You are on page 1of 1

Please note the following before calculating this project:

 All loads and prescribed displacements are initially switched off. In order to apply the loads or
prescribed displacements they have to be switched on in a staged construction phase. If this project only
contains Total Multiplier phases a Staged Construction phase must be inserted! Please make sure to
update the references to preceding phases.
 Contraction of a tunnel is entered in staged construction by double clicking on the tunnel
reference point. The contraction multipliers A and B are no longer used.

You might also like