Professional Documents
Culture Documents
Assignment 1: Institute of Technology of Cambodia
Assignment 1: Institute of Technology of Cambodia
Assignment 1
Topic: Policy of vertical clearances in Cambodia or US and their Reality
Student name’s: ID
Table of Contents
I. Introduction:...........................................................................................................................................................2
II. Objective:................................................................................................................................................................2
III. Specifications:.........................................................................................................................................................2
1) For Major Structures.......................................................................................................................................2
2) For Minor Structures......................................................................................................................................2
3) For Federal Aid Participation..........................................................................................................................2
4) Tunnel Clearances...........................................................................................................................................3
IV. Site Observation:....................................................................................................................................................3
V. Comparison between the high way design manual of the US and observation on site:.........................................5
VI. Limitation for allowing type of car travel in Phnom Penh city:...............................................................................6
Page | 1
I. Introduction:
Vertical clearance is the minimum clearance under overhead structures (including over the
paved shoulders). Height of the bridge is the maximum vertical drop distance from the bridge deck
(the road, rail or other transport bed of a bridge) down to the ground or water surface beneath the
bridge span. And it also depends on some factors are effected on selection of level design such as
the region for construction, type of road and the structure are walked across.
II. Objective:
The main objectives of the study are comparison about 3 options of the policy vertical
clearances between the Highway Design Manual, Cambodia Standard and measurement data in
real situation for constructed in around Phnom Penh city such as flyover, and the plat of
commercial on the road. Add more, we will demonstrate about limitation of access movement of a
kind truck travel on some road in our city. So, there are necessaries for drivers to understand the
policy of vertical clearances that are allowable travelling of heavy trucks in our city.
III. Specifications:
According to the high way design manual of the US for any structures above any roads always has
the allowable clearance as below:
Page | 2
Railroad Facilities
1) 7.1 m over the top of rails for non-electrified rail systems
2) 7.4 m over the top of rails for existing or proposed 25 kv electrification
3) 8 m over the top of rails for existing or proposed 50 kv electrification.
4) Tunnel Clearances
The minimum vertical clearance shall be 4.6 m measured at any point over the traveled way
and 4.5 m above the gutter at the curb line.
1) 5 Makara Skyway:
2) 7
Makara Skyway:
Page | 3
3) Sterng mean chey Skyway:
Page | 4
5) The plate of commercial on the street 21 near Ta Kmau statue:
Vertical clearance
Nº Site study Type
(m)
Skyway 5
1 5 Makara Skyway
Tunnel 5
2 7 Makara Skyway Skyway 5.2
Tunnel 5
3 Sterng mean chey Skyway
Sign Structures 5.2
4 Skype Bridge at Chompu voan Pedestrian over-crossings 5.5
5 Ta Kmau Sign Structure 5.2
Page | 5
Tunnel 5m 4.5 m
3 Sterng mean chey Skyway
Sign Structure 5.2 m 5.5 m
4 Sky Bridge at Chompu voan Pedestrian over-crossings 5.5 m 5.4 m
5 Ta kmau Sign Structure 5.2 m 5.5 m
On the results after we compared between HDM and the real site show that: For construction of
structure relate to vertical clearance in our country are stayed in specification of HMD.
VI. Limitation for allowing type of car travel in Phnom Penh city:
The policy for allowing type of car travel in Phnom Penh city are define by Phnom Penh capital
hall. There are several main roads for applying on this policy such as below:
2) Type B: Concrete mixer trucks are not allowing for travelling start from 6 AM to 9 AM and
4 PM to 8 PM.
Page | 6
3) Type C: Heavy trucks (6 to 10 tons) are not allowing for travelling start from 6 AM to 9
AM and 4 PM to 8 PM.
4) Type D: Heavy trucks (10 to 24 tons) are allow for travelling start from 8 PM to 6 AM.
Page | 7