DETAIL TANGGA KE RUANG STP (BASEMENT) - Model
DETAIL TANGGA KE RUANG STP (BASEMENT) - Model
25
proyeksi man hole
55
55
120 x 80 cm
80 man hole Pitu Besi Pitu Besi
120 x 80 cm
Handrail Besi Hollow
200
60x40 mm
175
Handrail Besi Hollow
60x40 mm 1. 20-03-20 For Construction
120
120
120
Finish Lantai
Step Nosing 10 cm
dengan groove 0.5cm
400
400
Pasangan
Batu Bata
DENAH KUNCI
10 x @ 18.18 =200
b
90
200
a
pasir urug
90
18.2
150 10
15 160 30
182.5
POTONGAN 1 - TAMPAK A -
A1 SKALA 1 : 25 - A1 SKALA 1 : 25 -
A3 SKALA 1 : 50 A3 SKALA 1 : 50
40
40
40
20
45
40
Besi tempa 10x10 mm Besi tempa 10x10 mm
Dynabolt Dynabolt
15 15 Besi Plat 40.40.3 mm Besi Plat 40.40.3 mm
10
50 60 40
75 50
125
BASEMENT
FFL -4.00
SSL -4.05 DETAIL a - POTONGAN DETAIL -
A1 SKALA 1 : 5 - A1 SKALA 1 : 5 -
A3 SKALA 1 : 10 A3 SKALA 1 : 10
PT. JKS CM
30 30
20 10 20 10
Step Nosing 10 cm
dengan groove 0.5cm
18.2
SEWAGE TREATMENT PLANT
Pitu Besi FFL -4.00 man hole
SSL -4.05 120 x 80 cm
18.2
DENAH -
A1 SKALA 1 : 25 - DETAIL b -
A3 SKALA 1 : 50
A1 SKALA 1 : 10 -
A3 SKALA 1 : 20