Professional Documents
Culture Documents
Batch
Batch
All loads and prescribed displacements are initially switched off. In order to apply the loads or
prescribed displacements they have to be switched on in a staged construction phase. If this project only
contains Total Multiplier phases a Staged Construction phase must be inserted! Please make sure to
update the references to preceding phases.
Contraction of a tunnel is entered in staged construction by double clicking on the tunnel
reference point. The contraction multipliers A and B are no longer used.