FusionModule1000A40 CT Solution

V200R003C00
Quick Installation Guide

Issue 01
Date 2019-02-25

HUAWEI TECHNOLOGIES CO., LTD.


Copyright © Huawei Technologies Co., Ltd. 2019. All rights reserved.
No part of this document may be reproduced or transmitted in any form or by any means without prior
written consent of Huawei Technologies Co., Ltd.

Trademarks and Permissions

and other Huawei trademarks are trademarks of Huawei Technologies Co., Ltd.
All other trademarks and trade names mentioned in this document are the property of their respective
holders.

Notice
The purchased products, services and features are stipulated by the contract made between Huawei and
the customer. All or part of the products, services and features described in this document may not be
within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements,
information, and recommendations in this document are provided "AS IS" without warranties, guarantees or
representations of any kind, either express or implied.
The information in this document is subject to change without notice. Every effort has been made in the
preparation of this document to ensure accuracy of the contents, but all statements, information, and
recommendations in this document do not constitute a warranty of any kind, express or implied.

Huawei Technologies Co., Ltd.


Address: Huawei Industrial Base
Bantian, Longgang
Shenzhen 518129
People's Republic of China

Website: http://e.huawei.com

Issue 01 (2019-02-25) Copyright © Huawei Technologies Co., Ltd. i


FusionModule1000A40 CT Solution
Quick Installation Guide About This Document

About This Document

Purpose
This document describes the precautions, checklist of devices installed onsite, parameters, and
drawings for installing the FusionModule1000A40 prefabricated all-in-one data center
(FusionModule1000 for short), providing installation guidance and technical support for
onsite installation personnel and technical support engineers.

Intended Audience
This document is intended for:
 Maintenance engineer
 Technical support engineer
 System engineer
 Commissioning engineer
 Data configuration engineer

Symbol Conventions
The symbols that may be found in this document are defined as follows.

Symbol Remarks
Indicates an imminently hazardous situation which, if
not avoided, will result in serious injury or death.

Indicates a potentially hazardous situation which, if not


avoided, could result in serious injury or death.

Indicates a potentially hazardous situation which, if not


avoided, may result in minor or moderate injury.

Issue 01 (2019-02-25) Copyright © Huawei Technologies Co., Ltd. ii


FusionModule1000A40 CT Solution
Quick Installation Guide About This Document

Symbol Remarks
Indicates a potentially hazardous situation which, if not
avoided, could result in equipment damage, data loss,
performance deterioration, or unanticipated results.
NOTICE is used to address practices not related to
personal injury.
Calls attention to important information, best practices
and tips.
NOTE is used to address information not related to
personal injury, equipment damage, and environment
deterioration.

Change History
Changes between document issues are cumulative. Therefore, the latest document issue
contains all updates made in previous issues.

Issue 01 (2019-02-25)
This issue is the first official release.

Issue 01 (2019-02-25) Copyright © Huawei Technologies Co., Ltd. iii


FusionModule1000A40 CT Solution
Quick Installation Guide Contents

Contents

About This Document .................................................................................................................... ii


1 Quick Installation Guide Usage................................................................................................. 1
2 Checklist of Devices Installed Onsite and Installation Drawings ...................................... 2

Issue 01 (2019-02-25) Copyright © Huawei Technologies Co., Ltd. iv


FusionModule1000A40 CT Solution
Quick Installation Guide 1 Quick Installation Guide Usage

1 Quick Installation Guide Usage

This chapter describes the notes for using the quick installation guide.
 Before using this document, get familiar with the actual product configuration and be
clear of the solution configuration for the data center in use, the type of power grid used
by the customer, and the internal configuration of each container.
 Before performing an operation, ensure that the prerequisites are met. Otherwise, the
expected result may not be achieved. More seriously, equipment damage and personal
injury may occur.
 Before using this document, read through and keep in mind the safety precautions in this
document, the precautions in each chapter or section, and the cautions and notes for
operations.
 This manual provides only the drawings and parameters involved in onsite installation of
the solution. For the installation methods, see FusionModule1000A40 Prefabricated
All-in-One Data Center Installation Guide.
 Precautions provided in this document are only supplementary to the local laws and
regulations governing the prefabricated all-in-one data center.
 Some parameters mentioned in this document should be provided and configured by
onsite technical support engineers based on the actual application of the prefabricated
all-in-one data center.
 Put on necessary protective equipment such as the safety helmet and gloves before
entering the site.
 The figures provided in this document illustrate only installation and connection methods.
The actual product appearance prevails.
 If not otherwise specified, the units of sizes marked in the figures are mm by default.

Issue 01 (2019-02-25) Copyright © Huawei Technologies Co., Ltd. 1


FusionModule1000A40 CT Solution 2 Checklist of Devices Installed Onsite and Installation
Quick Installation Guide Drawings

2 Checklist of Devices Installed Onsite and


Installation Drawings

Issue 01 (2019-02-25) Copyright © Huawei Technologies Co., Ltd. 2


Checklist of Devices Installed Onsite
Installation Corresponding Chapter in Diagram
Subcategory Item Tools Materials Diagram Name
Sequence Installation Guide ID
Determining the Container Determining the Container
Marker, ink fountain, long leather measuring tape N/A
Installation Position Installation Position
Installing Containers Removing the Container Cover Safety helmet, safety belt, step ladder, protective gloves N/A Removing the Container Cover Site Space and Container
(Concrete Platform NO.S001
Crane, socket wrench, torque wrench, Phillips screwdriver, Installation Position Diagram
Solution)
jack, steel hoisting rope, level, level gauge, hammer drill, right Container to be hoisted, expansion bolt, (Concrete Platform Scenario)
Hoisting and Securing Containers Hoisting and Securing Containers
angle, marker, ink fountain, long leather measuring tape, claw angle steel bracket
Installing hammer, vacuum cleaner
Containers Torque wrench, level, level gauge, hammer drill, right angle,
Single-capacity base, twistlock, expansion
Installing Container Bases marker, ink fountain, long leather measuring tape, claw Installing Container Bases
bolts, washers, nut
Installing Containers hammer, vacuum cleaner Site Space and Container
NO.S002
(Base Solution) Removing the Container Cover Safety helmet, safety belt, step ladder, protective gloves N/A Removing the Container Cover Installation Position Diagram
(Single-capacity Base Scenario)
Hoisting and Securing Containers Crane, torque wrench, steel hoisting rope, level Containers to be hoisted, spacer Hoisting and Securing Containers
Ground lug or ground cable, M12x30
Grounding Containers Grounding Containers Torque wrench Grounding Containers NO.S003 Container Grounding Diagram
stainless steel bolt assembly

Installing the External (Optional) Installing the External External Cable Tray Installation
Installing the External Cable Tray Adjustable wrench, Phillips screwdriver External cable tray NO.S005
Cable Tray Cable Tray Position Diagram

Installing a Fire Fire Hammer Installation Position


Installing a Fire Hammer N/A Fire hammer Installing a Fire Hammer NO.S006
Hammer Diagram
Installing
Awning, awning mounting plate, rubber Awning Installation Position
External Installing Awnings Installing Awnings Socket wrench, step ladder, Phillips screwdriver, glue gun (Optional) Installing Awnings NO.S007
pad, white sealant, awning bolt Diagram
Accessories
for Containers Step Ladder Installation Position
NO.S008 Diagram (Concrete Platform
Adjustable wrench, torque wrench, marker, hammer drill, claw Scenario)
Installing Step Ladders Installing Step Ladders Step ladder, expansion bolt (Optional) Installing Step Ladders
hammer, vacuum cleaner Step Ladder Installation Position
NO.S009 Diagram (Single-capacity Base
Scenario)

DN25 PP-R pipe, bend, straight connector,


Installing Installing Drainpipes Hacksaw, protective gloves, hot melt device Installing Drainpipes
10 mm thick thermal insulation foam
External Air Installing External Air
NO.S004 Container Pipe Installation Position
Conditioner Conditioner Pipes 1" PP-R male connector, DN25 PP-R pipe, Diagram
Pipes Installing Water Refill Pipes Hacksaw, protective gloves, hot melt device bend, straight connector, 10 mm thick Installing Water Refill Pipes
thermal insulation foam
Removing Transport
Removing Transport Protection
Protection Materials
Step ladder Materials for Fire Extinguishing
for Fire Extinguishing
Devices
Devices
Removing
Removing the
Transport
Compressor Fasteners N/A N/A N/A N/A
Protection Removing Transport Protection
Adjustable wrench, Phillips screwdriver, solid wrench
Materials Removing the Liquid Materials for Air Conditioners
Level Detector
Fastener
Removing the Sliding Removing the Cabinet Sliding Base
Adjustable wrench
Door Fasteners Fasteners
Installation Corresponding Chapter in Diagram
Subcategory Item Tools Materials Diagram Name
Sequence Installation Guide ID
CT Cabinet Installation Position
Level, hammer drill, right angle, marker, ink fountain, claw NO.S013
Installing a CT Cabinet Installing a CT Cabinet Cabinet (Optional) Installing a CT Cabinet Diagram
hammer, vacuum cleaner, adjustable wrench
NO.S021 CT Cabinet Cable Routing Diagram
Installing CT Cabinet Installing CT Cabinet Sealing Socket wrench, torque wrench, adjustable wrench, Phillips (Optional) Installing CT Cabinet
CT cabinet sealing plate N/A N/A
Sealing Plates Plates screwdriver Sealing Plates
Installing the IP6X Installing the IP6X Dustproof (Optional) Installing the IP6X
Phillips screwdriver IP6X dustproof module N/A N/A
Dustproof Module Module Dustproof Module
TP481200B DC Power System
Installing the TP481200B Installing TP481200B Power
Installing Power N/A Rectifiers NO.P007 Rectifier Installation Position
Rectifier Modules
Supply and Diagram
Distribution Devices Phillips screwdriver, pallet truck, adjustable wrench, protective TP481200B DC Power System
Installing Batteries Insulation tape, battery, copper bar or cable Installing Batteries NO.P005
gloves Battery Wiring Diagram
Installing Cooling Installing a Low-Temperature (Optional) Installing a Low- Cooling Device Installation Position
Flat-head screwdriver Low-temperature component NO.C004
Devices Component Temperature Component Diagram
Monitoring Device Installation
NO.M004
Position Diagram
(Optional) Installing ECC800 ECC800 3G Antenna Installation
Installing ECC800 Accessories Phillips screwdriver SIM card, 3G antenna, RF_Z antenna NO.S017
Accessories Position Diagram

Installing ECC800 3G Antenna Cable


NO.S018
Devices Routing Diagram
Inside the Monitoring Device Installation
NO.M004
Containers Position Diagram
Installing Monitoring
Devices WiFi Antenna Installation Position
Installing the WiFi Antenna N/A WiFi antenna Installing the WiFi Antenna NO.S019
Diagram
WiFi Antenna Cable Routing
NO.S020
Diagram
Installing a Pad Phillips screwdriver Pad, pad charging cable Installing a Pad Monitoring Device Installation
NO.M004
Installing the BIM Insulated torque wrench, insulation gloves Power cable (Optional) Installing the BIM Position Diagram

Installing the Access Permission (Optional) Installing the Access


N/A IC card writer, fingerprint recorder N/A N/A
Assigners Permission Assigners
Fire cylinder, high-pressure hose, sealing
Protective gloves, pallet truck, pipe wrench, adjustable wrench, tape, pneumatic switch hose and its (Optional) Installing the Fire
step ladder accessory, threaded adapter, I-shaped Cylinder (CE)
Installing CE Fire Extinguishing connection pipe
Installing Fire Devices Installing Batteries for the Fire Extinguishing Device
Protective gloves Extinguishant control panel batteries NO.F004
Extinguishing Devices Extinguishant Control Panel (CE) Installation Position Diagram (CE)
External horn strobe and its screws, Installing an External Horn Strobe
Phillips screwdriver, step ladder
transparent sealant (CE)
Installing Batteries for the (Optional) Installing Batteries for
Phillips screwdriver VESDA batteries
VESDA Power Box the VESDA Power Box
Installation Corresponding Chapter in Diagram
Subcategory Item Tools Materials Diagram Name
Sequence Installation Guide ID

Installing an External Insulation tape, wire stripper, adjustable wrench, waterproof External camera mounting kit, camera, (Optional) Installing an External External Camera Mounting Kit
Installing an External Camera NO.S012
Camera tape, RJ45 crimping tool, Phillips screwdriver, wiring terminal hoop Camera Installation Position Diagram

Installing
Devices Installing the External Installing the External Camera (Optional) Installing the External Signal SPD Installation Position
Adjustable wrench, Phillips screwdriver Signal SPD NO.S014
Outside the Camera SPD Module SPD Module Camera SPD Module Diagram
Containers
NO.M005 External Camera Wiring Diagram
Installing External (Optional) Installing External Signal
Installing External Signal Cables Crimping tool, Phillips screwdriver, cable cutter, heat gun Cable tie, cable, terminal, heat shrink tubing
Signal Cables Cables
NO.S016 Signal SPD Cable Routing Diagram

Connecting
Installing External Installing External Input Power Crimping tool, Phillips screwdriver, adjustable wrench, cable Installing External Input Power Wiring Diagram from the Mains to
External Cable tie, cable, terminal, heat shrink tubing NO.P008
Input Power Cables Cables cutter, heat gun Cables the Power PDB
Cables
40ft-AIO-CT-2N Rack config view

Network frame (Network frame)


Frame top Frame back
1 Collector_ECC800 Collector_ECC800 BOM: 02311JEX 1
2 Cable management tray Cable management tray BOM: 21030523 2

Frame right
Frame left
3 AI/DI Module-1 BOM: 02310RKM 3
1U Filler Panel or Filler panel BOM: 21140700
4 4
Lightning Box (Optional) Lightning Box BOM:21030116 (Optional)
5 1U Filler Panel 5
6 1U Filler Panel 6
Frame bottom