well 0.50 63mm 300 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Seasonal 9 months 0.00 Not required Bore well 0.50 63mm 300 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Seasonal 9 months 0.00 Not required Bore well 0.50 63mm 300 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Seasonal 9 months 0.00 Not required Bore well 0.50 63mm 300 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Seasonal 9 months 0.00 Not required Bore well 0.50 63mm 300 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Seasonal 9 months 0.00 Not required Bore well 0.50 63mm 300 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Seasonal 9 months 0.00 Not required Bore well 0.50 63mm 300 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Seasonal 9 months 0.00 Not required Bore well 0.50 63mm 300 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Seasonal 9 months 0.00 Not required Bore well 0.50 63mm 300 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Seasonal 9 months 0.00 Not required Bore well 0.50 63mm 300 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Seasonal 9 months 0.00 Not required Bore well 0.50 63mm 300 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Seasonal 9 months 0.00 Not required Bore well 0.50 63mm 300 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Seasonal 9 months 0.00 Not required Bore well 0.50 63mm 300 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Seasonal 9 months 0.00 Not required Bore well 0.50 63mm 300 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Seasonal 9 months 0.00 Not required Bore well 0.50 63mm 300 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Seasonal 9 months 0.00 Not required Bore well 0.50 63mm 300 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Seasonal 9 months 0.00 Not required Bore well 0.50 63mm 300 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Seasonal 9 months 0.00 Not required Bore well 0.50 63mm 300 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 1000 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Seasonal 9 months 0.00 Not required Bore well 0.50 63mm 300 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Seasonal 9 months 0.00 Not required Bore well 0.50 63mm 300 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
Not Source Borewell 0.00 MPWS - 3 Continous -- 0.00 Not required Bore well 0.50 63mm 450 262.63
HDPE
6Kg/Cm2
-- -- 0.00 New SVS BW 3 seasonal 2 months 0.50 - Bore well 0.50 75 mm 650 300.36
HDPE
6Kg/Cm2
-- -- 0.00 Aug Bore well -- Continous -- 0.50 -- Bore well 0.50 75 mm 1200 300.36
HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

6Kg/Cm2
-- -- 0.00 Aug Bore well -- Continous -- 0.50 -- Bore well 0.50 75 mm 1200 300.36
HDPE
6Kg/Cm2
-- -- 0.00 New SVS BW 3 seasonal 2 months 0.50 - Bore well 0.50 75 mm 650 300.36
HDPE
6Kg/Cm2
-- -- 0.00 Aug Bore well -- Continous -- 0.50 -- Bore well 0.50 75 mm 1200 300.36
HDPE
6Kg/Cm2
-- -- 0.00 Aug Bore well -- Continous -- 0.50 -- Bore well 0.50 75 mm 1200 300.36
HDPE
6Kg/Cm2
-- -- 0.00 Aug Bore well -- Continous -- 0.50 -- Bore well 0.50 75 mm 1200 300.36
HDPE
6Kg/Cm2
-- -- 0.00 Aug Bore well -- Continous -- 0.50 -- Bore well 0.50 75 mm 1200 300.36
HDPE
6Kg/Cm2
-- -- 0.00 Aug Bore well -- Continous -- 0.50 -- Bore well 0.50 75 mm 1200 300.36
HDPE
6Kg/Cm2
-- -- 0.00 Aug Bore well -- Continous -- 0.50 -- Bore well 0.50 75 mm 1200 300.36
HDPE
6Kg/Cm2
-- -- 0.00 Aug Bore well -- Continous -- 0.50 -- Bore well 0.50 75 mm 1200 300.36
HDPE
6Kg/Cm2
-- -- 0.00 Aug Bore well -- Continous -- 0.50 -- Bore well 0.50 75 mm 1200 300.36
HDPE
6Kg/Cm2
-- -- 0.00 Aug Bore well -- Continous -- 0.50 -- Bore well 0.50 75 mm 1200 300.36
HDPE
6Kg/Cm2
-- -- 0.00 Aug Bore well -- Continous -- 0.50 -- Bore well 0.50 75 mm 1200 300.36
HDPE
6Kg/Cm2
-- -- 0.00 Aug Bore well -- Continous -- 0.50 -- Bore well 0.50 75 mm 1200 300.36
HDPE
6Kg/Cm2
-- -- 0.00 New SVS BW 3 seasonal 2 months 0.50 - Bore well 0.50 75 mm 650 300.36
HDPE
6Kg/Cm2
-- -- 0.00 Aug Bore well -- Continous -- 0.50 -- Bore well 0.50 75 mm 1200 300.36
HDPE
Subsurface 6Kg/Cm2
Sustainable -- 0.00 Aug to SVS 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 1200 300.36
Bore well HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

Subsurface 6Kg/Cm2
Sustainable -- 0.00 Aug to SVS 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 1200 300.36
Bore well HDPE
Subsurface 6Kg/Cm2
Sustainable -- 0.00 Aug to SVS 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 500 300.36
Bore well HDPE
Subsurface 6Kg/Cm2
Sustainable -- 0.00 Aug to SVS 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 500 300.36
Bore well HDPE
Subsurface 6Kg/Cm2
Sustainable -- 0.00 Aug to SVS 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 1200 300.36
Bore well HDPE
Subsurface 6Kg/Cm2
Sustainable -- 0.00 Aug to SVS 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 500 300.36
Bore well HDPE
Subsurface 6Kg/Cm2
Sustainable -- 0.00 Aug to SVS 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 1000 300.36
Bore well HDPE
Subsurface 6Kg/Cm2
Sustainable -- 0.00 Aug to SVS 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 1000 300.36
Bore well HDPE
Subsurface 6Kg/Cm2
Sustainable -- 0.00 New SVS 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 1000 300.36
Bore well HDPE
Subsurface 6Kg/Cm2
Sustainable -- 0.00 Aug to SVS 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 500 300.36
Bore well HDPE
Subsurface 6Kg/Cm2
Sustainable -- 0.00 Aug to SVS 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 500 300.36
Bore well HDPE
Subsurface 6Kg/Cm2
Sustainable -- 0.00 New SVS 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 1000 300.36
Bore well HDPE
Subsurface 6Kg/Cm2
Sustainable -- 0.00 Aug to SVS 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 1000 300.36
Bore well HDPE
Subsurface 6Kg/Cm2
Sustainable -- 0.00 Aug to SVS 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 1200 300.36
Bore well HDPE
Subsurface 6Kg/Cm2
Sustainable -- 0.00 Aug to SVS 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 1000 300.36
Bore well HDPE
Subsurface 6Kg/Cm2
Sustainable -- 0.00 New SVS 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 1000 300.36
Bore well HDPE
Subsurface 6Kg/Cm2
Sustainable -- 0.00 Aug to SVS 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 500 300.36
Bore well HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

Subsurface 6Kg/Cm2
Sustainable -- 0.00 Aug to SVS 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 500 300.36
Bore well HDPE
Subsurface 6Kg/Cm2
Sustainable -- 0.00 Aug to SVS 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 800 300.36
Bore well HDPE
Subsurface 6Kg/Cm2
Sustainable -- 0.00 Aug to SVS 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 500 300.36
Bore well HDPE
Subsurface 6Kg/Cm2
Sustainable -- 0.00 Aug to SVS 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 500 300.36
Bore well HDPE
Subsurface 6Kg/Cm2
Sustainable -- 0.00 Aug to SVS 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 500 300.36
Bore well HDPE
Subsurface 6Kg/Cm2
Sustainable -- 0.00 Aug to SVS 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 500 300.36
Bore well HDPE
Subsurface 6Kg/Cm2
Sustainable -- 0.00 Aug to SVS 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 500 300.36
Bore well HDPE
Subsurface 6Kg/Cm2
Sustainable -- 0.00 Aug to SVS 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 300 300.36
Bore well HDPE
Subsurface 6Kg/Cm2
Sustainable -- 0.00 Aug to SVS 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 600 300.36
Bore well HDPE
Subsurface 6Kg/Cm2
Sustainable -- 0.00 Aug to SVS 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 500 300.36
Bore well HDPE
Subsurface 6Kg/Cm2
Sustainable -- 0.00 Aug to SVS 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 1000 300.36
Bore well HDPE
Subsurface 6Kg/Cm2
Sustainable -- 0.00 Aug to SVS 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 1000 300.36
Bore well HDPE
Subsurface 6Kg/Cm2
Sustainable -- 0.00 Aug to SVS 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 1000 300.36
Bore well HDPE
6Kg/Cm2
-- Soakpits 0.50 New SVS Bore well 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 600 300.36
HDPE
6Kg/Cm2
Sustainable Soakpits 0.50 Aug Bore well 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 850 300.36
HDPE
6Kg/Cm2
Sustainable Soakpits 0.50 Aug Bore well 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 800 300.36
HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

6Kg/Cm2
Sustainable Soakpits 0.50 Aug Bore well 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 1000 300.36
HDPE
6Kg/Cm2
Sustainable Soakpits 0.50 Aug Bore well 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 1500 300.36
HDPE
6Kg/Cm2
Sustainable Soakpits 0.50 New SVS Bore well 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 600 300.36
HDPE
6Kg/Cm2
Sustainable Soakpits 0.50 New SVS Bore well 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 500 300.36
HDPE
6Kg/Cm2
Sustainable Soakpits 0.50 Aug Bore well 4 Continous -- 0.50 -- Soak Pits 0.50 75 mm 650 300.36
HDPE
6Kg/Cm2
Sustainable Soakpits 0.50 Aug Bore well 4 Continous -- 0.50 -- Soak Pits 0.50 75 mm 300 300.36
HDPE
6Kg/Cm2
Sustainable Soakpits 0.50 Aug Bore well 4 Continous -- 0.50 -- Soak Pits 0.50 75 mm 300 300.36
HDPE
6Kg/Cm2
Sustainable Soakpits 0.50 Aug Bore well 4 Continous -- 0.50 -- Soak Pits 0.50 75 mm 400 300.36
HDPE
6Kg/Cm2
Sustainable Soakpits 0.50 New SVS Bore well 4 Continous -- 0.50 -- Soak Pits 0.50 75 mm 500 300.36
HDPE
6Kg/Cm2
Sustainable Soakpits 0.50 Aug Bore well 4 Continous -- 0.50 -- Soak Pits 0.50 75 mm 400 300.36
HDPE
6Kg/Cm2
Sustainable Soakpits 0.50 Aug Bore well 4 Continous -- 0.50 -- Soak Pits 0.50 75 mm 500 300.36
HDPE
6Kg/Cm2
Sustainable Soakpits 0.50 Aug Bore well 4 Continous -- 0.50 -- Soak Pits 0.50 75 mm 400 300.36
HDPE
6Kg/Cm2
Sustainable Soakpits 0.50 Aug Bore well 4 Continous -- 0.50 -- Soak Pits 0.50 75 mm 600 300.36
HDPE
6Kg/Cm2
Sustainable Soakpits 0.50 New SVS Bore well 4 Continous -- 0.50 -- Soak Pits 0.50 75 mm 450 300.36
HDPE
6Kg/Cm2
-- Soakpits 0.50 New SVS Bore well 4 Continous -- 0.50 -- Soak Pits 0.50 75 mm 300 300.36
HDPE
6Kg/Cm2
-- Soakpits 0.50 New SVS Bore well 4 Continous -- 0.50 -- Soak Pits 0.50 75 mm 400 300.36
HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

6Kg/Cm2
-- Soakpits 0.50 New SVS Bore well 4 Continous -- 0.50 -- Soak Pits 0.50 75 mm 500 300.36
HDPE
6Kg/Cm2
-- Soakpits 0.50 New SVS Bore well 4 Continous -- 0.50 -- Soak Pits 0.50 75 mm 350 300.36
HDPE
6Kg/Cm2
Sustainable Soakpits 0.50 Aug Bore well 4 Continous -- 0.50 -- Soak Pits 0.50 75 mm 800 300.36
HDPE
6Kg/Cm2
-- Soakpits 0.50 New SVS Bore well 4 Continous -- 0.50 -- Soak Pits 0.50 75 mm 500 300.36
HDPE
6Kg/Cm2
-- Soakpits 0.50 New SVS Bore well 4 Continous -- 0.50 -- Soak Pits 0.50 75 mm 600 300.36
HDPE
6Kg/Cm2
Sustainable Soakpits 0.50 Aug Bore well 4 Continous -- 0.50 -- Soak Pits 0.50 75 mm 0 300.36
HDPE
6Kg/Cm2
-- Soakpits 0.50 New SVS Bore well 4 Continous -- 0.50 -- Soak Pits 0.50 75 mm 600 300.36
HDPE
6Kg/Cm2
Sustainable Soakpits 0.50 Aug Bore well 4 Continous -- 0.50 -- Soak Pits 0.50 75 mm 0 300.36
HDPE
6Kg/Cm2
-- Soakpits 0.50 New SVS Bore well 4 Continous -- 0.50 -- Soak Pits 0.50 75 mm 500 300.36
HDPE
6Kg/Cm2
-- Soakpits 0.50 New SVS Bore well 4 Continous -- 0.50 -- Soak Pits 0.50 75 mm 600 300.36
HDPE
6Kg/Cm2
-- Soakpits 0.50 New SVS Bore well 4 Continous -- 0.50 -- Soak Pits 0.50 75 mm 400 300.36
HDPE
6Kg/Cm2
Sustainable Soakpits 0.50 Aug Bore well 4 Continous -- 0.50 -- Soak Pits 0.50 75 mm 600 300.36
Sub HDPE
not sustainable 6Kg/Cm2
Soakpits 0.50 Aug to SVS surface 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 800 300.36
(driedup) Sub HDPE
not sustainable Borewell 6Kg/Cm2
Soakpits 0.50 Aug to SVS surface 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 900 300.36
(driedup) Sub HDPE
not sustainable Borewell 6Kg/Cm2
Soakpits 0.50 Aug to SVS surface 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 800 300.36
(driedup) Sub HDPE
not sustainable Borewell 6Kg/Cm2
Soakpits 0.50 Aug to SVS surface 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 1200 300.36
(driedup) HDPE
Borewell
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

Sub
6Kg/Cm2
-- -- 0.00 New SVS surface 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 1000 300.36
Sub HDPE
not sustainable Borewell 6Kg/Cm2
Soakpits 0.50 Aug surface 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 800 300.36
(driedup) Sub HDPE
not sustainable Borewell 6Kg/Cm2
Soakpits 0.50 Aug surface 4 Continous -- 1.00 -- Soak Pits 0.50 90mm 1200 355.43
(driedup) HDPE
Borewell 6Kg/Cm2
Sustainable -- 0.00 Aug to SVS Bore well 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 600 300.36
HDPE
6Kg/Cm2
Sustainable -- 0.00 New SVS Bore well 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 800 300.36
HDPE
6Kg/Cm2
Sustainable -- 0.00 New SVS Bore well 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 600 300.36
HDPE
6Kg/Cm2
Sustainable -- 0.00 New SVS Bore well 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 600 300.36
HDPE
6Kg/Cm2
Sustainable -- 0.00 New SVS Bore well 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 1000 300.36
HDPE
6Kg/Cm2
Sustainable -- 0.00 New SVS Bore well 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 600 300.36
HDPE
6Kg/Cm2
Sustainable -- 0.00 New SVS Bore well 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 500 300.36
HDPE
6Kg/Cm2
Sustainable -- 0.00 New SVS Bore well 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 800 300.36
HDPE
6Kg/Cm2
Sustainable -- 0.00 New SVS Bore well 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 800 300.36
HDPE
6Kg/Cm2
Sustainable -- 0.00 Aug to SVS Bore well 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 1000 300.36
HDPE
6Kg/Cm2
Sustainable -- 0.00 Aug to SVS Bore well 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 500 300.36
HDPE
6Kg/Cm2
Sustainable -- 0.00 New SVS Bore well 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 800 300.36
HDPE
6Kg/Cm2
Sustainable -- 0.00 Aug to SVS Bore well 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 600 300.36
HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

6Kg/Cm2
Sustainable -- 0.00 Aug to SVS Bore well 4 Continous -- 2.00 -- Soak Pits 0.50 75 mm 1200 300.36
HDPE
6Kg/Cm2
Sustainable -- 0.00 Aug to SVS Bore well 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 800 300.36
HDPE
6Kg/Cm2
Sustainable -- 0.00 New SVS Bore well 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 800 300.36
HDPE
6Kg/Cm2
Sustainable -- 0.00 New SVS Bore well 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 500 300.36
HDPE
6Kg/Cm2
Sustainable -- 0.00 Aug to SVS Bore well 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 800 300.36
HDPE
6Kg/Cm2
Sustainable -- 0.00 New SVS Bore well 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 500 300.36
HDPE
6Kg/Cm2
Sustainable -- 0.00 New SVS Bore well 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 500 300.36
HDPE
6Kg/Cm2
-- -- 0.00 New SVS Bore well 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 1500 300.36
HDPE
6Kg/Cm2
-- -- 0.00 New SVS Bore well 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 1000 300.36
HDPE
6Kg/Cm2
-- -- 0.00 New SVS Bore well 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 1000 300.36
HDPE
6Kg/Cm2
-- -- 0.00 New SVS Bore well 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 1000 300.36
HDPE
6Kg/Cm2
-- -- 0.00 New SVS Bore well 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 1500 300.36
HDPE
6Kg/Cm2
Sustainable -- 0.00 Aug to SVS Bore well 4 Continous -- 2.00 -- Soak Pits 1.00 90mm 800 355.43
HDPE
6Kg/Cm2
-- -- 0.00 New SVS Bore well 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 600 300.36
HDPE
6Kg/Cm2
-- -- 0.00 New SVS Bore well 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 800 300.36
HDPE
6Kg/Cm2
-- -- 0.00 New SVS Bore well 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 600 300.36
HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

6Kg/Cm2
-- -- 0.00 New SVS Bore well 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 600 300.36
HDPE
6Kg/Cm2
-- -- 0.00 New SVS Bore well 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 600 300.36
HDPE
6Kg/Cm2
-- -- 0.00 New SVS Bore well 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 600 300.36
HDPE
6Kg/Cm2
-- -- 0.00 New SVS Bore well 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 800 300.36
HDPE
6Kg/Cm2
-- -- 0.00 New SVS Bore well 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 600 300.36
HDPE
6Kg/Cm2
-- -- 0.00 New SVS Bore well 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 600 300.36
HDPE
6Kg/Cm2
-- -- 0.00 New SVS Bore well 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 600 300.36
Sub- HDPE
6Kg/Cm2
-- -- 0.00 New SVS Surface 4 Continous -- 1.00 -- Saok Pits 0.50 75 mm 800 300.36
Sub- HDPE
Bore well 6Kg/Cm2
-- -- 0.00 New SVS Surface 4 Continous -- 1.00 -- Saok Pits 0.50 75 mm 1200 300.36
Sub- HDPE
Bore well 6Kg/Cm2
-- -- 0.00 New SVS Surface 4 Continous -- 1.00 -- Saok Pits 0.50 75 mm 1000 300.36
Sub- HDPE
Bore well 6Kg/Cm2
-- -- 0.00 New SVS Surface 4 Continous -- 1.00 -- Saok Pits 0.50 75 mm 1000 300.36
Sub- HDPE
Bore well 6Kg/Cm2
Not(dried up) -- 0.00 Aug SVS Surface 4 Continous -- 1.00 -- Saok Pits 0.50 75 mm 1000 300.36
Sub- HDPE
Bore well 6Kg/Cm2
-- -- 0.00 NEW SVS Surface 4 Continous -- 1.00 -- Saok Pits 0.50 75 mm 800 300.36
Sub- HDPE
Bore well 6Kg/Cm2
Sustainable -- 0.00 New SVS Surface 4 Continous -- 1.00 -- Saok Pits 0.50 75 mm 650 300.36
Sub- HDPE
Bore well 6Kg/Cm2
Sustainable -- 0.00 New SVS Surface 4 Continous -- 1.00 -- Saok Pits 0.50 90mm 2500 355.43
Sub- HDPE
Bore well 6Kg/Cm2
-- -- 0.00 New SVS Surface 4 Continous -- 1.00 -- Saok Pits 0.50 75 mm 1200 300.36
HDPE
Bore well
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

Sub-
6Kg/Cm2
-- -- 0.00 New SVS Surface 4 Continous -- 1.00 -- Saok Pits 0.50 75 mm 1200 300.36
Sub- HDPE
Bore well 6Kg/Cm2
-- -- 0.00 New SVS Surface 4 Continous -- 1.00 -- Saok Pits 0.50 75 mm 1500 300.36
Sub- HDPE
Bore well 6Kg/Cm2
-- -- 0.00 New SVS Surface 4 Continous -- 1.00 -- Saok Pits 0.50 75 mm 2000 300.36
Sub- HDPE
Bore well 6Kg/Cm2
Not(Less LPM) -- 0.00 New SVS Surface 4 Continous -- 1.00 -- Saok Pits 0.50 90mm 2500 355.43
Sub- HDPE
Bore well 6Kg/Cm2
-- -- 0.00 New SVS Surface 4 Continous -- 1.00 -- Saok Pits 0.50 75 mm 1000 300.36
Sub- HDPE
Bore well 6Kg/Cm2
-- -- 0.00 New SVS Surface 4 Continous -- 1.00 -- Saok Pits 0.50 75 mm 800 300.36
Sub- HDPE
Bore well 6Kg/Cm2
Sustainable -- 0.00 Aug SVS Surface 4 Continous -- 1.00 -- Saok Pits 0.50 90mm 1200 355.43
Sub- HDPE
Bore well 6Kg/Cm2
Not(Dried up) -- 0.00 Aug SVS Surface 4 Continous -- 1.00 -- Saok Pits 0.50 75 mm 1200 300.36
Sub- HDPE
Bore well 6Kg/Cm2
Not(Dried up) -- 0.00 Aug SVS Surface 4 Continous -- 1.00 -- Saok Pits 0.50 90mm 1500 355.43
Sub- HDPE
Bore well 6Kg/Cm2
-- -- 0.00 New SVS Surface 4 Continous -- 1.00 -- Saok Pits 0.50 75 mm 1000 300.36
Sub- HDPE
Bore well 6Kg/Cm2
-- -- 0.00 New SVS Surface 4 Continous -- 1.00 -- Saok Pits 0.50 75 mm 800 300.36
Sub- HDPE
NOT(Less Bore well 6Kg/Cm2
-- 0.00 Aug SVS Surface 4 Continous -- 1.00 -- Saok Pits 0.50 75 mm 1200 300.36
Yield) Sub- HDPE
Bore well 6Kg/Cm2
-- -- 0.00 New SVS Surface 4 Continous -- 1.00 -- Saok Pits 0.50 75 mm 800 300.36
Sub- HDPE
Bore well 6Kg/Cm2
-- -- 0.00 New SVS Surface 4 Continous -- 1.00 -- Saok Pits 0.50 75 mm 800 300.36
Sub- HDPE
Bore well 6Kg/Cm2
-- -- 0.00 New SVS Surface 4 Continous -- 1.00 -- Saok Pits 0.50 75 mm 800 300.36
HDPE
Bore well 6Kg/Cm2
Sustainable -- 0.00 New SVS Bore well -- Continous -- 0.50 -- Bore well 0.50 75 mm 1000 300.36
HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

6Kg/Cm2
Sustainable -- 0.00 New SVS Bore well -- Continous -- 0.50 -- Bore well 0.50 75 mm 1000 300.36
HDPE
6Kg/Cm2
-- -- 0.00 Addl.SVS - -- Continous -- 0.00 -- Bore well 0.50 75 mm 700 300.36
HDPE
Augmentatio 6Kg/Cm2
-- -- 0.00 - -- -- -- 0.00 -- 0 0.00 75 mm 1400 300.36
n HDPE
Augmentatio 6Kg/Cm2
-- -- 0.00 - -- -- -- 0.00 -- 0 0.00 75 mm 1000 300.36
n HDPE
6Kg/Cm2
-- -- 0.00 New SVS Bore well 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 1500 300.36
HDPE
6Kg/Cm2
Sustainable Soak pits 0.50 New SVS Bore well 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 1500 300.36
HDPE
6Kg/Cm2
Sustainable Soak pits 0.50 New SVS Bore well 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 2000 300.36
HDPE
6Kg/Cm2
Sustainable Soak pits 0.50 Aug to SVS Bore well 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 400 300.36
HDPE
6Kg/Cm2
Sustainable Soak pits 0.50 Aug to SVS Bore well 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 400 300.36
HDPE
6Kg/Cm2
Sustainable Soak pits 0.50 Aug to SVS Bore well 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 500 300.36
HDPE
6Kg/Cm2
Sustainable Soak pits 0.50 Aug to SVS Bore well 4 Continous -- 1.00 -- Soak Pits 0.50 75 mm 1000 300.36
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 New SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 300 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 New SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 300 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 New SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 300 355.43
HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

6Kg/Cm2
Not Source Borewell 0 New SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 300 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 New SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 New SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 New SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 300 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 New SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 300 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 New SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 300 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 New SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 300 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 New SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 300 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 New SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 New SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 300 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 New SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 300 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 300 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 New SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 New SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 300 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 New SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 300 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 New SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 300 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 New SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 300 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 New SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 300 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 New SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 New SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 New SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 New SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 New SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 New SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 New SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 New SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 New SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 300 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 New SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 300 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 New SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 New SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 300 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 New SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 New SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 300 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 New SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 New SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 300 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 300 355.43
HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 300 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 New SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 New SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 300 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 New SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 New SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 New SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 New SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 New SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 300 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 New SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 300 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 New SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 New SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 300 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 New SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 300 355.43
HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

6Kg/Cm2
Not Source Borewell 0 New SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 300 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 New SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 300 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 New SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 New SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 New SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 300 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 New SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 300 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 New SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 300 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 New SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 New SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 New SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 New SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 New SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 New SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 300 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

6Kg/Cm2
Not Source Borewell 0 New SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 New SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 New SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 New SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 New SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 New SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 New SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 New SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 New SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 New SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 New SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 New SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 New SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 New SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 New SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 New SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 New SVS Bore well 3 Continous 4 0.00 Not required Bore well 0.5 63mm 450 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 600 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 600 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 600 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
0- 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 600 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 600 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
0- 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
0- 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 1200 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 1200 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 1200 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 0.00 Not required - 0 90mm 500 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 350 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 515 355.43
HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 800 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 900 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 800 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 1250 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 1420 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 950 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 1150 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 1200 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 1250 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 1350 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 1400 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 1250 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 1200 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 250 355.43
HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

6Kg/Cm2
Sustainable - 0 Aug. to SVS - - Contineous 4 0.00 - - 0 90mm 340 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 350 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 170 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 250 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 515 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 350 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 400 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS - - Contineous 4 0.00 - - 0 90mm 250 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 350 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 400 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 400 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS - - Contineous 4 0.00 - - 0 90mm 340 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 515 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 350 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 0.70 Not required - 0 90mm 400 355.43
HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 400 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 400 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 170 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 515 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 900 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS - - Contineous 4 0.00 - - 0 90mm 250 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 0 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 170 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 150 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 150 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 150 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 250 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 515 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 0.90 Not required - 0 90mm 0 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 170 355.43
HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 515 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 0 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 0.70 Not required - 0 90mm 250 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS - - Contineous 4 0.00 - - 0 90mm 0 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 250 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 515 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS - - Contineous 4 0.00 - - 0 90mm 340 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 800 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 800 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 800 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 400 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 250 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 400 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 250 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 900 355.43
HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 400 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 900 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 1000 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 900 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 1500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS - - Contineous 4 0.00 - - 0 90mm 250 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS - - Contineous 4 0.00 - - 0 90mm 250 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS - - Contineous 4 0.00 - - 0 90mm 250 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS - - Contineous 4 0.00 - - 0 90mm 250 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS - - Contineous 4 0.00 - - 0 90mm 1500 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 250 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 1000 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 400 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 400 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 400 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 170 355.43
HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 400 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 400 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS - - Contineous 4 0.00 - - 0 90mm 250 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS - - Contineous 4 0.00 - - 0 90mm 250 355.43
HDPE

6Kg/Cm2
Sustainable - 0 Aug. to SVS - - Contineous 4 0.00 - - 0 90mm 250 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS - - Contineous 4 0.00 - - 0 90mm 250 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS - - Contineous 4 0.00 - - 0 90mm 250 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS - - Contineous 4 0.00 - - 0 90mm 250 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 400 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS - - Contineous 4 0.00 - - 0 90mm 800 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 550 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 3400 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 1100 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 250 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 170 355.43
HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

6Kg/Cm2
Sustainable - 0 Aug. to SVS - - Contineous 4 0.00 - - 0 90mm 250 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS - - Contineous 4 0.00 - - 0 90mm 250 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 400 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS - - Contineous 4 0.00 - - 0 90mm 250 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 515 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 515 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 400 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS - - Contineous 4 0.00 - - 0 90mm 135 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 170 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 170 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 515 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS - - Contineous 4 0.00 - - 0 90mm 250 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS - - Contineous 4 0.00 - - 0 90mm 250 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS - - Contineous 4 0.00 - - 0 90mm 250 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 1500 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 400 355.43
HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 1500 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 400 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 1500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS - - Contineous 4 0.00 Not required - 0 90mm 0 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 1500 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 515 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 515 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS - - Contineous 4 0.00 - - 0 90mm 250 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS - - Contineous 4 0.00 - - 0 90mm 250 355.43
HDPE
6Kg/Cm2
Not Source Borewell Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 250 355.43
HDPE
6Kg/Cm2
Not Source Borewell Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 250 355.43
HDPE
6Kg/Cm2
Not Source Borewell Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 250 355.43
HDPE
6Kg/Cm2
Not Source Borewell Aug. to SVS Bore well 3 Contineous 1.00 Not required - 0 90mm 200 355.43
HDPE
6Kg/Cm2
Not Source Borewell Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 168 355.43
HDPE
6Kg/Cm2
Not Source Borewell Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 200 355.43
HDPE
Sustainable Source Borewell 0 New SVS Bore well 3 Seasonal 4 Not required - 0 90mm HDPE 6kg 1500 355.43
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 300 355.43
HDPE
6Kg/Cm2
Not Bore well 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 300 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 430 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 550 355.43
HDPE
6Kg/Cm2
Not Bore well 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 550 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 320 355.43
HDPE
C/o 6Kg/Cm2
Sustainable - 0 Bore well 3 Seasonal 4 Checkdam 5 - 0 355.43
Checkdam HDPE
C/o 6Kg/Cm2
Sustainable - 0 Bore well 3 Seasonal 4 Checkdam 8 - 0 355.43
Checkdam HDPE
C/o 6Kg/Cm2
Sustainable - 0 Bore well 3 Seasonal 4 Checkdam 15 - 0 355.43
Checkdam HDPE
C/o 6Kg/Cm2
Sustainable - 0 Bore well 3 Seasonal 4 Checkdam 15 - 0 355.43
Checkdam HDPE
C/o 6Kg/Cm2
Sustainable - 0 Bore well 3 Seasonal 4 Checkdam 15 - 0 355.43
Checkdam HDPE
C/o 6Kg/Cm2
Sustainable - 0 Bore well 3 Seasonal 4 Checkdam 4 - 0 355.43
Checkdam HDPE
C/o 6Kg/Cm2
Sustainable - 0 Bore well 3 Seasonal 4 Checkdam 4 - 0 355.43
Checkdam HDPE
C/o 6Kg/Cm2
Sustainable - 0 Bore well 3 Seasonal 4 Checkdam 4 - 0 355.43
Checkdam HDPE
C/o 6Kg/Cm2
Sustainable - 0 Bore well 3 Seasonal 4 Checkdam 4 - 0 355.43
Checkdam HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

C/o 6Kg/Cm2
Sustainable - 0 Bore well 3 Seasonal 4 Checkdam 4 - 0 355.43
Checkdam HDPE
C/o 6Kg/Cm2
Sustainable - 0 Bore well 3 Seasonal 4 Checkdam 4 - 0 355.43
Checkdam HDPE
C/o 6Kg/Cm2
Sustainable - 0 Bore well 3 Seasonal 4 Checkdam 4 - 0 355.43
Checkdam HDPE
C/o 6Kg/Cm2
Sustainable - 0 Bore well 3 Seasonal 4 Checkdam 4 - 0 355.43
Checkdam HDPE
C/o 6Kg/Cm2
Sustainable - 0 Bore well 3 Seasonal 4 Checkdam 4 - 0 355.43
Checkdam HDPE
C/o 6Kg/Cm2
Sustainable - 0 Bore well 3 Seasonal 4 Checkdam 4 - 0 355.43
Checkdam HDPE
C/o 6Kg/Cm2
Sustainable - 0 Bore well 3 Seasonal 4 Checkdam 4 - 0 355.43
Checkdam HDPE
C/o 6Kg/Cm2
Sustainable - 0 Bore well 3 Seasonal 4 Checkdam 4 - 0 355.43
Checkdam HDPE
C/o 6Kg/Cm2
Sustainable - 0 Bore well 3 Seasonal 4 Checkdam 4 - 0 355.43
Checkdam HDPE
C/o 6Kg/Cm2
Sustainable - 0 Bore well 3 Seasonal 4 Checkdam 4 - 0 355.43
Checkdam HDPE
C/o 6Kg/Cm2
Sustainable - 0 Bore well 3 Seasonal 4 Checkdam 4 - 0 355.43
Checkdam HDPE
C/o 6Kg/Cm2
Sustainable - 0 Bore well 3 Seasonal 4 Checkdam 4 - 0 355.43
Checkdam HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 800 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 200 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 200 355.43
HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 200 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 200 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 200 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 800 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 200 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 800 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 800 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 200 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 200 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 200 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 800 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 200 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 800 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 200 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 200 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 200 355.43
HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 200 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 200 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 800 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 200 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 200 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 200 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 200 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 0.00 Not required - 0 90mm 800 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 200 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 200 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 850 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 200 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 200 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 1200 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 1350 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 900 355.43
HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

6Kg/Cm2
Not - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 200 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 200 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 200 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 200 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 200 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 200 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 200 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 1250 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 200 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 200 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 200 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 200 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 800 355.43
HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 200 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 200 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 200 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 200 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 200 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 200 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 800 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 200 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 800 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 200 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 - 0 0 90mm 480 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 - 0 0 90mm 480 355.43
HDPE
6Kg/Cm2
New SVS Bore well 3 Seasonal 4 0.00 - - 0 90mm 200 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 0.00 - - 0 90mm 200 355.43
HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

6Kg/Cm2
Sustainable - 0 New SVS - - 0.00 - - 0 90mm 200 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 0.00 - - 0 90mm 200 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 0.00 - - 0 90mm 200 355.43
HDPE
6Kg/Cm2
New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 450 355.43
HDPE
6Kg/Cm2
New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 450 355.43
HDPE
6Kg/Cm2
New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 450 355.43
HDPE
6Kg/Cm2
New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 450 355.43
HDPE

6Kg/Cm2
New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 450 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS - - 1.00 Not required - 0 90mm 450 355.43
HDPE
6Kg/Cm2
Not - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 450 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS - - 1.00 Not required - 0 90mm 450 355.43
HDPE
6Kg/Cm2
Not - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 450 355.43
HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 450 355.43
HDPE
6Kg/Cm2
Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 0 355.43
HDPE
6Kg/Cm2
Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 0 355.43
HDPE
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 0.00 - - - - - - 355.43
6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 900 355.43
HDPE
6Kg/Cm2
Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 1500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 1500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 1500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS - - 1.00 Not required - 0 90mm 450 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 1500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 1500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 1500 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 - 0 0 90mm 480 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 430 355.43
HDPE
6Kg/Cm2
Not - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 515 355.43
HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 1500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS - - 1.00 Not required - 0 90mm 450 355.43
HDPE
6Kg/Cm2
Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 900 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 1500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 1500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 900 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 450 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS - - 1.00 Not required - 0 90mm 450 355.43
HDPE
6Kg/Cm2
Not - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 - 0 0 90mm 480 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 515 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS - - 1.00 Not required - 0 90mm 450 355.43
HDPE
6Kg/Cm2
Not - 0 New SVS - - Contineous 4 0.00 - - 0 90mm 800 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS - - 1.00 Not required - 0 90mm 450 355.43
HDPE
6Kg/Cm2
New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 450 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 800 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS - - 0.00 - - 0 90mm 200 355.43
HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 1500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 400 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS - - - 0 0 90mm 480 355.43
HDPE
6Kg/Cm2
Aug. to SVS Bore well 3 Seasonal 4 1.00 - 0 0 90mm 480 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 0.00 Not required - 0 90mm 400 355.43
HDPE
6Kg/Cm2
Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 515 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS - - Not required - 0 90mm 515 355.43
HDPE
6Kg/Cm2
Aug. to SVS Bore well 3 Seasonal 4 1.00 - 0 0 90mm 550 355.43
HDPE
6Kg/Cm2
Not - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 430 355.43
HDPE
6Kg/Cm2
Not - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 - 0 0 90mm 550 355.43
HDPE
6Kg/Cm2
Not - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 - 0 0 90mm 550 355.43
HDPE
6Kg/Cm2
Not - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 515 355.43
HDPE
6Kg/Cm2
Not - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 0 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS - - - 0 0 90mm 550 355.43
HDPE
6Kg/Cm2
Not - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 - 0 0 90mm 480 355.43
HDPE
6Kg/Cm2
Not - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 515 355.43
HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

6Kg/Cm2
Not - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 0 355.43
HDPE
6Kg/Cm2
Not - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 430 355.43
HDPE
6Kg/Cm2
Not - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 - 0 0 90mm 480 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 1500 355.43
HDPE
6Kg/Cm2
Not - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 - 0 0 90mm 550 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 1500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 1200 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 0 355.43
HDPE
6Kg/Cm2
Not - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 - 0 0 90mm 480 355.43
HDPE
6Kg/Cm2
Not - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 0 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS - - - 0 0 90mm 480 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.50 Not required - 0 90mm 800 355.43
HDPE
6Kg/Cm2
Aug. to SVS Bore well 3 Seasonal 4 1.00 - 0 0 90mm 550 355.43
HDPE
6Kg/Cm2
Not - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 - 0 0 90mm 480 355.43
HDPE
6Kg/Cm2
New SVS Bore well 3 Seasonal 4 1.50 Not required - 0 90mm 800 355.43
HDPE
6Kg/Cm2
New SVS Bore well 3 Seasonal 4 1.50 Not required - 0 90mm 800 355.43
HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

6Kg/Cm2
Not - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 0 355.43
HDPE
6Kg/Cm2
Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 430 355.43
HDPE
6Kg/Cm2
Aug. to SVS Bore well 3 Seasonal 4 1.00 - 0 0 90mm 480 355.43
HDPE
6Kg/Cm2
Aug. to SVS Bore well 3 Seasonal 4 1.00 - 0 0 90mm 480 355.43
HDPE
6Kg/Cm2
Not - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 430 355.43
HDPE
6Kg/Cm2
Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required 0 0 90mm 340 355.43
HDPE
6Kg/Cm2
Not - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required 0 0 90mm 400 355.43
HDPE
6Kg/Cm2
Not - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 - 0 0 90mm 480 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 430 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 800 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 515 355.43
HDPE
6Kg/Cm2
Not - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 0 355.43
HDPE
6Kg/Cm2
Not - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required 0 0 90mm 400 355.43
HDPE
6Kg/Cm2
Not - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required 0 0 90mm 340 355.43
HDPE
6Kg/Cm2
Not - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 - 0 0 90mm 480 355.43
HDPE
6Kg/Cm2
Not - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 450 355.43
HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

6Kg/Cm2
Not - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required 0 0 90mm 340 355.43
HDPE
6Kg/Cm2
Not - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 - 0 0 90mm 480 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS - - 0.00 - - 0 90mm 200 355.43
HDPE
6Kg/Cm2
Not - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required 0 0 90mm 340 355.43
HDPE
6Kg/Cm2
Not - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 515 355.43
HDPE
6Kg/Cm2
New SVS Bore well 3 Seasonal 4 0.00 - - 0 90mm 200 355.43
HDPE
6Kg/Cm2
Not - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required 0 0 90mm 340 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 515 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 4 1.00 Not required - 0 90mm 515 355.43
HDPE
6Kg/Cm2
New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 1500 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 515 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 515 355.43
HDPE
6Kg/Cm2
Not - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 515 355.43
HDPE
6Kg/Cm2
New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 800 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 800 355.43
HDPE
6Kg/Cm2
Not - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required 0 0 90mm 340 355.43
HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

6Kg/Cm2
Not - 0 New SVS Bore well 3 Seasonal 4 0.00 - - 0 90mm 200 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS - - 0.00 - - 0 90mm 200 355.43
HDPE
6Kg/Cm2
Not - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required 0 0 90mm 340 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 800 355.43
HDPE
6Kg/Cm2
Not - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required 0 0 90mm 400 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 515 355.43
HDPE
6Kg/Cm2
Aug. to SVS Bore well 3 Seasonal 4 0.00 Not required - 0 90mm 430 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 515 355.43
HDPE
6Kg/Cm2
Not Source Borewell 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 515 355.43
HDPE
6Kg/Cm2
Not - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 - 0 0 90mm 550 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS - - 0.00 - - 0 90mm 200 355.43
HDPE
6Kg/Cm2
Aug. to SVS Bore well 3 Seasonal 4 1.00 - 0 0 90mm 500 355.43
HDPE
6Kg/Cm2
New SVS Bore well 3 Seasonal 4 0.00 - - 0 90mm 200 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS - - 0.00 - - 0 90mm 200 355.43
HDPE
6Kg/Cm2
New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 1500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 1500 355.43
HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

6Kg/Cm2
Sustainable - 0 New SVS - - 0.00 - - 0 90mm 200 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 1200 355.43
HDPE
6Kg/Cm2
Sustainable - New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 1500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 1200 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS - - 0.00 - - 0 90mm 200 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 1500 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS - - 0.00 - - 0 90mm 200 355.43
HDPE
6Kg/Cm2
New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 450 355.43
HDPE

6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 0.00 Not required - 0 90mm 450 355.43
HDPE
6Kg/Cm2
Not - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 0 355.43
HDPE
6Kg/Cm2
Not - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 - 0 0 90mm 480 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 0.00 - 0 0 90mm 480 355.43
HDPE
6Kg/Cm2
Not - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 0 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS - - 1.00 Not required - 0 90mm 450 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 0.00 - 0 0 90mm 480 355.43
HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

6Kg/Cm2
Not - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 1200 355.43
HDPE
6Kg/Cm2
New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 450 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 450 355.43
HDPE
6Kg/Cm2
Not - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 - 0 0 90mm 480 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 450 355.43
HDPE
6Kg/Cm2
Not - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 - 0 0 90mm 480 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 450 355.43
HDPE
6Kg/Cm2
Sustainable - Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 0 355.43
HDPE
6Kg/Cm2
Not - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 - 0 0 90mm 480 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 450 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 450 355.43
HDPE
6Kg/Cm2
Not - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 900 355.43
HDPE
6Kg/Cm2
Not - 0 Aug. to SVS Bore well 3 Seasonal 4 0.00 - - 0 90mm 200 355.43
HDPE
6Kg/Cm2
Sustainable - Aug. to SVS Bore well 3 Seasonal 4 1.00 - 0 0 90mm 480 355.43
HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

6Kg/Cm2
Sustainable - Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 1500 355.43
HDPE
6Kg/Cm2
Sustainable - Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 900 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS - - 0.00 - - 0 90mm 200 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS - - 0.00 - - 0 90mm 200 355.43
HDPE
6Kg/Cm2
Aug. to SVS Bore well 3 Seasonal 4 0.00 - - 0 90mm 200 355.43
HDPE
6Kg/Cm2
Not - 0 Aug. to SVS Bore well 3 Seasonal 4 0.00 - - 0 90mm 200 355.43
HDPE
6Kg/Cm2
Not - 0 Aug. to SVS Bore well 3 Seasonal 4 0.00 - - 0 90mm 200 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS - - 0.00 - - 0 90mm 200 355.43
HDPE
6Kg/Cm2
Not - 0 Aug. to SVS Bore well 3 Seasonal 4 0.00 - - 0 90mm 200 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS - - 0.00 - - 0 90mm 200 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 450 355.43
HDPE
6Kg/Cm2
Not - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 - 0 0 90mm 480 355.43
HDPE
6Kg/Cm2
Not - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required 0 0 90mm 340 355.43
HDPE
6Kg/Cm2
Not - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 0 355.43
HDPE
6Kg/Cm2
Sustainable - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required 0 0 90mm 340 355.43
HDPE
proposal for sustainability
Exisitng Source sustainability details New Source Pumping Main
of new source

If the new
If seasonal, If the new source
Name of source is
average is other than
source borewell,
Whether If not sustainable, dried up bore well,
Amount (surface/su Categorisation Amount Amount
source is Nature of work Name of Continous / period for permission from Type &
( Rs in b surface) of Mandals as ( Rs in Type ( Rs in Dia Length Rate
sustainable or proposed for source work Seasonal the past competent Class
(Lakhs) mention per GWD (1over (Lakhs) (Lakhs)
not sustainabilty three years authority
the name exploited,
(in (mandatory)
of source 2critical, 3Semi
months) taken or not
critical & 4Safe)

6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 450 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 450 355.43
HDPE
6Kg/Cm2
Sustainable - 0 New SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 450 355.43
HDPE
6Kg/Cm2
Not - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 Not required - 0 90mm 0 355.43
HDPE
6Kg/Cm2
Not - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 - 0 0 90mm 480 355.43
HDPE
6Kg/Cm2
Not - 0 Aug. to SVS Bore well 3 Seasonal 4 1.00 - 0 0 90mm 480 355.43
HDPE
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60
1.95 0 0 0.00 5 3 0.75 63 4Kg/Cm2 HDPE 350 249.63 0.87 0.61 0.40 9.09 Hon'ble MLA concerned
1.95 0 0 0.00 5 0.5 0.50 63 4Kg/Cm2 HDPE 500 249.63 1.25 0.27 0.40 8.87 Hon'ble MLA concerned
1.80 0 0 0.00 5 0.5 0.50 63 4Kg/Cm2 HDPE 500 249.63 1.25 0.50 0.32 4.87 Hon'ble MLA concerned

1.80 0 0 0.00 5 0.5 0.50 63 4Kg/Cm2 HDPE 500 249.63 1.25 0.50 0.32 4.87 Hon'ble MLA concerned

0.45 10000 68.78 6.88 5 0.5 0.50 63 4Kg/Cm2 HDPE 250 249.63 0.62 0.30 0.35 14.60 Hon'ble MLA concerned

0.45 10000 68.78 6.88 5 0.5 0.50 63 4Kg/Cm2 HDPE 250 249.63 0.62 0.40 0.35 9.70 Hon'ble MLA concerned

1.95 40000 41.14 16.46 5 3 0.75 75 4Kg/Cm2 HDPE 600 278.63 1.67 0.50 0.18 22.51 Hon'ble MLA concerned

0.45 40000 41.14 16.46 5 0.5 0.50 63 4Kg/Cm2 HDPE 250 249.63 0.62 0.30 0.35 19.68 Hon'ble MLA concerned

1.35 10000 68.78 6.88 5 0.5 0.50 63 4Kg/Cm2 HDPE 300 249.63 0.75 0.30 0.19 11.47 Hon'ble MLA concerned

0.90 60000 31.21 18.73 5 0.5 0.50 63 4Kg/Cm2 HDPE 800 249.63 2.00 0.70 0.39 23.71 Hon'ble MLA concerned
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

0.90 60000 31.21 18.73 5 0.5 0.50 63 4Kg/Cm2 HDPE 800 249.63 2.00 0.70 0.39 23.71 Hon'ble MLA concerned
0.60 10000 68.78 6.88 5 0.5 0.50 63 4Kg/Cm2 HDPE 100 249.63 0.25 0.10 0.18 9.01 Hon'ble MLA concerned
1.95 40000 41.14 16.46 5 3 0.75 75 4Kg/Cm2 HDPE 600 278.63 1.67 0.50 0.18 22.51 Hon'ble MLA concerned
1.80 20000 46.47 9.29 5 0.5 0.50 63 4Kg/Cm2 HDPE 300 249.63 0.75 0.30 0.24 14.39 Hon'ble MLA concerned
3.60 0 0 0.00 5 0.12 0.60 63 4Kg/Cm2 HDPE 600 249.63 1.50 0.75 0.55 8.00 Hon'ble MLA concerned
1.20 10000 68.78 6.88 5 0.5 0.50 63 4Kg/Cm2 HDPE 500 249.63 1.25 0.75 0.30 11.88 Hon'ble MLA concerned
2.40 10000 68.78 6.88 5 0.5 0.50 63 4Kg/Cm2 HDPE 500 249.63 1.25 0.60 0.25 12.88 Hon'ble MLA concerned
3.60 10000 68.78 6.88 5 0.12 0.60 63 4Kg/Cm2 HDPE 600 249.63 1.50 0.75 0.55 14.88
1.50 40000 41.14 16.46 5 0.5 0.50 63 4Kg/Cm2 HDPE 600 249.63 1.50 0.20 0.40 21.56 Hon'ble MLA concerned
1.80 0 0 0.00 5 0.5 0.50 63 4Kg/Cm2 HDPE 600 249.63 1.50 0.20 0.40 4.90 Hon'ble MLA concerned
1.80 40000 41.14 16.46 5 0.5 0.50 63 4Kg/Cm2 HDPE 600 249.63 1.50 0.20 0.40 21.36 Hon'ble MLA concerned
1.80 0 0 0.00 5 0.5 0.50 63 4Kg/Cm2 HDPE 600 249.63 1.50 0.20 0.40 4.90 Hon'ble MLA concerned
1.80 0 0 0.00 5 0.5 0.50 63 4Kg/Cm2 HDPE 600 249.63 1.50 0.20 0.40 4.90 Hon'ble MLA concerned
3.00 100000 28.82 28.82 5 0.1 0.50 63 HDPE 4Kg 800 249.63 2.00 0.50 3.00 48.22 Hon'ble MLA concerned

3.00 0 0 0.00 5 0.1 0.50 63 HDPE 4Kg 1000 249.63 2.50 0.20 0.60 15.20 Hon'ble MLA concerned

1.20 0 0 0.00 5 0.1 0.50 63 HDPE 4Kg 200 249.63 0.50 0.20 0.20 3.80 Hon'ble MLA concerned
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

3.00 40000 41.14 16.46 5 0.1 0.50 63 HDPE 4Kg 800 249.63 2.00 0.20 2.00 34.56 Hon'ble MLA concerned
4.51 0 0 0.00 5 0.1 0.50 63 HDPE 4Kg 200 249.63 0.50 0.50 0.50 16.90 Hon'ble MLA concerned
1.80 0 0 0.00 5 0.1 0.50 63 HDPE 4Kg 400 249.63 1.00 0.20 0.50 5.20 Hon'ble MLA concerned
3.00 0 0 0.00 5 0.1 0.50 63 HDPE 4Kg 0 249.63 0.00 0.20 0.50 5.40 Hon'ble MLA concerned
1.80 20000 46.47 9.29 5 0.1 0.50 63 HDPE 4Kg 400 249.63 1.00 0.50 0.50 14.79 Hon'ble MLA concerned
1.80 100000 28.82 28.82 5 0.1 0.50 63 HDPE 4Kg 400 249.63 1.00 0.50 0.50 34.32 Hon'ble MLA concerned
3.60 10000 68.78 6.88 5 0.1 0.50 63 HDPE 4Kg 400 249.63 1.00 0.20 0.50 13.88 Hon'ble MLA concerned
7.5 KL
3.00 35 2.00 5 0.1 0.50 63 HDPE 4Kg 400 249.63 1.00 0.20 0.50 8.40 Hon'ble MLA concerned
GLSR
3.00 0 0 0.00 5 0.1 0.50 63 HDPE 4Kg 400 249.63 1.00 0.20 0.50 6.40 Hon'ble MLA concerned
3.00 0 0 0.00 5 0.1 0.50 63 HDPE 4Kg 400 249.63 1.00 0.50 0.50 17.90 Hon'ble MLA concerned
3.00 40000 41.14 16.46 5 0.1 0.50 63 HDPE 4Kg 400 249.63 1.00 0.50 0.50 23.16 Hon'ble MLA concerned
3.00 0 0 0.00 5 0.1 0.50 63 HDPE 4Kg 400 249.63 1.00 0.20 0.50 6.40 Hon'ble MLA concerned
1.80 20000 46.47 9.29 5 3 0.75 63 HDPE 4Kg 1000 249.63 2.50 0.40 0.60 16.34 Hon'ble MLA concerned
1.80 0 0 0.00 5 3 0.75 75 4Kg/Cm2 HDPE 1300 278.63 3.62 0.50 0.24 7.91 Hon'ble MLA concerned

4.51 0 0 0.00 5 3 0.75 75 4Kg/Cm2 HDPE 1700 278.63 4.74 1.26 0.40 12.65 Hon'ble MLA concerned

0.90 0 0 0.00 5 3 0.75 75 4Kg/Cm2 HDPE 200 278.63 0.56 0.50 0.21 3.92 Hon'ble MLA concerned
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

0.60 0 0 0.00 5 3 0.75 63 HDPE 4Kg 100 249.63 0.25 0.50 0.00 3.10 Hon'ble MLA concerned
0.60 0 0 0.00 5 3 0.75 63 HDPE 4Kg 100 249.63 0.25 0.50 0.00 3.10 Hon'ble MLA concerned

1.50 0 0 0.00 5 3 0.75 75 4Kg/Cm2 HDPE 300 278.63 0.84 0.50 0.18 4.77 Hon'ble MLA concerned

1.80 0 0 0.00 5 3 0.75 75 4Kg/Cm2 HDPE 600 278.63 1.67 0.50 0.13 5.85 Hon'ble MLA concerned
0.90 0 0 0.00 5 3 0.75 75 4Kg/Cm2 HDPE 200 278.63 0.56 0.50 0.21 3.92 Hon'ble MLA concerned
1.50 0 0 0.00 5 3 0.75 75 4Kg/Cm2 HDPE 300 278.63 0.84 0.50 0.18 4.77 Hon'ble MLA concerned
1.50 0 0 0.00 5 3 0.75 75 4Kg/Cm2 HDPE 300 278.63 0.84 0.50 0.18 4.77 Hon'ble MLA concerned
1.50 0 0 0.00 5 3 0.75 75 4Kg/Cm2 HDPE 300 278.63 0.84 0.50 0.18 4.77 Hon'ble MLA concerned
1.50 0 0 0.00 5 3 0.75 75 4Kg/Cm2 HDPE 300 278.63 0.84 0.50 0.18 4.77 Hon'ble MLA concerned
1.50 0 0 0.00 5 3 0.75 75 4Kg/Cm2 HDPE 300 278.63 0.84 0.50 0.18 4.77 Hon'ble MLA concerned
1.50 0 0 0.00 5 3 0.75 75 4Kg/Cm2 HDPE 300 278.63 0.84 0.50 0.18 4.77 Hon'ble MLA concerned
1.50 0 0 0.00 5 3 0.75 75 4Kg/Cm2 HDPE 300 278.63 0.84 0.50 0.18 4.77 Hon'ble MLA concerned

1.50 0 0 0.00 5 3 0.75 75 4Kg/Cm2 HDPE 300 278.63 0.84 0.50 0.18 4.77 Hon'ble MLA concerned

1.50 0 0 0.00 5 3 0.75 75 4Kg/Cm2 HDPE 300 278.63 0.84 0.50 0.18 4.77 Hon'ble MLA concerned
1.50 0 0 0.00 5 3 0.75 75 4Kg/Cm2 HDPE 300 278.63 0.84 0.50 0.18 4.77 Hon'ble MLA concerned
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

1.50 0 0 0.00 5 3 0.75 0 -- 0 0 0.00 1.50 0.00 4.75 Hon'ble MLA concerned
1.50 0 0 0.00 5 3 0.75 75 4Kg/Cm2 HDPE 300 278.63 0.84 0.50 0.18 4.77 Hon'ble MLA concerned
0.60 0 0 0.00 5 3 0.75 63 HDPE 4Kg 100 249.63 0.25 0.50 0.00 3.10 Hon'ble MLA concerned
1.80 20000 46.47 9.29 5 3 0.75 75 4Kg/Cm2 HDPE 600 278.63 1.67 0.50 0.13 15.15 Hon'ble MLA concerned
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
0.79 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.56 0.10 0.00 9.32
0.79 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.56 0.10 0.00 9.32
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
0.79 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.56 0.10 0.00 9.32
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
0.79 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.56 0.10 0.00 9.32
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
0.79 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.56 0.10 0.00 9.32
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
0.79 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.56 0.10 0.00 9.32
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58 Hon'ble MLA concerned
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
2.10 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 700 278.63 1.95 0.50 0.05 13.18
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
0.79 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.56 0.10 0.00 9.32
0.79 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.56 0.10 0.00 9.32
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
1.84 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 700 278.63 1.95 0.10 0.19 12.16
1.84 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 700 278.63 1.95 0.10 0.19 12.16
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
1.84 40000 41.14 16.46 5 0.5 0.50 75 4Kg/Cm2 HDPE 750 278.63 2.09 0.10 0.09 22.27
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
0.79 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.56 0.10 0.00 9.32
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
0.79 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.56 0.10 0.00 9.32
0.79 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.56 0.10 0.00 9.32
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
0.79 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.56 0.10 0.00 9.32
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
0.79 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.56 0.10 0.00 9.32
0.79 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.56 0.10 0.00 9.32
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
0.79 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.56 0.10 0.00 9.32
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
0.79 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.56 0.10 0.00 9.32
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
0.79 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.56 0.10 0.00 9.32
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
0.79 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.56 0.10 0.00 9.32
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
0.79 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.56 0.10 0.00 9.32
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
0.79 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.56 0.10 0.00 9.32
0.79 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.56 0.10 0.00 9.32
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
0.00 60000 31.21 18.73 5 0.5 0.50 75 4Kg/Cm2 HDPE 700 278.63 1.95 0.00 0.00 21.18
1.31 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.30 0.00 10.61
2.63 40000 41.14 16.46 5 0.6 0.60 75 4Kg/Cm2 HDPE 700 278.63 1.95 0.30 0.08 23.21
1.31 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 800 278.63 2.23 0.50 0.00 13.22
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
0.79 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.56 0.10 0.00 9.32 Hon'ble MLA concerned
1.31 20000 46.47 9.29 5 0.5 0.60 75 4Kg/Cm2 HDPE 500 278.63 1.39 0.30 0.05 14.15
1.31 10000 68.78 6.88 5 0.5 0.60 75 4Kg/Cm2 HDPE 500 278.63 1.39 0.30 0.05 11.73
1.58 10000 68.78 6.88 5 0.5 0.60 75 4Kg/Cm2 HDPE 500 278.63 1.39 0.30 0.01 11.96
1.31 10000 68.78 6.88 5 0.5 0.60 75 4Kg/Cm2 HDPE 700 278.63 1.95 0.30 0.06 12.30
2.63 0 0 0.00 10 1 1.00 75 4Kg/Cm2 HDPE 1000 278.63 2.79 0.00 0.00 7.61
2.10 10000 68.78 6.88 5 0.5 0.60 75 4Kg/Cm2 HDPE 800 278.63 2.23 0.30 0.06 13.37
1.31 40000 41.14 16.46 5 0.5 0.60 75 4Kg/Cm2 HDPE 700 278.63 1.95 0.30 0.06 21.88
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
0.79 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.56 0.10 0.00 9.32 Hon'ble MLA concerned
0.79 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.56 0.10 0.00 9.32
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58 Hon'ble MLA concerned
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

0.79 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.56 0.10 0.00 9.32
0.79 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.56 0.10 0.00 9.32 Hon'ble MLA concerned
0.79 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.56 0.10 0.00 9.32 Hon'ble MLA concerned
0.79 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.56 0.10 0.00 9.32
0.79 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.56 0.10 0.00 9.32 Hon'ble MLA concerned
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
0.79 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.56 0.10 0.00 9.32
0.79 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.56 0.10 0.00 9.32
0.79 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.56 0.10 0.00 9.32
0.79 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.56 0.10 0.00 9.32
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
0.79 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.56 0.10 0.00 9.32 Hon'ble MLA concerned
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
0.79 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.56 0.10 0.00 9.32
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

0.79 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.56 0.10 0.00 9.32
0.79 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.56 0.10 0.00 9.32
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
0.79 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.56 0.10 0.00 9.32
0.79 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.56 0.10 0.00 9.32
0.79 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.56 0.10 0.00 9.32
0.79 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.56 0.10 0.00 9.32
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
0.79 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.56 0.10 0.00 9.32
0.79 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.56 0.10 0.00 9.32 Hon'ble MLA concerned
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58 Hon'ble MLA concerned
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58 Hon'ble MLA concerned
0.79 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.56 0.10 0.00 9.32
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
1.31 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 500 278.63 1.39 0.10 0.05 10.93
2.10 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 500 278.63 1.39 0.10 0.04 11.71
1.31 0 0 0.00 5 0.5 0.50 75 4Kg/Cm2 HDPE 800 278.63 2.23 0.00 0.06 5.30
1.31 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 500 278.63 1.39 0.50 0.15 11.43
1.31 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 500 278.63 1.39 0.50 0.15 11.43
1.18 0 0 0.00 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 3.30
K.Premsagar Rao, Hon'ble
1.78 0 0 0.00 5 0.1 0.50 75 6Kg/Cm2 HDPE 750 278.63 2.09 0.00 0.02 5.39
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
1.78 0 0 0.00 5 0.1 0.50 75 6Kg/Cm2 HDPE 750 278.63 2.09 0.00 0.02 5.39
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
1.78 0 0 0.00 5 0.1 0.50 75 6Kg/Cm2 HDPE 750 278.63 2.09 0.00 0.02 5.39
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
1.78 0 0 0.00 5 0.1 0.50 75 6Kg/Cm2 HDPE 750 278.63 2.09 0.00 0.02 5.39
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
1.78 0 0 0.00 5 0.1 0.50 75 6Kg/Cm2 HDPE 750 278.63 2.09 0.00 0.02 5.39
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
1.78 0 0 0.00 5 0.1 0.50 75 6Kg/Cm2 HDPE 750 278.63 2.09 0.00 0.02 5.39
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
2.13 40000 41.14 16.46 5 0.1 0.50 75 6Kg/Cm2 HDPE 950 278.63 2.65 0.50 0.00 23.24
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
1.78 0 0 0.00 5 0.1 0.50 75 6Kg/Cm2 HDPE 750 278.63 2.09 0.00 0.02 5.39
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
1.78 0 0 0.00 5 0.1 0.50 75 6Kg/Cm2 HDPE 750 278.63 2.09 0.00 0.02 5.39
M.L.C Local Bodies Adilabad
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

1.78 20000 46.47 9.29 0 0 0.00 75 6Kg/Cm2 HDPE 1300 278.63 3.62 1.00 0.13 16.82 --
1.78 20000 46.47 9.29 0 0 0.00 75 6Kg/Cm2 HDPE 1300 278.63 3.62 1.00 0.13 16.82 --
1.78 20000 46.47 9.29 0 0 0.00 75 6Kg/Cm2 HDPE 1300 278.63 3.62 1.00 0.13 16.82 --
1.78 20000 46.47 9.29 0 0 0.00 75 6Kg/Cm2 HDPE 1300 278.63 3.62 1.00 0.13 16.82 --
1.78 20000 46.47 9.29 0 0 0.00 75 6Kg/Cm2 HDPE 1300 278.63 3.62 1.00 0.13 16.82 --
1.78 20000 46.47 9.29 0 0 0.00 75 6Kg/Cm2 HDPE 1300 278.63 3.62 1.00 0.13 16.82 --
1.78 20000 46.47 9.29 0 0 0.00 75 6Kg/Cm2 HDPE 1350 278.63 3.76 1.00 0.10 16.93 --
1.78 20000 46.47 9.29 0 0 0.00 75 6Kg/Cm2 HDPE 1350 278.63 3.76 1.00 0.10 16.93 --
1.78 20000 46.47 9.29 0 0 0.00 75 6Kg/Cm2 HDPE 1300 278.63 3.62 1.00 0.13 16.82 --
1.78 20000 46.47 9.29 0 0 0.00 75 6Kg/Cm2 HDPE 1350 278.63 3.76 1.00 0.10 16.93 --
1.78 20000 46.47 9.29 0 0 0.00 75 6Kg/Cm2 HDPE 1350 278.63 3.76 1.00 0.10 16.93 --
1.78 20000 46.47 9.29 0 0 0.00 75 6Kg/Cm2 HDPE 1300 278.63 3.62 1.00 0.13 16.82 --
1.78 20000 46.47 9.29 0 0 0.00 75 6Kg/Cm2 HDPE 1300 278.63 3.62 1.00 0.13 16.82 --
1.78 20000 46.47 9.29 0 0 0.00 75 6Kg/Cm2 HDPE 1350 278.63 3.76 1.00 0.10 16.93 --
1.78 20000 46.47 9.29 0 0 0.00 75 6Kg/Cm2 HDPE 1300 278.63 3.62 1.00 0.13 16.82 --
1.78 20000 46.47 9.29 0 0 0.00 75 6Kg/Cm2 HDPE 1350 278.63 3.76 1.00 0.10 16.93 --
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

Sri Rathode Ramesh, MP


3.55 40000 41.14 16.46 10 1 1.00 75 6Kg/Cm2 HDPE 500 278.63 1.39 0.45 0.00 23.45 Adilabad (Local Bodies),
Sri Rathode Ramesh, MP
Adilabad
1.78 40000 41.14 16.46 7.5 0.75 0.75 75 6Kg/Cm2 HDPE 750 278.63 2.09 1.00 0.48 23.15 Adilabad (Local Bodies),
Adilabad
2.10 0 0 0.00 5 0.6 0.6 75 6Kg/Cm2 HDPE 1000 278.63 2.79 2 0.13 9.42
2.10 0 0 0.00 5 0.6 0.6 75 6Kg/Cm2 HDPE 1100 278.63 3.06 1 0.16 8.13
2.10 0 0 0.00 5 0.6 0.6 75 6Kg/Cm2 HDPE 1500 278.63 4.18 0.8 0.08 8.96
2.10 0 0 0.00 5 0.6 0.6 75 6Kg/Cm2 HDPE 1200 278.63 3.34 0.7 0.09 8.03
2.10 0 0 0.00 5 0.6 0.6 75 6Kg/Cm2 HDPE 1000 278.63 2.79 0.5 0.13 7.32
2.10 0 0 0.00 5 0.6 0.6 75 6Kg/Cm2 HDPE 1500 278.63 4.18 0.8 0.08 8.96
1.50 20000 46.47 9.29 5 3 0.75 63 HDPE 4Kg 450 249.63 1.12 0.34 0.40 14.41 Hon'ble MLA concerned
1.95 40000 41.14 16.46 5 3 0.75 75 4Kg/Cm2 HDPE 600 278.63 1.67 0.50 0.18 22.51 Hon'ble MLA concerned
1.95 40000 41.14 16.46 5 3 0.75 75 4Kg/Cm2 HDPE 600 278.63 1.67 0.50 0.18 22.51 Hon'ble MLA concerned
1.50 20000 46.47 9.29 5 3 0.75 63 HDPE 4Kg 450 249.63 1.12 0.34 0.40 14.41 Hon'ble MLA concerned
1.50 20000 46.47 9.29 5 3 0.75 63 HDPE 4Kg 450 249.63 1.12 0.34 0.40 14.41 Hon'ble MLA concerned
1.20 20000 46.47 9.29 5 3 0.75 63 HDPE 4Kg 400 249.63 1.00 0.34 0.40 13.98 Hon'ble MLA concerned
1.50 20000 46.47 9.29 5 3 0.75 63 HDPE 4Kg 450 249.63 1.12 0.34 0.40 14.41 Hon'ble MLA concerned
1.50 20000 46.47 9.29 5 3 0.75 63 HDPE 4Kg 450 249.63 1.12 0.34 0.40 14.41 Hon'ble MLA concerned
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

1.50 20000 46.47 9.29 5 3 0.75 63 HDPE 4Kg 450 249.63 1.12 0.34 0.40 14.41 Hon'ble MLA concerned
1.50 20000 46.47 9.29 5 3 0.75 63 HDPE 4Kg 450 249.63 1.12 0.34 0.40 14.41 Hon'ble MLA concerned
1.50 20000 46.47 9.29 5 3 0.75 63 HDPE 4Kg 450 249.63 1.12 0.34 0.40 14.41 Hon'ble MLA concerned
1.50 20000 46.47 9.29 5 3 0.75 63 HDPE 4Kg 450 249.63 1.12 0.34 0.40 14.41 Hon'ble MLA concerned
1.50 20000 46.47 9.29 5 3 0.75 63 HDPE 4Kg 450 249.63 1.12 0.34 0.40 14.41 Hon'ble MLA concerned
1.50 20000 46.47 9.29 5 3 0.75 63 HDPE 4Kg 450 249.63 1.12 0.34 0.40 14.41 Hon'ble MLA concerned
1.50 20000 46.47 9.29 5 3 0.75 63 HDPE 4Kg 450 249.63 1.12 0.34 0.40 14.41 Hon'ble MLA concerned
1.50 20000 46.47 9.29 5 3 0.75 63 HDPE 4Kg 450 249.63 1.12 0.34 0.40 14.41 Hon'ble MLA concerned
1.50 20000 46.47 9.29 5 3 0.75 63 HDPE 4Kg 450 249.63 1.12 0.34 0.40 14.41 Hon'ble MLA concerned
1.50 20000 46.47 9.29 5 3 0.75 63 HDPE 4Kg 450 249.63 1.12 0.34 0.40 14.41 Hon'ble MLA concerned
1.50 20000 46.47 9.29 5 3 0.75 63 HDPE 4Kg 450 249.63 1.12 0.34 0.40 14.41 Hon'ble MLA concerned
1.50 20000 46.47 9.29 5 3 0.75 63 HDPE 4Kg 450 249.63 1.12 0.34 0.40 14.41 Hon'ble MLA concerned
1.50 20000 46.47 9.29 5 3 0.75 63 HDPE 4Kg 450 249.63 1.12 0.34 0.40 14.41 Hon'ble MLA concerned
1.50 20000 46.47 9.29 5 3 0.75 63 HDPE 4Kg 450 249.63 1.12 0.34 0.40 14.41 Hon'ble MLA concerned
1.50 20000 46.47 9.29 5 3 0.75 63 HDPE 4Kg 450 249.63 1.12 0.34 0.40 14.41 Hon'ble MLA concerned
1.50 20000 46.47 9.29 5 3 0.75 63 HDPE 4Kg 450 249.63 1.12 0.34 0.40 14.41 Hon'ble MLA concerned
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

1.50 20000 46.47 9.29 5 3 0.75 63 HDPE 4Kg 450 249.63 1.12 0.34 0.40 14.41 Hon'ble MLA concerned
1.50 20000 46.47 9.29 5 3 0.75 63 HDPE 4Kg 450 249.63 1.12 0.34 0.40 14.41 Hon'ble MLA concerned
1.50 20000 46.47 9.29 5 3 0.75 63 HDPE 4Kg 450 249.63 1.12 0.34 0.40 14.41 Hon'ble MLA concerned
1.50 20000 46.47 9.29 5 3 0.75 63 HDPE 4Kg 450 249.63 1.12 0.34 0.40 14.41 Hon'ble MLA concerned
1.50 20000 46.47 9.29 5 3 0.75 63 HDPE 4Kg 450 249.63 1.12 0.34 0.40 14.41 Hon'ble MLA concerned
1.50 20000 46.47 9.29 5 3 0.75 63 HDPE 4Kg 450 249.63 1.12 0.34 0.40 14.41 Hon'ble MLA concerned
1.35 20000 46.47 9.29 5 3 0.75 63 HDPE 4Kg 400 249.63 1.00 0.34 0.40 14.13 Hon'ble MLA concerned
1.95 40000 41.14 16.46 5 3 0.75 75 4Kg/Cm2 HDPE 600 278.63 1.67 0.50 0.18 22.51 Hon'ble MLA concerned
1.50 20000 46.47 9.29 5 3 0.75 63 HDPE 4Kg 450 249.63 1.12 0.34 0.40 14.41 Hon'ble MLA concerned
0.90 0 0 0.00 5 3 0.75 75 4Kg/Cm2 HDPE 300 278.63 0.84 0.50 0.18 3.67 Hon'ble MLA concerned
1.20 20000 46.47 9.29 5 3 0.75 63 HDPE 4Kg 450 249.63 1.12 0.34 0.40 14.11 Hon'ble MLA concerned
1.50 20000 46.47 9.29 5 3 0.75 63 HDPE 4Kg 450 249.63 1.12 0.34 0.40 14.41 Hon'ble MLA concerned
1.20 20000 46.47 9.29 5 3 0.75 63 HDPE 4Kg 450 249.63 1.12 0.34 0.40 14.11 Hon'ble MLA concerned
1.05 20000 46.47 9.29 5 3 0.75 63 HDPE 4Kg 450 249.63 1.12 0.34 0.40 13.96 Hon'ble MLA concerned
1.95 40000 41.14 16.46 5 3 0.75 75 4Kg/Cm2 HDPE 600 278.63 1.67 0.50 0.18 22.51 Hon'ble MLA concerned
1.95 40000 41.14 16.46 5 3 0.75 75 4Kg/Cm2 HDPE 600 278.63 1.67 0.50 0.18 22.51 Hon'ble MLA concerned
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

0.90 20000 46.47 9.29 5 3 0.75 63 HDPE 4Kg 450 249.63 1.12 0.34 0.40 13.81 Hon'ble MLA concerned
0.90 20000 46.47 9.29 5 3 0.75 63 HDPE 4Kg 450 249.63 1.12 0.34 0.40 13.81 Hon'ble MLA concerned
0.90 20000 46.47 9.29 5 3 0.75 63 HDPE 4Kg 450 249.63 1.12 0.34 0.40 13.81 Hon'ble MLA concerned
0.90 20000 46.47 9.29 5 3 0.75 63 HDPE 4Kg 450 249.63 1.12 0.34 0.40 13.81 Hon'ble MLA concerned
1.50 20000 46.47 9.29 5 3 0.75 63 HDPE 4Kg 450 249.63 1.12 0.34 0.40 14.41 Hon'ble MLA concerned
1.50 20000 46.47 9.29 5 3 0.75 63 HDPE 4Kg 450 249.63 1.12 0.34 0.40 14.41 Hon'ble MLA concerned
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
0.79 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.56 0.10 0.00 9.32
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
0.79 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.56 0.10 0.00 9.32
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
0.79 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.56 0.10 0.00 9.32
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58 Hon'ble MLA concerned
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
0.79 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.56 0.10 0.00 9.32
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
0.79 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.56 0.10 0.00 9.32
0.79 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.56 0.10 0.00 9.32 Hon'ble MLA concerned
0.79 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.56 0.10 0.00 9.32
0.79 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.56 0.10 0.00 9.32
0.79 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.56 0.10 0.00 9.32
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
0.79 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.56 0.10 0.00 9.32
0.79 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.56 0.10 0.00 9.32
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
0.79 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.56 0.10 0.00 9.32
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
0.79 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.56 0.10 0.00 9.32 Hon'ble MLA concerned
0.79 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.56 0.10 0.00 9.32
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
0.79 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.56 0.10 0.00 9.32 Hon'ble MLA concerned
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
0.79 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.56 0.10 0.00 9.32
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
0.79 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.56 0.10 0.00 9.32
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

0.79 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.56 0.10 0.00 9.32
Sri Pendur Laxman Rao,
2.63 40000 41.14 16.46 5 0.5 0.50 75 4Kg/Cm2 HDPE 250 278.63 0.70 0.10 0.06 20.94
DCCB Director, Adilabad
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
0.79 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.56 0.10 0.00 9.32
0.79 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.56 0.10 0.00 9.32
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
1.18 10000 68.78 6.88 5 0.5 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.42 0.10 0.00 9.58
1.95 40000 41.14 16.46 5 3 0.75 75 4Kg/Cm2 HDPE 600 278.63 1.67 0.50 0.18 22.51
3.60 0 0 0.00 5 0.12 0.60 63 HDPE 4Kg 600 249.63 1.50 0.75 0.55 8.00
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

3.60 0 0 0.00 5 0.12 0.60 63 HDPE 4Kg 600 249.63 1.50 0.75 0.55 8.00 Hon'ble MLA concerned
1.95 40000 41.14 16.46 5 3 0.75 75 4Kg/Cm2 HDPE 600 278.63 1.67 0.50 0.18 22.51
3.60 0 0 0.00 5 0.12 0.60 63 HDPE 4Kg 600 249.63 1.50 0.75 0.55 8.00
3.60 0 0 0.00 5 0.12 0.60 63 HDPE 4Kg 600 249.63 1.50 0.75 0.55 8.00
3.60 0 0 0.00 5 0.12 0.60 63 HDPE 4Kg 600 249.63 1.50 0.75 0.55 8.00 Hon'ble MLA concerned
3.60 0 0 0.00 5 0.12 0.60 63 HDPE 4Kg 600 249.63 1.50 0.75 0.55 8.00 Hon'ble MLA concerned
3.60 0 0 0.00 5 0.12 0.60 63 HDPE 4Kg 600 249.63 1.50 0.75 0.55 8.00
3.60 0 0 0.00 5 0.12 0.60 63 HDPE 4Kg 600 249.63 1.50 0.75 0.55 8.00
3.60 0 0 0.00 5 0.12 0.60 63 HDPE 4Kg 600 249.63 1.50 0.75 0.55 8.00
3.60 0 0 0.00 5 0.12 0.60 63 HDPE 4Kg 600 249.63 1.50 0.75 0.55 8.00
3.60 0 0 0.00 5 0.12 0.60 63 HDPE 4Kg 600 249.63 1.50 0.75 0.55 8.00
3.60 0 0 0.00 5 0.12 0.60 63 HDPE 4Kg 600 249.63 1.50 0.75 0.55 8.00
3.60 0 0 0.00 5 0.12 0.60 63 HDPE 4Kg 600 249.63 1.50 0.75 0.55 8.00
1.95 40000 41.14 16.46 5 3 0.75 75 4Kg/Cm2 HDPE 600 278.63 1.67 0.50 0.18 22.51
3.60 0 0 0.00 5 0.12 0.60 63 HDPE 4Kg 600 249.63 1.50 0.75 0.55 8.00
Hon'ble MLA Nirmal Sri. A.
3.60 0 0 0.00 5 0.12 0.60 63 HDPE 4Kg 200 249.63 0.50 2.00 0.80 9.00
Maheshwar Reddy,
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

Hon'ble MLA Nirmal Sri. A.


3.60 20000 46.47 9.29 5 0.12 0.60 63 HDPE 4Kg 200 249.63 0.50 2.00 0.80 18.30
Maheshwar Reddy,
1.50 10000 68.78 6.88 5 0.12 0.60 63 HDPE 4Kg 200 249.63 0.50 1.00 0.90 12.88
1.50 0 0 0.00 5 0.12 0.60 -- -- 0 250 0.00 2.00 0.40 6.00
Hon'ble MLA Nirmal Sri. A.
3.60 100000 28.82 28.82 5 0.12 0.60 63 HDPE 4Kg 400 249.63 1.00 2.00 1.30 38.82
Maheshwar Reddy,
1.50 5000 4 4.00 5 0.12 0.60 63 HDPE 4Kg 300 249.63 0.75 2.00 0.65 11.00
3.00 0 0 0.00 5 0.12 0.60 63 HDPE 4Kg 200 249.63 0.50 1.00 0.40 7.00
3.00 0 0 0.00 5 0.12 0.60 63 HDPE 4Kg 200 249.63 0.50 1.00 0.40 7.00
Hon'ble MLA Nirmal Sri. A.
3.00 20000 46.47 9.29 5 0.12 0.60 63 HDPE 4Kg 500 249.63 1.25 2.00 0.65 18.30
Maheshwar Reddy,
Hon'ble MLA Nirmal Sri. A.
1.50 10000 68.78 6.88 5 0.12 0.60 63 HDPE 4Kg 300 249.63 0.75 1.00 0.65 12.88
Maheshwar Reddy,
Hon'ble MLA Nirmal Sri. A.
1.50 20000 46.47 9.29 5 0.12 0.60 63 HDPE 4Kg 200 249.63 0.50 1.00 0.90 15.30
Maheshwar Reddy,
3.00 5000 4 4.00 5 0.12 0.60 63 HDPE 4Kg 200 249.63 0.50 2.00 0.40 12.00
3.00 0 0 0.00 5 0.12 0.60 63 HDPE 4Kg 200 249.63 0.50 1.00 0.40 7.00
Hon'ble MLA Nirmal Sri. A.
3.60 0 0 0.00 5 0.12 0.60 63 HDPE 4Kg 200 249.63 0.50 1.00 0.80 8.00
Maheshwar Reddy,
3.00 20000 46.47 9.29 5 0.12 0.60 63 HDPE 4Kg 300 249.63 0.75 1.00 1.15 17.30
3.00 5000 4 4.00 5 0.12 0.60 63 HDPE 4Kg 200 249.63 0.50 1.00 0.40 11.00
1.50 0 0 0.00 5 0.12 0.60 -- -- 0 0 0.00 1.00 0.40 5.00
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

Hon'ble MLA Nirmal Sri. A.


1.50 5000 10 10.00 5 0.12 0.60 63 HDPE 4Kg 200 249.63 0.50 1.00 0.90 16.00
Maheshwar Reddy,
2.40 0 0 0.00 5 0.12 0.60 63 HDPE 4Kg 200 249.63 0.50 1.00 1.00 7.00
1.50 10000 68.78 6.88 5 0.12 0.60 63 HDPE 4Kg 300 249.63 0.75 1.00 0.65 12.88
1.50 10000 68.78 6.88 5 0.12 0.60 63 HDPE 4Kg 200 249.63 0.50 1.00 0.90 12.88
7.5 KL
1.50 35 2.00 5 0.12 0.60 63 HDPE 4Kg 200 249.63 0.50 1.00 0.90 8.00
GLSR
1.50 0 0 0.00 5 0.12 0.60 63 HDPE 4Kg 200 249.63 0.50 1.00 0.90 6.00
1.50 5000 4 4.00 5 0.12 0.60 63 HDPE 4Kg 200 249.63 0.50 1.00 0.90 10.00
Hon'ble MLA Nirmal Sri. A.
0.90 0 0 0.00 5 0.12 0.60 63 HDPE 4Kg 200 249.63 0.50 1.00 0.50 5.00
Maheshwar Reddy,
1.80 5000 10 10.00 5 0.12 0.60 63 HDPE 4Kg 200 249.63 0.50 1.00 0.60 16.00
1.50 20000 46.47 9.29 5 0.12 0.60 63 HDPE 4Kg 200 249.63 0.50 1.00 0.90 15.30
3.00 40000 41.14 16.46 5 0.12 0.60 63 HDPE 4Kg 300 249.63 0.75 2.00 1.15 25.46
3.00 40000 41.14 16.46 5 0.12 0.60 63 HDPE 4Kg 300 249.63 0.75 2.00 1.15 25.46
3.00 40000 41.14 16.46 5 0.12 0.60 63 HDPE 4Kg 300 249.63 0.75 2.00 1.15 25.46
1.80 20000 46.47 9.29 5 0.12 0.60 63 HDPE 4Kg 800 249.63 2.00 1.00 0.60 17.29
2.55 10000 68.78 6.88 5 0.5 0.50 63 HDPE 4Kg 850 249.63 2.12 1.50 0.46 16.01
2.40 10000 68.78 6.88 5 0.5 0.50 63 HDPE 4Kg 800 249.63 2.00 1.50 0.74 16.02
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

3.00 20000 46.47 9.29 5 0.12 0.60 63 HDPE 4Kg 1500 249.63 3.74 2.00 0.65 21.29
4.51 10000 68.78 6.88 5 0.5 0.50 63 HDPE 4Kg 1000 249.63 2.50 1.00 0.64 18.02
1.80 20000 46.47 9.29 5 0.12 0.60 63 HDPE 4Kg 600 249.63 1.50 2.00 1.10 18.29
1.50 10000 68.78 6.88 5 0.5 0.50 63 HDPE 4Kg 800 249.63 2.00 1.50 0.64 15.02
1.95 10000 68.78 6.88 5 0.5 0.50 63 HDPE 4Kg 1200 249.63 3.00 1.50 0.69 16.02
Hon'ble MLA Nirmal Sri. A.
0.90 0 0 0.00 5 0.5 0.50 63 HDPE 4Kg 1600 249.63 3.99 3.00 0.24 10.14
Maheshwar Reddy,
0.90 0 0 0.00 5 0.5 0.50 63 HDPE 4Kg 800 249.63 2.00 2.00 0.24 7.14
Hon'ble MLA Nirmal Sri. A.
1.20 10000 68.78 6.88 5 0.5 0.50 63 HDPE 4Kg 750 249.63 1.87 1.50 0.56 14.01
Maheshwar Reddy,
1.50 20000 46.47 9.29 5 0.12 0.60 63 HDPE 4Kg 600 249.63 1.50 1.50 0.40 16.29
1.20 10000 68.78 6.88 5 0.5 0.50 63 HDPE 4Kg 600 249.63 1.50 1.50 0.94 14.02
1.50 20000 46.47 9.29 5 0.12 0.60 63 HDPE 4Kg 650 249.63 1.62 1.50 0.27 16.29
Hon'ble MLA Nirmal Sri. A.
1.20 0 0 0.00 5 0.12 0.60 63 HDPE 4Kg 900 249.63 2.25 1.50 0.45 7.50
Maheshwar Reddy,
Hon'ble MLA Nirmal Sri. A.
1.80 0 0 0.00 5 0.12 0.60 63 HDPE 4Kg 850 249.63 2.12 1.50 0.47 7.99
Maheshwar Reddy,
1.35 10000 68.78 6.88 5 0.5 0.50 63 HDPE 4Kg 600 249.63 1.50 3.00 0.29 15.02
0.90 10000 68.78 6.88 5 0.5 0.50 63 HDPE 4Kg 800 249.63 2.00 1.50 0.74 14.02
1.20 10000 68.78 6.88 5 0.12 0.60 63 HDPE 4Kg 800 249.63 2.00 1.50 0.70 14.38
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

1.50 10000 68.78 6.88 5 0.5 0.50 63 HDPE 4Kg 600 249.63 1.50 1.50 0.64 14.02
1.05 10000 68.78 6.88 5 0.5 0.50 63 HDPE 4Kg 600 249.63 1.50 1.50 0.59 13.52
2.40 10000 68.78 6.88 5 0.12 0.60 63 HDPE 4Kg 1000 249.63 2.50 2.00 1.00 16.88
1.50 10000 68.78 6.88 5 0.5 0.50 63 HDPE 4Kg 1100 249.63 2.75 1.50 0.39 15.02
1.80 10000 68.78 6.88 5 0.5 0.50 63 HDPE 4Kg 700 249.63 1.75 1.50 0.59 14.52
0.00 0 0 0.00 0 0 0.00 63 HDPE 4Kg 600 249.63 1.50 1.50 0.50 5.00
1.80 10000 68.78 6.88 5 0.12 0.60 63 HDPE 4Kg 1200 249.63 3.00 1.50 0.60 15.88
0.00 0 0 0.00 0 0 0.00 63 HDPE 4Kg 0 249.63 0.00 1.00 0.50 3.00
1.50 10000 68.78 6.88 5 0.5 0.50 63 HDPE 4Kg 600 249.63 1.50 1.50 0.64 14.02
1.80 10000 68.78 6.88 5 0.5 0.50 63 HDPE 4Kg 800 249.63 2.00 1.50 0.84 15.02
1.20 10000 68.78 6.88 5 0.5 0.50 63 HDPE 4Kg 600 249.63 1.50 1.50 0.44 13.52
1.80 0 0 0.00 5 0.12 0.60 63 HDPE 4Kg 1000 249.63 2.50 1.00 0.60 8.00
2.40 0 0 0.00 5 0.12 0.60 63 HDPE 4Kg 900 249.63 2.25 1.50 0.25 9.00
2.70 0 0 0.00 5 0.12 0.60 63 HDPE 4Kg 800 249.63 2.00 1.40 0.30 9.00
Hon'ble MLA Nirmal Sri. A.
2.40 10000 68.78 6.88 5 0.12 0.60 63 HDPE 4Kg 1200 249.63 3.00 1.50 0.50 16.88
Maheshwar Reddy,
Hon'ble MLA Nirmal Sri. A.
3.60 40000 41.14 16.46 5 0.12 0.60 63 HDPE 4Kg 1000 249.63 2.50 1.50 0.80 27.46
Maheshwar Reddy,
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

3.00 40000 41.14 16.46 5 0.12 0.60 63 HDPE 4Kg 900 249.63 2.25 2.00 0.65 26.46
Hon'ble MLA Nirmal Sri. A.
2.40 60000 31.21 18.73 7.5 0.75 0.75 63 HDPE 4Kg 1200 249.63 3.00 2.00 0.70 29.57
Maheshwar Reddy,
4.27 150 KL 40 40.00 10 1 1.00 63 HDPE 4Kg 1500 249.63 3.74 2.00 1.25 54.26
1.80 100000 28.82 28.82 7.5 0.75 0.75 63 HDPE 4Kg 2500 249.63 6.24 2.00 0.55 41.66
2.40 40000 41.14 16.46 5 0.12 0.60 63 HDPE 4Kg 2000 249.63 4.99 2.00 0.50 28.45
1.80 40000 41.14 16.46 5 0.12 0.60 63 HDPE 4Kg 1000 249.63 2.50 2.00 0.60 25.45
1.80 20000 46.47 9.29 5 0.12 0.60 63 HDPE 4Kg 1000 249.63 2.50 2.00 0.60 18.29
3.00 20000 46.47 9.29 5 0.12 0.60 63 HDPE 4Kg 1000 249.63 2.50 2.00 0.40 19.29
1.80 60000 31.21 18.73 7.5 0.75 0.75 63 HDPE 4Kg 2000 249.63 4.99 2.00 0.80 30.57
1.50 40000 41.14 16.46 5 0.12 0.60 63 HDPE 4Kg 1500 249.63 3.74 2.00 0.65 26.45
2.40 20000 46.47 9.29 5 0.12 0.60 63 HDPE 4Kg 1000 249.63 2.50 2.00 0.50 18.79
2.40 20000 46.47 9.29 5 0.12 0.60 63 HDPE 4Kg 800 249.63 2.00 2.00 0.50 18.29
3.00 100000 28.82 28.82 7.5 0.75 0.75 63 HDPE 4Kg 2000 249.63 4.99 2.00 0.60 41.67
1.50 60000 31.21 18.73 7.5 0.75 0.75 63 HDPE 4Kg 2000 249.63 4.99 2.00 0.60 30.07
2.40 20000 46.47 9.29 5 0.12 0.60 63 HDPE 4Kg 1000 249.63 2.50 2.00 0.50 18.79
1.80 60000 31.21 18.73 7.5 0.75 0.75 63 HDPE 4Kg 2000 249.63 4.99 2.00 0.80 30.57
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

3.60 100000 28.82 28.82 7.5 0.75 0.75 63 HDPE 4Kg 3000 249.63 7.49 2.00 0.50 45.66
2.40 60000 31.21 18.73 7.5 0.75 0.75 63 HDPE 4Kg 1000 249.63 2.50 2.00 0.70 28.58
2.40 20000 46.47 9.29 5 0.12 0.60 63 HDPE 4Kg 1500 249.63 3.74 2.00 0.25 19.79
1.50 40000 41.14 16.46 5 0.12 0.60 63 HDPE 4Kg 1500 249.63 3.74 2.00 0.65 26.45
2.40 60000 31.21 18.73 7.5 0.75 0.75 63 HDPE 4Kg 2500 249.63 6.24 2.00 0.95 32.57
1.50 60000 31.21 18.73 7.5 0.75 0.75 63 HDPE 4Kg 2000 249.63 4.99 2.00 0.60 30.07
1.50 60000 31.21 18.73 7.5 0.75 0.75 63 HDPE 4Kg 2000 249.63 4.99 2.00 0.60 30.07
4.51 20000 46.47 9.29 5 0.12 0.60 63 HDPE 4Kg 1000 249.63 2.50 2.00 1.90 22.30
3.00 10000 68.78 6.88 5 0.12 0.60 63 HDPE 4Kg 1000 249.63 2.50 1.50 1.90 17.88
3.00 20000 46.47 9.29 5 0.12 0.60 63 HDPE 4Kg 1500 249.63 3.74 2.00 2.15 22.29
3.00 20000 46.47 9.29 5 0.12 0.60 63 HDPE 4Kg 1500 249.63 3.74 1.50 2.65 22.29
4.51 10000 68.78 6.88 5 0.12 0.60 63 HDPE 4Kg 800 249.63 2.00 2.00 2.90 20.38
2.84 200 KL 45.00 45.00 10 1 1.00 90 HDPE 4Kg 4000 325.43 13.02 3.00 4.00 71.86
1.80 20000 46.47 9.29 5 0.12 0.60 63 HDPE 4Kg 1500 249.63 3.74 2.00 2.35 21.29
2.40 10000 68.78 6.88 5 0.12 0.60 63 HDPE 4Kg 1500 249.63 3.74 1.50 2.25 18.88
1.80 60000 31.21 18.73 7.5 0.75 0.75 63 HDPE 4Kg 1500 249.63 3.74 2.00 3.05 31.57
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

1.80 10000 68.78 6.88 5 0.12 0.60 63 HDPE 4Kg 800 249.63 2.00 1.50 1.60 15.88
1.80 20000 46.47 9.29 5 0.12 0.60 63 HDPE 4Kg 800 249.63 2.00 2.00 3.10 20.29
1.80 40000 41.14 16.46 5 0.12 0.60 63 HDPE 4Kg 2000 249.63 4.99 1.50 2.60 29.45
2.40 60000 31.21 18.73 7.5 0.75 0.75 63 HDPE 4Kg 2500 249.63 6.24 2.00 1.95 33.57
1.80 20000 46.47 9.29 5 0.12 0.60 63 HDPE 4Kg 800 249.63 2.00 1.50 2.60 19.29
1.80 20000 46.47 9.29 5 0.12 0.60 63 HDPE 4Kg 1000 249.63 2.50 2.00 2.60 20.29
1.80 10000 68.78 6.88 5 0.12 0.60 63 HDPE 4Kg 800 249.63 2.00 1.50 2.60 16.88
2.40 20000 46.47 9.29 5 0.12 0.60 63 HDPE 4Kg 800 249.63 2.00 2.00 0.60 18.39
3.60 40000 41.14 16.46 5 0.12 0.60 63 HDPE 4Kg 1200 249.63 3.00 2.00 0.80 27.96
3.00 40000 41.14 16.46 5 0.12 0.60 63 HDPE 4Kg 1500 249.63 3.74 2.00 0.75 28.05
3.00 40000 41.14 16.46 5 0.12 0.60 63 HDPE 4Kg 1200 249.63 3.00 2.00 0.60 27.16
3.00 40000 41.14 16.46 5 0.12 0.60 63 HDPE 4Kg 1200 249.63 3.00 2.00 0.60 27.16
2.40 20000 46.47 9.29 5 0.12 0.60 63 HDPE 4Kg 800 249.63 2.00 2.00 0.60 18.39
1.95 20000 46.47 9.29 5 0.12 0.60 63 HDPE 4Kg 800 249.63 2.00 2.00 0.40 17.74
8.89 0 0 0.00 7.5 0.75 0.75 63 HDPE 4Kg 3000 249.63 7.49 3.00 0.35 21.97
3.60 60000 31.21 18.73 7.5 0.75 0.75 63 HDPE 4Kg 1200 249.63 3.00 2.00 0.50 30.08
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

3.60 20000 46.47 9.29 7.5 0.75 0.75 63 HDPE 4Kg 1500 249.63 3.74 2.00 1.25 22.14
4.51 40000 41.14 16.46 5 0.12 0.60 63 HDPE 4Kg 1800 249.63 4.49 2.00 0.40 29.95
6.01 20000 46.47 9.29 7.5 0.75 0.75 63 HDPE 4Kg 1000 249.63 2.50 2.00 0.60 22.65
8.89 60000 31.21 18.73 7.5 0.75 0.75 63 HDPE 4Kg 2500 249.63 6.24 2.00 0.10 38.20
3.00 40000 41.14 16.46 5 0.12 0.60 63 HDPE 4Kg 1200 249.63 3.00 2.00 0.40 26.96
2.40 20000 46.47 9.29 5 0.12 0.60 63 HDPE 4Kg 800 249.63 2.00 2.00 0.50 18.29
4.27 100000 28.82 28.82 7.5 0.75 0.75 63 HDPE 4Kg 3000 249.63 7.49 2.00 0.40 45.22
3.60 60000 31.21 18.73 7.5 0.75 0.75 63 HDPE 4Kg 2500 249.63 6.24 2.00 0.25 33.07
5.33 100000 28.82 28.82 7.5 0.75 0.75 63 HDPE 4Kg 2000 249.63 4.99 2.00 0.35 43.74
3.00 40000 41.14 16.46 5 0.12 0.60 63 HDPE 4Kg 1500 249.63 3.74 2.00 0.15 27.45
2.40 10000 68.78 6.88 5 0.12 0.60 63 HDPE 4Kg 600 249.63 1.50 2.00 0.50 15.38
3.60 40000 41.14 16.46 5 0.12 0.60 63 HDPE 4Kg 2500 249.63 6.24 2.00 0.05 30.45
2.40 10000 68.78 6.88 5 0.12 0.60 63 HDPE 4Kg 600 249.63 1.50 2.00 0.50 15.38
2.40 10000 68.78 6.88 5 0.12 0.60 63 HDPE 4Kg 800 249.63 2.00 2.00 0.50 15.88
2.40 40000 41.14 16.46 5 0.12 0.60 63 HDPE 4Kg 1200 249.63 3.00 2.00 0.50 26.45
3.00 40000 41.14 16.46 5 0.12 0.60 75 4Kg/Cm2 HDPE 1500 278.63 4.18 1.50 2.00 28.74
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

3.00 40000 41.14 16.46 5 0.12 0.60 75 4Kg/Cm2 HDPE 1500 278.63 4.18 1.50 2.00 28.74
2.10 20000 46.47 9.29 5 0.12 0.60 75 4Kg/Cm2 HDPE 800 278.63 2.23 1.50 1.50 17.73
4.21 0 0 0.00 0 0 0.00 -- -- 0 0 0.00 0.00 0.40 4.61
3.00 0 0 0.00 5 0.12 0.60 -- -- 0 0 0.00 1.50 0.45 5.55
4.51 40000 41.14 16.46 5 0.12 0.60 75 4Kg/Cm2 HDPE 800 278.63 2.23 1.50 1.90 28.69
4.51 40000 41.14 16.46 5 0.12 0.60 75 4Kg/Cm2 HDPE 1500 278.63 4.18 2.00 2.15 31.89
6.01 40000 41.14 16.46 5 0.12 0.60 75 4Kg/Cm2 HDPE 1500 278.63 4.18 2.00 2.65 33.89
1.20 60000 31.21 18.73 5 0.12 0.60 75 4Kg/Cm2 HDPE 2000 278.63 5.57 1.50 2.70 32.30
1.20 60000 31.21 18.73 5 0.12 0.60 75 4Kg/Cm2 HDPE 1000 278.63 2.79 1.00 2.70 29.01
1.50 40000 41.14 16.46 5 0.12 0.60 75 4Kg/Cm2 HDPE 1200 278.63 3.34 1.00 2.90 27.80
3.00 20000 46.47 9.29 5 0.12 0.60 75 4Kg/Cm2 HDPE 1000 278.63 2.79 1.00 1.90 20.58
1.599 0 0 0.000 5 0.50 0.50 75 4Kg/Cm2 HDPE 550 278.63 1.532465 0.87 0 5.00
1.599 0 0 0.000 5 0.50 0.50 75 4Kg/Cm2 HDPE 550 278.63 1.532465 0.87 0 5.00
1.066 20000 46.47 9.294 5 0.50 0.50 75 4Kg/Cm2 HDPE 210 278.63 0.585123 0.50 0.06 12.50
1.066 10000 68.78 6.878 5 0.50 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.55726 0.50 0 10.00
1.066 20000 46.47 9.294 5 0.50 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.55726 0.50 0.08 12.50
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

1.066 10000 68.78 6.878 5 0.50 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.55726 0.50 0 10.00
1.599 20000 46.47 9.294 5 0.50 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.417945 0.50 0 12.80
1.599 0 0 0.000 5 0.50 0.50 75 4Kg/Cm2 HDPE 700 278.63 1.95041 0.45 0 5.00
1.599 0 0 0.000 5 0.50 0.50 75 4Kg/Cm2 HDPE 700 278.63 1.95041 0.45 0 5.00
1.599 40000 41.14 16.456 5 0.50 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.417945 0.50 0 20.00
1.599 0 0 0.000 5 0.50 0.50 75 4Kg/Cm2 HDPE 700 278.63 1.95041 0.45 0 5.00
1.599 10000 68.78 6.878 5 0.50 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.417945 0.10 0 10.00
1.066 0 0 0.000 5 0.50 0.50 75 4Kg/Cm2 HDPE 700 278.63 1.95041 0.90 0.08 5.00
1.066 20000 46.47 9.294 5 0.50 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.55726 0.50 0 12.40
1.599 0 0 0.000 5 0.50 0.50 75 4Kg/Cm2 HDPE 700 278.63 1.95041 0.45 0 5.00
1.066 10000 68.78 6.878 5 0.50 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.55726 0.50 0 10.00
1.066 20000 46.47 9.294 5 0.50 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.55726 0.50 0 12.40
1.066 40000 41.14 16.456 5 0.50 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.55726 0.40 0 19.50
1.599 10000 68.78 6.878 5 0.50 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.417945 0.10 0 10.00
1.066 20000 46.47 9.294 5 0.50 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.55726 0.50 0 12.40
1.599 10000 68.78 6.878 5 0.50 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.417945 0.10 0 10.00
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

1.599 0 0 0.000 5 0.50 0.50 75 4Kg/Cm2 HDPE 700 278.63 1.95041 0.45 0 5.00
1.066 0 0 0.000 5 0.50 0.50 75 4Kg/Cm2 HDPE 700 278.63 1.95041 0.90 0.08 5.00
1.066 0 0 0.000 5 0.50 0.50 75 4Kg/Cm2 HDPE 750 278.63 2.089725 0.75 0.09 5.00

1.599 40000 41.14 16.456 5 0.50 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.417945 0.50 0 20.00

1.066 60000 31.21 18.723 5 0.5 0.5 75 4Kg/Cm2 HDPE 200 278.63 0.55726 0 0 21.00 Hon'ble MLA concerned
1.599 0 0 0.000 5 0.50 0.50 75 4Kg/Cm2 HDPE 700 278.63 1.95041 0.45 0 5.00
1.066 10000 68.78 6.878 5 0.50 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.55726 0.50 0 10.00
1.599 0 0.000 5 0.5 0.5 75 4Kg/Cm2 HDPE 150 278.63 0.417945 0 0 3.00
1.066 40000 41.14 16.456 5 0.50 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.55726 0.40 0 19.50 Hon'ble MLA concerned
1.066 20000 46.47 9.294 5 0.50 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.55726 0.50 0 12.40
1.066 40000 41.14 16.456 5 0.50 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.55726 0.40 0 19.50
1.599 20000 46.47 9.294 5 0.5 0.5 75 4Kg/Cm2 HDPE 150 278.63 0.417945 0.10 0 12.40
1.599 20000 46.47 9.294 5 0.50 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.417945 0.50 0 12.80
1.599 0 0 0.000 5 0.50 0.50 75 4Kg/Cm2 HDPE 700 278.63 1.95041 0.45 0 5.00
1.599 0 0 0.000 5 0.50 0.50 75 4Kg/Cm2 HDPE 700 278.63 1.95041 0.45 0 5.00
1.599 10000 68.78 6.878 5 0.50 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.417945 0.10 0 10.00
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

1.599 0 0 0.000 5 0.50 0.50 75 4Kg/Cm2 HDPE 700 278.63 1.95041 0.45 0 5.00
1.599 10000 68.78 6.878 5 0.50 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.417945 0.10 0 10.00
1.599 20000 46.47 9.294 5 0.50 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.417945 0.50 0 12.80
1.599 0 0 0.000 5 0.50 0.50 75 4Kg/Cm2 HDPE 700 278.63 1.95041 0.45 0 5.00
1.599 20000 46.47 9.294 5 0.50 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.417945 0.50 0 12.80
1.599 10000 68.78 6.878 5 0.50 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.417945 0.10 0 10.00
1.599 40000 41.14 16.456 5 0.50 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.417945 0.50 0 20.00
1.066 60000 31.21 18.723 5 0.50 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.55726 0.50 0 21.80
1.066 20000 46.47 9.294 5 0.50 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.55726 0.50 0 12.40
1.599 20000 46.47 9.294 5 0.50 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.417945 0.50 0 12.80
1.066 10000 68.78 6.878 5 0.50 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.55726 0.50 0 10.00
1.599 10000 68.78 6.878 5 0.50 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.417945 0.10 0 10.00
1.066 20000 46.47 9.294 5 0.50 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.55726 0.50 0 12.40
1.599 10000 68.78 6.878 5 0.50 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.417945 0.10 0 10.00
1.066 10000 68.78 6.878 5 0.50 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.55726 0.50 0 10.00
1.066 0 0 0.000 5 0.50 0.50 75 4Kg/Cm2 HDPE 700 278.63 1.95041 0.90 0.08 5.00
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

1.066 0 0 0.000 5 0.50 0.50 75 4Kg/Cm2 HDPE 750 278.63 2.089725 0.75 0.09 5.00
1.599 10000 68.78 6.878 5 0.50 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.417945 0.10 0 10.00
1.066 10000 68.78 6.878 5 0.50 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.55726 0.50 0 10.00
1.599 0 0 0.000 5 0.50 0.50 75 4Kg/Cm2 HDPE 700 278.63 1.95041 0.45 0 5.00
1.599 0 0 0.000 5 0.50 0.50 75 4Kg/Cm2 HDPE 700 278.63 1.95041 0.45 0 5.00
1.599 10000 68.78 6.878 5 0.50 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.417945 0.10 0 10.00
1.599 20000 46.47 9.294 5 0.50 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.417945 0.50 0 12.80
1.599 20000 46.47 9.294 5 0.50 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.417945 0.50 0 12.80
1.599 10000 68.78 6.878 5 0.50 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.417945 0.10 0 10.00
1.599 20000 46.47 9.294 5 0.50 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.417945 0.50 0 12.80
1.066 0 0 0.000 5 0.50 0.50 75 4Kg/Cm2 HDPE 750 278.63 2.089725 0.75 0.09 5.00
1.599 0 0 0.000 5 0.50 0.50 75 4Kg/Cm2 HDPE 700 278.63 1.95041 0.45 0 5.00
1.066 20000 46.47 9.294 5 0.50 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.55726 0.50 0 12.40
1.599 10000 68.78 6.878 5 0.50 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.417945 0.10 0 10.00
1.066 10000 68.78 6.878 5 0.50 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.55726 0.50 0 10.00
1.066 10000 68.78 6.878 5 0.50 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.55726 0.50 0 10.00
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

1.066 20000 46.47 9.294 5 0.50 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.55726 0.50 0 12.40
1.599 0 0 0.000 5 0.50 0.50 75 4Kg/Cm2 HDPE 700 278.63 1.95041 0.45 0 5.00
1.066 10000 68.78 6.878 5 0.50 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.55726 0.50 0 10.00
1.599 40000 41.14 16.456 5 0.50 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.417945 0.50 0 20.00
1.599 10000 68.78 6.878 5 0.50 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.417945 0.10 0 10.00
1.066 10000 68.78 6.878 5 0.50 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.55726 0.50 0 10.00
1.599 40000 41.14 16.456 5 0.50 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.417945 0.50 0 20.00 Hon'ble MLA concerned
1.066 0 0 0.000 5 0.50 0.50 75 4Kg/Cm2 HDPE 700 278.63 1.95041 0.90 0.08 5.00
1.066 10000 68.78 6.878 5 0.50 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.55726 0.50 0 10.00
1.599 0 0 0.000 5 0.50 0.50 75 4Kg/Cm2 HDPE 700 278.63 1.95041 0.45 0 5.00
1.599 10000 68.78 6.878 5 0.50 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.417945 0.10 0 10.00
1.599 0 0 0.000 5 0.50 0.50 75 4Kg/Cm2 HDPE 700 278.63 1.95041 0.45 0 5.00
1.599 10000 68.78 6.878 5 0.50 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.417945 0.10 0 10.00
1.599 0 0 0.000 5 0.50 0.50 75 4Kg/Cm2 HDPE 700 278.63 1.95041 0.45 0 5.00
1.599 0 0 0.000 5 0.50 0.50 75 4Kg/Cm2 HDPE 700 278.63 1.95041 0.45 0 5.00
1.599 0 0 0.000 5 0.50 0.50 75 4Kg/Cm2 HDPE 700 278.63 1.95041 0.45 0 5.00
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

1.599 0 0 0.000 5 0.50 0.50 75 4Kg/Cm2 HDPE 700 278.63 1.95041 0.45 0 5.00
1.599 40000 41.14 16.456 5 0.50 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.417945 0.50 0 20.00 Hon'ble MLA concerned
1.599 0 0 0.000 5 0.50 0.50 75 4Kg/Cm2 HDPE 700 278.63 1.95041 0.45 0 5.00
1.599 0 0 0.000 5 0.50 0.50 75 4Kg/Cm2 HDPE 700 278.63 1.95041 0.45 0 5.00
1.599 0 0 0.000 5 0.50 0.50 75 4Kg/Cm2 HDPE 700 278.63 1.95041 0.45 0 5.00
1.599 20000 46.47 9.294 5 0.50 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.417945 0.50 0 12.80
1.599 0 0 0.000 5 0.50 0.50 75 4Kg/Cm2 HDPE 700 278.63 1.95041 0.45 0 5.00
1.599 0 0 0.000 5 0.50 0.50 75 4Kg/Cm2 HDPE 700 278.63 1.95041 0.45 0 5.00
1.599 0 0 0.000 5 0.50 0.50 75 4Kg/Cm2 HDPE 700 278.63 1.95041 0.45 0 5.00
1.599 0 0 0.000 5 0.50 0.50 75 4Kg/Cm2 HDPE 700 278.63 1.95041 0.45 0 5.00
1.599 0 0 0.000 5 0.50 0.50 75 4Kg/Cm2 HDPE 700 278.63 1.95041 0.45 0 5.00
1.599 0 0 0.000 5 0.50 0.50 75 4Kg/Cm2 HDPE 700 278.63 1.95041 0.45 0 5.00
1.599 20000 46.47 9.294 5 0.50 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.417945 0.50 0 12.80
1.599 10000 68.78 6.878 5 0.50 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.417945 0.10 0 10.00
1.066 0 0 0.000 5 0.50 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.417945 0.50 0.02 3.00
1.599 0 0 0.00 5 0.5 0.5 75 4Kg/Cm2 HDPE 400 278.63 0.9 0 0 3.50
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

1.599 10000 68.78 6.878 5 0.50 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.417945 0.10 0 10.00
1.599 0 0 0.000 5 0.50 0.50 75 4Kg/Cm2 HDPE 700 278.63 1.95041 0.45 0 5.00
1.599 0 0 0.000 5 0.50 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.417945 0.48 0 3.50
1.599 0 0 0.00 5 0.5 0.5 75 4Kg/Cm2 HDPE 400 278.63 1.11452 0 0 3.70 Hon'ble MLA concerned
1.599 10000 68.78 6.878 5 0.50 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.417945 0.10 0 10.00
1.599 0 0 0.000 5 0.50 0.50 75 4Kg/Cm2 HDPE 700 278.63 1.95041 0.45 0 5.00
1.599 0 0 0.000 5 0.50 0.50 75 4Kg/Cm2 HDPE 700 278.63 1.95041 0.45 0 5.00
1.599 0 0 0.000 5 0.50 0.50 75 4Kg/Cm2 HDPE 700 278.63 1.95041 0.45 0 5.00
1.599 10000 68.78 6.878 5 0.50 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.417945 0.10 0 10.00
1.599 0 0 0.00 5 0.5 0.5 75 4Kg/Cm2 HDPE 400 278.63 1.11452 0 0 3.70
1.599 0 0 0.00 5 0.5 0.5 75 4Kg/Cm2 HDPE 400 278.63 1.11452 0 0 3.70
1.599 0 0 0.000 5 0.50 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.417945 0.48 0 3.50
1.599 0 0 0.00 5 0.5 0.5 75 4Kg/Cm2 HDPE 400 278.63 1.11452 0 0 3.70
1.599 0 0 0.000 5 0.50 0.50 75 4Kg/Cm2 HDPE 700 278.63 1.95041 0.45 0 5.00
1.599 0 0 0.000 5 0.50 0.50 75 4Kg/Cm2 HDPE 700 278.63 1.95041 0.45 0 5.00
1.599 0 0 0.000 5 0.50 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.417945 0.48 0 3.50
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

1.599 0 0 0.00 5 0.5 0.5 75 4Kg/Cm2 HDPE 400 278.63 1.11452 0 0 3.70 Hon'ble MLA concerned
1.599 0 0 0.000 5 0.50 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.417945 0.48 0 3.50
1.599 0 0 0.00 5 0.5 0.5 75 4Kg/Cm2 HDPE 400 278.63 1.11452 0 0 3.70
1.599 0 0 0.000 5 0.50 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.417945 0.48 0 3.50
1.599 0 0 0.00 5 0.5 0.5 75 4Kg/Cm2 HDPE 400 278.63 1.11452 0 0 3.70
1.599 0 0 0.000 5 0.50 0.50 75 4Kg/Cm2 HDPE 700 278.63 1.95041 0.45 0 5.00
1.599 0 0 0.000 5 0.50 0.50 75 4Kg/Cm2 HDPE 700 278.63 1.95041 0.45 0 5.00
1.599 0 0 0.000 5 0.50 0.50 75 4Kg/Cm2 HDPE 700 278.63 1.95041 0.45 0 5.00
1.599 0 0 0.000 5 0.50 0.50 75 4Kg/Cm2 HDPE 700 278.63 1.95041 0.45 0 5.00
1.599 10000 68.78 6.878 5 0.50 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.417945 0.10 0 10.00
1.599 10000 68.78 6.878 5 0.50 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.417945 0.10 0 10.00
1.599 0 0 0.000 5 0.50 0.50 75 4Kg/Cm2 HDPE 700 278.63 1.95041 0.45 0 5.00
1.599 10000 68.78 6.878 5 0.50 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.417945 0.10 0 10.00
1.599 0 0 0.000 5 0.50 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.417945 0.48 0 3.50
1.599 0 0 0.00 5 0.5 0.5 75 4Kg/Cm2 HDPE 400 278.63 1.11452 0 0 3.70
1.599 10000 68.78 6.878 5 0.50 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.417945 0.10 0 10.00
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

1.599 0 0 0.000 5 0.50 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.417945 0.48 0 3.50
1.599 0 0 0.00 5 0.5 0.5 75 4Kg/Cm2 HDPE 400 278.63 1.11452 0 0 3.70
1.599 0 0 0.000 5 0.50 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.417945 0.48 0 3.50
1.599 0 0 0.00 5 0.5 0.5 75 4Kg/Cm2 HDPE 400 278.63 1.11452 0 0 3.70
1.599 0 0 0.000 5 0.50 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.417945 0.48 0 3.50
1.599 0 0 0.00 5 0.5 0.5 75 4Kg/Cm2 HDPE 400 278.63 1.11452 0 0 3.70
1.599 0 0 0.00 5 0.5 0.5 75 4Kg/Cm2 HDPE 400 278.63 1.11452 0 0 3.70
1.599 10000 68.78 6.878 5 0.50 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.417945 0.10 0 10.00
1.599 10000 68.78 6.878 5 0.50 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.417945 0.10 0 10.00
1.599 0 0 0.00 5 0.5 0.5 75 4Kg/Cm2 HDPE 400 278.63 1.11452 0 0 3.70
1.599 0 0 0.000 5 0.50 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.417945 0.48 0 3.50
1.599 0 0 0.00 5 0.5 0.5 75 4Kg/Cm2 HDPE 400 278.63 1.11452 0 0 3.70
1.599 10000 68.78 6.878 5 0.50 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.417945 0.10 0 10.00
1.599 0 0 0.00 5 0.5 0.5 75 4Kg/Cm2 HDPE 400 278.63 1.11452 0 0 3.70
1.599 0 0 0.000 5 0.50 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.417945 0.48 0 3.50
1.599 0 0 0.00 5 0.5 0.5 75 4Kg/Cm2 HDPE 400 278.63 1.11452 0 0 3.70
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

1.599 0 0 0.000 5 0.50 0.50 75 4Kg/Cm2 HDPE 700 278.63 1.95041 0.45 0 5.00
1.599 0 0 0.000 5 0.50 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.417945 0.48 0 3.50
1.599 0 0 0.00 5 0.5 0.5 75 4Kg/Cm2 HDPE 400 278.63 1.11452 0 0 3.70
1.599 0 0 0.000 5 0.50 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.417945 0.48 0 3.50
1.599 0 0 0.00 5 0.5 0.5 75 4Kg/Cm2 HDPE 400 278.63 1.11452 0 0 3.70
1.599 0 0 0.00 5 0.5 0.5 75 4Kg/Cm2 HDPE 400 278.63 1.11452 0 0 3.70
1.599 0 0 0.00 5 0.5 0.5 75 4Kg/Cm2 HDPE 400 278.63 1.11452 0 0 3.70
1.599 0 0 0.00 5 0.5 0.5 75 4Kg/Cm2 HDPE 400 278.63 1.11452 0 0 3.70
1.599 0 0 0.00 5 0.5 0.5 75 4Kg/Cm2 HDPE 400 278.63 1.11452 0 0 3.70
1.599 0 0 0.00 5 0.5 0.5 75 4Kg/Cm2 HDPE 400 278.63 1.11452 0 0 3.70
1.599 0 0 0.00 5 0.5 0.5 75 4Kg/Cm2 HDPE 400 278.63 1.11452 0 0 3.70
1.599 0 0 0.00 5 0.5 0.5 75 4Kg/Cm2 HDPE 400 278.63 1.11452 0 0 3.70
1.599 0 0 0.00 5 0.5 0.5 75 4Kg/Cm2 HDPE 400 278.63 1.11452 0 0 3.70
1.599 0 0 0.00 5 0.5 0.5 75 4Kg/Cm2 HDPE 400 278.63 1.11452 0 0 3.70
1.599 0 0 0.00 5 0.5 0.5 75 4Kg/Cm2 HDPE 400 278.63 1.11452 0 0 3.70
1.599 0 0.000 5 0.5 0.5 75 4Kg/Cm2 HDPE 150 278.63 0.417945 0 0 3.00
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

1.599 0 0 0.00 5 0.5 0.5 75 4Kg/Cm2 HDPE 400 278.63 1.11452 0 0 3.70
1.599 10000 68.78 6.878 5 0.50 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.417945 0.10 0 10.00
1.599 10000 68.78 6.878 5 0.50 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.417945 0.10 0 10.00
1.599 0 0 0.000 5 0.50 0.50 75 4Kg/Cm2 HDPE 700 278.63 1.95041 0.45 0 5.00
1.599 10000 68.78 6.878 5 0.50 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.417945 0.10 0 10.00
1.599 0 0 0.00 5 0.5 0.5 75 4Kg/Cm2 HDPE 400 278.63 1.11452 0 0 3.70
1.599 0 0 0.000 5 0.50 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.417945 0.48 0 3.50
1.599 0 0 0.00 5 0.5 0.5 75 4Kg/Cm2 HDPE 400 278.63 1.11452 0 0 3.70
1.599 0 0 0.00 5 0.5 0.5 75 4Kg/Cm2 HDPE 400 278.63 1.11452 0 0 3.70
1.599 0 0 0.000 5 0.50 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.417945 0.48 0 3.50
1.599 0 0 0.00 5 0.5 0.5 75 4Kg/Cm2 HDPE 400 278.63 1.11452 0 0 3.70
1.599 0 0 0.00 5 0.5 0.5 75 4Kg/Cm2 HDPE 400 278.63 1.11452 0 0 3.70
1.599 0 0 0.000 5 0.50 0.50 75 4Kg/Cm2 HDPE 700 278.63 1.95041 0.45 0 5.00
1.599 0 0 0.000 5 0.50 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.417945 0.48 0 3.50
1.599 0 0 0.00 5 0.5 0.5 75 4Kg/Cm2 HDPE 400 278.63 1.11452 0 0 3.70
1.599 0 0 0.00 5 0.5 0.5 75 4Kg/Cm2 HDPE 400 278.63 1.11452 0 0 3.70
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

1.599 0 0 0.00 5 0.5 0.5 75 4Kg/Cm2 HDPE 400 278.63 1.11452 0 0 3.70
1.599 10000 68.78 6.878 5 0.50 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.417945 0.10 0 10.00
1.599 0 0 0.00 5 0.5 0.5 75 4Kg/Cm2 HDPE 400 278.63 1.11452 0 0 3.70
1.599 0 0 0.000 5 0.50 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.417945 0.48 0 3.50
1.599 0 0 0.00 5 0.5 0.5 75 4Kg/Cm2 HDPE 400 278.63 1.11452 0 0 3.70
1.599 0 0 0.00 5 0.5 0.5 75 4Kg/Cm2 HDPE 400 278.63 1.11452 0 0 3.70
1.599 0 0 0.00 5 0.5 0.5 75 4Kg/Cm2 HDPE 400 278.63 1.11452 0 0 3.70
1.599 0 0 0.000 5 0.50 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.417945 0.48 0 3.50
1.599 0 0 0.00 5 0.5 0.5 75 4Kg/Cm2 HDPE 400 278.63 1.11452 0 0 3.70
1.599 0 0 0.000 5 0.50 0.50 75 4Kg/Cm2 HDPE 700 278.63 1.95041 0.45 0 5.00
1.599 10000 68.78 6.878 5 0.50 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.417945 0.10 0 10.00
1.599 0 0 0.00 5 0.5 0.5 75 4Kg/Cm2 HDPE 400 278.63 1.11452 0 0 3.70
1.599 0 0 0.000 5 0.50 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.417945 0.48 0 3.50
1.599 0 0 0.00 5 0.5 0.5 75 4Kg/Cm2 HDPE 400 278.63 1.11452 0 0 3.70
1.599 0 0 0.000 5 0.50 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.417945 0.48 0 3.50
1.599 0 0 0.00 5 0.5 0.5 75 4Kg/Cm2 HDPE 400 278.63 1.11452 0 0 3.70
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

1.599 0 0 0.00 5 0.5 0.5 75 4Kg/Cm2 HDPE 400 278.63 1.11452 0 0 3.70
1.599 0 0 0.00 5 0.5 0.5 75 4Kg/Cm2 HDPE 400 278.63 1.11452 0 0 3.70
1.599 10000 68.78 6.878 5 0.50 0.50 75 4Kg/Cm2 HDPE 150 278.63 0.417945 0.10 0 10.00
1.599 0 0 0.00 5 0.5 0.5 75 4Kg/Cm2 HDPE 400 278.63 1.11452 0 0 3.70
1.599 20000 46.47 9.294 5 0.5 0.5 75 4Kg/Cm2 HDPE 150 278.63 0.417945 0.10 0 12.40
K.Premsagar Rao, Hon'ble
1.777 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 750 278.63 2.089725 0 0.02 5.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
1.777 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 750 278.63 2.089725 0 0.02 5.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
1.777 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 750 278.63 2.089725 0 0.02 5.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
1.777 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 750 278.63 2.089725 0 0.02 5.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
1.777 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 750 278.63 2.089725 0 0.02 5.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
1.777 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 750 278.63 2.089725 0 0.02 5.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
1.777 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 750 278.63 2.089725 0 0.02 5.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
1.777 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 750 278.63 2.089725 0 0.02 5.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
1.777 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 750 278.63 2.089725 0 0.02 5.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
1.777 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 750 278.63 2.089725 0 0.02 5.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
1.777 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 750 278.63 2.089725 0 0.02 5.00
M.L.C Local Bodies Adilabad
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

K.Premsagar Rao, Hon'ble


2.133 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 1450 278.63 4.040135 1 0 9.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
1.777 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 750 278.63 2.089725 1 0.02 6.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
1.777 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 750 278.63 2.089725 0 0.02 5.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
1.777 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 900 278.63 2.50767 0 0.02 6.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
1.777 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 750 278.63 2.089725 1 0.02 6.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
1.777 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 750 278.63 2.089725 1 0.02 6.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
2.133 20000 46.47 9.294 5 0.10 0.50 75 4Kg/Cm2 HDPE 1450 278.63 4.040135 1 0 18.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
2.133 20000 46.47 9.294 5 0.10 0.50 75 4Kg/Cm2 HDPE 1450 278.63 4.040135 1 0 18.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
1.777 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 750 278.63 2.089725 0 0.02 5.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
1.777 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 750 2.089725 0 0.02 5.00
278.63 M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
1.777 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 750 278.63 2.089725 0 0.02 5.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
1.777 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 750 278.63 2.089725 0 0.02 5.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
1.777 10000 68.78 6.878 5 0.10 0.50 75 4Kg/Cm2 HDPE 750 278.63 2.089725 0 0.02 12.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
2.133 20000 46.47 9.294 5 0.10 0.50 75 4Kg/Cm2 HDPE 1450 278.63 4.040135 1 0 18.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
1.777 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 750 278.63 2.089725 0 0.02 5.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
1.777 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 750 278.63 2.089725 0 0.02 5.00
M.L.C Local Bodies Adilabad
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

K.Premsagar Rao, Hon'ble


1.777 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 750 278.63 2.089725 0 0.02 5.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
1.777 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 750 278.63 2.089725 0 0.02 5.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
2.133 20000 46.47 9.294 5 0.10 0.50 75 4Kg/Cm2 HDPE 1450 278.63 4.040135 1 0 18.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
1.777 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 750 278.63 2.089725 1 0.02 6.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
1.777 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 750 278.63 2.089725 0 0.02 5.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
1.777 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 750 278.63 2.089725 0 0.02 5.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
1.777 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 900 278.63 2.50767 0 0.02 6.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
1.777 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 750 278.63 2.089725 1 0.02 6.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
1.777 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 750 278.63 2.089725 0 0.02 5.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
1.777 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 750 278.63 2.089725 0 0.02 5.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
1.777 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 750 278.63 2.089725 0 0.02 5.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
1.777 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 750 278.63 2.089725 0 0.02 5.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
1.777 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 750 278.63 2.089725 0 0.02 5.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
1.777 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 750 278.63 2.089725 0 0.02 5.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
1.777 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 750 278.63 2.089725 0 0.02 5.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
1.777 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 750 278.63 2.089725 0 0.02 5.00
M.L.C Local Bodies Adilabad
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

K.Premsagar Rao, Hon'ble


1.777 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 750 278.63 2.089725 0 0.02 5.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
1.777 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 750 278.63 2.089725 0 0.02 5.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
1.777 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 750 278.63 2.089725 0 0.02 5.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
1.777 10000 68.78 6.878 5 0.10 0.50 75 4Kg/Cm2 HDPE 750 278.63 2.089725 0 0.02 12.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
1.777 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 750 278.63 2.089725 0 0.02 5.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
1.777 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 750 278.63 2.089725 0 0.02 5.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
1.777 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 750 278.63 2.089725 0 0.02 5.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
1.777 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 750 278.63 2.089725 0 0.02 5.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
1.777 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 750 278.63 2.089725 0 0.02 5.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
1.777 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 750 278.63 2.089725 0 0.02 5.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
1.777 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 750 278.63 2.089725 0 0.02 5.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
1.777 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 750 278.63 2.089725 0 0.02 5.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
1.777 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 750 278.63 2.089725 0 0.02 5.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
1.777 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 750 278.63 2.089725 0 0.02 5.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
1.777 10000 68.78 6.878 5 0.10 0.50 75 4Kg/Cm2 HDPE 750 278.63 2.089725 0 0.02 12.00
M.L.C Local Bodies Adilabad
Sri Athram Sakku,
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00
MLA,Asifabad
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

Sri Athram Sakku,


1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1300 278.63 3.62219 1 0.13 17.00
MLA,Asifabad
Sri Athram Sakku,
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1300 278.63 3.62219 1 0.13 17.00
MLA,Asifabad
Sri Athram Sakku,
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1200 278.63 3.34356 1 0.1 17.00
MLA,Asifabad
Sri Athram Sakku,
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1300 278.63 3.62219 1 0.13 17.00
MLA,Asifabad
Sri Athram Sakku,
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1200 278.63 3.34356 1 0.1 17.00
MLA,Asifabad
Sri Athram Sakku,
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1300 278.63 3.62219 1 0.13 17.00
MLA,Asifabad
Sri Athram Sakku,
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1300 278.63 3.62219 1 0.13 17.00
MLA,Asifabad
Sri Athram Sakku,
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1300 278.63 3.62219 1 0.13 17.00
MLA,Asifabad
Sri Athram Sakku,
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00
MLA,Asifabad
Sri Athram Sakku,
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1300 278.63 3.62219 1 0.13 17.00
MLA,Asifabad
Sri Athram Sakku,
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00
MLA,Asifabad
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1200 278.63 3.34356 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1300 278.63 3.62219 1 0.13 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1300 278.63 3.62219 1 0.13 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1300 278.63 3.62219 1 0.13 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1300 278.63 3.62219 1 0.13 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1300 278.63 3.62219 1 0.13 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1300 278.63 3.62219 1 0.13 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1300 278.63 3.62219 1 0.13 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
4.265 40000 41.14 16.456 0 0.10 0.00 75 4Kg/Cm2 HDPE 1450 278.63 4.040135 1 0.31 27.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1300 278.63 3.62219 1 0.13 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1300 278.63 3.62219 1 0.13 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1300 278.63 3.62219 1 0.13 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1300 278.63 3.62219 1 0.13 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1300 278.63 3.62219 1 0.13 17.00 --
K.Premsagar Rao, Hon'ble
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00
M.L.C Local Bodies Adilabad
1.777 20000 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1300 3.62219 1 0.13 17.00 --
46.47 278.63
K.Premsagar Rao, Hon'ble
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00
M.L.C Local Bodies Adilabad
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1300 278.63 3.62219 1 0.13 17.00 --

1.777 20000 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1300 3.62219 1 0.13 17.00 --
46.47 278.63
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1300 278.63 3.62219 1 0.13 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1300 278.63 3.62219 1 0.13 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1300 278.63 3.62219 1 0.13 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1300 278.63 3.62219 1 0.13 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1300 278.63 3.62219 1 0.13 17.00 --
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1300 278.63 3.62219 1 0.13 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1300 278.63 3.62219 1 0.13 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1300 278.63 3.62219 1 0.13 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1300 278.63 3.62219 1 0.13 17.00 --

1.777 20000 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1300 3.62219 1 0.13 17.00 --
46.47 278.63
K.Premsagar Rao, Hon'ble
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00
M.L.C Local Bodies Adilabad
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1300 278.63 3.62219 1 0.13 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1300 278.63 3.62219 1 0.13 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1300 278.63 3.62219 1 0.13 17.00 --
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1300 278.63 3.62219 1 0.13 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1300 278.63 3.62219 1 0.13 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --

1.777 20000 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1300 3.62219 1 0.13 17.00 --
46.47 278.63
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1300 278.63 3.62219 1 0.13 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1300 278.63 3.62219 1 0.13 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1300 278.63 3.62219 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1300 278.63 3.62219 1 0.13 17.00 --
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1300 278.63 3.62219 1 0.13 17.00 --
K.Premsagar Rao, Hon'ble
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00
M.L.C Local Bodies Adilabad
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1300 278.63 3.62219 1 0.13 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1300 278.63 3.62219 1 0.13 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1300 278.63 3.62219 1 0.13 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1300 278.63 3.62219 1 0.13 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1300 278.63 3.62219 1 0.13 17.00 --
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1300 278.63 3.62219 1 0.13 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1300 278.63 3.62219 1 0.13 17.00 --
K.Premsagar Rao, Hon'ble
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00
M.L.C Local Bodies Adilabad
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1300 278.63 3.62219 1 0.13 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1300 278.63 3.62219 1 0.13 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1300 278.63 3.62219 1 0.13 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1300 278.63 3.62219 1 0.13 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1300 278.63 3.62219 1 0.13 17.00 --

1.777 20000 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 3.761505 1 0.1 17.00 --
46.47 278.63
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1300 278.63 3.62219 1 0.13 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1300 278.63 3.62219 1 0.13 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1300 278.63 3.62219 1 0.13 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1300 278.63 3.62219 1 0.13 17.00 --
4.265 40000 41.14 16.456 0 0.10 0.00 75 4Kg/Cm2 HDPE 1400 278.63 3.90082 1 0.34 27.00 --

1.777 20000 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1300 3.62219 1 0.13 17.00 --
46.47 278.63

1.777 20000 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 3.761505 1 0.1 17.00 --
46.47 278.63
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1300 278.63 3.62219 1 0.13 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1300 278.63 3.62219 1 0.13 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1300 278.63 3.62219 1 0.13 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1300 278.63 3.62219 1 0.13 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
4.265 0 0.00 0 0.1 0 75 6 1500 278.63 4.17945 1 0.38 11.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1300 278.63 3.62219 1 0.13 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1200 278.63 3.34356 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1300 278.63 3.62219 1 0.13 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1300 278.63 3.62219 1 0.13 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1300 278.63 3.62219 1 0.13 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1300 278.63 3.62219 1 0.13 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1300 278.63 3.62219 1 0.13 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1300 278.63 3.62219 1 0.13 17.00 --
1.777 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.1 17.00 --

1.777 10000 6.878 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 3.761505 1 0.1 14.00 --
68.78 278.63
Athram Sakku, Hon'ble M.L.A
1.019 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 550 278.63 1.481865 0 0 4.00
Asifabad
K.Sammaiah, Hon'ble M.L.A
1.499 0 0 0.00 5 0.1 0.5 75 6 0 278.63 0 0 0 3.00
,Sirpur-T
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

Sri Athram Sakku,


2.843 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 3000 278.63 8.3589 1 0.17 23.00
MLA,Asifabad
Sri Athram Sakku,
3.199 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 2950 278.63 8.219585 1 0.01 23.00
MLA,Asifabad
Sri Athram Sakku,
2.843 20000 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 3050 8.498215 1 0.03 23.00
46.47 278.63 MLA,Asifabad
Sri Athram Sakku,
4.443 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 2550 278.63 7.105065 1 0.07 23.00
MLA,Asifabad
Sri Athram Sakku,
5.047 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 2350 278.63 6.547805 1 0.12 23.00
MLA,Asifabad
Sri Athram Sakku,
3.377 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 2850 278.63 7.940955 1 0.14 23.00
MLA,Asifabad
Sri Athram Sakku,
4.087 20000 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 2650 7.383695 1 0.09 23.00
46.47 278.63 MLA,Asifabad
Sri Athram Sakku,
4.265 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 2600 278.63 7.24438 1 0.08 23.00
MLA,Asifabad
Sri Athram Sakku,
4.443 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 2550 278.63 7.105065 1 0.07 23.00
MLA,Asifabad
Sri Athram Sakku,
4.798 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 2450 278.63 6.826435 1 0.05 23.00
MLA,Asifabad
Sri Athram Sakku,
4.976 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 2400 278.63 6.68712 1 0.04 23.00
MLA,Asifabad
Sri Athram Sakku,
4.443 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 2550 278.63 7.105065 1 0.07 23.00
MLA,Asifabad
Sri Athram Sakku,
4.265 10000 6.88 0 0.1 0 75 6 4000 11.1452 1 0.04 24.00
68.78 278.63 MLA,Asifabad
Athram Sakku, Hon'ble M.L.A
0.889 0 0 0.00 5 0.1 0.5 75 6 450 278.63 1.253835 0 0.06 4.00
Asifabad
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

K.Premsagar Rao, Hon'ble


1.208 0 0 0.00 5 0.1 0.5 - - 0 0 0 0.01 2.00
278.63 M.L.C Local Bodies Adilabad
Athram Sakku, Hon'ble M.L.A
1.244 0 0 0.00 5 0.1 0.5 75 6 550 278.63 1.532465 0 0 4.00
Asifabad
K.Premsagar Rao, Hon'ble
0.604 0 0 0.00 5 0.1 0.5 75 6 0 278.63 0 0 0.01 2.00
M.L.C Local Bodies Adilabad
Athram Sakku, Hon'ble M.L.A
0.889 0 0 0.00 5 0.1 0.5 75 6 450 1.253835 0 0.06 4.00
278.63 Asifabad
Athram Sakku, Hon'ble M.L.A
1.830 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 400 278.63 1.11452 0 0 4.00
Asifabad
Athram Sakku, Hon'ble M.L.A
1.244 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 1000 278.63 2.7863 0 0 6.00
Asifabad
Athram Sakku, Hon'ble M.L.A
1.422 20000 46.47 9.294 5 0.10 0.50 75 4Kg/Cm2 HDPE 850 278.63 2.368355 1 0.05 16.00
Asifabad
K.Premsagar Rao, Hon'ble
0.889 60000 18.723 0.10 0.00 75 4Kg/Cm2 HDPE 0 0 0.58 20.00
31.21 278.63 M.L.C Local Bodies Adilabad
Athram Sakku, Hon'ble M.L.A
1.244 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 700 278.63 1.95041 0 0 5.00
Asifabad
Athram Sakku, Hon'ble M.L.A
1.422 10000 68.78 6.878 0 0.10 0.00 75 4Kg/Cm2 HDPE 650 278.63 1.811095 1 0.08 12.00
Asifabad
Athram Sakku, Hon'ble M.L.A
1.422 0 0 0.00 0 0.1 0 75 6 650 278.63 1.811095 1 0.08 5.00
Asifabad
K.Premsagar Rao, Hon'ble
1.208 0 0 0.00 5 0.1 0.5 - - 0 278.63 0 0 0.01 2.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
1.830 0 0 0.00 5 0.1 0.5 75 6 0 278.63 0 0 0 3.00
M.L.C Local Bodies Adilabad
Athram Sakku, Hon'ble M.L.A
1.244 0 0 0.00 5 0.1 0.5 75 6 550 278.63 1.532465 0 0 4.00
Asifabad
K.Premsagar Rao, Hon'ble
1.422 0 0 0.00 5 0.1 0.5 75 6 0 278.63 0 0 0.14 3.00
M.L.C Local Bodies Adilabad
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

K.Premsagar Rao, Hon'ble


1.422 0 0 0.00 5 0.1 0.5 75 6 850 278.63 2.368355 1 0.05 6.00
M.L.C Local Bodies Adilabad
Athram Sakku, Hon'ble M.L.A
1.422 0 0 0.00 0 0.1 0 75 6 650 278.63 1.811095 1 0.08 5.00
Asifabad
K.Premsagar Rao, Hon'ble
0.604 0 0 0.00 5 0.1 0.5 75 6 0 278.63 0 0 0.01 2.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
1.830 0 0 0.00 5 0.1 0.5 75 6 0 278.63 0 0 0 3.00
M.L.C Local Bodies Adilabad
Athram Sakku, Hon'ble M.L.A
3.199 40000 16.456 5 0.10 0.50 75 4Kg/Cm2 HDPE 2000 5.5726 0.50 0.09 27.00
41.14 278.63 Asifabad
K.Premsagar Rao, Hon'ble
0.889 10000 68.78 6.88 0.1 0 - - 0 278.63 0 0.58 8.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
0.000 0 0 0.00 0 0.1 0 75 6 0 278.63 0 0 0 1.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
0.604 0 0 0.00 5 0.1 0.5 75 6 0 278.63 0 0 0.01 2.00
M.L.C Local Bodies Adilabad
Athram Sakku, Hon'ble M.L.A
0.533 0 0 0.00 5 0.1 0.5 75 6 750 278.63 2.089725 1 0.04 5.00
Asifabad
Athram Sakku, Hon'ble M.L.A
0.533 0 0 0.00 5 0.1 0.5 75 6 750 278.63 2.089725 1 0.04 5.00
Asifabad
Athram Sakku, Hon'ble M.L.A
0.533 0 0 0.00 5 0.1 0.5 75 6 750 278.63 2.089725 1 0.04 5.00
Asifabad
Athram Sakku, Hon'ble M.L.A
0.889 0 0 0.00 0 0.1 0 75 6 450 1.253835 1 1.06 5.00
278.63 Asifabad
K.Premsagar Rao, Hon'ble
1.830 0 0 0.00 5 0.1 0.5 75 6 0 278.63 0 0 0 3.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
0.000 0 0 0.00 4 0.1 0.4 75 6 0 278.63 0 0 0 1.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
0.604 0 0 0.00 5 0.1 0.5 75 6 0 0 0 0.01 2.00
278.63 M.L.C Local Bodies Adilabad
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

K.Premsagar Rao, Hon'ble


1.830 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 0 278.63 0 0 0 3.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
0.000 0 0 0.00 0 0.1 0 75 6 0 278.63 0 0 0 1.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
0.889 40000 41.14 16.456 5 0.10 0.50 75 4Kg/Cm2 HDPE 0 278.63 0 0 0.07 19.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
0.000 0 0 1.00 0 0.1 0 - - 0 278.63 0 0 0 1.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
0.889 0 0 0.00 5 0.1 0.5 75 6 450 278.63 1.253835 0 0.06 4.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
1.830 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 0 278.63 0 0 0 3.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
1.208 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 0 0 0 0.01 2.00
278.63 M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
2.843 20000 46.47 9.294 5 0.10 0.50 75 4Kg/Cm2 HDPE 900 278.63 2.50767 0 0.06 16.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
2.843 40000 16.456 5 0.10 0.50 75 4Kg/Cm2 HDPE 900 2.50767 0 0.06 23.00
41.14 278.63 M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
2.843 0 0.00 5 0.1 0.5 75 6 900 278.63 2.50767 0 0.06 7.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
1.422 0 0 0.00 0 0.1 0 75 6 650 278.63 1.811095 1 0.08 5.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
0.889 0 0 0.00 5 0.1 0.5 75 6 450 278.63 1.253835 0 0.06 4.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
1.422 0 0 0.00 5 0.1 0.5 75 6 850 278.63 2.368355 1 0.05 6.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
0.889 0 0 0.00 5 0.1 0.5 75 6 450 278.63 1.253835 0 0.06 4.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
3.199 0 0 0.00 5 0.1 0.5 75 6 2000 278.63 5.5726 0.4 0.09 11.00
M.L.C Local Bodies Adilabad
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

K.Premsagar Rao, Hon'ble


1.422 0 0 0.00 0 0.1 0 75 6 650 278.63 1.811095 1 0.08 5.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
3.199 10000 68.78 6.878 5 0.10 0.50 75 4Kg/Cm2 HDPE 2000 278.63 5.5726 0.50 0.09 18.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
3.554 20000 46.47 9.294 5 0.10 0.50 75 4Kg/Cm2 HDPE 1850 278.63 5.154655 0.50 0.1 20.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
3.199 10000 68.78 6.878 5 0.10 0.50 75 4Kg/Cm2 HDPE 2000 278.63 5.5726 0.50 0.09 18.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
5.331 10000 68.78 6.878 5 0.10 0.50 75 4Kg/Cm2 HDPE 1000 278.63 2.7863 1.4 0.04 18.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
0.889 40000 41.14 16.456 0.10 0.00 75 4Kg/Cm2 HDPE 0 278.63 0 0.58 18.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
0.889 40000 41.14 16.456 0.10 0.00 75 4Kg/Cm2 HDPE 0 278.63 0 0.58 18.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
0.889 40000 41.14 16.456 0.10 0.00 75 4Kg/Cm2 HDPE 0 278.63 0 0.58 18.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
0.889 10000 68.78 6.878 0.10 0.00 75 4Kg/Cm2 HDPE 0 278.63 0 0.58 8.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
5.331 0 0 0.00 5 0.1 0.5 - - 0 278.63 0 6.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
0.889 0 0 0.00 5 0.1 0.5 75 6 450 278.63 1.253835 0 0.06 4.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
3.554 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 1850 278.63 5.154655 0.50 0.1 11.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
1.422 0 0 0.00 5 0.1 0.5 75 6 850 278.63 2.368355 1 0.05 6.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
1.422 0 0 0.00 0 0.1 0 75 6 650 278.63 1.811095 1 0.08 5.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
1.422 0 0 0.00 0 0.1 0 75 6 650 1.811095 1 0.08 5.00
278.63 M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
0.604 0 0 0.00 5 0.1 0.5 75 6 0 278.63 0 0 0.01 2.00
M.L.C Local Bodies Adilabad
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

K.Premsagar Rao, Hon'ble


1.422 10000 68.78 6.878 0 0.10 0.00 75 4Kg/Cm2 HDPE 650 278.63 1.811095 1 0.08 12.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
1.422 0 0 0.000 0 0.10 0.00 75 4Kg/Cm2 HDPE 650 278.63 1.811095 1 0.08 5.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
0.889 10000 68.78 6.878 0.10 0.00 75 4Kg/Cm2 HDPE 0 278.63 0 0.58 8.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
0.889 20000 9.294 0.10 0.00 75 4Kg/Cm2 HDPE 0 0 0.58 11.00
46.47 278.63 M.L.C Local Bodies Adilabad

K.Premsagar Rao, Hon'ble


0.889 20000 9.294 0.10 0.00 75 4Kg/Cm2 HDPE 0 0 0.58 11.00
46.47 278.63 M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
0.889 10000 68.78 6.878 0.10 0.00 75 4Kg/Cm2 HDPE 0 278.63 0 0.58 8.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
0.889 0 0.00 0.1 0 75 6 500 278.63 1.39315 1 0.08 3.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
0.889 20000 46.47 9.294 0.10 0.00 75 4Kg/Cm2 HDPE 0 278.63 0 0.58 11.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
1.422 0 0 0.00 5 0.1 0.5 75 6 850 278.63 2.368355 1 0.05 6.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
2.843 10000 68.78 6.88 0 0.1 0 75 6 3000 278.63 8.3589 0 0.9 19.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
1.955 10000 6.878 5 0.10 0.50 75 4Kg/Cm2 HDPE 1430 3.984409 1 0.05 15.00
68.78 278.63 M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
12.085 0 0 0.00 7.5 0.1 0.75 75 6 1200 278.63 3.34356 2 1.12 20.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
3.910 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 1750 278.63 4.876025 1 0.08 11.00
M.L.C Local Bodies Adilabad
K.Sammaiah, Hon'ble M.L.A
0.889 10000 68.78 6.878 5 0.10 0.50 75 4Kg/Cm2 HDPE 450 278.63 1.253835 0 0.06 11.00
,Sirpur-T
K.Premsagar Rao, Hon'ble
0.604 0 0 0.00 5 0.1 0.5 75 6 0 278.63 0 0 0.01 2.00
M.L.C Local Bodies Adilabad
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

K.Sammaiah, Hon'ble M.L.A


0.889 20000 46.47 9.294 0.10 0.00 75 4Kg/Cm2 HDPE 0 278.63 0 0.58 11.00
,Sirpur-T
K.Sammaiah, Hon'ble M.L.A
0.889 0 0.00 0.1 0 75 6 200 278.63 0.55726 0.04 1.00
,Sirpur-T
K.Sammaiah, Hon'ble M.L.A
1.422 0 0 0.00 0 0.1 0 75 6 650 278.63 1.811095 1 0.08 5.00
,Sirpur-T
K.Sammaiah, Hon'ble M.L.A
0.889 0 0 0.000 0 0.10 0.00 75 4Kg/Cm2 HDPE 400 278.63 1.11452 0.50 0 3.00
,Sirpur-T
K.Sammaiah, Hon'ble M.L.A
1.830 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 0 278.63 0 0 0 3.00
,Sirpur-T
K.Sammaiah, Hon'ble M.L.A
1.830 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 0 278.63 0 2.00 0 5.00
,Sirpur-T
K.Sammaiah, Hon'ble M.L.A
1.422 10000 68.78 6.878 0 0.10 0.00 75 4Kg/Cm2 HDPE 650 278.63 1.811095 1 0.08 12.00
,Sirpur-T
K.Sammaiah, Hon'ble M.L.A
0.480 0 0 0.00 0 0.1 0 - - 0 278.63 0 0.6 0.01 1.00
,Sirpur-T
K.Sammaiah, Hon'ble M.L.A
0.604 20000 46.47 9.294 5 0.10 0.50 75 4Kg/Cm2 HDPE 0 278.63 0 0 0.01 11.00
,Sirpur-T
K.Sammaiah, Hon'ble M.L.A
0.604 0 0 0.00 5 0.1 0.5 75 6 0 278.63 0 0 0.01 2.00
,Sirpur-T
K.Sammaiah, Hon'ble M.L.A
1.830 0 0 0.00 5 0.1 0.5 75 6 0 278.63 0 0 0 3.00
,Sirpur-T
K.Premsagar Rao, Hon'ble
0.889 40000 41.14 16.456 0.10 0.00 75 4Kg/Cm2 HDPE 0 278.63 0 0.58 18.00
M.L.C Local Bodies Adilabad
K.Sammaiah, Hon'ble M.L.A
0.889 40000 41.14 16.456 0.10 0.00 75 4Kg/Cm2 HDPE 0 278.63 0 0.58 18.00
,Sirpur-T
K.Sammaiah, Hon'ble M.L.A
0.889 0 0.00 0.1 0 - - 0 278.63 0 0.58 1.00
,Sirpur-T
K.Sammaiah, Hon'ble M.L.A
5.331 10000 68.78 6.878 10 0.10 1.00 75 4Kg/Cm2 HDPE 600 278.63 1.67178 2.5 1.52 20.00
,Sirpur-T
K.Sammaiah, Hon'ble M.L.A
1.422 0 0 0.00 5 0.1 0.5 75 6 850 278.63 2.368355 1 0.05 6.00
,Sirpur-T
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

K.Sammaiah, Hon'ble M.L.A


5.331 0 0 0.00 10 0.1 1 75 6 1550 278.63 4.318765 3 1.46 16.00
,Sirpur-T
K.Premsagar Rao, Hon'ble
1.422 0 0 0.00 5 0.1 0.5 75 6 850 278.63 2.368355 1 0.05 6.00
M.L.C Local Bodies Adilabad
K.Sammaiah, Hon'ble M.L.A
5.331 20000 46.47 9.294 10 0.10 1.00 75 4Kg/Cm2 HDPE 600 278.63 1.67178 2.5 1.52 22.00
,Sirpur-T
K.Sammaiah, Hon'ble M.L.A
0.000 0 0 0.00 0 0.1 0 75 6 350 278.63 0.975205 1 0.06 2.00
,Sirpur-T
K.Sammaiah, Hon'ble M.L.A
5.331 20000 46.47 9.294 10 0.10 1.00 75 4Kg/Cm2 HDPE 600 278.63 1.67178 2.5 1.52 22.00
,Sirpur-T
K.Sammaiah, Hon'ble M.L.A
1.830 0 0 0.00 5 0.1 0.5 75 6 0 278.63 0 0 0 3.00
,Sirpur-T
K.Sammaiah, Hon'ble M.L.A
1.830 0 0 0.00 5 0.1 0.5 75 6 0 278.63 0 0 0 3.00
,Sirpur-T
K.Sammaiah, Hon'ble M.L.A
0.889 40000 41.14 16.456 5 0.10 0.50 75 4Kg/Cm2 HDPE 0 278.63 0 0 0.08 18.00
,Sirpur-T
K.Sammaiah, Hon'ble M.L.A
0.889 20000 46.47 9.294 5 0.10 0.50 75 4Kg/Cm2 HDPE 0 278.63 0 0 0.08 11.00
,Sirpur-T
K.Premsagar Rao, Hon'ble
0.889 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 300 278.63 0.83589 0 0.5 4.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
0.889 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 300 278.63 0.83589 0 0.5 4.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
0.889 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 300 278.63 0.83589 0 0.5 4.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
0.711 10000 68.78 6.878 5 0.10 0.50 75 4Kg/Cm2 HDPE 280 278.63 0.780164 0 0.5 10.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
0.597 10000 68.78 6.878 5 0.10 0.50 75 4Kg/Cm2 HDPE 348 278.63 0.9696324 0 0.5 10.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
0.711 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 350 278.63 0.975205 0 0.5 4.00
M.L.C Local Bodies Adilabad
K.Sammaiah, Hon'ble M.L.A
5.331 40000 41.14 16.46 0 0.1 0 75 6 0 278.63 0 0.43 0.09 22.00
,Sirpur-T
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

N.Diwakar Rao, Ex-MLA,


1.066 0 0 0.00 5 0.1 0.5 75 6 0 278.63 0 0.6 0.03 3.00
Luxettipet
N.Diwakar Rao, Ex-MLA,
1.066 40000 41.14 16.456 5 0.10 0.50 75 4Kg/Cm2 HDPE 700 278.63 1.95041 0.7 0.04 22.00
Luxettipet
N.Diwakar Rao, Ex-MLA,
1.528 40000 41.14 16.46 5 0.1 0.5 75 6 450 278.63 1.253835 0 0.04 21.00
Luxettipet
N.Diwakar Rao, Ex-MLA,
1.955 0 0 0.00 7.5 0.1 0.75 75 6 2300 278.63 6.40849 0.9 0.05 11.00
Luxettipet
N.Diwakar Rao, Ex-MLA,
1.955 20000 46.47 9.29 7.5 0.1 0.75 75 6 2300 278.63 6.40849 0.9 0.05 20.00
Luxettipet
N.Diwakar Rao, Ex-MLA,
1.137 0 0 0.00 0 0.1 0 75 6 0 278.63 0 0 0.07 2.00
Luxettipet
0.000 0 0 0.00 0 0.1 0 75 6 0 0 0 0 5.00 --
278.63
0.000 0 0 0.00 0 0.1 0 75 6 0 278.63 0 0 0 8.00 --

0.000 0 0 0.00 0 0.1 0 75 6 0 0 0 0 15.00 --


278.63
0.000 0 0 0.00 0 0.1 0 75 6 0 278.63 0 0 0 15.00 --
0.000 0 0 0.00 0 0.1 0 75 6 0 278.63 0 0 0 15.00 --
0.000 0 0 0.00 0 0.1 0 75 6 0 278.63 0 0 0 4.00 --
0.000 0 0 0.00 0 0.1 0 75 6 0 278.63 0 0 0 4.00 --
0.000 0 0 0.00 0 0.1 0 75 6 0 278.63 0 0 0 4.00 --
0.000 0 0 0.000 0 0.10 0.00 75 4Kg/Cm2 HDPE 0 278.63 0 0 0 4.00 --
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

0.000 0 0 0.00 0 0.1 0 75 6 0 278.63 0 0 0 4.00 --


0.000 0 0 0.00 0 0.1 0 75 6 0 278.63 0 0 0 4.00 --
0.000 0 0 0.000 0 0.10 0.00 75 4Kg/Cm2 HDPE 0 278.63 0 0 0 4.00 --
0.000 0 0 0.00 0 0.1 0 75 6 0 278.63 0 0 0 4.00 --
0.000 0 0 0.000 0 0.10 0.00 75 4Kg/Cm2 HDPE 0 278.63 0 0 0 4.00 --
0.000 0 0 0.000 0 0.10 0.00 75 4Kg/Cm2 HDPE 0 278.63 0 0 0 4.00 --
0.000 0 0 0.000 0 0.10 0.00 75 4Kg/Cm2 HDPE 0 278.63 0 0 0 4.00 --
0.000 0 0 0.00 0 0.1 0 75 6 0 278.63 0 0 0 4.00 --
0.000 0 0 0.00 0 0.1 0 75 6 0 278.63 0 0 0 4.00 --
0.000 0 0 0.00 0 0.1 0 75 6 0 278.63 0 0 0 4.00 --
0.000 0 0 0.00 0 0.1 0 75 6 0 278.63 0 0 0 4.00 --
0.000 0 0 0.00 0 0.1 0 75 6 0 278.63 0 0 0 4.00 --
K.Premsagar Rao, Hon'ble
2.843 20000 46.47 9.29 0 0.1 0 75 6 3000 278.63 4.08 1 0.17 18.00
M.L.C Local Bodies Adilabad
K.Premsagar Rao, Hon'ble
0.711 10000 6.878 0 0.50 0.00 75 4Kg/Cm2 HDPE 3000 0 0.50 0.15 9.00
M.L.C Local Bodies Adilabad
68.78 278.63
K.Premsagar Rao, Hon'ble
0.711 0 0.00 0 0.5 0 75 6 3000 278.63 0 0.3 0.15 2.00
M.L.C Local Bodies Adilabad
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

0.711 0 0 0.000 0 0.50 0.00 75 4Kg/Cm2 HDPE 2500 278.63 6.96575 0.50 0.15 9.00 --
0.711 0 0.00 0 0.5 0 75 6 3000 278.63 0 0.3 0.15 2.00 --
0.711 20000 46.47 9.294 0 0.50 0.00 75 4Kg/Cm2 HDPE 3000 278.63 0 0.50 0.15 12.00 --
2.843 0 0.00 0 0.1 0 75 6 3000 278.63 4.08 1 0.17 9.00 --
0.711 40000 41.14 16.456 0 0.50 0.00 75 4Kg/Cm2 HDPE 3000 278.63 0 0.50 0.15 19.00 --
2.843 0 0.00 0 0.1 0 75 6 3000 278.63 4.08 1 0.17 9.00 --
2.843 0 0.00 0 0.1 0 75 6 3000 278.63 4.08 1 0.17 9.00 --
0.711 40000 41.14 16.456 0 0.50 0.00 75 4Kg/Cm2 HDPE 3000 278.63 0 0.50 0.15 19.00 --
0.711 0 0 0.000 0 0.50 0.00 75 4Kg/Cm2 HDPE 2500 278.63 6.96575 0.50 0.15 9.00 --
0.711 10000 68.78 6.878 0 0.50 0.00 75 4Kg/Cm2 HDPE 3000 278.63 0 0.50 0.15 9.00 --
1.800 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 3000 278.63 0 0 0 12.00 --
0.711 0 0 0.000 0 0.50 0.00 75 4Kg/Cm2 HDPE 3000 278.63 0 1.50 0.15 3.00 --
1.800 0 0 0.000 0 0.10 0.00 75 4Kg/Cm2 HDPE 3000 278.63 0 2.00 0 5.00 --
0.711 0 0 0.000 0 0.50 0.00 75 4Kg/Cm2 HDPE 2500 278.63 6.96575 0.50 0.15 9.00 --
0.711 40000 41.14 16.456 0 0.50 0.00 75 4Kg/Cm2 HDPE 3000 278.63 0 0.50 0.15 19.00 --
0.711 0 0 0.000 0 0.50 0.00 75 4Kg/Cm2 HDPE 2500 278.63 6.96575 0.50 0.15 9.00 --
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

0.711 0 0 0.000 0 0.50 0.00 75 4Kg/Cm2 HDPE 2500 278.63 6.96575 0.50 0.15 9.00 --
0.711 0 0.00 0 0.5 0 75 6 3000 278.63 0 0.3 0.15 2.00 --
1.800 0 0.20 0 0.1 0 75 6 3000 278.63 0 0 0 3.00 --
0.711 20000 46.47 9.294 0 0.50 0.00 75 4Kg/Cm2 HDPE 3000 278.63 0 0.50 0.15 12.00 --
0.711 10000 68.78 6.878 0 0.50 0.00 75 4Kg/Cm2 HDPE 3000 278.63 0 0.50 0.15 9.00 --
0.711 0 0.00 0 0.5 0 75 6 3000 278.63 0 0.3 0.15 2.00 --
0.711 0 0 0.000 0 0.50 0.00 75 4Kg/Cm2 HDPE 3000 278.63 0 1.50 0.15 3.00 --
1.800 10000 68.78 6.878 0 0.10 0.00 75 4Kg/Cm2 HDPE 3000 278.63 0 0 0 9.00 --

0.711 10000 6.878 0 0.50 0.00 75 4Kg/Cm2 HDPE 3000 0 0.50 0.15 9.00 --
68.78 278.63
0.711 10000 68.78 6.878 0 0.50 0.00 75 4Kg/Cm2 HDPE 3000 278.63 0 0.50 0.15 9.00 --
1.800 0 0 0.000 0 0.10 0.00 75 4Kg/Cm2 HDPE 3000 278.63 0 2.00 0 5.00 --
0.711 20000 46.47 9.294 0 0.50 0.00 75 4Kg/Cm2 HDPE 3000 278.63 0 0.50 0.15 12.00 --
0.711 0 0 0.000 0 0.50 0.00 75 4Kg/Cm2 HDPE 3000 278.63 0 0.50 0.15 2.00 --
4.265 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 2600 278.63 7.24438 1 0.08 23.00 --
1.800 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 3000 278.63 0 0 0 12.00 --
3.199 10000 68.78 6.878 0 0.50 0.00 75 4Kg/Cm2 HDPE 3000 278.63 0 0.50 0.11 12.00 --
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

0.711 0 0.00 0 0.5 0 75 6 3000 278.63 0 0.3 0.15 2.00 --

0.711 0 0 0.000 0 0.50 0.00 75 4Kg/Cm2 HDPE 2500 6.96575 0.50 0.15 9.00 --
278.63

0.711 40000 16.456 0 0.50 0.00 75 4Kg/Cm2 HDPE 3000 0 0.50 0.15 19.00 --
41.14 278.63
0.711 40000 41.14 16.456 0 0.50 0.00 75 4Kg/Cm2 HDPE 3000 278.63 0 0.50 0.15 19.00 --

0.711 40000 16.456 0 0.50 0.00 75 4Kg/Cm2 HDPE 3000 0 0.50 0.15 19.00 --
41.14 278.63
0.711 0 0 0.000 0 0.50 0.00 75 4Kg/Cm2 HDPE 2500 278.63 6.96575 0.50 0.15 9.00 --

0.711 0 0 0.000 0 0.50 0.00 75 4Kg/Cm2 HDPE 3000 0 1.50 0.15 3.00 --
278.63

1.800 0 0 0.000 0 0.10 0.00 75 4Kg/Cm2 HDPE 3000 0 2.00 0 5.00 --


278.63

0.711 0 0 0.000 0 0.50 0.00 75 4Kg/Cm2 HDPE 2500 6.96575 0.50 0.15 9.00 --
278.63

0.711 0 0 0.000 0 0.50 0.00 75 4Kg/Cm2 HDPE 2500 6.96575 0.50 0.15 9.00 --
278.63
0.711 0 0 0.000 0 0.50 0.00 75 4Kg/Cm2 HDPE 2500 278.63 6.96575 0.50 0.15 9.00 --
0.711 0 0 0.000 0 0.50 0.00 75 4Kg/Cm2 HDPE 3000 278.63 0 1.50 0.15 3.00 --

1.800 0 0 0.000 0 0.10 0.00 75 4Kg/Cm2 HDPE 3000 0 2.00 0 5.00 --


278.63
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

0.711 0 0 0.000 0 0.50 0.00 75 4Kg/Cm2 HDPE 2500 6.96575 0.50 0.15 9.00 --
278.63
0.711 10000 68.78 6.878 0 0.50 0.00 75 4Kg/Cm2 HDPE 3000 278.63 0 0.50 0.15 9.00 --

0.711 0 0 0.000 0 0.50 0.00 75 4Kg/Cm2 HDPE 2500 6.96575 0.50 0.15 9.00 --
278.63

0.711 0 0 0.000 0 0.50 0.00 75 4Kg/Cm2 HDPE 2500 6.96575 0.50 0.15 9.00 --
278.63
0.711 0 0 0.000 0 0.50 0.00 75 4Kg/Cm2 HDPE 2500 278.63 6.96575 0.50 0.15 9.00 --

0.711 10000 6.878 0 0.50 0.00 75 4Kg/Cm2 HDPE 3000 0 0.50 0.15 9.00 --
68.78 278.63
1.800 0 0 0.000 0 0.10 0.00 75 4Kg/Cm2 HDPE 3000 278.63 0 2.00 0 5.00 --
0.711 10000 68.78 6.878 0 0.50 0.00 75 4Kg/Cm2 HDPE 3000 278.63 0 0.50 0.15 9.00 --
1.800 0 0 0.000 0 0.10 0.00 75 4Kg/Cm2 HDPE 3000 278.63 0 2.00 0 5.00 --

0.711 20000 9.294 0 0.50 0.00 75 4Kg/Cm2 HDPE 3000 0 0.50 0.15 12.00 --
46.47 278.63

1.706 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 500 1.39315 0.75 0.01 5.00 --
278.63
1.706 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 500 278.63 1.39315 0.75 0.01 5.00 --
0.711 40000 41.14 16.456 0 0.10 0.00 75 4Kg/Cm2 HDPE 0 278.63 0 0.7 0.03 18.00 --
0.711 40000 41.14 16.456 0 0.10 0.00 75 4Kg/Cm2 HDPE 0 278.63 0 0.7 0.03 18.00 --
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

0.711 40000 41.14 16.456 0 0.10 0.00 75 4Kg/Cm2 HDPE 0 278.63 0 0.7 0.03 18.00 --
0.711 40000 41.14 16.456 0 0.10 0.00 75 4Kg/Cm2 HDPE 0 278.63 0 0.7 0.03 18.00 --
0.711 40000 41.14 16.456 0 0.10 0.00 75 4Kg/Cm2 HDPE 0 278.63 0 0.7 0.03 18.00 --

1.599 20000 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 3200 8.91616 1 0.11 22.00 --
46.47 278.63

1.599 20000 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 3200 8.91616 1 0.11 22.00 --
46.47 278.63

1.599 20000 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 3200 8.91616 1 0.11 22.00 --
46.47 278.63

1.599 20000 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 3200 8.91616 1 0.11 22.00 --
46.47 278.63

1.599 20000 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 3200 8.91616 1 0.11 22.00 --
46.47 278.63

1.599 20000 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 3200 8.91616 1 0.11 22.00 --
46.47 278.63

1.599 0 0.00 0 0.1 0 75 6 3200 8.91616 1 0.11 13.00 --


278.63
1.599 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 3200 278.63 8.91616 1 0.11 22.00 --

1.599 0 0.00 0 0.1 0 75 6 3200 8.91616 1 0.11 13.00 --


278.63
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

1.599 0 0.00 0 0.1 0 75 6 3200 8.91616 1 0.11 13.00 --


278.63
0.000 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 0 278.63 0 0 0 2.00 --
0.000 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 0 278.63 0 0 0 2.00 --
- - - - - - - - - - 278.63 - 1 0 1.00 --
3.199 10000 68.78 6.878 5 0.10 0.50 75 4Kg/Cm2 HDPE 2000 278.63 5.5726 0.50 0.09 18.00 --
5.331 0 0 0.000 10 0.10 1.00 75 4Kg/Cm2 HDPE 600 278.63 1.67178 2.5 1.52 13.00 --
5.331 0 0 0.000 10 0.10 1.00 75 4Kg/Cm2 HDPE 600 278.63 1.67178 2.5 1.52 13.00 --
5.331 10000 68.78 6.878 10 0.10 1.00 75 4Kg/Cm2 HDPE 600 278.63 1.67178 2.5 1.52 20.00 --
1.599 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 3200 278.63 8.91616 1 0.11 22.00 --
5.331 0 0 0.000 10 0.10 1.00 75 4Kg/Cm2 HDPE 600 278.63 1.67178 2.5 1.52 13.00 --
5.331 0 0 0.000 10 0.10 1.00 75 4Kg/Cm2 HDPE 600 278.63 1.67178 2.5 1.52 13.00 --
5.331 0 0 0.000 10 0.10 1.00 75 4Kg/Cm2 HDPE 600 278.63 1.67178 2.5 1.52 13.00 --
1.706 0 0 0.00 5 0.1 0.5 75 6 500 278.63 1.39315 0.75 0.01 5.00 --
1.528 0 0 0.00 5 0.1 0.5 75 6 450 278.63 1.253835 0 0.04 4.00 --

1.499 0 0 0.00 5 0.1 0.5 75 6 0 0 0 0 3.00 --


278.63
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

5.331 0 0 0.000 10 0.10 1.00 75 4Kg/Cm2 HDPE 600 278.63 1.67178 2.5 1.52 13.00 --
1.599 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 3200 278.63 8.91616 1 0.11 22.00 --
3.199 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 2000 278.63 5.5726 0.50 0.09 11.00 --
5.331 0 0 0.000 10 0.10 1.00 75 4Kg/Cm2 HDPE 600 278.63 1.67178 2.5 1.52 13.00 --
5.331 10000 68.78 6.878 10 0.10 1.00 75 4Kg/Cm2 HDPE 600 278.63 1.67178 2.5 1.52 20.00 --
3.199 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 2000 278.63 5.5726 0.50 0.09 11.00 --
1.599 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 3200 278.63 8.91616 1 0.11 22.00 --
1.599 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 3200 278.63 8.91616 1 0.11 22.00 --
1.706 0 0 0.00 5 0.1 0.5 75 6 500 278.63 1.39315 0.75 0.01 5.00 --
1.499 40000 41.14 16.456 5 0.10 0.50 75 4Kg/Cm2 HDPE 0 278.63 0 0 0 19.00 --
1.599 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 3200 278.63 8.91616 1 0.11 22.00 --
2.843 0 0.00 0 0.1 0 75 6 3000 278.63 8.3589 0 0.9 12.00 --
1.599 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 3200 278.63 8.91616 1 0.11 22.00 --
1.599 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 3200 278.63 8.91616 1 0.11 22.00 --
2.843 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 4000 278.63 4.08 2 0.17 17.00 --
0.711 40000 41.14 16.456 0 0.10 0.00 75 4Kg/Cm2 HDPE 0 278.63 0 0.7 0.03 18.00 --
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

5.331 10000 68.78 6.878 10 0.10 1.00 75 4Kg/Cm2 HDPE 600 278.63 1.67178 2.5 1.52 20.00 --
1.422 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.19 17.00 --
1.706 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 900 278.63 2.50767 0.75 0.01 5.00 --
1.706 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 500 278.63 1.39315 0.75 0.01 5.00 --
1.422 0 0 0.000 0 0.10 0.00 75 4Kg/Cm2 HDPE 1350 278.63 3.761505 1 0.19 6.00 --
1.499 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 0 278.63 0 0 0 3.00 --
1.499 60000 31.21 18.723 5 0.10 0.50 75 4Kg/Cm2 HDPE 0 278.63 0 0 0 21.00 --
1.955 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 800 278.63 2.22904 0.7 0.04 6.00 --
1.528 0 0 0.00 5 0.1 0.5 75 6 450 278.63 1.253835 0 0.04 4.00 --
1.955 0 0 0.00 5 0.1 0.5 75 6 800 278.63 2.22904 0.7 0.04 6.00 --
1.955 0 0 0.00 5 0.1 0.5 75 6 800 278.63 2.22904 0.7 0.04 6.00 --
1.499 0 0 0.00 5 0.1 0.5 75 6 0 278.63 0 0 0 3.00 --
0.000 0 0 0.00 5 0.1 0.5 75 6 0 278.63 0 0 0 2.00 --
1.955 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 800 278.63 2.22904 0.7 0.04 5.00 --
1.706 0 0 0.00 5 0.1 0.5 75 6 500 278.63 1.39315 0.75 0.01 5.00 --
1.499 0 0 0.00 5 0.1 0.5 75 6 0 278.63 0 0 0 3.00 --
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

0.000 0 0 0.00 5 0.1 0.5 75 6 0 278.63 0 0 0 2.00 --


1.528 0 0 0.00 5 0.1 0.5 75 6 450 278.63 1.253835 0 0.04 4.00 --
1.706 0 0 0.00 5 0.1 0.5 75 6 500 278.63 1.39315 0.75 0.01 5.00 --
5.331 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 4500 278.63 12.53835 0 0.9 29.00 --
1.955 0 0 0.00 5 0.1 0.5 75 6 800 278.63 2.22904 0.7 0.04 6.00 --
5.331 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 4500 278.63 12.53835 0 0.9 29.00 --
4.265 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 3500 278.63 9.75205 2 0.04 26.00 --
0.000 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 2800 278.63 7.80164 0 0 9.00 --
1.706 0 0 0.00 5 0.1 0.5 75 6 500 278.63 1.39315 0.75 0.01 5.00 --
0.000 0 0 0.00 5 0.1 0.5 75 6 0 278.63 0 0 0 2.00 --
1.706 40000 41.14 16.456 5 0.10 0.50 75 4Kg/Cm2 HDPE 500 278.63 1.39315 0.75 0.01 4.00 --
2.843 20000 46.47 9.294 7.5 0.10 0.75 75 4Kg/Cm2 HDPE 3000 278.63 8.3589 2 0.46 25.00 --
1.955 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 800 278.63 2.22904 0.7 0.04 6.00 --
1.706 0 0 0.00 5 0.1 0.5 75 6 500 278.63 1.39315 0.75 0.01 5.00 --
2.843 20000 46.47 9.294 7.5 0.10 0.75 75 4Kg/Cm2 HDPE 3000 278.63 8.3589 2 0.46 25.00 --
2.843 20000 46.47 9.294 7.5 0.10 0.75 75 4Kg/Cm2 HDPE 3000 278.63 8.3589 2 0.46 25.00 --
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

0.000 0 0 0.00 5 0.1 0.5 75 6 0 278.63 0 0 0 2.00 --


1.528 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 750 278.63 2.089725 0 0.04 5.00 --
1.706 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 500 278.63 1.39315 0.75 0.01 5.00 --
1.706 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 500 278.63 1.39315 0.75 0.01 5.00 --
1.528 0 0 0.00 5 0.1 0.5 75 6 450 278.63 1.253835 0 0.04 4.00 --
1.208 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 300 278.63 0.83589 0.45 0.01 4.00 --
1.422 0 0 0.00 5 0.1 0.5 75 6 300 278.63 0.83589 0.5 0.03 4.00 --
1.706 0 0 0.00 5 0.1 0.5 75 6 500 278.63 1.39315 0.75 0.01 5.00 --
1.528 10000 68.78 6.878 5 0.10 0.50 75 4Kg/Cm2 HDPE 450 278.63 1.253835 0 0.04 11.00 --
2.843 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 3000 278.63 4.08 1 0.17 18.00 --
1.499 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 0 278.63 0 0 0 3.00 --
0.000 0 0 0.00 5 0.1 0.5 75 6 0 278.63 0 0 0 2.00 --
1.422 0 0 0.00 5 0.1 0.5 75 6 300 278.63 0.83589 0.5 0.03 4.00 --
1.208 0 0 0.00 5 0.1 0.5 75 6 0 278.63 0 0.49 0.00 3.20 --
1.706 0 0 0.00 5 0.1 0.5 75 6 500 278.63 1.39315 0.75 0.01 5.00 --
1.599 0 0 0.00 7.5 0.1 0.75 75 6 1450 278.63 4.040135 1 0.03 8.00 --
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

1.208 0 0 0.00 5 0.1 0.5 75 6 0 278.63 0 0.49 0.00 3.20 --


1.706 0 0 0.00 5 0.1 0.5 75 6 500 278.63 1.39315 0.75 0.01 5.00 --
0.711 0 0 0.000 0 0.10 0.00 75 4Kg/Cm2 HDPE 550 278.63 1.532465 0.7 0.03 3.00 --
1.208 0 0 0.00 5 0.1 0.5 75 6 0 278.63 0 0.49 0.00 3.20 --
1.499 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 0 278.63 0 0 0 3.00 --
0.711 40000 41.14 16.456 0 0.10 0.00 75 4Kg/Cm2 HDPE 0 278.63 0 0.7 0.03 18.00 --
1.208 0 0 0.00 5 0.1 0.5 75 6 0 278.63 0 0.49 0.00 3.20 --
1.499 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 0 278.63 0 0 0 3.00 --
1.499 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 0 278.63 0 0 0 3.00 --
5.331 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 4500 278.63 12.53835 0 0.9 29.00 --
1.499 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 0 278.63 0 0 0 3.00 --
1.499 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 0 278.63 0 0 0 3.00 --
1.499 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 0 278.63 0 0 0 3.00 --
2.843 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 3000 278.63 4.08 1 0.17 18.00 --
2.843 0 0 0.000 0 0.10 0.00 75 4Kg/Cm2 HDPE 3000 278.63 4.08 1 0.17 9.00 --
1.208 0 0 0.00 5 0.1 0.5 75 6 0 278.63 0 0.49 0.00 3.20 --
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

0.711 0 0.00 0 0.1 0 75 6 0 278.63 0 0.7 0.03 1.00 --


0.711 0 0 0.000 0 0.10 0.00 75 4Kg/Cm2 HDPE 550 278.63 1.532465 0.7 0.03 3.00 --
1.208 0 0 0.00 5 0.1 0.5 75 6 0 278.63 0 0.49 0.00 3.20 --
2.843 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 3000 278.63 4.08 1 0.17 18.00 --
1.422 0 0 0.00 5 0.1 0.5 75 6 300 278.63 0.83589 0.5 0.03 4.00 --
1.499 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 300 278.63 0.83589 0.45 0 4.00 --
1.528 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 450 278.63 1.253835 0 0.04 3.00 --
1.499 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 0 278.63 0 0 0 3.00 --
1.499 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 900 278.63 2.50767 0 0 6.00 --
1.955 0 0 0.00 5 0.1 0.5 75 6 800 278.63 2.22904 0.7 0.04 6.00 --
0.711 10000 68.78 6.878 0 0.10 0.00 75 4Kg/Cm2 HDPE 0 278.63 0 0.7 0.03 8.00 --
1.777 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 200 278.63 0.55726 0.50 0.01 4.00 --
0.711 40000 41.14 16.456 0 0.10 0.00 75 4Kg/Cm2 HDPE 0 278.63 0 0.7 0.03 18.00 --
0.711 40000 41.14 16.456 0 0.10 0.00 75 4Kg/Cm2 HDPE 0 278.63 0 0.7 0.03 18.00 --
5.331 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 4500 278.63 12.53835 0 0.9 29.00 --
5.331 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 4500 278.63 12.53835 0 0.9 29.00 --
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

0.711 40000 41.14 16.456 0 0.10 0.00 75 4Kg/Cm2 HDPE 0 278.63 0 0.7 0.03 18.00 --
4.265 40000 41.14 16.456 0 0.10 0.00 75 4Kg/Cm2 HDPE 3500 278.63 9.75205 2 0.04 34.00 --
5.331 0 0.00 0 0.1 0 75 6 4500 278.63 12.53835 0 0.9 20.00 --
4.265 40000 41.14 16.456 0 0.10 0.00 75 4Kg/Cm2 HDPE 3500 278.63 9.75205 2 0.04 34.00 --
0.711 40000 41.14 16.456 0 0.10 0.00 75 4Kg/Cm2 HDPE 0 278.63 0 0.7 0.03 18.00 --
5.331 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 4500 278.63 12.53835 0 0.9 29.00 --
0.711 40000 41.14 16.456 0 0.10 0.00 75 4Kg/Cm2 HDPE 0 278.63 0 0.7 0.03 18.00 --

1.599 20000 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 3200 8.91616 1 0.11 22.00 --
46.47 278.63

1.599 10000 6.878 0 0.10 0.00 75 4Kg/Cm2 HDPE 3200 8.91616 1 0.11 19.00 --
68.78 278.63
0.000 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 2800 278.63 7.80164 0 0 9.00 --
1.706 0 0 0.00 5 0.1 0.5 75 6 500 278.63 1.39315 0.75 0.01 5.00 --
1.706 0 0 0.00 5 0.1 0.5 75 6 500 278.63 1.39315 0.75 0.01 4.00 --
0.000 0 0 0.00 5 0.1 0.5 75 6 0 278.63 0 0 0 2.00 --
1.599 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 3200 278.63 8.91616 1 0.11 22.00 --
1.706 0 0 0.00 5 0.1 0.5 75 6 500 278.63 1.39315 0.75 0.01 4.00 --
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

4.265 0 0.00 0 0.1 0 75 6 3000 278.63 8.3589 2 0.04 16.00 --


1.599 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 3200 278.63 8.91616 1 0.11 22.00 --

1.599 20000 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 3200 8.91616 1 0.11 22.00 --
46.47 278.63
1.706 0 0 0.00 5 0.1 0.5 75 6 500 278.63 1.39315 0.75 0.01 5.00 --

1.599 20000 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 3200 8.91616 1 0.11 22.00 --
46.47 278.63
1.706 0 0 0.00 5 0.1 0.5 75 6 500 278.63 1.39315 0.75 0.01 5.00 --
1.599 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 3200 278.63 8.91616 1 0.11 22.00 --
0.000 10000 68.78 6.878 5 0.10 0.50 75 4Kg/Cm2 HDPE 0 278.63 0 0 0 8.00 --

1.706 0 0 0.00 5 0.1 0.5 75 6 500 1.39315 0.75 0.01 5.00 --


278.63
1.599 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 3200 278.63 8.91616 1 0.11 22.00 --
1.599 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 3200 278.63 8.91616 1 0.11 22.00 --
3.199 0 0 0.00 5 0.1 0.5 75 6 2000 278.63 5.5726 0.4 0.09 11.00 --
0.711 0 0.00 0 0.1 0 75 6 0 278.63 0 0.7 0.03 1.00 --
1.706 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 500 278.63 1.39315 0.75 0.01 5.00 --
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

5.331 0 0 0.000 10 0.10 1.00 75 4Kg/Cm2 HDPE 600 278.63 1.67178 2.5 1.52 13.00 --
3.199 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 2000 278.63 5.5726 0.50 0.09 11.00 --
0.711 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 0 278.63 0 0.7 0.03 11.00 --

0.711 10000 6.878 0 0.10 0.00 75 4Kg/Cm2 HDPE 0 0 0.7 0.03 8.00 --
68.78 278.63

0.711 0 0 0.000 0 0.10 0.00 75 4Kg/Cm2 HDPE 0 0 0.7 0.03 1.00 --


278.63
0.711 0 0.00 0 0.1 0 75 6 0 278.63 0 0.7 0.03 1.00 --
0.711 0 0.00 0 0.1 0 75 6 0 278.63 0 0.7 0.03 1.00 --
0.711 10000 68.78 6.878 0 0.10 0.00 75 4Kg/Cm2 HDPE 0 278.63 0 0.7 0.03 8.00 --
0.711 0 0.00 0 0.1 0 75 6 0 278.63 0 0.7 0.03 1.00 --
0.711 10000 68.78 6.878 0 0.10 0.00 75 4Kg/Cm2 HDPE 0 278.63 0 0.7 0.03 8.00 --
1.599 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 3200 278.63 8.91616 1 0.11 22.00 --
1.706 0 0 0.00 5 0.1 0.5 75 6 500 278.63 1.39315 0.75 0.01 5.00 --
1.208 0 0 0.00 5 0.1 0.5 75 6 0 278.63 0 0.49 0.00 3.20 --
0.000 0 0 0.00 5 0.1 0.5 75 6 0 278.63 0 0 0 2.00 --
1.208 0 0 0.000 5 0.10 0.50 75 4Kg/Cm2 HDPE 0 278.63 0 0.50 0.01 3.20 --
OHSR/ GLSR on Hillock Pumpsets G/M for single point distribution with battery taps

Total proposal
cost
LS. Amt.
Capacity Power (Lakhs) (Col.
Amount Amount not more Represented by
Amount( R as per Amount( R Capacity supply 31+37+40+45
Rate Rate /HP ( Rs in Dia Type & Class Length Rate (Rs in than 10%)
s in (Lakhs) column s in (Lakhs) (H.P) +48+51+56+5
(Lakhs) (Lakhs) 7+58)
(22)

1.599 20000 46.47 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 3200 278.63 8.91616 1 0.11 22.00 --

1.599 20000 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 3200 8.91616 1 0.11 22.00 --
46.47 278.63

1.599 20000 9.294 0 0.10 0.00 75 4Kg/Cm2 HDPE 3200 8.91616 1 0.11 22.00 --
46.47 278.63
0.000 0 0 0.00 5 0.1 0.5 75 6 0 278.63 0 0 0 2.00 --
1.706 0 0 0.00 5 0.1 0.5 75 6 500 278.63 1.39315 0.75 0.01 5.00 --
1.706 0 0 0.00 5 0.1 0.5 75 6 500 278.63 1.39315 0.75 0.01 5.00 --
Source
creation,
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
testing &
obtaining
61 62 63 64
necessary 65 66 67 68
permission
Engineer in chief ENC RWSS 0.0088 0.20 8.89 Category-9 Existing BW SubSurface (Bore well) 2.52 51.02 ST
s, survey
Engineer in chief ENC RWSS 0.0051 and
0.20 8.67 Category-9 Existing OW SubSurface (Openwell) 8.51 35.96 Plain
preparation
Engineer in chief ENC RWSS 0.0040 0.20
of D 4.67 Category-9 Existing BW SubSurface (Bore well) 18.90 4.85 Plain

Engineer in chief ENC RWSS 0.0145 0.20 4.67 Category-9 Existing BW SubSurface (Bore well) 0.00 94.94 ST

Engineer in chief ENC RWSS 0.0987 0.20 14.40 Category-9 Existing BW SubSurface (Bore well) 0.00 86.49 ST

Engineer in chief ENC RWSS 0.0120 0.20 9.50 Category-9 New (Addnl.) SubSurface (Bore well) 8.65 10.75 Plain

Engineer in chief 0.0592 0.70 21.81 Category-1 Existing BW SubSurface (Bore well) 26.32 25.79 Plain

Engineer in chief 0.0332 0.70 18.98 Category-1 Existing BW SubSurface (Bore well) 13.68 1.69 Plain

Engineer in chief ENC RWSS 0.0459 0.20 11.27 Category-9 Existing BW SubSurface (Bore well) 32.00 36.00 Plain

Engineer in chief ENC RWSS 0.0086 0.20 23.51 Category-9 New (Addnl.) SubSurface (Bore well) 11.81 0.00 Plain
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
testing &
obtaining
Engineer in chief ENC RWSS 0.0100 0.20
necessary 23.51 Category-9 Existing BW SubSurface (Bore well) 13.88 0.21 Plain
permission
Engineer in chief 0.0581 0.20 8.81 Category-1 Existing BW SubSurface (Bore well) 0.00 100.00 ST
s, survey
0.1286 and
0.70 21.81 Category-3 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
preparation
Engineer in chief ENC RWSS 0.0411 0.20
of D 14.19 Category-9 Existing BW SubSurface (Bore well) 0.00 71.43 ST
Engineer in chief ENC RWSS 0.0320 0.70 7.30 Category-9 Existing BW SubSurface (Bore well) 32.00 36.00 Plain
Engineer in chief ENC RWSS 0.0095 0.20 11.68 Category-9 Existing BW SubSurface (Bore well) 30.36 0.00 Plain
Engineer in chief ENC RWSS 0.0343 0.20 12.68 Category-9 New (Addnl.) SubSurface (Bore well) 0.00 98.40 ST
0.0695 0.70 14.18 Category-3 Existing BW SubSurface (Bore well) 0.00 79.91 ST
Engineer in chief ENC RWSS 0.0096 0.70 20.86 Category-9 Existing BW SubSurface (Bore well) 15.20 0.00 Plain
Engineer in chief ENC RWSS 0.0136 0.20 4.70 Category-9 Existing BW SubSurface (Bore well) 0.00 97.22 ST
Engineer in chief ENC RWSS 0.0106 0.20 21.16 Category-9 Existing BW SubSurface (Bore well) 30.53 5.19 Plain
Engineer in chief ENC RWSS 0.0283 0.20 4.70 Category-9 Existing BW SubSurface (Bore well) 0.00 100.00 ST
Engineer in chief ENC RWSS 0.0033 0.20 4.70 Category-9 Existing BW SubSurface (Bore well) 9.03 10.96 Plain
Engineer in chief ENC RWSS 0.0331 0.60 47.62 Category-9 Existing BW SubSurface (Bore well) 13.60 12.43 Plain

Engineer in chief ENC RWSS 0.0209 0.60 14.60 Category-9 Existing BW SubSurface (Bore well) 0.00 22.25 Plain

Engineer in chief ENC RWSS 0.0380 0.60 3.20 Category-9 Existing BW SubSurface (Bore well) 0.00 100.00 ST
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
testing &
obtaining
Engineer in chief ENC RWSS 0.0238 0.60
necessary 33.96 Category-9 Existing BW SubSurface (Bore well) 0.00 40.69 ST
permission
Engineer in chief ENC RWSS 0.0403 0.60 16.30 Category-9 Existing BW SubSurface (Bore well) 1.67 8.11 Plain
s, survey
Engineer in chief ENC RWSS 0.0100 and
0.60 4.60 Category-9 Existing BW SubSurface (Bore well) 5.56 4.41 Plain
preparation
Engineer in chief ENC RWSS 0.0246 0.60
of D 4.80 Category-9 Existing BW SubSurface (Bore well) 0.00 100.00 ST
Engineer in chief ENC RWSS 0.0136 0.60 14.19 Category-9 Existing BW SubSurface (Bore well) 0.00 71.31 ST
Engineer in chief ENC RWSS 0.0083 0.60 33.72 Category-9 Existing BW SubSurface (Bore well) 10.85 11.95 Plain
Engineer in chief ENC RWSS 0.0267 0.60 13.28 Category-9 Existing BW SubSurface (Bore well) 1.35 42.00 ST
Engineer in chief ENC RWSS 0.0283 0.60 7.80 Category-9 Existing BW SubSurface (Bore well) 38.72 10.77 Plain
Engineer in chief ENC RWSS 0.0160 0.60 5.80 Category-9 Existing BW SubSurface (Bore well) 0.50 71.82 ST
Engineer in chief ENC RWSS 0.0255 0.60 17.30 Category-9 Existing BW SubSurface (Bore well) 0.00 34.28 Plain
Engineer in chief ENC RWSS 0.0138 0.60 22.56 Category-9 Existing BW SubSurface (Bore well) 13.12 9.54 Plain
Engineer in chief 0.1255 0.60 5.80 Category-1 Existing BW SubSurface (Bore well) 0.00 76.47 ST
Engineer in chief ENC RWSS 0.0074 0.70 15.64 Category-9 Existing BW SubSurface (Bore well) 15.61 6.87 Plain
Engineer in chief ENC RWSS 0.0058 0.70 7.21 Category-9 Existing BW SubSurface (Bore well) 3.39 2.43 Plain

Engineer in chief 0.0029 0.70 11.95 Category-1 Existing BW SubSurface (Bore well) 31.00 5.98 Plain

Engineer in chief ENC RWSS 0.0072 0.70 3.22 Category-9 Existing BW SubSurface (Bore well) 10.62 20.15 Plain
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
testing &
obtaining
Engineer in chief ENC RWSS 0.0046 0.70
necessary 2.40 Category-9 Existing BW SubSurface (Bore well) 10.93 0.00 Plain
permission
Engineer in chief ENC RWSS 0.0032 0.70 2.40 Category-9 Existing BW SubSurface (Bore well) 30.90 0.00 Plain
s, survey
and
Engineer in chief ENC RWSS 0.0028 0.70
preparation 4.07 Category-9 Existing BW SubSurface (Bore well) 12.07 11.18 Plain
of D
Engineer in chief 0.0075 0.70 5.15 Category-1 Existing BW SubSurface (Bore well) 13.00 7.98 Plain
Engineer in chief ENC RWSS 0.0044 0.70 3.22 Category-9 Existing BW SubSurface (Bore well) 29.83 3.35 Plain
Engineer in chief ENC RWSS 0.0078 0.70 4.07 Category-9 Existing BW SubSurface (Bore well) 0.98 8.50 Plain
Engineer in chief ENC RWSS 0.0022 0.70 4.07 Category-9 Existing BW SubSurface (Bore well) 25.67 0.00 Plain
Engineer in chief ENC RWSS 0.0036 0.70 4.07 Category-9 Existing BW SubSurface (Bore well) 15.32 4.80 Plain
Engineer in chief ENC RWSS 0.0039 0.70 4.07 Category-9 Existing BW SubSurface (Bore well) 17.78 5.74 Plain
Engineer in chief ENC RWSS 0.0077 0.70 4.07 Category-9 Existing BW SubSurface (Bore well) 12.38 5.79 Plain
Engineer in chief ENC RWSS 0.0053 0.70 4.07 Category-9 Existing BW SubSurface (Bore well) 0.44 85.56 ST
Engineer in chief ENC RWSS 0.0058 0.70 4.07 Category-9 Existing BW SubSurface (Bore well) 4.29 15.44 Plain

Engineer in chief ENC RWSS 0.0029 0.70 4.07 Category-9 Existing BW SubSurface (Bore well) 8.51 0.99 Plain

Engineer in chief 0.0084 0.70 4.07 Category-1 Existing BW SubSurface (Bore well) 7.03 11.07 Plain
Engineer in chief ENC RWSS 0.0127 0.70 4.07 Category-9 Existing BW SubSurface (Bore well) 8.80 23.20 Plain
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
testing &
obtaining
Engineer in chief ENC RWSS 0.0036 0.70
necessary 4.05 Category-9 Existing BW SubSurface (Bore well) 30.52 0.00 Plain
permission
Engineer in chief ENC RWSS 0.0093 0.70 4.07 Category-9 Existing BW SubSurface (Bore well) 14.65 12.89 Plain
s, survey
Engineer in chief ENC RWSS 0.0081 and
0.70 2.40 Category-9 Existing BW SubSurface (Bore well) 2.60 2.08 Plain
preparation
Engineer in chief ENC RWSS 0.0616 0.70
of D 14.45 Category-9 Existing BW SubSurface (Bore well) 0.00 1.22 Plain
0.0406 0.20 9.38 Category-3 New (Addnl.) SubSurface (Bore well) 0.00 87.71 ST
0.0961 0.20 9.12 Category-1 Existing BW SubSurface (Bore well) 1.03 98.97 ST
0.0105 0.20 9.12 Category-3 Existing BW SubSurface (Bore well) 29.09 44.42 ST
0.0301 0.20 9.38 Category-3 New (Addnl.) SubSurface (Bore well) 2.83 97.17 ST
0.1277 0.20 9.38 Category-1 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
0.0686 0.20 9.12 Category-3 Existing BW SubSurface (Bore well) 0.00 100.00 ST
0.0192 0.20 9.38 Category-1 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
0.1313 0.20 9.12 Category-1 Existing BW SubSurface (Bore well) 19.72 76.06 ST
0.1212 0.20 9.38 Category-1 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
0.0305 0.20 9.38 Category-3 New (Addnl.) SubSurface (Bore well) 0.32 98.41 ST
0.1545 0.20 9.38 Category-1 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
0.2082 0.20 9.38 Category-1 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
testing &
obtaining
0.0297 0.20
necessary 9.38 Category-3 New (Addnl.) SubSurface (Bore well) 0.00 84.52 ST
permission
0.1195 0.20 9.12 Category-1 Existing BW SubSurface (Bore well) 0.00 100.00 ST
s, survey
0.0235 and
0.20 9.38 Category-1 New (Addnl.) SubSurface (Bore well) 18.18 12.29 Plain
preparation
0.0188 0.20
of D 9.12 Category-1 Existing BW SubSurface (Bore well) 0.00 81.89 ST
Engineer in chief ENC RWSS 0.0084 0.20 9.38 Category-9 New (Addnl.) SubSurface (Bore well) 15.66 34.82 Plain
0.0309 0.20 9.38 Category-3 New (Addnl.) SubSurface (Bore well) 11.61 48.06 ST
0.0141 0.20 9.38 Category-1 New (Addnl.) SubSurface (Bore well) 1.18 46.97 ST
0.0481 0.20 9.38 Category-3 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
0.0887 0.20 9.38 Category-1 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
0.2902 0.20 9.38 Category-1 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
0.2234 0.20 12.98 Category-1 0.00 100.00 ST
0.0290 0.20 9.38 Category-3 New (Addnl.) SubSurface (Bore well) 0.00 43.94 ST
0.0194 0.20 9.38 Category-3 New (Addnl.) SubSurface (Bore well) 4.86 95.14 ST
0.1916 0.20 9.38 Category-3 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
0.0304 0.20 9.38 Category-3 New (Addnl.) SubSurface (Bore well) 20.63 79.37 ST
0.0205 0.20 9.38 Category-1 New (Addnl.) SubSurface (Bore well) 15.42 0.00 Plain
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
testing &
obtaining
0.0812 0.20
necessary 9.38 Category-1 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
permission
0.0290 0.20 9.12 Category-3 Existing BW SubSurface (Bore well) 0.00 74.77 ST
s, survey
0.1097 and
0.20 9.12 Category-1 Existing BW SubSurface (Bore well) 0.00 100.00 ST
preparation
0.0285 0.20
of D 9.38 Category-1 New (Addnl.) SubSurface (Bore well) 23.51 20.54 Plain
0.0186 0.20 9.38 Category-3 New (Addnl.) SubSurface (Bore well) 8.74 91.26 ST
0.0364 0.20 9.38 Category-3 New (Addnl.) SubSurface (Bore well) 1.90 96.58 ST
0.1147 0.20 11.96 Category-1 New (Addnl.) SubSurface (Bore well) 0.00 91.51 ST
0.2060 0.20 11.96 Category-1 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
0.1041 0.20 9.38 Category-1 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
0.0665 0.20 9.38 Category-1 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
0.0371 0.20 9.38 Category-3 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
0.0921 0.20 9.38 Category-1 New (Addnl.) SubSurface (Bore well) 0.00 83.65 ST
0.0402 0.20 9.38 Category-3 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
0.0716 0.20 22.07 Category-1 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
0.1995 0.20 9.38 Category-1 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
0.1036 0.20 9.12 Category-1 Existing BW SubSurface (Bore well) 0.00 100.00 ST
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
testing &
obtaining
0.0939 0.20
necessary 9.38 Category-1 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
permission
0.0958 0.20 9.38 Category-1 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
s, survey
0.0127 and
0.20 9.12 Category-3 Existing BW SubSurface (Bore well) 12.23 87.77 ST
preparation
0.1260 0.20
of D 9.12 Category-1 Existing BW SubSurface (Bore well) 0.00 100.00 ST
0.2456 0.20 9.38 Category-3 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
0.1665 0.20 9.12 Category-1 Existing BW SubSurface (Bore well) 0.00 100.00 ST
0.1842 0.20 9.38 Category-1 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
0.0971 0.20 9.12 Category-1 Existing BW SubSurface (Bore well) 0.00 100.00 ST
0.1036 0.20 9.12 Category-1 Existing BW SubSurface (Bore well) 0.00 100.00 ST
0.0168 0.20 9.38 Category-1 New (Addnl.) SubSurface (Bore well) 1.75 94.92 ST
0.0181 0.20 9.38 Category-3 New (Addnl.) SubSurface (Bore well) 0.00 77.50 ST
0.0779 0.20 9.38 Category-1 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
0.1392 0.20 9.12 Category-1 Existing BW SubSurface (Bore well) 0.00 100.00 ST
0.1570 0.20 9.38 Category-1 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
0.1212 0.20 9.38 Category-1 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
0.0223 0.20 9.12 Category-3 Existing BW SubSurface (Bore well) 0.00 93.79 ST
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
testing &
obtaining
0.1330 0.20
necessary 9.38 Category-1 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
permission
0.1312 0.20 9.38 Category-1 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
s, survey
0.1036 and
0.20 9.12 Category-3 Existing BW SubSurface (Bore well) 0.00 100.00 ST
preparation
0.0591 0.20
of D 9.38 Category-3 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
0.1371 0.20 9.12 Category-3 Existing BW SubSurface (Bore well) 0.00 100.00 ST
0.0709 0.20 9.38 Category-1 New (Addnl.) SubSurface (Bore well) 0.00 14.81 Plain
0.0366 0.20 9.12 Category-3 Existing BW SubSurface (Bore well) 0.00 88.63 ST
0.2589 0.20 9.38 Category-3 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
0.0783 0.20 9.12 Category-1 Existing BW SubSurface (Bore well) 0.00 100.00 ST
0.0671 0.20 9.12 Category-1 Existing BW SubSurface (Bore well) 0.00 100.00 ST
0.0760 0.20 9.38 Category-1 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
0.0117 0.20 20.98 Category-1 0.00 0.06 Plain
0.0066 0.20 10.41 Category-1 6.25 9.38 Plain
0.0116 0.20 23.01 Category-1 16.13 0.00 Plain
0.0097 0.20 13.02 Category-1 18.42 3.02 Plain
0.0351 0.20 9.38 Category-3 New (Addnl.) SubSurface (Bore well) 0.00 81.68 ST
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
testing &
obtaining
0.0388 0.20
necessary 9.38 Category-3 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
permission
0.1019 0.20 9.38 Category-1 New (Addnl.) SubSurface (Bore well) 11.70 88.30 ST
s, survey
Engineer in chief ENC RWSS 0.0179 and
0.20 9.12 Category-9 Existing BW SubSurface (Bore well) 38.27 11.35 Plain
preparation
0.0120 0.20
of D 13.95 Category-1 73.01 2.88 Plain
0.0123 0.20 11.53 Category-1 15.67 2.61 Plain
0.0830 0.20 11.76 Category-1 100.00 0.00 Plain
0.1538 0.20 12.10 Category-1 0.00 31.25 Plain
0.0080 0.20 7.41 Category-1 3.68 4.74 Plain
0.0041 0.20 13.17 Category-1 11.67 1.33 Plain
0.0075 0.20 21.68 Category-1 18.42 0.00 Plain
0.1277 0.20 9.38 Category-1 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
0.1774 0.20 9.38 Category-1 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
Engineer in chief ENC RWSS 0.0224 0.20 9.12 Category-9 Existing BW SubSurface (Bore well) 30.77 38.46 Plain
0.1504 0.20 9.12 Category-3 Existing BW SubSurface (Bore well) 0.00 100.00 ST
Engineer in chief ENC RWSS 0.0128 0.20 9.38 Category-9 New (Addnl.) SubSurface (Bore well) 1.47 22.12 Plain
0.0614 0.20 9.38 Category-3 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
testing &
obtaining
0.1097 0.20
necessary 9.12 Category-3 Existing BW SubSurface (Bore well) 0.00 100.00 ST
permission
Engineer in chief ENC RWSS 0.0352 0.20 9.12 Category-9 Existing BW SubSurface (Bore well) 25.28 0.00 Plain
s, survey
Engineer in chief ENC RWSS 0.0084 and
0.20 9.12 Category-9 Existing BW SubSurface (Bore well) 34.92 3.78 Plain
preparation
0.0268 0.20
of D 9.12 Category-3 Existing BW SubSurface (Bore well) 26.15 73.85 ST
Engineer in chief ENC RWSS 0.0111 0.20 9.12 Category-9 Existing BW SubSurface (Bore well) 14.15 9.16 Plain
0.0958 0.20 9.38 Category-1 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
0.0880 0.20 9.12 Category-1 Existing BW SubSurface (Bore well) 0.00 100.00 ST
0.0880 0.20 9.12 Category-3 Existing BW SubSurface (Bore well) 0.00 100.00 ST
0.0518 0.20 9.12 Category-1 Existing BW SubSurface (Bore well) 0.00 100.00 ST
0.0388 0.20 9.12 Category-3 Existing BW SubSurface (Bore well) 16.67 41.67 ST
0.0532 0.20 9.38 Category-1 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
0.0304 0.20 9.38 Category-3 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
Engineer in chief ENC RWSS 0.0100 0.20 9.12 Category-9 Existing BW SubSurface (Bore well) 22.38 17.88 Plain
0.1623 0.20 9.38 Category-3 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
0.1528 0.20 9.12 Category-3 Existing BW SubSurface (Bore well) 0.00 100.00 ST
0.0630 0.20 9.38 Category-3 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
testing &
obtaining
0.0880 0.20
necessary 9.12 Category-3 Existing BW SubSurface (Bore well) 0.00 100.00 ST
permission
0.1865 0.20 9.12 Category-3 Existing BW SubSurface (Bore well) 0.00 100.00 ST
s, survey
0.0826 and
0.20 9.38 Category-1 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
preparation
0.0007 0.20
of D 9.12 Category-1 Existing BW SubSurface (Bore well) 11.49 22.33 Plain
0.0804 0.20 9.12 Category-1 Existing BW SubSurface (Bore well) 0.00 100.00 ST
0.0832 0.20 9.12 Category-3 Existing BW SubSurface (Bore well) 0.00 100.00 ST
0.0127 0.20 9.12 Category-3 Existing BW SubSurface (Bore well) 18.39 41.83 ST
0.0661 0.20 9.38 Category-1 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
0.0706 0.20 9.12 Category-3 Existing BW SubSurface (Bore well) 0.00 100.00 ST
Engineer in chief ENC RWSS 0.0165 0.20 9.12 Category-9 Existing BW SubSurface (Bore well) 24.78 2.48 Plain
Engineer in chief ENC RWSS 0.0626 0.20 9.38 Category-9 New (Addnl.) SubSurface (Bore well) 0.00 0.00 Plain
0.1197 0.20 9.38 Category-3 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
0.0977 0.20 9.38 Category-1 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
Engineer in chief ENC RWSS 0.0190 0.20 9.38 Category-9 New (Addnl.) SubSurface (Bore well) 27.44 0.00 Plain
0.1865 0.20 9.12 Category-1 Existing BW SubSurface (Bore well) 0.00 100.00 ST
0.1349 0.20 9.38 Category-3 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
testing &
obtaining
0.0987 0.20
necessary 9.38 Category-1 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
permission
0.0927 0.20 10.73 Category-1 0.00 100.00 ST
s, survey
0.2928 and
0.20 11.51 Category-1 0.00 100.00 ST
preparation
0.0057 0.20
of D 5.10 Category-1 22.38 17.88 Plain
0.1906 0.20 11.23 Category-1 0.00 100.00 ST
0.1906 0.20 11.23 Category-1 0.00 100.00 ST
0.0275 0.80 2.50 Category-1 0.00 100.00 ST
ENC, RWS&S Hyderabad -- 0.0089 1.20 4.19 Category 1 New (Addnl.) SubSurface (Bore well) 10.07 0.00 Plain
ENC, RWS&S Hyderabad -- 0.0269 1.20 4.19 Category 1 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
ENC, RWS&S Hyderabad -- 0.0442 1.20 4.19 Category 1 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
ENC, RWS&S Hyderabad -- 0.0428 1.20 4.19 Category 1 New (Addnl.) SubSurface (Bore well) 20.63 27.78 Plain
ENC, RWS&S Hyderabad -- 0.0369 1.20 4.19 Category 1 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
ENC, RWS&S Hyderabad -- 0.0528 1.20 4.19 Category 1 New (Addnl.) SubSurface (Bore well) 30.39 65.69 ST
ENC, RWS&S Hyderabad -- 0.0106 1.20 22.04 Category 1 New (Addnl.) SubSurface (Bore well) 31.01 2.41 Plain
ENC, RWS&S Hyderabad -- 0.0586 1.20 4.19 Category 1 New (Addnl.) SubSurface (Bore well) 34.78 28.26 Plain
ENC, RWS&S Hyderabad -- 0.0913 1.20 4.19 Category 1 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
testing &
obtaining
-- -- 0.3739 1.20
necessary 15.62 Category 3 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
permission
-- -- 0.3235 1.20 15.62 Category 3 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
s, survey
-- -- 0.5801 and
1.20 15.62 Category 3 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
preparation
-- -- 0.2474 1.20
of D 15.62 Category 3 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
-- -- 0.2629 1.20 15.62 Category 3 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
-- -- 0.2549 1.20 15.62 Category 3 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
-- -- 0.2646 1.20 15.73 Category 3 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
-- -- 0.4342 1.20 15.73 Category 3 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
-- -- 0.3505 1.20 15.62 Category 3 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
-- -- 0.7055 1.20 15.73 Category 3 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
-- -- 0.0773 1.20 15.73 Category 3 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
-- -- 0.1038 1.20 15.62 Category 3 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
-- -- 0.1602 1.20 15.62 Category 3 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
-- -- 0.2352 1.20 15.73 Category 3 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
-- -- 0.1026 1.20 15.62 Category 3 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
-- -- 0.1512 1.20 15.73 Category 3 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
testing &
obtaining
0.0171 0.80
necessary 22.65 Category 9 New (Addnl.) SubSurface (Bore well) 17.87 7.29 Plain
permission
0.0421 0.80 22.35 Category 9 New (Addnl.) SubSurface (Bore well) 12.73 22.55 Plain
s, survey
0.0020 and
0.20 9.22 Category-1 New (Addnl.) SubSurface (Bore well) 23.45 7.14 Plain
preparation
0.0055 0.20
of D 7.93 Category-3 New (Addnl.) SubSurface (Bore well) 46.77 16.11 SC
0.0037 0.20 8.76 Category-1 New (Addnl.) SubSurface (Bore well) 13.50 12.47 Plain
0.0056 0.20 7.83 Category-3 New (Addnl.) SubSurface (Bore well) 36.83 24.09 Plain
0.0041 0.20 7.12 Category-1 New (Addnl.) SubSurface (Bore well) 24.25 7.55 Plain
0.0015 0.20 8.76 Category-3 New (Addnl.) SubSurface (Bore well) 15.82 2.88 Plain
Engineer in chief ENC RWSS 0.0360 0.70 13.71 Category-9 Existing BW SubSurface (Bore well) 1.00 71.00 ST
Engineer in chief 0.0294 0.70 21.81 Category-1 Existing BW SubSurface (Bore well) 9.01 24.93 Plain
Engineer in chief ENC RWSS 0.0161 0.70 21.81 Category-9 Existing BW SubSurface (Bore well) 32.26 0.86 Plain
Engineer in chief ENC RWSS 0.0114 0.70 13.71 Category-9 Existing BW SubSurface (Bore well) 32.51 5.63 Plain
Engineer in chief ENC RWSS 0.0062 0.70 13.71 Category-9 Existing BW SubSurface (Bore well) 33.98 2.08 Plain
Engineer in chief ENC RWSS 0.0044 0.70 13.28 Category-9 Existing BW SubSurface (Bore well) 12.92 0.41 Plain
Engineer in chief ENC RWSS 0.0059 0.70 13.71 Category-9 Existing BW SubSurface (Bore well) 24.84 0.61 Plain
Engineer in chief ENC RWSS 0.1287 0.70 13.71 Category-9 Existing BW SubSurface (Bore well) 11.61 35.71 Plain
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
testing &
obtaining
Engineer in chief ENC RWSS 0.1211 0.70
necessary 13.71 Category-9 Existing BW SubSurface (Bore well) 0.00 100.00 ST
permission
Engineer in chief ENC RWSS 0.0415 0.70 13.71 Category-9 Existing BW SubSurface (Bore well) 0.00 100.00 ST
s, survey
Engineer in chief 0.2442 and
0.70 13.71 Category-1 Existing BW SubSurface (Bore well) 0.00 100.00 ST
preparation
Engineer in chief ENC RWSS 0.1100 0.70
of D 13.71 Category-9 Existing BW SubSurface (Bore well) 0.00 100.00 ST
Engineer in chief ENC RWSS 0.1455 0.70 13.71 Category-9 Existing BW SubSurface (Bore well) 0.00 100.00 ST
Engineer in chief ENC RWSS 0.0591 0.70 13.71 Category-9 Existing BW SubSurface (Bore well) 0.00 91.80 ST
Engineer in chief ENC RWSS 0.4366 0.70 13.71 Category-9 Existing BW SubSurface (Bore well) 0.00 100.00 ST
Engineer in chief ENC RWSS 0.0218 0.70 13.71 Category-9 Existing BW SubSurface (Bore well) 1.06 51.36 ST
Engineer in chief ENC RWSS 0.4503 0.70 13.71 Category-9 Existing BW SubSurface (Bore well) 0.00 100.00 ST
Engineer in chief ENC RWSS 0.1162 0.70 13.71 Category-9 Existing BW SubSurface (Bore well) 0.00 98.39 ST
Engineer in chief ENC RWSS 0.0372 0.70 13.71 Category-9 Existing BW SubSurface (Bore well) 1.55 90.44 ST
Engineer in chief ENC RWSS 0.0204 0.70 13.71 Category-9 Existing BW SubSurface (Bore well) 35.27 0.00 Plain
Engineer in chief ENC RWSS 0.0049 0.70 13.71 Category-9 Existing BW SubSurface (Bore well) 16.10 9.74 Plain
Engineer in chief ENC RWSS 0.0369 0.70 13.71 Category-9 Existing BW SubSurface (Bore well) 6.92 27.69 Plain
Engineer in chief ENC RWSS 0.0853 0.70 13.71 Category-9 Existing BW SubSurface (Bore well) 0.00 100.00 ST
Engineer in chief ENC RWSS 0.2362 0.70 13.71 Category-9 Existing BW SubSurface (Bore well) 0.00 100.00 ST
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
testing &
obtaining
Engineer in chief 0.1695 0.70
necessary 13.71 Category-1 Existing BW SubSurface (Bore well) 0.00 100.00 ST
permission
Engineer in chief ENC RWSS 0.0487 0.70 13.71 Category-9 Existing BW SubSurface (Bore well) 0.00 100.00 ST
s, survey
Engineer in chief ENC RWSS 0.0148 and
0.70 13.71 Category-9 Existing BW SubSurface (Bore well) 15.91 8.11 Plain
preparation
Engineer in chief ENC RWSS 0.0693 0.70
of D 13.71 Category-9 Existing BW SubSurface (Bore well) 0.00 100.00 ST
Engineer in chief ENC RWSS 0.0367 0.70 13.71 Category-9 Existing BW SubSurface (Bore well) 4.07 75.32 ST
Engineer in chief ENC RWSS 0.0536 0.70 13.71 Category-9 Existing BW SubSurface (Bore well) 0.00 100.00 ST
Engineer in chief ENC RWSS 0.0225 0.70 13.43 Category-9 Existing BW SubSurface (Bore well) 4.77 95.23 ST
Engineer in chief ENC RWSS 0.0081 0.70 21.81 Category-9 Existing BW SubSurface (Bore well) 19.04 13.15 Plain
Engineer in chief ENC RWSS 0.0060 0.70 13.71 Category-9 Existing BW SubSurface (Bore well) 27.16 0.88 Plain
Engineer in chief ENC RWSS 0.0142 0.70 2.97 Category-9 Existing BW SubSurface (Bore well) 9.69 67.05 ST
Engineer in chief ENC RWSS 0.0451 0.70 13.41 Category-9 Existing BW SubSurface (Bore well) 0.00 92.97 ST
Engineer in chief ENC RWSS 0.0062 0.70 13.71 Category-9 Existing BW SubSurface (Bore well) 8.57 0.00 Plain
Engineer in chief ENC RWSS 0.0416 0.70 13.41 Category-9 Existing BW SubSurface (Bore well) 0.00 98.53 ST
Engineer in chief ENC RWSS 0.0386 0.70 13.26 Category-9 Existing BW SubSurface (Bore well) 0.00 100.00 ST
Engineer in chief ENC RWSS 0.0086 0.70 21.81 Category-9 Existing BW SubSurface (Bore well) 18.62 0.42 Plain
Engineer in chief ENC RWSS 0.0116 0.70 21.81 Category-9 Existing BW SubSurface (Bore well) 25.66 1.08 Plain
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
testing &
obtaining
Engineer in chief 0.1367 0.70
necessary 13.11 Category-1 Existing BW SubSurface (Bore well) 0.00 100.00 ST
permission
Engineer in chief ENC RWSS 0.0852 0.70 13.11 Category-9 Existing BW SubSurface (Bore well) 0.00 100.00 ST
s, survey
Engineer in chief ENC RWSS 0.1552 and
0.70 13.11 Category-9 Existing BW SubSurface (Bore well) 0.00 70.79 ST
preparation
Engineer in chief 0.2158 0.70
of D 13.11 Category-1 Existing BW SubSurface (Bore well) 0.00 100.00 ST
Engineer in chief ENC RWSS 0.0109 0.70 13.71 Category-9 Existing BW SubSurface (Bore well) 19.77 9.70 Plain
Engineer in chief ENC RWSS 0.0153 0.70 13.71 Category-9 Existing BW SubSurface (Bore well) 19.00 0.00 Plain
0.0967 0.20 9.38 Category-1 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
0.1084 0.20 9.12 Category-1 Existing BW SubSurface (Bore well) 27.91 12.79 Plain
0.3090 0.20 9.38 Category-1 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
0.1140 0.20 9.38 Category-1 New (Addnl.) SubSurface (Bore well) 0.00 88.10 ST
0.1114 0.20 9.38 Category-3 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
0.0255 0.20 9.12 Category-3 Existing BW SubSurface (Bore well) 0.00 43.72 ST
0.0166 0.20 9.38 Category-1 New (Addnl.) SubSurface (Bore well) 28.94 0.00 Plain
0.1680 0.20 9.38 Category-1 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
0.3729 0.20 9.12 Category-1 Existing BW SubSurface (Bore well) 0.00 100.00 ST
Engineer in chief ENC RWSS 0.0113 0.20 9.38 Category-9 New (Addnl.) SubSurface (Bore well) 31.24 35.03 Plain
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
testing &
obtaining
0.1114 0.20
necessary 9.38 Category-1 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
permission
0.1197 0.20 9.38 Category-1 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
s, survey
0.0167 and
0.20 9.12 Category-1 Existing BW SubSurface (Bore well) 12.88 27.37 Plain
preparation
0.0215 0.20
of D 9.38 Category-3 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
0.2520 0.20 9.12 Category-3 Existing BW SubSurface (Bore well) 0.00 100.00 ST
Engineer in chief ENC RWSS 0.0011 0.20 9.12 Category-9 Existing BW SubSurface (Bore well) 23.36 9.36 Plain
0.0717 0.20 9.12 Category-1 Existing BW SubSurface (Bore well) 0.00 100.00 ST
0.0177 0.20 9.12 Category-3 Existing BW SubSurface (Bore well) 7.41 44.68 ST
0.0208 0.20 9.12 Category-3 Existing BW SubSurface (Bore well) 0.00 100.00 ST
0.1596 0.20 9.38 Category-1 New (Addnl.) SubSurface (Bore well) 0.00 58.33 ST
0.1197 0.20 9.38 Category-1 New (Addnl.) SubSurface (Bore well) 5.00 36.25 Plain
0.1036 0.20 9.12 Category-1 Existing BW SubSurface (Bore well) 0.00 50.00 ST
0.1002 0.20 9.12 Category-1 Existing BW SubSurface (Bore well) 0.00 100.00 ST
0.0311 0.20 9.38 Category-3 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
0.0726 0.20 9.38 Category-1 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
0.1019 0.20 9.38 Category-1 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
testing &
obtaining
0.0315 0.20
necessary 9.38 Category-3 New (Addnl.) SubSurface (Bore well) 0.00 93.09 ST
permission
0.1165 0.20 9.12 Category-1 Existing BW SubSurface (Bore well) 0.00 100.00 ST
s, survey
0.0958 and
0.20 9.38 Category-1 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
preparation
0.1076 0.20
of D 9.38 Category-1 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
Engineer in chief ENC RWSS 0.0203 0.20 9.12 Category-9 Existing BW SubSurface (Bore well) 14.16 27.67 Plain
0.0343 0.20 9.12 Category-3 Existing BW SubSurface (Bore well) 3.31 70.59 ST
0.0083 0.20 9.38 Category-3 New (Addnl.) SubSurface (Bore well) 0.00 94.82 ST
0.1008 0.20 9.38 Category-1 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
Engineer in chief ENC RWSS 0.0062 0.20 9.12 Category-9 Existing BW SubSurface (Bore well) 2.25 9.91 Plain
0.0348 0.20 9.38 Category-3 New (Addnl.) SubSurface (Bore well) 14.18 81.09 ST
0.0971 0.20 9.12 Category-1 Existing BW SubSurface (Bore well) 0.00 97.92 ST
0.0347 0.20 9.38 Category-3 New (Addnl.) SubSurface (Bore well) 0.36 99.64 ST
0.1182 0.20 9.38 Category-3 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
0.1916 0.20 9.38 Category-1 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
0.0091 0.20 9.12 Category-3 Existing BW SubSurface (Bore well) 16.12 57.86 ST
0.0324 0.20 9.38 Category-1 New (Addnl.) SubSurface (Bore well) 0.00 90.88 ST
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
testing &
obtaining
0.0413 0.20
necessary 9.12 Category-1 Existing BW SubSurface (Bore well) 0.00 100.00 ST
Hon'ble MLA and Dist permission
0.0598 0.20 20.74 Category-1 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
Collector Adilabad s, survey
0.0134 and
0.20 9.38 Category-3 New (Addnl.) SubSurface (Bore well) 0.00 90.66 ST
preparation
0.0229 0.20
of D 9.38 Category-3 New (Addnl.) SubSurface (Bore well) 5.74 44.98 ST
0.0169 0.20 9.38 Category-3 New (Addnl.) SubSurface (Bore well) 2.82 96.47 ST
0.0895 0.20 9.38 Category-1 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
0.0265 0.20 9.38 Category-3 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
0.0331 0.20 9.38 Category-3 New (Addnl.) SubSurface (Bore well) 10.73 86.51 ST
0.0833 0.20 9.38 Category-1 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
0.0674 0.20 9.38 Category-1 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
0.2027 0.20 9.12 Category-1 Existing BW SubSurface (Bore well) 0.00 100.00 ST
0.0942 0.20 9.12 Category-1 Existing BW SubSurface (Bore well) 0.00 100.00 ST
0.0288 0.20 9.38 Category-1 New (Addnl.) SubSurface (Bore well) 0.00 0.00 Plain
0.2227 0.20 9.38 Category-3 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
0.1876 0.70 21.81 Category-1 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
0.0281 0.70 7.30 Category-3 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
testing &
obtaining
Engineer in chief ENC RWSS 0.0045 0.70
necessary 7.30 Category-9 New (Addnl.) SubSurface (Bore well) 30.17 16.02 Plain
permission
0.2251 0.70 21.81 Category-1 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
s, survey
0.0111 and
0.70 7.30 Category-3 New (Addnl.) SubSurface (Bore well) 22.22 45.42 ST
preparation
0.0488 0.70
of D 7.30 Category-3 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
Engineer in chief ENC RWSS 0.0137 0.70 7.30 Category-9 New (Addnl.) SubSurface (Bore well) 20.48 26.45 Plain
Engineer in chief ENC RWSS 0.0076 0.70 7.30 Category-9 New (Addnl.) SubSurface (Bore well) 25.76 9.26 Plain
0.0206 0.70 7.30 Category-3 New (Addnl.) SubSurface (Bore well) 6.17 60.41 ST
0.0485 0.70 7.30 Category-3 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
0.0023 0.70 7.30 Category5 New (Addnl.) SubSurface (Bore well) 21.60 18.51 Plain
0.0108 0.70 7.30 Category5 New (Addnl.) SubSurface (Bore well) 15.00 54.73 ST
0.0150 0.70 7.30 Category5 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
0.0106 0.70 7.30 Category5 New (Addnl.) SubSurface (Bore well) 26.95 71.20 ST
0.0035 0.70 7.30 Category5 New (Addnl.) SubSurface (Bore well) 6.29 0.30 Plain
0.0168 0.70 21.81 Category5 New (Addnl.) SubSurface (Bore well) 8.81 4.85 Plain

CMP No. 0.0101 0.70 7.30 Category5 New (Addnl.) SubSurface (Bore well) 6.06 28.16 Plain
173/CMP-
Chief Minister 0.0284 1.20 7.80 Category-8 Existing BW SubSurface (Bore well) 0.00 99.68 ST
MM/2012, Dt.
17/01/2012.
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
Submitted to n, Yield
Hon'ble testing &
Minister for obtaining
0.0953 1.20
necessary 17.10 Category-1 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
Panchyath Raj
& RWS, Dt. permission
0.0355 1.20 11.68 Category-3 Existing BW SubSurface (Bore well) 0.00 100.00 ST
01-10-2012. s, survey
Submitted to
0.0469 and
1.20 4.80 Category-3 Existing BW SubSurface (Bore well) 0.00 74.22 ST
Hon'ble
preparation
Minister for
0.0228 1.20
of D 37.62 Category-1 Existing BW SubSurface (Bore well) 26.80 4.11 Plain
Panchyath Raj
& RWS, Dt. 0.0567 1.20 9.80 Category-3 Existing BW SubSurface (Bore well) 0.00 100.00 ST
01-10-2012.
0.0648 1.20 5.80 Category-3 Existing BW SubSurface (Bore well) 0.00 100.00 ST
0.0609 1.20 5.80 Category-1 Existing BW SubSurface (Bore well) 0.00 100.00 ST

CMP No. 0.1143 1.20 17.10 Category-1 Existing BW SubSurface (Bore well) 0.00 100.00 ST
173/CMP-
Chief Minister CMP No.Dt. 0.0422 1.20 11.68 Category-8 Existing BW SubSurface (Bore well) 0.00 65.90 ST
MM/2012,
173/CMP-
17/01/2012.
Chief Minister 0.0776 1.20 14.10 Category-8 Existing BW SubSurface (Bore well) 0.00 100.00 ST
MM/2012, Dt.
17/01/2012. 0.3159 1.20 10.80 Category-3 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST

CMP No. 0.0235 1.20 5.80 Category-3 Existing BW SubSurface (Bore well) 0.00 100.00 ST
173/CMP-
Chief Minister 0.0909 1.20 6.80 Category-8 Existing BW SubSurface (Bore well) 0.00 100.00 ST
MM/2012, Dt.
17/01/2012. 0.0783 1.20 16.10 Category-3 Existing BW SubSurface (Bore well) 23.53 76.47 ST
0.1897 1.20 9.80 Category-1 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
0.0685 1.20 3.80 Category-3 Existing BW SubSurface (Bore well) 0.00 100.00 ST
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
CMP No. testing &
173/CMP- obtaining
Chief Minister 0.2424 1.20
necessary 14.80 Category-8 Existing BW SubSurface (Bore well) 0.00 100.00 ST
MM/2012, Dt.
17/01/2012. permission
0.1297 1.20 5.80 Category-3 Existing BW SubSurface (Bore well) 0.00 100.00 ST
s, survey
0.1385 and
1.20 11.68 Category-1 Existing BW SubSurface (Bore well) 0.00 100.00 ST
preparation
0.1130 1.20
of D 11.68 Category-3 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
0.1026 1.20 6.80 Category-3 Existing BW SubSurface (Bore well) 0.00 100.00 ST
0.1111 1.20 4.80 Category-3 Existing BW SubSurface (Bore well) 0.00 100.00 ST
Submitted to
Hon'ble 0.1852 1.20 8.80 Category-1 New (Addnl.) SubSurface (Bore well) 27.78 51.85 ST
Minister for
0.0137 1.20 3.80 Category-1 Existing BW SubSurface (Bore well) 9.56 88.80 ST
Panchyath Raj
& RWS, Dt. 0.0741 1.20 14.80 Category-3 Existing BW SubSurface (Bore well) 0.00 100.00 ST
01-10-2012.
0.0735 1.20 14.10 Category-3 Existing BW SubSurface (Bore well) 0.00 100.00 ST
0.0263 1.20 24.26 Category-1 Existing BW SubSurface (Bore well) 13.33 0.72 Plain
0.0232 1.20 24.26 Category-1 Existing BW SubSurface (Bore well) 11.66 0.00 Plain
0.0729 1.20 24.26 Category-1 Existing BW SubSurface (Bore well) 0.00 100.00 ST
0.0816 1.20 16.09 Category-1 New (Addnl.) SubSurface (Bore well) 25.47 0.00 Plain
0.0593 1.20 14.81 Category-3 Existing BW SubSurface (Bore well) 15.93 68.52 ST
0.0361 1.20 14.82 Category-3 Existing BW SubSurface (Bore well) 0.00 86.94 ST
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
testing &
obtaining
0.0565 1.20
necessary 20.09 Category-3 Existing BW SubSurface (Bore well) 0.00 100.00 ST
permission
0.0819 1.20 16.82 Category-3 Existing BW SubSurface (Bore well) 0.00 100.00 ST
s, survey
0.0782 and
1.20 17.09 Category-3 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
preparation
0.1669 1.20
of D 13.82 Category-1 New (Addnl.) SubSurface (Bore well) 7.78 87.78 ST

CMP No. 0.0405 0.70 15.32 Category-3 Existing BW SubSurface (Bore well) 0.76 78.23 ST
173/CMP-
Chief Minister 0.0426 0.70 9.44 Category-8 Existing BW SubSurface (Bore well) 0.00 100.00 ST
MM/2012, Dt.
17/01/2012. 0.1133 0.70 6.44 Category-1 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
CMP No.
173/CMP-
Chief Minister 0.0623 0.70 13.31 Category-8 Existing BW SubSurface (Bore well) 0.00 100.00 ST
MM/2012, Dt.
17/01/2012. 0.0815 0.70 15.59 Category-3 Existing BW SubSurface (Bore well) 0.00 100.00 ST
0.0599 0.70 13.32 Category-1 Existing BW SubSurface (Bore well) 0.00 100.00 ST

CMP No. 0.0580 0.70 15.59 Category-3 Existing BW SubSurface (Bore well) 0.00 100.00 ST
173/CMP-
Chief Minister CMP No.Dt. 0.0375 0.70 6.80 Category-8 Existing BW SubSurface (Bore well) 0.00 70.00 ST
MM/2012,
173/CMP-
17/01/2012.
Chief Minister 0.0272 0.70 7.29 Category-8 Existing BW SubSurface (Bore well) 7.14 69.05 ST
MM/2012, Dt.
17/01/2012. 0.0863 0.70 14.32 Category-3 Existing BW SubSurface (Bore well) 0.00 65.52 ST
0.2002 0.70 13.32 Category-1 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
0.2875 0.70 13.68 Category-1 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
testing &
obtaining
0.2804 0.70
necessary 13.32 Category-1 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
permission
0.2703 0.70 12.82 Category-1 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
s, survey
0.0223 and
0.70 16.18 Category-3 Existing BW SubSurface (Bore well) 5.29 49.87 ST
preparation
0.1502 0.70
of D 14.32 Category-1 Existing BW SubSurface (Bore well) 0.00 0.00 Plain
0.2904 0.70 13.82 Category-1 New (Addnl.) SubSurface (Bore well) 0.00 0.00 Plain
0.0675 0.70 4.30 Category-3 Existing BW SubSurface (Bore well) 0.00 100.00 ST
0.2646 0.70 15.18 Category-1 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
0.0233 0.70 2.30 Category-3 Existing BW SubSurface (Bore well) 0.00 62.79 ST
0.2261 0.70 13.32 Category-1 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
0.0995 0.70 14.32 Category-1 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
0.1827 0.70 12.82 Category-1 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
0.0421 0.70 7.30 Category-3 Existing BW SubSurface (Bore well) 0.00 100.00 ST
0.0262 1.20 7.80 Category-3 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
0.0373 1.20 7.80 Category-3 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
ENC
CMPRWSS
No. 0.0264 1.20 15.68 Category-9 New (Addnl.) SubSurface (Bore well) 29.06 14.84 Plain
173/CMP-
Chief Minister 0.0135 1.20 26.26 Category-8 New (Addnl.) SubSurface (Bore well) 19.76 0.64 Plain
MM/2012, Dt.
17/01/2012.
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
testing &
Submitted to obtaining
Hon'ble 0.0731 1.20
necessary 25.26 Category-1 Existing BW SubSurface (Bore well) 7.46 0.83 Plain
Minister for permission
0.0209 1.20 28.37 Category-1 Existing BW SubSurface (Bore well) 34.35 5.45 Plain
Panchyath Raj s, survey
& RWS, Dt. 0.0173 and
1.20 53.06 Category-1 Existing BW SubSurface (Bore well) 9.59 16.63 Plain
01-10-2012. preparation
0.0288 1.20
of D 40.46 Category-1 Existing BW SubSurface (Bore well) 10.14 0.00 Plain
0.0701 1.20 27.25 Category-1 Existing BW SubSurface (Bore well) 32.27 27.34 Plain
0.0592 1.20 24.25 Category-1 Existing BW SubSurface (Bore well) 0.00 100.00 ST
0.0919 1.20 17.09 Category-1 Existing BW SubSurface (Bore well) 0.00 100.00 ST
0.1096 1.20 18.09 Category-1 Existing BW SubSurface (Bore well) 11.93 0.00 Plain
0.0319 1.20 29.37 Category-1 Existing BW SubSurface (Bore well) 21.71 0.00 Plain
0.0675 1.20 25.25 Category-1 Existing BW SubSurface (Bore well) 23.72 0.00 Plain
0.1062 1.20 17.59 Category-1 Existing BW SubSurface (Bore well) 6.78 0.00 Plain
0.1034 1.20 17.09 Category-1 Existing BW SubSurface (Bore well) 6.78 0.00 Plain
0.0262 1.20 40.47 Category-1 Existing BW SubSurface (Bore well) 13.12 2.39 Plain
0.0324 1.20 28.87 Category-1 Existing BW SubSurface (Bore well) 7.64 0.00 Plain
0.1112 1.20 17.59 Category-3 Existing BW SubSurface (Bore well) 0.00 100.00 ST
0.0273 1.20 29.37 Category-1 Existing BW SubSurface (Bore well) 19.59 0.72 Plain
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
testing &
obtaining
0.0246 2.20
necessary 43.46 Category-1 Existing BW SubSurface (Bore well) 9.38 3.56 Plain
permission
0.0301 1.20 27.38 Category-1 Existing BW SubSurface (Bore well) 17.47 0.00 Plain
s, survey
0.0995 and
1.20 18.59 Category-1 Existing BW SubSurface (Bore well) 0.00 100.00 ST
preparation
0.0652 1.20
of D 25.25 Category-1 Existing BW SubSurface (Bore well) 32.27 27.34 Plain
0.0225 1.20 31.37 Category-1 Existing BW SubSurface (Bore well) 10.14 0.00 Plain
0.0403 1.20 28.87 Category-1 Existing BW SubSurface (Bore well) 28.25 2.01 Plain
0.0362 1.20 28.87 Category-1 Existing BW SubSurface (Bore well) 26.11 2.05 Plain
0.0572 1.20 21.10 Category-3 Existing BW SubSurface (Bore well) 0.00 50.00 ST
0.0860 1.20 16.68 Category-3 Existing BW SubSurface (Bore well) 0.00 50.00 ST
0.0526 1.20 21.09 Category-3 Existing BW SubSurface (Bore well) 0.00 50.00 ST
0.0606 1.20 21.09 Category-1 Existing BW SubSurface (Bore well) 0.00 50.00 ST
0.0849 1.20 19.18 Category-3 Existing BW SubSurface (Bore well) 0.00 50.00 ST
0.0122 2.20 69.66 Category-3 Existing BW SubSurface (Bore well) 11.04 2.66 Plain
0.1231 1.20 20.09 Category-3 Existing BW SubSurface (Bore well) 0.00 96.53 ST
0.1926 1.20 17.68 Category-1 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
0.0479 1.20 30.37 Category-3 Existing BW SubSurface (Bore well) 15.78 2.43 Plain
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
testing &
obtaining
0.1868 1.20
necessary 14.68 Category-1 New (Addnl.) SubSurface (Bore well) 0.00 100.00 ST
permission
0.0799 1.20 19.09 Category-3 Existing BW SubSurface (Bore well) 0.00 78.74 ST
s, survey
0.0864 and
1.20 28.25 Category-1 Existing BW SubSurface (Bore well) 49.27 3.52 SC
preparation
0.0487 1.20
of D 32.37 Category-1 Existing BW SubSurface (Bore well) 5.65 59.28 ST
0.0784 1.20 18.09 Category-1 New (Addnl.) SubSurface (Bore well) 21.14 29.67 Plain
0.1253 1.20 19.09 Category-1 Existing BW SubSurface (Bore well) 12.35 0.00 Plain
0.1607 1.20 15.68 Category-1 Existing BW SubSurface (Bore well) 0.00 100.00 ST
0.0953 1.20 17.19 Category-3 New Source SubSurface (Bore well) 0.00 70.47 ST
0.0329 1.20 26.76 Category-1 New Source SubSurface (Bore well) 0.00 0.00 Plain
0.0386 1.20 26.85 Category-1 New Source SubSurface (Bore well) 21.76 3.86 Plain
0.0356 1.20 25.96 Category-1 New Source SubSurface (Bore well) 17.43 0.00 Plain
0.0267 1.20 25.96 Category-1 New Source SubSurface (Bore well) 23.43 0.00 Plain
0.0613 1.20 17.19 Category-1 New Source SubSurface (Bore well) 39.33 0.00 Plain
0.0501 1.20 16.54 Category-1 New Source SubSurface (Bore well) 30.23 0.00 Plain
0.0115 1.20 20.77 Category-1 New Source SubSurface (Bore well) 12.66 6.49 Plain
0.0308 1.20 28.88 Category-1 New Source SubSurface (Bore well) 19.43 2.76 Plain
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
testing &
obtaining
0.0167 1.20
necessary 20.94 Category-1 New Source SubSurface (Bore well) 33.03 0.76 Plain
permission
0.0382 1.20 28.75 Category-1 New Source SubSurface (Bore well) 12.88 8.93 Plain
s, survey
0.0755 and
1.20 21.45 Category-1 New Source SubSurface (Bore well) 0.00 100.00 ST
preparation
0.0188 1.20
of D 37.00 Category-1 New Source SubSurface (Bore well) 20.94 0.39 Plain
0.0362 1.20 25.76 Category-1 New Source SubSurface (Bore well) 18.01 0.00 Plain
0.0457 1.20 17.09 Category-1 New Source SubSurface (Bore well) 0.00 100.00 ST
0.0132 1.20 44.02 Category-1 New Source SubSurface (Bore well) 8.93 0.79 Plain
0.0161 1.20 31.87 Category-1 New Source SubSurface (Bore well) 0.00 13.55 Plain
0.0105 1.20 42.54 Category-1 New Source SubSurface (Bore well) 10.05 0.60 Plain
0.0489 1.20 26.25 Category-3 New Source SubSurface (Bore well) 33.33 15.51 Plain
0.0699 1.20 14.18 Category-3 New Source SubSurface (Bore well) 0.00 100.00 ST
0.0265 1.20 29.25 Category-1 New Source SubSurface (Bore well) 20.31 22.32 Plain
0.1025 1.20 14.18 Category-1 New Source SubSurface (Bore well) 0.00 100.00 ST
0.0794 1.20 14.68 Category-1 New Source SubSurface (Bore well) 0.00 100.00 ST
0.0442 1.20 25.25 Category-1 New Source SubSurface (Bore well) 14.86 0.00 Plain
0.0292 0.70 28.04 Category-1 New BW SubSurface (Bore well) 19.59 5.89 Plain
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
testing &
obtaining
0.0322 0.70
necessary 28.04 Category-1 New BW SubSurface (Bore well) 15.34 1.01 Plain
permission
0.0072 0.20 17.53 Category-1 New BW SubSurface (Bore well) 13.07 0.00 Plain
s, survey
0.0034 and
0.20 4.41 Category-1 Existing BW SubSurface (Bore well) 24.44 1.56 Plain
preparation
0.0038 0.20
of D 5.35 Category-1 Existing BW SubSurface (Bore well) 24.98 15.25 Plain
0.0494 1.20 27.49 Category-1 New BW SubSurface (Bore well) 37.87 0.00 Plain
0.0450 1.20 30.69 Category-1 New BW SubSurface (Bore well) 9.45 15.23 Plain
0.0464 1.20 32.69 Category-1 New BW SubSurface (Bore well) 12.72 5.75 Plain
0.0106 1.20 31.10 Category-1 New BW SubSurface (Bore well) 19.87 2.87 Plain
0.0126 1.20 27.81 Category-1 New BW SubSurface (Bore well) 18.68 3.30 Plain
0.0151 1.20 26.60 Category-1 New BW SubSurface (Bore well) 23.59 1.14 Plain
0.0184 1.20 19.38 Category-1 New BW SubSurface (Bore well) 17.47 7.26 Plain
0.0877192982 0.20 4.80 Category-1 Existing BW SubSurface (Bore well) - ST -
0.0549450549 0.20 4.80 Category-1 Existing BW SubSurface (Bore well) - ST -
0.0226860254 0.20 12.30 Category-1 Existing BW SubSurface (Bore well) - ST -
0.0471698113 0.20 9.80 Category-1 Existing BW SubSurface (Bore well) - ST -
0.0364431487 0.20 12.30 Category-1 Existing BW SubSurface (Bore well) - ST -
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
testing &
obtaining
0.0367647059 0.20
necessary 9.80 Category-3 Existing BW SubSurface (Bore well) - ST -
permission
0.0357541899 0.20 12.60 Category-1 Existing BW SubSurface (Bore well) - ST -
s, survey
0.0549450549 and
0.20 4.80 Category-1 Existing BW SubSurface (Bore well) - - PLAIN
preparation
0.0510204082 0.20
of D 4.80 Category-1 Existing BW SubSurface (Bore well) - ST -
0.0301204819 0.20 19.80 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0877192982 0.20 4.80 Category-1 Existing BW SubSurface (Bore well) - ST -
0.0366300366 0.20 9.80 Category-1 Existing BW SubSurface (Bore well) - ST -
0.0490196078 0.20 4.80 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0251521298 0.20 12.20 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0694444444 0.20 4.80 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0364963504 0.20 9.80 Category-3 Existing BW SubSurface (Bore well) - ST -
0.035530086 0.20 12.20 Category-3 Existing BW SubSurface (Bore well) - ST -
0.028057554 0.20 19.30 Category-3 Existing BW SubSurface (Bore well) - - PLAIN
0.0350877193 0.20 9.80 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0338797814 0.20 12.20 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0625 0.20 9.80 Category-3 Existing BW SubSurface (Bore well) - ST -
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
testing &
obtaining
0.0568181818 0.20
necessary 4.80 Category-1 Existing BW SubSurface (Bore well) - ST -
permission
0.125 0.20 4.80 Category-1 Existing BW SubSurface (Bore well) - ST -
s, survey
0.0694444444 and
0.20 4.80 Category-1 Existing BW SubSurface (Bore well) - ST -
preparation
0.0317460317 of D
0.20 19.80 Category-3 Existing BW SubSurface (Bore well) - ST -

Engineer in chief ENC RWSS 0.0057755776 0.2 20.8 Category-9 Existing BW SubSurface (Bore well) - ST -
0.0819672131 0.20 4.80 Category-1 Existing BW SubSurface (Bore well) - ST -
0.0641025641 0.20 9.80 Category-1 Existing BW SubSurface (Bore well) - ST -
0.0034364261 0.2 2.8 Category-3 New (Addnl.) SubSurface (Bore well) - ST -
Engineer in chief ENC RWSS 0.0264945652 0.20 19.30 Category-9 Existing BW SubSurface (Bore well) - - PLAIN
0.0325459318 0.20 12.20 Category-1 Existing BW SubSurface (Bore well) - ST -
0.0265306122 0.20 19.30 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0049206349 0.2 12.2 Category-3 New (Addnl.) SubSurface (Bore well) - ST -
0.0245681382 0.20 12.60 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0555555556 0.20 4.80 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0471698113 0.20 4.80 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0625 0.20 9.80 Category-3 Existing BW SubSurface (Bore well) - ST -
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
testing &
obtaining
0.1041666667 0.20
necessary 4.80 Category-3 Existing BW SubSurface (Bore well) - ST -
permission
0.0666666667 0.20 9.80 Category-3 Existing BW SubSurface (Bore well) - ST -
s, survey
0.0351648352 and
0.20 12.60 Category-3 Existing BW SubSurface (Bore well) - ST -
preparation
0.0462962963 0.20
of D 4.80 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0380952381 0.20 12.60 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0408163265 0.20 9.80 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0324675325 0.20 19.80 Category-3 Existing BW SubSurface (Bore well) - ST -
0.020260223 0.20 21.60 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0255144033 0.20 12.20 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0419672131 0.20 12.60 Category-3 Existing BW SubSurface (Bore well) - ST -
0.045045045 0.20 9.80 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0591715976 0.20 9.80 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0340659341 0.20 12.20 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0568181818 0.20 9.80 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0636942675 0.20 9.80 Category-3 Existing BW SubSurface (Bore well) - ST -
0.05 0.20 4.80 Category-3 Existing BW SubSurface (Bore well) - ST -
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
testing &
obtaining
0.0442477876 0.20
necessary 4.80 Category-3 Existing BW SubSurface (Bore well) - ST -
permission
0.0495049505 0.20 9.80 Category-3 Existing BW SubSurface (Bore well) - ST -
s, survey
0.0429184549 and
0.20 9.80 Category-3 Existing BW SubSurface (Bore well) - ST -
preparation
0.1041666667 0.20
of D 4.80 Category-1 Existing BW SubSurface (Bore well) - ST -
0.0833333333 0.20 4.80 Category-1 Existing BW SubSurface (Bore well) - ST -
0.035335689 0.20 9.80 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0419672131 0.20 12.60 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0246153846 0.20 12.60 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0609756098 0.20 9.80 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0406349206 0.20 12.60 Category-3 Existing BW SubSurface (Bore well) - ST -
0.1 0.20 4.80 Category-3 Existing BW SubSurface (Bore well) - ST -
0.125 0.20 4.80 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0371257485 0.20 12.20 Category-1 Existing BW SubSurface (Bore well) - ST -
0.0448430493 0.20 9.80 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0505050505 0.20 9.80 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0757575758 0.20 9.80 Category-3 Existing BW SubSurface (Bore well) - ST -
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
testing &
obtaining
0.0386292835 0.20
necessary 12.20 Category-3 Existing BW SubSurface (Bore well) - ST -
permission
0.0543478261 0.20 4.80 Category-3 Existing BW SubSurface (Bore well) - ST -
s, survey
0.0425531915 and
0.20 9.80 Category-3 Existing BW SubSurface (Bore well) - ST -
preparation
0.030816641 0.20
of D 19.80 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0446428571 0.20 9.80 Category-1 Existing BW SubSurface (Bore well) - ST -
0.0578034682 0.20 9.80 Category-3 Existing BW SubSurface (Bore well) - ST -
Engineer in chief ENC RWSS 0.032 0.20 19.80 Category-9 Existing BW SubSurface (Bore well) - - PLAIN
0.125 0.20 4.80 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0704225352 0.20 9.80 Category-3 Existing BW SubSurface (Bore well) - ST -
0.1515151515 0.20 4.80 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0403225806 0.20 9.80 Category-3 Existing BW SubSurface (Bore well) - ST -
0.1666666667 0.20 4.80 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0649350649 0.20 9.80 Category-3 Existing BW SubSurface (Bore well) - ST -
0.05 0.20 4.80 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0431034483 0.20 4.80 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0892857143 0.20 4.80 Category-1 Existing BW SubSurface (Bore well) - ST -
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
testing &
obtaining
0.0833333333 0.20
necessary 4.80 Category-1 Existing BW SubSurface (Bore well) - ST -
permission
Engineer in chief ENC RWSS 0.0329489292 0.20 19.80 Category-9 Existing BW SubSurface (Bore well) - - PLAIN
s, survey
0.0833333333 and
0.20 4.80 Category-3 Existing BW SubSurface (Bore well) - ST -
preparation
0.0746268657 0.20
of D 4.80 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0581395349 0.20 4.80 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0331606218 0.20 12.60 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0476190476 0.20 4.80 Category-1 Existing BW SubSurface (Bore well) - ST -
0.0454545455 0.20 4.80 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0520833333 0.20 4.80 Category-3 Existing BW SubSurface (Bore well) - ST -
0.05 0.20 4.80 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0588235294 0.20 4.80 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0416666667 0.20 4.80 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0387878788 0.20 12.60 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0512820513 0.20 9.80 Category-3 Existing BW SubSurface (Bore well) - ST -
0.25 0.20 2.80 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0357142857 0.2 3.3 Category-3 Existing BW SubSurface (Bore well) - ST -
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
testing &
obtaining
0.0757575758 0.20
necessary 9.80 Category-3 Existing BW SubSurface (Bore well) - ST -
permission
0.0476190476 0.20 4.80 Category-3 Existing BW SubSurface (Bore well) - ST -
s, survey
0.035 and
0.20 3.30 Category-3 Existing BW SubSurface (Bore well) - ST -
preparation
Engineer in chief ENC RWSS 0.0051388889 0.2D
of 3.5 Category-9 Existing BW SubSurface (Bore well) - - PLAIN
0.0555555556 0.20 9.80 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0833333333 0.20 4.80 Category-3 Existing BW SubSurface (Bore well) - ST -
0.1086956522 0.20 4.80 Category-1 Existing BW SubSurface (Bore well) - ST -
0.05 0.20 4.80 Category-1 Existing BW SubSurface (Bore well) - ST -
0.0333333333 0.20 9.80 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0149797571 0.2 3.5 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0086651054 0.2 3.5 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0777777778 0.20 3.30 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0925 0.2 3.5 Category-1 Existing BW SubSurface (Bore well) - ST -
0.1851851852 0.20 4.80 Category-1 Existing BW SubSurface (Bore well) - - PLAIN
0.0515463918 0.20 4.80 Category-3 Existing BW SubSurface (Bore well) - ST -
0.04375 0.20 3.30 Category-1 Existing BW SubSurface (Bore well) - ST -
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
testing &
obtaining
Engineer in chief ENC RWSS 0.007505071 necessary 0.2 3.5 Category-9 Existing BW SubSurface (Bore well) - - PLAIN
permission
0.04375 0.20 3.30 Category-1 Existing BW SubSurface (Bore well) - ST -
s, survey
0.037 and
0.2 3.5 Category-3 Existing BW SubSurface (Bore well) - ST -
preparation
0.0460526316 0.20
of D 3.30 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0336363636 0.2 3.5 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0666666667 0.20 4.80 Category-1 Existing BW SubSurface (Bore well) - ST -
0.1041666667 0.20 4.80 Category-1 Existing BW SubSurface (Bore well) - ST -
0.0537634409 0.20 4.80 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0454545455 0.20 4.80 Category-1 Existing BW SubSurface (Bore well) - ST -
0.0366300366 0.20 9.80 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0602409639 0.20 9.80 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0694444444 0.20 4.80 Category-1 Existing BW SubSurface (Bore well) - ST -
0.0383141762 0.20 9.80 Category-3 Existing BW SubSurface (Bore well) - ST -
0.1 0.20 3.30 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0197860963 0.2 3.5 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0378787879 0.20 9.80 Category-3 Existing BW SubSurface (Bore well) - ST -
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
testing &
obtaining
0.0875 0.20
necessary 3.30 Category-3 Existing BW SubSurface (Bore well) - ST -
permission
0.0171296296 0.2 3.5 Category-3 Existing BW SubSurface (Bore well) - ST -
s, survey
0.0343137255 and
0.20 3.30 Category-3 Existing BW SubSurface (Bore well) - ST -
preparation
0.0147410359 0.2D
of 3.5 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0372340426 0.20 3.30 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0296 0.2 3.5 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0154166667 0.2 3.5 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0384615385 0.20 9.80 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0740740741 0.20 9.80 Category-1 Existing BW SubSurface (Bore well) - ST -
0.0190721649 0.2 3.5 Category-3 Existing BW SubSurface (Bore well) - ST -
0.14 0.20 3.30 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0672727273 0.2 3.5 Category-3 Existing BW SubSurface (Bore well) - ST -
0.037037037 0.20 9.80 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0181372549 0.2 3.5 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0384615385 0.20 3.30 Category-1 Existing BW SubSurface (Bore well) - ST -
0.0411111111 0.2 3.5 Category-3 Existing BW SubSurface (Bore well) - ST -
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
testing &
obtaining
0.0531914894 0.20
necessary 4.80 Category-1 Existing BW SubSurface (Bore well) - ST -
permission
0.04375 0.20 3.30 Category-1 Existing BW SubSurface (Bore well) - ST -
s, survey
0.0902439024 and
0.2 3.5 Category-3 Existing BW SubSurface (Bore well) - ST -
preparation
0.1590909091 0.20
of D 3.30 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0296 0.2 3.5 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0336363636 0.2 3.5 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0406593407 0.2 3.5 Category-3 Existing BW SubSurface (Bore well) - ST -
0.018974359 0.2 3.5 Category-3 Existing BW SubSurface (Bore well) - ST -
0.018974359 0.2 3.5 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0355769231 0.2 3.5 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0342592593 0.2 3.5 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0224242424 0.2 3.5 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0293650794 0.2 3.5 Category-3 Existing BW SubSurface (Bore well) - ST -
0.05 0.2 3.5 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0425287356 0.2 3.5 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0023455825 0.2 2.8 Category-1 New (Addnl.) SubSurface (Bore well) - ST -
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
testing &
obtaining
0.0103641457 0.2
necessary 3.5 Category-3 Existing BW SubSurface (Bore well) - ST -
permission
0.0371747212 0.20 9.80 Category-3 Existing BW SubSurface (Bore well) - ST -
s, survey
0.0473933649 and
0.20 9.80 Category-3 Existing BW SubSurface (Bore well) - ST -
preparation
0.15625 0.20
of D 4.80 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0621118012 0.20 9.80 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0170506912 0.2 3.5 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0466666667 0.20 3.30 Category-1 Existing BW SubSurface (Bore well) - ST -
0.0234177215 0.2 3.5 Category-3 Existing BW SubSurface (Bore well) - - PLAIN
0.0169724771 0.2 3.5 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0411764706 0.20 3.30 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0352380952 0.2 3.5 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0308333333 0.2 3.5 Category-3 Existing BW SubSurface (Bore well) - ST -
0.125 0.20 4.80 Category-1 Existing BW SubSurface (Bore well) - ST -
0.14 0.20 3.30 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0349056604 0.2 3.5 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0616666667 0.2 3.5 Category-3 Existing BW SubSurface (Bore well) - ST -
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
testing &
obtaining
0.0183168317 0.2
necessary 3.5 Category-3 Existing BW SubSurface (Bore well) - ST -
permission
0.064516129 0.20 9.80 Category-1 Existing BW SubSurface (Bore well) - ST -
s, survey
0.032173913 and
0.2 3.5 Category-3 Existing BW SubSurface (Bore well) - ST -
preparation
0.0833333333 0.20
of D 3.30 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0122516556 0.2 3.5 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0198924731 0.2 3.5 Category-3 Existing BW SubSurface (Bore well) - ST -
0.026618705 0.2 3.5 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0833333333 0.20 3.30 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0224242424 0.2 3.5 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0724637681 0.20 4.80 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0344827586 0.20 9.80 Category-1 Existing BW SubSurface (Bore well) - ST -
0.0211428571 0.2 3.5 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0795454545 0.20 3.30 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0040883978 0.2 3.5 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0466666667 0.20 3.30 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0205555556 0.2 3.5 Category-3 Existing BW SubSurface (Bore well) - ST -
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
testing &
obtaining
0.0840909091 0.2
necessary 3.5 Category-3 Existing BW SubSurface (Bore well) - ST -
permission
0.0411111111 0.2 3.5 Category-3 Existing BW SubSurface (Bore well) - ST -
s, survey
0.0420168067 and
0.20 9.80 Category-3 Existing BW SubSurface (Bore well) - ST -
preparation
0.0168181818 0.2D
of 3.5 Category-3 Existing BW SubSurface (Bore well) - ST -
0.0080887149 0.2 12.2 Category5 New (Addnl.) SubSurface (Bore well) - ST -
ENC, RWS&S Hyderabad -- 0.0495049505 1.20 3.80 Category 1 New (Addnl.) SubSurface (Bore well) - ST -
ENC, RWS&S Hyderabad -- 0.0549450549 1.20 3.80 Category 1 New (Addnl.) SubSurface (Bore well) - ST -
ENC, RWS&S Hyderabad -- 0.037037037 1.20 3.80 Category 1 New (Addnl.) SubSurface (Bore well) - ST -
ENC, RWS&S Hyderabad -- 0.0675675676 1.20 3.80 Category 1 New (Addnl.) SubSurface (Bore well) - ST -
ENC, RWS&S Hyderabad -- 0.2380952381 1.20 3.80 Category 1 New (Addnl.) SubSurface (Bore well) - ST -
ENC, RWS&S Hyderabad -- 0.0694444444 1.20 3.80 Category 1 New (Addnl.) SubSurface (Bore well) - ST -
ENC, RWS&S Hyderabad -- 0.0251256281 1.20 3.80 Category 1 New (Addnl.) SubSurface (Bore well) - ST -
ENC, RWS&S Hyderabad -- 0.0757575758 1.20 3.80 Category 1 New (Addnl.) SubSurface (Bore well) - ST -
ENC, RWS&S Hyderabad -- 0.0649350649 1.20 3.80 Category 1 New (Addnl.) SubSurface (Bore well) - ST -
ENC, RWS&S Hyderabad -- 0.0561797753 1.20 3.80 Category 1 New (Addnl.) SubSurface (Bore well) - ST -
ENC, RWS&S Hyderabad -- 0.1219512195 1.20 3.80 Category 1 New (Addnl.) SubSurface (Bore well) - ST -
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
testing &
obtaining
ENC, RWS&S Hyderabad -- 0.0714285714 1.20
necessary 7.80 Category 1 New (Addnl.) SubSurface (Bore well) - ST -
permission
ENC, RWS&S Hyderabad -- 0.0359281437 1.20 4.80 Category 1 New (Addnl.) SubSurface (Bore well) - - PLAIN
s, survey
ENC, RWS&S Hyderabad -- 0.0274725275 and
1.20 3.80 Category 1 New (Addnl.) SubSurface (Bore well) - ST -
preparation
ENC, RWS&S Hyderabad -- 0.0625 1.20
of D 4.80 Category 1 New (Addnl.) SubSurface (Bore well) - - PLAIN
ENC, RWS&S Hyderabad -- 0.0413793103 1.20 4.80 Category 1 New (Addnl.) SubSurface (Bore well) - ST -
ENC, RWS&S Hyderabad -- 0.0789473684 1.20 4.80 Category 1 New (Addnl.) SubSurface (Bore well) - ST -
ENC, RWS&S Hyderabad -- 0.0366598778 1.20 16.80 Category 1 New (Addnl.) SubSurface (Bore well) - - PLAIN
ENC, RWS&S Hyderabad -- 0.0315236427 1.20 16.80 Category 1 New (Addnl.) SubSurface (Bore well) - - PLAIN
ENC, RWS&S Hyderabad -- 0.0236966825 1.20 3.80 Category 1 New (Addnl.) SubSurface (Bore well) - - PLAIN

ENC, RWS&S Hyderabad -- 0.0264550265 1.20 3.80 Category 1 New (Addnl.) SubSurface (Bore well) - ST -

ENC, RWS&S Hyderabad -- 0.0641025641 1.20 3.80 Category 1 New (Addnl.) SubSurface (Bore well) - ST -
ENC, RWS&S Hyderabad -- 0.0340136054 1.20 3.80 Category 1 New (Addnl.) SubSurface (Bore well) - - PLAIN
ENC, RWS&S Hyderabad -- 0.0283687943 1.20 10.80 Category 1 New (Addnl.) SubSurface (Bore well) - - PLAIN
ENC, RWS&S Hyderabad -- 0.0340909091 1.20 16.80 Category 1 New (Addnl.) SubSurface (Bore well) - - PLAIN
ENC, RWS&S Hyderabad -- 0.0331125828 1.20 3.80 Category 1 New (Addnl.) SubSurface (Bore well) - ST -
ENC, RWS&S Hyderabad -- 0.0268817204 1.20 3.80 Category 1 New (Addnl.) SubSurface (Bore well) - ST -
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
testing &
obtaining
ENC, RWS&S Hyderabad -- 0.0434782609 1.20
necessary 3.80 Category 1 New (Addnl.) SubSurface (Bore well) - ST -
permission
ENC, RWS&S Hyderabad -- 0.078125 1.20 3.80 Category 1 New (Addnl.) SubSurface (Bore well) - ST -
s, survey
ENC, RWS&S Hyderabad -- 0.0263929619 and
1.20 16.80 Category 1 New (Addnl.) SubSurface (Bore well) - - PLAIN
preparation
ENC, RWS&S Hyderabad -- 0.1818181818 1.20
of D 4.80 Category 1 New (Addnl.) SubSurface (Bore well) - ST -
ENC, RWS&S Hyderabad -- 0.1351351351 1.20 3.80 Category 1 New (Addnl.) SubSurface (Bore well) - ST -
ENC, RWS&S Hyderabad -- 0.0263157895 1.20 3.80 Category 1 New (Addnl.) SubSurface (Bore well) - ST -
ENC, RWS&S Hyderabad -- 0.0555555556 1.20 4.80 Category 1 New (Addnl.) SubSurface (Bore well) - ST -
ENC, RWS&S Hyderabad -- 0.15 1.20 4.80 Category 1 New (Addnl.) SubSurface (Bore well) - ST -
ENC, RWS&S Hyderabad -- 0.1063829787 1.20 3.80 Category 1 New (Addnl.) SubSurface (Bore well) - ST -
ENC, RWS&S Hyderabad -- 0.0531914894 1.20 3.80 Category 1 New (Addnl.) SubSurface (Bore well) - ST -
ENC, RWS&S Hyderabad -- 0.0242718447 1.20 3.80 Category 1 New (Addnl.) SubSurface (Bore well) - ST -
ENC, RWS&S Hyderabad -- 0.035971223 1.20 3.80 Category 1 New (Addnl.) SubSurface (Bore well) - ST -
ENC, RWS&S Hyderabad -- 0.0704225352 1.20 3.80 Category 1 New (Addnl.) SubSurface (Bore well) - ST -
ENC, RWS&S Hyderabad -- 0.1724137931 1.20 3.80 Category 1 New (Addnl.) SubSurface (Bore well) - ST -
ENC, RWS&S Hyderabad -- 0.0909090909 1.20 3.80 Category 1 New (Addnl.) SubSurface (Bore well) - ST -
ENC, RWS&S Hyderabad -- 0.0537634409 1.20 3.80 Category 1 New (Addnl.) SubSurface (Bore well) - ST -
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
testing &
obtaining
ENC, RWS&S Hyderabad -- 0.0602409639 1.20
necessary 3.80 Category 1 New (Addnl.) SubSurface (Bore well) - ST -
permission
ENC, RWS&S Hyderabad -- 0.0362318841 1.20 3.80 Category 1 New (Addnl.) SubSurface (Bore well) - ST -
s, survey
ENC, RWS&S Hyderabad -- 0.0221238938 and
1.20 3.80 Category 1 New (Addnl.) SubSurface (Bore well) - ST -
preparation
ENC, RWS&S Hyderabad -- 0.0397350993 1.20
of D 10.80 Category 1 New (Addnl.) SubSurface (Bore well) - - PLAIN
ENC, RWS&S Hyderabad -- 0.1612903226 1.20 3.80 Category 1 New (Addnl.) SubSurface (Bore well) - - PLAIN
ENC, RWS&S Hyderabad -- 0.0980392157 1.20 3.80 Category 1 New (Addnl.) SubSurface (Bore well) - ST -
ENC, RWS&S Hyderabad -- 0.0316455696 1.20 3.80 Category 1 New (Addnl.) SubSurface (Bore well) - ST -
ENC, RWS&S Hyderabad -- 0.0210084034 1.20 3.80 Category 1 New (Addnl.) SubSurface (Bore well) - - PLAIN
ENC, RWS&S Hyderabad -- 0.0301204819 1.20 3.80 Category 1 New (Addnl.) SubSurface (Bore well) - ST -
ENC, RWS&S Hyderabad -- 0.2083333333 1.20 3.80 Category 1 New (Addnl.) SubSurface (Bore well) - - PLAIN
ENC, RWS&S Hyderabad -- 0.0344827586 1.20 3.80 Category 1 New (Addnl.) SubSurface (Bore well) - ST -
ENC, RWS&S Hyderabad -- 0.0387596899 1.20 3.80 Category 1 New (Addnl.) SubSurface (Bore well) - ST -
ENC, RWS&S Hyderabad -- 0.0510204082 1.20 3.80 Category 1 New (Addnl.) SubSurface (Bore well) - ST -
ENC, RWS&S Hyderabad -- 0.0943396226 1.20 3.80 Category 1 New (Addnl.) SubSurface (Bore well) - ST -
ENC, RWS&S District
Hon'ble MinisterHyderabad
for Trible -- 0.0303030303 1.20 10.80 Category 1 New (Addnl.) SubSurface (Bore well) - - PLAIN
Colletor
Welfare D.O.Lr.No.45/M
Adilabad, 0.0817307692 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
(TW)/2012, Dated:
Dated:
05.03.2012
12.03.2012
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
Hon'ble Minister for Trible testing &
Welfare D.O.Lr.No.45/M obtaining
Hon'ble MinisterDated:
for Trible 0.4722222222 1.20
necessary 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
(TW)/2012,
Welfare05.03.2012
D.O.Lr.No.45/M permission
Hon'ble MinisterDated:
for Trible 0.6296296296 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
(TW)/2012, s, survey
Welfare05.03.2012
D.O.Lr.No.45/M and
Hon'ble MinisterDated:
for Trible 0.4594594595 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
(TW)/2012, preparation
Welfare05.03.2012
D.O.Lr.No.45/M
Hon'ble MinisterDated:
for Trible 0.1770833333 1.20
of D 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
(TW)/2012,
Welfare05.03.2012
D.O.Lr.No.45/M
Hon'ble MinisterDated:
for Trible 0.1382113821 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
(TW)/2012,
Welfare05.03.2012
D.O.Lr.No.45/M
Hon'ble MinisterDated:
for Trible 0.2207792208 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
(TW)/2012,
Welfare05.03.2012
D.O.Lr.No.45/M
Hon'ble MinisterDated:
for Trible 0.2098765432 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
(TW)/2012,
Welfare05.03.2012
D.O.Lr.No.45/M
Hon'ble MinisterDated:
for Trible 0.1976744186 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
(TW)/2012,
Welfare05.03.2012
D.O.Lr.No.45/M
Hon'ble MinisterDated:
for Trible 0.0445026178 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
(TW)/2012,
Welfare05.03.2012
D.O.Lr.No.45/M
Hon'ble MinisterDated:
for Trible 0.6071428571 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
(TW)/2012,
Welfare05.03.2012
D.O.Lr.No.45/M
0.2833333333 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
(TW)/2012, Dated:
05.03.2012
-- -- 0.3469387755 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.6296296296 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.5 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.1240875912 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.1531531532 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
testing &
obtaining
-- -- 0.0561056106 1.20
necessary 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
permission
-- -- 0.1976744186 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
s, survey
-- -- 0.2 and
1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
preparation
-- -- 0.8095238095 1.20
of D 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.2361111111 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.2 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.265625 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.1650485437 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.2537313433 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.1164383562 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.1382113821 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.1164383562 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.0454545455 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.068877551 1.20 25.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.0521472393 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.0894736842 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
testing &
obtaining
-- -- 0.1055900621 1.20
necessary 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
permission
-- -- 0.1118421053 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
s, survey
-- -- 0.0376106195 and
1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
preparation
-- -- 0.0596491228 1.20
of D 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.10625 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.0374449339 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.3090909091 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.0735930736 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.1287878788 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.0354906054 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.0429292929 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.2615384615 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
0.1734693878 1.20 15.80 Category 9 New (Addnl.) SubSurface (Bore well) - - PLAIN

-- -- 0.0379464286 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -

ENC, RWS&S Hyderabad 0.2179487179 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.2266666667 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
testing &
obtaining
-- -- 0.0913978495 1.20
necessary 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
permission
-- -- 0.10625 s, 1.20
survey 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
and
-- -- 0.1205673759 1.20
preparation 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
of D
-- -- 0.0705394191 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.1734693878 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.1393442623 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.1393442623 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - - PLAIN
-- -- 0.1416666667 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.1042944785 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.1734693878 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.2575757576 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.1770833333 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.0783410138 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.1259259259 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.1240875912 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.1049382716 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
testing &
obtaining
-- -- 0.0574324324 1.20
necessary 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
permission
-- -- 0.0407673861 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
s, survey
-- -- 0.0553745928 and
1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
preparation
-- -- 0.0515151515 1.20
of D 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.2833333333 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.0696721311 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.1465517241 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.0137540453 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -

-- -- 0.2741935484 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -

ENC, RWS&S Hyderabad 0.2179487179 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.1603773585 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.0335968379 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.019058296 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.1603773585 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.265625 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.2179487179 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
testing &
obtaining
-- -- 0.5666666667 1.20
necessary 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
permission
-- -- 0.2328767123 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
s, survey
-- -- 0.1808510638 and
1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
preparation
-- -- 0.5 1.20
of D 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.4473684211 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.5151515152 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -

-- -- 0.68 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -

-- -- 0.062962963 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -


-- -- 0.2833333333 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.0735930736 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.2297297297 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.1011904762 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.5666666667 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.3469387755 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.5666666667 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.4047619048 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
testing &
obtaining
-- -- 0.0928961749 1.20
necessary 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
permission
-- -- 0.298245614 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
s, survey
ENC, RWS&S Hyderabad 0.3617021277 and
1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
preparation
-- -- 0.17 1.20
of D 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.3269230769 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.1666666667 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.2236842105 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.1976744186 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.1717171717 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.0825242718 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.3148148148 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.1634615385 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.1588785047 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.34 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.2361111111 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.0776255708 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
testing &
obtaining
-- -- 0.85 1.20
necessary 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
permission
-- -- 0.7391304348 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
s, survey
-- -- 0.1808510638 and
1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
preparation
-- -- 1.3076923077 1.20
of D 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.3617021277 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
ENC, RWS&S Hyderabad 0.1223021583 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.1416666667 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.0833333333 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.5666666667 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.5666666667 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.0787037037 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.6071428571 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.25 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.2741935484 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.0772727273 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -

-- -- 0.4146341463 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -


Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
testing &
obtaining
-- -- 0.1268656716 1.20
necessary 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
permission
-- -- 0.1954022989 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
s, survey
-- -- 0.1049382716 and
1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
preparation
-- -- 0.1976744186 1.20
of D 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.6538461538 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.1770833333 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 1.3076923077 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.1542857143 1.20 25.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -

-- -- 0.5666666667 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -

-- -- 0.2023809524 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -

-- -- 0.1017964072 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -


-- -- 0.1574074074 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.1317829457 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.2098765432 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.7727272727 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.1297709924 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
testing &
obtaining
-- -- 1.8888888889 1.20
necessary 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
permission
-- -- 0.2151898734 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
s, survey
-- -- 0.3090909091 and
1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
preparation
-- -- 0.0123180291 1.2D
of 9.8 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.53125 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.1954022989 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.0656370656 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.320754717 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.0582191781 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.149122807 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.044386423 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 1.1333333333 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.1024096386 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.0639097744 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.2048192771 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.5666666667 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
testing &
obtaining
-- -- 0.1082802548 1.20
necessary 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
permission
-- -- 0.6538461538 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
s, survey
-- -- 0.3269230769 and
1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
preparation
-- -- 0.1789473684 1.20
of D 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 1.3076923077 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.2297297297 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.8947368421 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.2881355932 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.1588785047 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.2833333333 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.1954022989 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.3695652174 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.1976744186 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -

-- -- 0.0598290598 0.20 13.80 Category 3 Existing BW SubSurface (Bore well) - ST -


Memo.No.AE3
ENC, RWS&S Hyderabad /DEE2(N)/RW 0.0228571429 1.20 2.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
CE NRDWP (NORMAL), S&S/Sirpur
0.0026408451 1.2 1.8 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
RWS&S Hyderabad Constituency/
Adilabad/2012
,
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
District testing &
Hon'ble Minister for Trible
Colletor obtaining
Welfare D.O.Lr.No.45/M
Hon'ble MinisterDated:
for Trible Adilabad, 0.0293367347 1.20
necessary 21.80 Category 9 New (Addnl.) SubSurface (Bore well) - - PLAIN
(TW)/2012,
Welfare05.03.2012
D.O.Lr.No.45/M Dated: permission
12.03.2012 0.2346938776 1.20 21.80 Category 9 New (Addnl.) SubSurface (Bore well) - - PLAIN
(TW)/2012,
Hon'ble MinisterDated:
for Trible s, survey
05.03.2012
Welfare D.O.Lr.No.45/M and
0.0116810564 1.20
preparation 21.80 Category 9 New (Addnl.) SubSurface (Bore well) - - PLAIN
(TW)/2012,
Hon'ble MinisterDated:
for Trible
05.03.2012 of D
Welfare D.O.Lr.No.45/M
Hon'ble MinisterDated:
for Trible 0.0248648649 1.20 21.80 Category 9 New (Addnl.) SubSurface (Bore well) - - PLAIN
(TW)/2012,
Welfare05.03.2012
D.O.Lr.No.45/M
Hon'ble MinisterDated:
for Trible 0.0190082645 1.20 21.80 Category 9 New (Addnl.) SubSurface (Bore well) - - PLAIN
(TW)/2012,
Welfare05.03.2012
D.O.Lr.No.45/M
0.0073694329 1.20 21.80 Category 9 New (Addnl.) SubSurface (Bore well) - - PLAIN
(TW)/2012,
Hon'ble MinisterDated:
for Trible
05.03.2012
Welfare D.O.Lr.No.45/M
0.0812720848 1.20 21.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
(TW)/2012,
Hon'ble MinisterDated:
for Trible
05.03.2012
Welfare D.O.Lr.No.45/M
Hon'ble MinisterDated:
for Trible 0.0809859155 1.20 21.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
(TW)/2012,
Welfare05.03.2012
D.O.Lr.No.45/M
Hon'ble MinisterDated:
for Trible 0.0082260372 1.20 21.80 Category 9 New (Addnl.) SubSurface (Bore well) - - PLAIN
(TW)/2012,
Welfare05.03.2012
D.O.Lr.No.45/M
Hon'ble MinisterDated:
for Trible 0.0346907994 1.20 21.80 Category 9 New (Addnl.) SubSurface (Bore well) - - PLAIN
(TW)/2012,
Welfare05.03.2012
D.O.Lr.No.45/M
Hon'ble MinisterDated:
for Trible 0.0282902829 1.20 21.80 Category 9 New (Addnl.) SubSurface (Bore well) - - PLAIN
(TW)/2012,
Welfare05.03.2012
D.O.Lr.No.45/M
0.0153333333 1.20 21.80 Category 9 New (Addnl.) SubSurface (Bore well) - - PLAIN
(TW)/2012,
Hon'ble MinisterDated:
for Trible
05.03.2012
Welfare D.O.Lr.No.45/M
0.01191067 1.2 22.8 Category 9 New (Addnl.) SubSurface (Bore well) - - PLAIN
(TW)/2012, Dated:
05.03.2012
ENC, RWS&S Hyderabad 0.0043243243 1.2 2.8 Category 9 New (Addnl.) SubSurface (Bore well) - - PLAIN
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
testing &
obtaining
ENC, RWS&S Hyderabad 0.000952381 necessary
0.2 1.8 Category 9 Existing SubSurface (Bore well) - - PLAIN
permission
s, survey
ENC, RWS&S Hyderabad 0.0137931034 1.2 2.8 Category 9 New (Addnl.) SubSurface (Bore well) - - PLAIN
and
ENC, RWS&S Hyderabad 0.0008849558 preparation
1.2 0.8 Category 9 New (Addnl.) SubSurface (Bore well) - - PLAIN
of D
ENC, RWS&S Hyderabad 0.0054127199 1.2 2.8 Category 9 New (Addnl.) SubSurface (Bore well) - - PLAIN

ENC, RWS&S Hyderabad 0.0144927536 1.20 2.80 Category 9 New (Addnl.) SubSurface (Bore well) - - PLAIN
ENC, RWS&S Hyderabad 0.0180722892 1.20 4.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
ENC, RWS&S Hyderabad 0.015625 1.20 14.80 Category 9 New (Addnl.) SubSurface (Bore well) - - PLAIN

ENC, RWS&S Hyderabad 0.0076657723 0.20 19.80 Category 9 Existing BW SubSurface (Bore well) - - PLAIN

ENC, RWS&S Hyderabad 0.037593985 1.20 3.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
ENC, RWS&S Hyderabad 0.0241935484 1.20 10.80 Category 9 New (Addnl.) SubSurface (Bore well) - - PLAIN
ENC, RWS&S Hyderabad 0.0060096154 1.2 3.8 Category 3 New (Addnl.) SubSurface (Bore well) - - PLAIN
ENC, RWS&S Hyderabad 0.0036563071 0.2 1.8 Category 9 Existing SubSurface (Bore well) - - PLAIN
ENC, RWS&S Hyderabad 0.0057471264 1.2 1.8 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
ENC, RWS&S Hyderabad 0.0097560976 1.2 2.8 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
ENC, RWS&S Hyderabad 0.0088757396 0.9 2.1 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
testing &
obtaining
ENC, RWS&S Hyderabad 0.0212014134 1.2
necessary 4.8 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
permission
ENC, RWS&S Hyderabad 0.0058962264 1.2 3.8 Category 9 New (Addnl.) SubSurface (Bore well) - - PLAIN
s, survey
ENC, RWS&S Hyderabad 0.0038022814 and
1.2 0.8 Category 9 New (Addnl.) SubSurface (Bore well) - - PLAIN
preparation
ENC, RWS&S Hyderabad 0.0065075922 1.2D
of 1.8 Category 9 New (Addnl.) SubSurface (Bore well) - - PLAIN

ENC, RWS&S Hyderabad 0.0169067001 1.20 25.80 Category 9 New (Addnl.) SubSurface (Bore well) - - PLAIN

ENC, RWS&S Hyderabad 0.0161290323 0.2 7.8 Category 9 Existing SubSurface (Bore well) - - PLAIN
ENC, RWS&S Hyderabad 0.0012019231 1.2 -0.2 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
ENC, RWS&S Hyderabad 0.0027586207 1.2 0.8 Category 9 New (Addnl.) SubSurface (Bore well) - - PLAIN
ENC, RWS&S Hyderabad 0.0015600624 1.2 3.8 Category 9 New (Addnl.) SubSurface (Bore well) - - PLAIN
ENC, RWS&S Hyderabad 0.0018024513 1.2 3.8 Category 9 New (Addnl.) SubSurface (Bore well) - - PLAIN
ENC, RWS&S Hyderabad 0.0061728395 1.2 3.8 Category 9 New (Addnl.) SubSurface (Bore well) - - PLAIN

ENC, RWS&S Hyderabad 0.034965035 1.2 3.8 Category 3 New (Addnl.) SubSurface (Bore well) - ST -

ENC, RWS&S Hyderabad 0.0526315789 1.2 1.8 Category 9 New (Addnl.) SubSurface (Bore well) - ST -
ENC, RWS&S Hyderabad 0.0065359477 1.1 -0.1 Category 9 New (Addnl.) SubSurface (Bore well) - - PLAIN

ENC, RWS&S Hyderabad 0.0008853475 1.2 0.8 Category 9 New (Addnl.) SubSurface (Bore well) - - PLAIN
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
testing &
obtaining
ENC, RWS&S Hyderabad 0.0104895105 1.20
necessary 1.80 Category 9 New (Addnl.) SubSurface (Bore well) - - PLAIN
permission
ENC, RWS&S Hyderabad 0.0025575448 1.2 -0.2 Category 3 New (Addnl.) SubSurface (Bore well) - - PLAIN
s, survey
ENC, RWS&S Hyderabad 0.0112160567 and
0.90 18.10 Category 9 New (Addnl.) SubSurface (Bore well) SC - -
preparation
ENC, RWS&S Hyderabad 0.0015772871 0.2D
of 0.8 Category 9 Existing SubSurface (Bore well) - - PLAIN
ENC, RWS&S Hyderabad 0.0035492458 1.2 2.8 Category 9 New (Addnl.) SubSurface (Bore well) - - PLAIN
ENC, RWS&S Hyderabad 0.012295082 1.20 1.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -

ENC, RWS&S Hyderabad 0.0144927536 0.20 1.80 Category 3 Existing BW SubSurface (Bore well) - ST -

ENC, RWS&S Hyderabad 0.0197530864 1.20 14.80 Category 9 New (Addnl.) SubSurface (Bore well) - - PLAIN

ENC, RWS&S Hyderabad 0.0358814353 1.20 21.80 Category 9 New (Addnl.) SubSurface (Bore well) - - PLAIN

ENC, RWS&S Hyderabad 0.004691689 1.2 5.8 Category 9 New (Addnl.) SubSurface (Bore well) - - PLAIN
ENC, RWS&S Hyderabad 0.0063451777 1.2 3.8 Category 9 New (Addnl.) SubSurface (Bore well) - ST -
ENC, RWS&S Hyderabad 0.0049200492 1.2 2.8 Category 9 New (Addnl.) SubSurface (Bore well) SC - -
ENC, RWS&S Hyderabad 0.004 1.2 4.8 Category 9 New (Addnl.) SubSurface (Bore well) - - PLAIN
ENC, RWS&S Hyderabad 0.0027045301 1.2 2.8 Category 9 New (Addnl.) SubSurface (Bore well) - - PLAIN
ENC, RWS&S Hyderabad 0.0012053474 1.2 9.8 Category 9 New (Addnl.) SubSurface (Bore well) - - PLAIN
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
testing &
obtaining
ENC, RWS&S Hyderabad 0.0123762376 1.2
necessary 3.8 Category 9 New (Addnl.) SubSurface (Bore well) - - PLAIN
permission
ENC, RWS&S Hyderabad 0.0362903226 1.20 16.80 Category 9 New (Addnl.) SubSurface (Bore well) - - PLAIN
s, survey
ENC, RWS&S Hyderabad 0.0240384615 and
1.20 18.80 Category 3 New (Addnl.) SubSurface (Bore well) - - PLAIN
preparation
ENC, RWS&S Hyderabad 0.0329067642 1.20
of D 16.80 Category 9 New (Addnl.) SubSurface (Bore well) - - PLAIN
ENC, RWS&S Hyderabad 0.0344827586 1.20 16.80 Category 3 New (Addnl.) SubSurface (Bore well) - - PLAIN
ENC, RWS&S Hyderabad 0.007585335 0.20 17.80 Category 9 Existing BW SubSurface (Bore well) - - PLAIN
ENC, RWS&S Hyderabad 0.0586319218 0.20 17.80 Category 3 Existing BW SubSurface (Bore well) - ST -
ENC, RWS&S Hyderabad 0.0700389105 0.20 17.80 Category 3 Existing BW SubSurface (Bore well) - ST -
ENC, RWS&S Hyderabad 0.0310077519 0.20 7.80 Category 3 Existing BW SubSurface (Bore well) - ST -
ENC, RWS&S Hyderabad 0.0021459227 0.2 5.8 Category 9 Existing SubSurface (Bore well) - ST -
ENC, RWS&S Hyderabad 0.019138756 1.2 2.8 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
ENC, RWS&S Hyderabad 0.125 1.20 9.80 Category 9 New (Addnl.) SubSurface (Bore well) - - PLAIN
ENC, RWS&S Hyderabad 0.0029140359 1.2 4.8 Category 9 New (Addnl.) SubSurface (Bore well) - - PLAIN
ENC, RWS&S Hyderabad 0.0041322314 1.2 3.8 Category 9 New (Addnl.) SubSurface (Bore well) - - PLAIN

ENC, RWS&S Hyderabad 0.0016020506 1.2 3.8 Category 9 New (Addnl.) SubSurface (Bore well) - - PLAIN

ENC, RWS&S Hyderabad 0.0039215686 1.2 0.8 Category 9 New (Addnl.) SubSurface (Bore well) - - PLAIN
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
testing &
obtaining
ENC, RWS&S Hyderabad 0.0228136882 1.20
necessary 10.80 Category 9 New (Addnl.) SubSurface (Bore well) - - PLAIN
permission
ENC, RWS&S Hyderabad 0.0174216028 1.20 3.80 Category 9 New (Addnl.) SubSurface (Bore well) - ST -
s, survey
ENC, RWS&S Hyderabad 0.0158415842 and
0.20 7.80 Category 9 Existing BW SubSurface (Bore well) - - PLAIN
preparation
of D
ENC, RWS&S Hyderabad 0.0129716981 0.20 10.80 Category 9 Existing BW SubSurface (Bore well) - - PLAIN

ENC, RWS&S Hyderabad 0.0206378987 0.20 10.80 Category 9 Existing BW SubSurface (Bore well) - - PLAIN

ENC, RWS&S Hyderabad 0.0317460317 0.20 7.80 Category 9 Existing BW SubSurface (Bore well) - ST -
ENC, RWS&S Hyderabad 0.0089285714 0.2 2.8 Category 9 Existing SubSurface (Bore well) - ST -
ENC, RWS&S Hyderabad 0.0127462341 0.20 10.80 Category 9 Existing BW SubSurface (Bore well) - - PLAIN
ENC, RWS&S Hyderabad 0.0058823529 1.2 4.8 Category 9 New (Addnl.) SubSurface (Bore well) - - PLAIN
ENC, RWS&S Hyderabad 0.009047619 0.2 18.8 Category 9 Existing SubSurface (Bore well) - - PLAIN

ENC, RWS&S Hyderabad 0.0517241379 1.20 13.80 Category 9 New (Addnl.) SubSurface (Bore well) - - PLAIN

ENC, RWS&S Hyderabad 0.0088495575 1.2 18.8 Category 9 New (Addnl.) SubSurface (Bore well) - - PLAIN
Memo.No.AE3
ENC, RWS&S Hyderabad /DEE2(N)/RW 0.0428015564 1.20 9.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
CE NRDWP (NORMAL), S&S/Sirpur
0.018707483 1.20 9.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
RWS&S Hyderabad Constituency/
ENC, RWS&S Hyderabad Adilabad/2012 0.0099009901 1.2 0.8 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
,
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
Memo.No.AE3 n, Yield
/DEE2(N)/RW testing &
CE NRDWP (NORMAL), Memo.No.AE3
S&S/Sirpur obtaining
/DEE2(N)/RW 0.0160583942 0.20
necessary 10.80 Category 9 Existing BW SubSurface (Bore well) - - PLAIN
RWS&S Hyderabad Constituency/
CE NRDWP (NORMAL), Memo.No.AE3
S&S/Sirpur permission
Adilabad/2012 0.0004030633 0.2 0.8 Category 9 Existing SubSurface (Bore well) - - PLAIN
RWS&S Hyderabad /DEE2(N)/RW
Constituency/ s, survey
,
Memo.No.AE3
CE NRDWP (NORMAL), S&S/Sirpur
Adilabad/2012 and
/DEE2(N)/RW 0.002284148 1.2 3.8 Category 9 New (Addnl.) SubSurface (Bore well) - - PLAIN
RWS&S Hyderabad Constituency/
, preparation
CE NRDWP (NORMAL), Memo.No.AE3
S&S/Sirpur
Adilabad/2012 0.0197368421 0.20
of D 2.80 Category 9 Existing BW SubSurface (Bore well) - - PLAIN
RWS&S Hyderabad /DEE2(N)/RW
Constituency/
,
Memo.No.AE3
CE NRDWP (NORMAL), S&S/Sirpur
Adilabad/2012
/DEE2(N)/RW 0.0220588235 1.20 1.80 Category 9 New (Addnl.) SubSurface (Bore well) - - PLAIN
RWS&S Hyderabad Constituency/
,
CE NRDWP (NORMAL), Memo.No.AE3
S&S/Sirpur
Adilabad/2012 0.01953125 1.20 3.80 Category 3 New (Addnl.) SubSurface (Bore well) - - PLAIN
RWS&S Hyderabad /DEE2(N)/RW
Constituency/
,
Memo.No.AE3
CE NRDWP (NORMAL), S&S/Sirpur
Adilabad/2012
/DEE2(N)/RW 0.025 1.20 10.80 Category 9 New (Addnl.) SubSurface (Bore well) - - PLAIN
RWS&S Hyderabad Constituency/
,
CE NRDWP (NORMAL), Memo.No.AE3
S&S/Sirpur
Adilabad/2012 0.0022172949 0.2 0.8 Category 3 Existing SubSurface (Bore well) - ST -
RWS&S Hyderabad /DEE2(N)/RW
Constituency/
,
Memo.No.AE3
CE NRDWP (NORMAL), S&S/Sirpur
Adilabad/2012
/DEE2(N)/RW 0.0134969325 1.20 9.80 Category 9 New (Addnl.) SubSurface (Bore well) - - PLAIN
RWS&S Hyderabad Constituency/
,
CE NRDWP (NORMAL), Memo.No.AE3
S&S/Sirpur
Adilabad/2012 0.0018066847 1.2 0.8 Category 9 New (Addnl.) SubSurface (Bore well) - - PLAIN
RWS&S Hyderabad /DEE2(N)/RW
Constituency/
,
CE NRDWP (NORMAL), S&S/Sirpur
Adilabad/2012 0.0009276438 1.2 1.8 Category 9 New (Addnl.) SubSurface (Bore well) - - PLAIN
RWS&S Hyderabad Constituency/
,
Memo.No.AE3
ENC, RWS&S Hyderabad Adilabad/2012 0.0367346939 0.20 17.80 Category 9 Existing BW SubSurface (Bore well) - - PLAIN
/DEE2(N)/RW
,
Memo.No.AE3
CE NRDWP (NORMAL), S&S/Sirpur
/DEE2(N)/RW 0.0149501661 0.20 17.80 Category 9 Existing BW SubSurface (Bore well) - - PLAIN
RWS&S Hyderabad Constituency/
CE NRDWP (NORMAL), Memo.No.AE3
S&S/Sirpur
Adilabad/2012 0.0011160714 0.2 0.8 Category 9 Existing SubSurface (Bore well) - - PLAIN
RWS&S Hyderabad /DEE2(N)/RW
Constituency/
,
Memo.No.AE3
CE NRDWP (NORMAL), S&S/Sirpur
Adilabad/2012
/DEE2(N)/RW 0.0333889816 1.20 18.80 Category 9 New (Addnl.) SubSurface (Bore well) - ST -
RWS&S Hyderabad Constituency/
,
CE NRDWP (NORMAL), S&S/Sirpur
Adilabad/2012 0.0103270224 1.2 4.8 Category 9 New (Addnl.) SubSurface (Bore well) - - PLAIN
RWS&S Hyderabad Constituency/
,
Adilabad/2012
,
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
Memo.No.AE3 n, Yield
/DEE2(N)/RW testing &
CE NRDWP (NORMAL), S&S/Sirpur obtaining
0.0186046512 1.2
necessary 14.8 Category 9 New (Addnl.) SubSurface (Bore well) - - PLAIN
RWS&S Hyderabad Constituency/
Memo.No.AE3 permission
ENC, RWS&S Hyderabad Adilabad/2012 0.02 1.2 4.8 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
/DEE2(N)/RW s, survey
,
Memo.No.AE3
CE NRDWP (NORMAL), S&S/Sirpur and
/DEE2(N)/RW 0.0188517566 1.20 20.80 Category 9 New (Addnl.) SubSurface (Bore well) - - PLAIN
RWS&S Hyderabad Constituency/ preparation
CE NRDWP (NORMAL), Memo.No.AE3
S&S/Sirpur
Adilabad/2012 0.0045146727 0.2D
of 1.8 Category 9 Existing SubSurface (Bore well) - - PLAIN
RWS&S Hyderabad /DEE2(N)/RW
Constituency/
,
Memo.No.AE3
CE NRDWP (NORMAL), S&S/Sirpur
Adilabad/2012
/DEE2(N)/RW 0.0297297297 1.20 20.80 Category 9 New (Addnl.) SubSurface (Bore well) - - PLAIN
RWS&S Hyderabad Constituency/
,
CE NRDWP (NORMAL), Memo.No.AE3
S&S/Sirpur
Adilabad/2012 0.0068181818 1.2 1.8 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
RWS&S Hyderabad /DEE2(N)/RW
Constituency/
,
Memo.No.AE3
CE NRDWP (NORMAL), S&S/Sirpur
Adilabad/2012
/DEE2(N)/RW 0.0082191781 1.2 1.8 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
RWS&S Hyderabad Constituency/
,
CE NRDWP (NORMAL), Memo.No.AE3
S&S/Sirpur
Adilabad/2012 0.0390455531 0.20 17.80 Category 9 Existing BW SubSurface (Bore well) - - PLAIN
RWS&S Hyderabad /DEE2(N)/RW
Constituency/
,
CE NRDWP (NORMAL), S&S/Sirpur
Adilabad/2012 0.0163447251 0.20 10.80 Category 9 Existing BW SubSurface (Bore well) - - PLAIN
RWS&S Hyderabad Constituency/
,
ENC, RWS&S Hyderabad Adilabad/2012 0.0305343511 1.20 2.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
,
ENC, RWS&S Hyderabad 0.0677966102 1.20 2.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
ENC, RWS&S Hyderabad 0.0333333333 1.20 2.80 Category 3 New (Addnl.) SubSurface (Bore well) SC - -
ENC, RWS&S Hyderabad 0.0289855072 1.20 8.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
ENC, RWS&S Hyderabad 0.0317460317 1.20 8.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
Memo.No.AE3
ENC, RWS&S Hyderabad /DEE2(N)/RW 0.0184331797 1.20 2.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
CE NRDWP (NORMAL), S&S/Sirpur
0.0028844893 0.2 21.8 Category 9 Existing SubSurface (Bore well) - - PLAIN
RWS&S Hyderabad Constituency/
Adilabad/2012
,
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
testing &
obtaining
0.004379562 1.2
necessary 1.8 Category 9 New (Addnl.) SubSurface (Bore well) - - PLAIN
permission
0.0116033755 1.20 20.80 Category 9 New (Addnl.) SubSurface (Bore well) - - PLAIN
s, survey
0.0142372881 and
1.2 19.8 Category 9 New (Addnl.) SubSurface (Bore well) - - PLAIN
preparation
0.027638191 1.2D
of 9.8 Category 9 New (Addnl.) SubSurface (Bore well) SC - -
0.0164203612 1.2 18.8 Category 9 New (Addnl.) SubSurface (Bore well) - - PLAIN
0.0022123894 1.2 0.8 Category 9 New (Addnl.) SubSurface (Bore well) - - PLAIN

-- -- 0.0022133687 0.2 4.8 Category 6 Existing - - PLAIN

-- -- 0.0027072758 0.2 7.8 Category 6 Existing - - PLAIN

-- -- 0.0053956835 0.2 14.8 Category 6 Existing - - PLAIN

-- -- 0.012195122 0.2 14.8 Category 6 Existing - - PLAIN


-- -- 0.0420168067 0.2 14.8 Category 6 Existing - - PLAIN
-- -- 0.0062402496 0.2 3.8 Category 6 Existing SC - -
-- -- 0.0025923526 0.2 3.8 Category 6 Existing - - PLAIN
-- -- 0.0028288543 0.2 3.8 Category 6 Existing - ST -
-- -- 0.0172413793 0.20 3.80 Category 6 Existing BW SC - -
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
testing &
obtaining
-- -- 0.0075614367 0.2
necessary 3.8 Category 6 Existing - - PLAIN
permission
-- -- 0.0039447732 0.2 3.8 Category 6 Existing - - PLAIN
s, survey
-- -- 0.0088105727 and
0.20 3.80 Category 6 Existing BW - - PLAIN
preparation
-- -- 0.0078585462 0.2D
of 3.8 Category 6 Existing - - PLAIN
-- -- 0.0127795527 0.20 3.80 Category 6 Existing BW - - PLAIN
-- -- 0.0065789474 0.20 3.80 Category 6 Existing BW - - PLAIN
-- -- 0.0049689441 0.20 3.80 Category 6 Existing BW - - PLAIN
-- -- 0.0053050398 0.2 3.8 Category 6 Existing - - PLAIN
-- -- 0.0093023256 0.2 3.8 Category 6 Existing SC - -
-- -- 0.0018509949 0.2 3.8 Category 6 Existing - - PLAIN
-- -- 0.0079207921 0.2 3.8 Category 6 Existing - ST -
-- -- 0.00128123 0.2 3.8 Category 6 Existing - - PLAIN
0.0055607044 1.2 16.8 Category 9 New (Addnl.) SubSurface (Bore well) - - PLAIN

0.0326086957 1.20 7.80 Category 9 New (Addnl.) SubSurface (Bore well) - ST -

0.0109289617 1.2 0.8 Category 9 New (Addnl.) SubSurface (Bore well) - - PLAIN
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
testing &
obtaining
-- -- 0.1343283582 1.20
necessary 7.80 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
permission
-- -- 0.0027173913 1.2 0.8 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
s, survey
-- -- 0.0119521912 and
1.20 10.80 Category 7 New (Addnl.) SubSurface (Bore well) SC - -
preparation
-- -- 0.0108043217 1.2D
of 7.8 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
-- -- 0.013503909 1.20 17.80 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
-- -- 0.0037926675 1.2 7.8 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
-- -- 0.0056746532 1.2 7.8 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
-- -- 0.0137382502 1.20 17.80 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
-- -- 0.0647482014 1.20 7.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.0347490347 1.20 7.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.0161725067 1.20 10.80 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
-- -- 0.0272727273 1.20 1.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.0446428571 1.20 3.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.0517241379 1.20 7.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.0092864125 1.20 17.80 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
-- -- 0.28125 1.20 7.80 Category 7 New (Addnl.) SubSurface (Bore well) - ST -
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
testing &
obtaining
-- -- 0.1428571429 1.20
necessary 7.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
permission
-- -- 0.0054495913 1.2 0.8 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
s, survey
-- -- 0.0075 and
1.2 1.8 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
preparation
-- -- 0.0196078431 1.20
of D 10.80 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
-- -- 0.0326086957 1.20 7.80 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
-- -- 0.0011547344 1.2 0.8 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
-- -- 0.0161290323 1.20 1.80 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
-- -- 0.038961039 0.20 8.80 Category 3 Existing BW SubSurface (Bore well) - ST -

-- -- 0.0216346154 1.20 7.80 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN

-- -- 0.018442623 1.20 7.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -


-- -- 0.05 1.20 3.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.0134228188 1.20 10.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.0103626943 1.20 0.80 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
-- -- 0.0212177122 1.20 21.80 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
-- -- 0.0138248848 1.20 10.80 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
-- -- 0.0442804428 1.20 10.80 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
testing &
obtaining
-- -- 0.0019762846 necessary
1.2 0.8 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
permission
-- -- 0.05 s, 1.20
survey 7.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
and
-- -- 0.0147401086 preparation
1.20 17.80 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
of D
-- -- 0.0110208817 1.20 17.80 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN

-- -- 0.0147401086 1.20 17.80 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN

-- -- 0.1578947368 1.20 7.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -

-- -- 0.0196078431 1.20 1.80 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN

-- -- 0.1063829787 1.20 3.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -

-- -- 0.1578947368 1.20 7.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -

-- -- 0.1578947368 1.20 7.80 Category 7 New (Addnl.) SubSurface (Bore well) - ST -

-- -- 0.1578947368 1.20 7.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -


-- -- 0.03 1.20 1.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -

-- -- 0.0308641975 1.20 3.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -


Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
testing &
obtaining
-- -- 0.0555555556 necessary
1.20 7.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
permission
-- -- 0.0191082803 s, 1.20
survey 7.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
and
-- -- 0.0478723404 preparation
1.20 7.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
of D
-- -- 0.3 1.20 7.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -

-- -- 0.3103448276 1.20 7.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -

-- -- 0.0371900826 1.20 7.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -

-- -- 0.0381679389 1.20 3.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -


-- -- 0.0254237288 1.20 7.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.0326797386 1.20 3.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -

-- -- 0.0162381597 1.20 10.80 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN

-- -- 0.0381679389 1.20 3.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -

-- -- 0.0151975684 1.20 3.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -


-- -- 0.0656934307 0.20 17.80 Category 3 Existing BW - ST -
-- -- 0.0491803279 0.20 17.80 Category 3 Existing BW - ST -
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
testing &
obtaining
-- -- 0.144 0.20
necessary 17.80 Category 7 Existing BW - - PLAIN
permission
-- -- 0.0573248408 0.20 17.80 Category 3 Existing BW - ST -
s, survey
-- -- 0.0857142857 and
0.20 17.80 Category 3 Existing BW - ST -
preparation
-- -- 0.0626780627 of D
1.20 20.80 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN

-- -- 0.0411985019 1.20 20.80 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN

-- -- 0.0836501901 1.20 20.80 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN

-- -- 0.0408921933 1.20 20.80 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN

-- -- 0.075862069 1.20 20.80 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN

-- -- 0.0543209877 1.20 20.80 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN

-- -- 0.0710382514 1.2 11.8 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN

-- -- 0.2178217822 1.20 20.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -

-- -- 0.0208667737 1.2 11.8 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
testing &
obtaining
-- -- 0.0560344828 necessary
1.2 11.8 Category 7 New (Addnl.) SubSurface (Bore well) SC - -
permission
s, survey
-- -- 0.0122699387 1.20
and 0.80 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
-- -- 0.0122699387 preparation
1.20 0.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
of D
-- -- 0.0003449465 0.2 0.8 Category 7 Existing - - PLAIN
-- -- 0.0412844037 1.20 16.80 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
-- -- 0.0607476636 1.20 11.80 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
-- -- 0.0537190083 1.20 11.80 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
-- -- 0.04048583 1.20 18.80 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
-- -- 0.0094137783 1.20 20.80 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
-- -- 0.0334190231 1.20 11.80 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
-- -- 0.0341207349 1.20 11.80 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
-- -- 0.0336787565 1.20 11.80 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
-- -- 0.0101626016 1.2 3.8 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
-- -- 0.0454545455 1.2 2.8 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN

-- -- 0.0032967033 1.2 1.8 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
testing &
obtaining
-- -- 0.0393939394 1.20
necessary 11.80 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
permission
-- -- 0.0367892977 1.20 20.80 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
s, survey
-- -- 0.06875 and
1.20 9.80 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
preparation
-- -- 0.0386904762 1.20
of D 11.80 Category 7 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.0483091787 1.20 18.80 Category 7 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.0292553191 1.20 9.80 Category 7 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.0437375746 1.20 20.80 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
-- -- 0.0462184874 1.20 20.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.0046728972 1.2 3.8 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
-- -- 0.0151878497 1.20 17.80 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
-- -- 0.0321167883 1.20 20.80 Category 7 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.0070463887 0.2 11.8 Category 7 Existing - - PLAIN
-- -- 0.0431372549 1.20 20.80 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
-- -- 0.1083743842 1.20 20.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.0310786106 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.0393873085 0.20 17.80 Category 3 Existing BW - ST -
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
testing &
obtaining
-- -- 0.0507614213 1.20
necessary 18.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
permission
-- -- 0.0437017995 1.20 15.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
s, survey
-- -- 0.0245098039 and
0.20 4.80 Category 3 Existing BW - ST -
preparation
-- -- 0.0301204819 1.20
of D 3.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.0272727273 0.20 5.80 Category 7 Existing BW SubSurface (Bore well) - - PLAIN
-- -- 0.0517241379 1.20 1.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.0084643289 0.20 20.80 Category 7 Existing BW - - PLAIN
-- -- 0.024 1.20 4.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.00456621 1.2 2.8 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.0045146727 1.2 4.8 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.0116959064 1.2 4.8 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.0058479532 1.2 1.8 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.0071942446 1.2 0.8 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.0259067358 0.20 4.80 Category 3 Existing BW - ST -
-- -- 0.0028719127 1.2 3.8 Category 3 New (Addnl.) SubSurface (Bore well) - - PLAIN
-- -- 0.001986755 1.2 1.8 Category 3 New (Addnl.) SubSurface (Bore well) - - PLAIN
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
testing &
obtaining
-- -- 0.0021052632 1.2
necessary 0.8 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
permission
-- -- 0.0024875622 1.2 2.8 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
s, survey
-- -- 0.0020567668 and
1.2 3.8 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
preparation
-- -- 0.0581162325 1.20
of D 27.80 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
-- -- 0.0040567951 1.2 4.8 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.0643015521 1.20 27.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.0210526316 1.20 24.80 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
-- -- 0.0384615385 1.20 7.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.0027173913 1.2 3.8 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
-- -- 0.0038610039 1.2 0.8 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.0022185247 0.20 3.80 Category 7 Existing BW - - PLAIN
-- -- 0.0642673522 1.70 23.30 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
-- -- 0.0271493213 1.20 4.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.0037907506 1.2 3.8 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
-- -- 0.0358166189 1.70 23.30 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
-- -- 0.0801282051 1.70 23.30 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
testing &
obtaining
-- -- 0.0046620047 1.2
necessary 0.8 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
permission
-- -- 0.0318471338 1.20 3.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
s, survey
-- -- 0.0229357798 and
1.20 3.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
preparation
-- -- 0.0490196078 1.20
of D 3.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.0053333333 1.2 2.8 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.0156862745 1.20 2.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.0045819015 1.2 2.8 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.0027277687 1.2 3.8 Category 3 New (Addnl.) SubSurface (Bore well) - - PLAIN
-- -- 0.0248868778 1.20 9.80 Category 3 New (Addnl.) SubSurface (Bore well) - - PLAIN
-- -- 0.0666666667 1.20 16.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.0285714286 1.20 1.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.0080645161 1.2 0.8 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.0023529412 1.2 2.8 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
-- -- 0.0052202284 1.2 2 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
-- -- 0.0060240964 1.2 3.8 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
-- -- 0.0114285714 1.2 6.8 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
testing &
obtaining
-- -- 0.012749004 1.2
necessary 2 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
permission
-- -- 0.0023980815 1.2 3.8 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
s, survey
-- -- 0.0137614679 and
0.20 2.80 Category 7 Existing BW - - PLAIN
preparation
-- -- 0.0025396825 1.2D
of 2 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
-- -- 0.0416666667 1.20 1.80 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
-- -- 0.0509915014 0.20 17.80 Category 7 Existing BW - - PLAIN
-- -- 0.0072892938 1.2 2 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
-- -- 0.0222222222 1.20 1.80 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
-- -- 0.0588235294 1.20 1.80 Category 1 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.0585858586 1.20 27.80 Category 1 New (Addnl.) SubSurface (Bore well) SC - -
-- -- 0.0277777778 1.20 1.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.020979021 1.20 1.80 Category 3 New (Addnl.) SubSurface (Bore well) - - PLAIN
-- -- 0.0337078652 1.20 1.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.1104294479 1.20 16.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.0559006211 1.20 7.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.0023988006 1.2 2 Category 3 New (Addnl.) SubSurface (Bore well) - - PLAIN
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
testing &
obtaining
-- -- 0.0034482759 0.2
necessary 0.8 Category 3 Existing - - PLAIN
permission
-- -- 0.0154639175 0.20 2.80 Category 3 Existing BW - - PLAIN
s, survey
-- -- 0.0056939502 and
1.2 2 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
preparation
-- -- 0.0618556701 1.20
of D 16.80 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
-- -- 0.0039564787 1.2 2.8 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
-- -- 0.0338983051 1.20 2.80 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
-- -- 0.01171875 0.20 2.80 Category 7 Existing BW SubSurface (Bore well) - - PLAIN
-- -- 0.0294117647 1.20 1.80 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
-- -- 0.0545454545 1.20 4.80 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
-- -- 0.0017709563 1.2 4.8 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
-- -- 0.0316205534 0.20 7.80 Category 7 Existing BW - - PLAIN
-- -- 0.037037037 1.20 2.80 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
-- -- 0.0753138075 0.20 17.80 Category 7 Existing BW - - PLAIN
-- -- 0.0942408377 0.20 17.80 Category 7 Existing BW - - PLAIN
-- -- 0.0416666667 1.20 27.80 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
-- -- 0.0301455301 1.20 27.80 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
testing &
obtaining
-- -- 0.045112782 0.20
necessary 17.80 Category 7 Existing BW - - PLAIN
permission
-- -- 0.0338983051 1.20 32.80 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
s, survey
-- -- 0.0257731959 and
1.2 18.8 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
preparation
-- -- 0.0263157895 1.20
of D 32.80 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
-- -- 0.0334572491 0.20 17.80 Category 7 Existing BW - - PLAIN
-- -- 0.0618336887 1.20 27.80 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
-- -- 0.0582524272 0.20 17.80 Category 7 Existing BW - - PLAIN

-- -- 0.0782918149 1.20 20.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -

-- -- 0.0706319703 0.20 18.80 Category 3 Existing BW SubSurface (Bore well) - - PLAIN

-- -- 0.1525423729 1.20 7.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -


-- -- 0.0020929259 1.2 3.8 Category 3 New (Addnl.) SubSurface (Bore well) - - PLAIN
-- -- 0.0026809651 0.2 3.8 Category 3 Existing - - PLAIN
-- -- 0.0011007155 1.2 0.8 Category 3 New (Addnl.) SubSurface (Bore well) - - PLAIN
-- -- 0.0337423313 1.20 20.80 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
-- -- 0.0022792023 0.2 3.8 Category 7 Existing - - PLAIN
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
testing &
obtaining
-- -- 0.0154589372 1.2
necessary 14.8 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
permission
-- -- 0.0597826087 1.20 20.80 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
s, survey
and
-- -- 0.057591623 preparation
1.20 20.80 Category 3 New (Addnl.) SubSurface (Bore well) - - PLAIN
of D
-- -- 0.0085910653 1.2 3.8 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN

-- -- 0.0363036304 1.20 20.80 Category 1 New (Addnl.) SubSurface (Bore well) - - PLAIN

-- -- 0.0030266344 1.2 3.8 Category 7 New (Addnl.) SubSurface (Bore well) - ST -


-- -- 0.039497307 1.20 20.80 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
-- -- 0.013400335 1.20 6.80 Category 7 New (Addnl.) SubSurface (Bore well) SC - -

-- -- 0.0041528239 1.2 3.8 Category 1 New (Addnl.) SubSurface (Bore well) - - PLAIN

-- -- 0.0521327014 1.20 20.80 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
-- -- 0.0735785953 1.20 20.80 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
-- -- 0.0056876939 1.2 9.8 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
-- -- 0.0006830601 0.2 0.8 Category 7 Existing - - PLAIN
-- -- 0.0367647059 1.20 3.80 Category 3 New (Addnl.) SubSurface (Bore well) - - PLAIN
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
testing &
obtaining
-- -- 0.4193548387 1.20
necessary 11.80 Category 3 New (Addnl.) SubSurface (Bore well) - - PLAIN
permission
-- -- 0.0982142857 1.20 9.80 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
s, survey
-- -- 0.0192307692 and
0.20 10.80 Category 7 Existing BW - - PLAIN
preparation
-- -- 0.0158415842 of D
0.20 7.80 Category 7 Existing BW - - PLAIN

-- -- 0.0048309179 0.20 0.80 Category 7 Existing BW - - PLAIN

-- -- 0.0007047216 0.2 0.8 Category 7 Existing - - PLAIN


-- -- 0.0004409171 0.2 0.8 Category 7 Existing - - PLAIN
-- -- 0.0235294118 0.20 7.80 Category 7 Existing BW - - PLAIN
-- -- 0.0019120459 0.2 0.8 Category 7 Existing - - PLAIN
-- -- 0.025974026 0.20 7.80 Category 3 Existing BW - - PLAIN
-- -- 0.0218037661 1.20 20.80 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
-- -- 0.0029103609 1.2 3.8 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
-- -- 0.0035516093 1.2 2 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
-- -- 0.0019175455 1.2 0.8 Category 7 New (Addnl.) SubSurface (Bore well) - ST -
-- -- 0.0126984127 1.20 2.00 Category 3 New (Addnl.) SubSurface (Bore well) - ST -
Investigatio
n, Yield
testing & Source is existing Whether Source is Surface or
COST OF PART A & B
obtaining Category No Remarks
or new Subsurface
necessary
permission
s, survey
and
preparation
Endrosment of DPR
Endrosed by Per capita cost Cost of
Details
(Col.No. PART-B =
37+ (59-64)
amt.require
d towards
nvestigatio
n, Yield
testing &
obtaining
-- -- 0.0596205962 1.20
necessary 20.80 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
permission
-- -- 0.0367278798 s, 1.20
survey 20.80 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
and
preparation
-- -- 0.0337941628 1.20
of D 20.80 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN

-- -- 0.0015349194 1.2 0.8 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
-- -- 0.0067658999 1.2 3.8 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN
-- -- 0.0032488629 1.2 3.8 Category 7 New (Addnl.) SubSurface (Bore well) - - PLAIN

You might also like