V200R003C00
Quick Installation Guide
Issue 01
Date 2019-02-25
and other Huawei trademarks are trademarks of Huawei Technologies Co., Ltd.
All other trademarks and trade names mentioned in this document are the property of their respective
holders.
Notice
The purchased products, services and features are stipulated by the contract made between Huawei and
the customer. All or part of the products, services and features described in this document may not be
within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements,
information, and recommendations in this document are provided "AS IS" without warranties, guarantees or
representations of any kind, either express or implied.
The information in this document is subject to change without notice. Every effort has been made in the
preparation of this document to ensure accuracy of the contents, but all statements, information, and
recommendations in this document do not constitute a warranty of any kind, express or implied.
Website: http://e.huawei.com
Purpose
This document describes the precautions, checklist of devices installed onsite, parameters, and
drawings for installing the FusionModule1000A40 prefabricated all-in-one data center
(FusionModule1000 for short), providing installation guidance and technical support for
onsite installation personnel and technical support engineers.
Intended Audience
This document is intended for:
Maintenance engineer
Technical support engineer
System engineer
Commissioning engineer
Data configuration engineer
Symbol Conventions
The symbols that may be found in this document are defined as follows.
Symbol Remarks
Indicates an imminently hazardous situation which, if
not avoided, will result in serious injury or death.
Symbol Remarks
Indicates a potentially hazardous situation which, if not
avoided, could result in equipment damage, data loss,
performance deterioration, or unanticipated results.
NOTICE is used to address practices not related to
personal injury.
Calls attention to important information, best practices
and tips.
NOTE is used to address information not related to
personal injury, equipment damage, and environment
deterioration.
Change History
Changes between document issues are cumulative. Therefore, the latest document issue
contains all updates made in previous issues.
Issue 01 (2019-02-25)
This issue is the first official release.
Contents
This chapter describes the notes for using the quick installation guide.
Before using this document, get familiar with the actual product configuration and be
clear of the solution configuration for the data center in use, the type of power grid used
by the customer, and the internal configuration of each container.
Before performing an operation, ensure that the prerequisites are met. Otherwise, the
expected result may not be achieved. More seriously, equipment damage and personal
injury may occur.
Before using this document, read through and keep in mind the safety precautions in this
document, the precautions in each chapter or section, and the cautions and notes for
operations.
This manual provides only the drawings and parameters involved in onsite installation of
the solution. For the installation methods, see FusionModule1000A40 Prefabricated
All-in-One Data Center Installation Guide.
Precautions provided in this document are only supplementary to the local laws and
regulations governing the prefabricated all-in-one data center.
Some parameters mentioned in this document should be provided and configured by
onsite technical support engineers based on the actual application of the prefabricated
all-in-one data center.
Put on necessary protective equipment such as the safety helmet and gloves before
entering the site.
The figures provided in this document illustrate only installation and connection methods.
The actual product appearance prevails.
If not otherwise specified, the units of sizes marked in the figures are mm by default.
Installing the External (Optional) Installing the External External Cable Tray Installation
Installing the External Cable Tray Adjustable wrench, Phillips screwdriver External cable tray NO.S005
Cable Tray Cable Tray Position Diagram
Installing an External Insulation tape, wire stripper, adjustable wrench, waterproof External camera mounting kit, camera, (Optional) Installing an External External Camera Mounting Kit
Installing an External Camera NO.S012
Camera tape, RJ45 crimping tool, Phillips screwdriver, wiring terminal hoop Camera Installation Position Diagram
Installing
Devices Installing the External Installing the External Camera (Optional) Installing the External Signal SPD Installation Position
Adjustable wrench, Phillips screwdriver Signal SPD NO.S014
Outside the Camera SPD Module SPD Module Camera SPD Module Diagram
Containers
NO.M005 External Camera Wiring Diagram
Installing External (Optional) Installing External Signal
Installing External Signal Cables Crimping tool, Phillips screwdriver, cable cutter, heat gun Cable tie, cable, terminal, heat shrink tubing
Signal Cables Cables
NO.S016 Signal SPD Cable Routing Diagram
Connecting
Installing External Installing External Input Power Crimping tool, Phillips screwdriver, adjustable wrench, cable Installing External Input Power Wiring Diagram from the Mains to
External Cable tie, cable, terminal, heat shrink tubing NO.P008
Input Power Cables Cables cutter, heat gun Cables the Power PDB
Cables
40ft-AIO-CT-2N Rack config view
Frame right
Frame left
3 AI/DI Module-1 BOM: 02310RKM 3
1U Filler Panel or Filler panel BOM: 21140700
4 4
Lightning Box (Optional) Lightning Box BOM:21030116 (Optional)
5 1U Filler Panel 5
6 1U Filler Panel 6
Frame bottom