You are on page 1of 44
@ GE Medical Systems Technical Publications Direction 2260326-100 Revision 4 Proteus XR/a System Pre-Installation Manual Copyright © 2000, 2001 by General Electric Co. Service Documentation PROTEUS xRA GE NEDICAL SYSTEMS Prosinstaation Maniaal Reva DIRECTION 2260326-100 Tis page's intentional if bi PROTEUS xRA GE MEDICAL SYSTEMS Predinstallation Maral Reva DIRECTION 2260326-100 Direction 2260326-100 Revision 4 Proteus XRa System Per-Installation Manual X-RAY PROTECTION X:Ray equipment it not properly the operator 10 lake adequate The equipment & sold wih te Used’ “may” cause. Inury. precautors fo prevent "the understanding that the “General ‘Accoreinaly_ the instructions fossiisty of” an persons Elec Comoanv."_ Mecca! eran coriained ‘should "be carcessy exposing temseves or Systems Croup. #2 egerts, end thoroughly read. and others to redeton. represeriaives have no Understoos by overyone who eponebity for nury or damage wil uso the equipment betore is important that everyone which may” resu Tom Improper You ‘attempt to” ple "this having ‘anything todo wih x. Useofthe equipment cvipment in operation. The action be property Wanea and General Elect. Medical ity acquainted” wih the Varous potectve material anc Systoms Group, wil be glad to fecommendtons of he National devies are valsble. Is raed Basis and cooperate in placing Counc! on Radiation Protecton that such materia o° devices ba this equlpmentin use. Sind Meesurements ae published Used in'NGRP. Reporte avalabe from Attough this soparstun CRE” 'Pubteatons. 781 GAUTION: United Stated moucion’ gan radon efesss, Maniand 20614, and ot edevl law resirics this Stnor man the useful beam, no the ilemational Commssion on device to use by or on the practical design of equement can Rediaion “Protecion, "and. take ofder of a physian. provide compete protdion. Nor adequate stops to protect against Emrany proties design compel Uy IMPORTANT! . GE MEDICAL SYSTEMS Reva PROTEUS XRA PO. BoKsi4 you have any comments, suggestions” careatons iste information We document ease wrie them down, indude the ocurent ite and document number, and send them to: GENERAL ELECTRIC MEDICAL SYSTEMS MANAGER ~ INFORMATION INTEGRATION, AMERICAS W022 MILWAUKEE, WI 53201-0414 CERTIFIED ELECTRICAL CONTRACTOR STATEMENT A A elcncal rsatatons net are reimnary 1 pestonna of the fave atthe ste propaes for {he eauipment shel be performed by ‘ceneed ‘leeres| contacor ‘tion, acral feecs ito the Power Detiouion Unf fal be formed by beansed_vctca onctors, Omer conneciers between” peces of deca unmet, eaters, ane fes0%9 shall be potorred by qualted GE NMaxeal ‘personel. The products rived (andthe accompanying fectfest iatlators) aro hy ephitestas, and spool fengineenng compuiace i rogues Ir perermng at electrical ware 09 ‘hose proaut, GE wil uses ov Specially Tans tlc engines. Al OF GE'S elosrcal work on these reduets wil comply wit) te requtemers of the appieabie loeciteal coves The purchaser of GE equipment shat ony ules quelfed personne! (Le, GE fla enainaes, persons ofthe pary eevee companies wen fequvaion! taring, or Lcensec docidars) fo parte olctcal ‘svacng onthe ecupment DAMAGE IN TRANSPORTATION AL onokeges_ should pe closely ‘aminee_al_ime_of den, Samage is anparent, rave notation ‘damage in shipment” wer on all copies oft eight or ares ti belare debvery is accepted or "signed fr" by a General Eactic representative of 8 Pospil receiving agent Whether noted or Concealed, damage MUST bo reported 1 the carer immediately upon discovery, oF i any event, thin 14 dye ter receipt andthe Contents ane containers held for Inapectn by the camion A traneperaton company lino pay «claim for damage fan inspection [St requested within ts 14-day poted cal Tate and ‘Transporation, Miwaukes, WI (414) 827~3849/ 6°205~3449 immediately tor Ccemage ie fours. Als time be ‘ead to supply name of cari. Gelvery dete, consgnee name, freight or exproes bil pure, Hom damaged and orient ot damage. Complete instructions segaraing ‘lam procedure are found Section “Sof he Poly & Procedure Bubetins. PROTEUS xRA GE MEDICAL SYSTEMS: Presinsallation Manual Reva DIRECTION 2260326-100 REGULATORY REQUIREMENTS This product conforms with he requirements of Council Directive 99/42/EEC coneeming mecieal cievices when irbears the following CE marking of conformity: ¢ € 0459 Note: This equipment generates, uses, and can radiate radio frequency energy, The ‘equipment may cause radio ffequency Interference 10 other medical and hon’madical devices and radio communications. Te provide reasonableprotection ‘agaist such interference, the Sifhouate VA System complies with emissions mis: fora Group 1, Class A Medial Devices as statod in EN €0601~1~2. However, there is no guarantee that interference will not occur in @ pariculer instalation. If this equipment Is found to cause interference (which may be ai | Tomography 205m] 240m | -a05m| so4am | 109s | 154pei | 7psi | 154 ps pion 100 t) | (008 t) | x00) |cse000R.)| ea KPa) | (108 KPa) |(48'KPA)| (108 ¥Pa) 4-2. Equipment Heat output (Dissipation) ‘See Taba 33, ‘reat ourPUts'8y COMPONENT) PRODUCT OR MAXIMUM HEAT OUTPUT (BTU) [MAXIMUM HEAT OUTPUT (WATTS) [COMPONENT ae a Table Ase 7500 00 [Generar 2086 7 | Pou $00 as Conwsle 60 oo Nong Tobe 2a on 1-3. Radiation Protection Because Xay equipment produces rasaton, special precautions be taken of special ste modficaters may be requred. The General Elec Company does not meke recommendatone regarding radiation protecon. fs the purchasers respensibiy to coneult = radiation physicist for sdviee on Fadition protec in Xray oom By nod PROTEUS XR GE MEDICAL SYSTEMS Pre-instalation Marval REV 4 DIRECTION 2260326-100, SECTION 2 STRUCTURAL REQUIREMENTS: 24 22 23 24 Room Size Soe Chapter 5, Room Layouts, fr racommendsd and minimum Proteus XRls systom room dmensions. Door Size Requirements Winiur door size aio apply to halway and elevator. See chop 7, Planing ‘les or sdeional deta, Door Height “The minimum dor height i 1.9m (74.8 in) Door wiatn “The minimum doar with i .01 394i). Floor Requirements The preferred method of Installing the Tab\e is using provided Moor anchors inateee: The provided Noor anchere can be used in al eiemic 2000. Floor Requirements when using provided Floor Anchors ‘The floor bearing the Proteus XRia system must be conereteand the thickness ‘ofthe floor st east 180mm (5.9 in) ‘The Tab Assembly Is placed an the Foor, which must aoceptthe weight ant the weigharee defnod in Table 4-1 The weight ofthe comploe able 6200 kg. +The ground surface must be rther horizontal + The besting surface ofthe base plate is 0.86 m2 ‘The Proteus xRla Table system must be fizad onthe or. Wall requirements, ‘The wal stand shouldbe securely fastened io the wal o prevent tipping. For wall tan fxaton, he wall should be concrete or tricks andthe thickness sat least 100mm(3.9in) PROTEUS XRIs GE MEDICAL SYSTEMS Pre-netallstion Manual REVS DIRECTION 2260326100 “This page is intertionaly le blank PROTEUS XRa GE NEDICAL SYSTEMS Presinstaliation Manual Reva DIRECTION 2260326:100, CHAPTER 4 PHYSICAL CHARACTERISTICS SECTION 1 DIMENSION DRAWINGS Refer to this section for dimensional drawings forthe components af the Proteus xR/a systom, These components noise: + Table Assembiy + Wal Stand * Generstor Cabinet 2 Console 141 Proteus XRla Generator Cabint fer fo lustration 4-4 4-2 Proteus XRa Elevating and Pedestal (Option) Table “Side View Refer to lustiation 4-2 Top View Refer to lustration 4-2, Bottom Plate Refer uststion 4-4 4-3 Proteus XRla Wall Stand Refer to Mustration 4-5 4-4 Proteus XRla System Console Refer to lustration 4-6 45 Protous XRi2 System Console Bracket Mounting Refer to Mustain 47 1-8 Protous XRia System Console Pedestal Mounting eter io lustaion 4-8, PROTEUS xRla installation Manual IRECTION 2260325-100 GE MEDICAL SYSTEMS REV re 77) fever wat mounting Hoe pee ta [| Fon ve ak Vien PROTEUS XRIs GE MEDICAL SYSTEWS Presinstallation Maral REV DIRECTION 2260326-100, te; Teble height in lustitin is refered to elevating table. For pedestal tbl, the ‘nei can only a select among 500,510, 600, 750 ara 800mm. Note: 3,0 ae cable entrancos PROTEUS XRis GE MEDICAL SYSTENS. rosinsiallation Manual Revs DIRECTION 2260326-100 ERR has eo a Tax Note: is cable ontance. PROTEUS XR/a GE MEDICAL SYSTEMS, Pre.inetallation Manual Reva DIRECTION 2260326-100, Wait Stand with a knee spacer ari PROTEUS XR's GE MEDICAL SYSTEMS Prosinstallation Manual Reva DIRECTION 2260321 tee PROTEUS XR's GEMEDICAL SYSTEMS reinsaltation Man REV DIRECTION 2260326-100, ‘CONSOLE PEDESTAL MOUNTING treo ow: 2, bare cable entrances. PROTEUS XRis GE MEDICAL SYSTEMS Precnstalition anus) REVe DIRECTION 2260326-100, SECTION 2 MOUNTING REQUIREMENTS 24 Floor Leading and Recommended Mounting Methods See Table d-1 PROTEUS a SYSTEM F.0OR LOADING, WEIGATS, ANO WOUNTING METHODS TOAD] WEIGHT? proouctor| NET DIMENSIONS BEARING | OCCUPIED COMPONENT | WEIGHT. AREA | AREA” | NOUNTING kg |__| merHoo Saneraer 180 0.7 ea Biol oa anne bi Table 12 er omnia Assembly floor Wal Stand ow ve ee Bath Foor and Wall Aunt Conn wa} HE a a a 77 pan Podesta pedestal) Mount ‘Console 3 30 Ea w 08 [S| wat mount PROTEUS xRIa GE MEDICAL SYSTEMS. Presnstalatlon Manual REV 4 DIRECTION zaso326-100 CHAPTER 5 ROOM LAYOUTS SECTION 1 ROOM LAYOUT CONSIDERATIONS. 1-1 Radiation Production ‘Because X-Ray equipment procicas radiation, you may need ta take special precautions or make special ste moaifatons. The General Elec Company Goes not make recerimendaton regarding radiation proacton, I's the purchasers responstiy to consul radiation physi fox advisement on Faclation protection in X-Ray rooms. 1.2 Service Access ‘low spproprista space for service accass of equipment. Consult component ‘eunsiliaion drectons for cearance formation, 4.3 Clinical Accass Make sure that you plan the room withthe folowing clinical access requirements! ‘+ Provide easy access io the patent table. Stoichers and other mobile hospital equipment must reach the table quickly, ‘+ Gincians atte patient table myst be able to communicate with assistants in the cen area 1+ Operators the contol ares must have easy access ta the control conscle Homover. position the contols (incusng handswiches) s0 the operaior cannat take exposures while looking around ar stancing culsice the contra oot’ lead glass window ‘Consult customer on the number and location of nonelectieal tines (el ‘oxygen, vacuurn, water, at) in te vascular room, Note ‘ne ganaraty accepted practice 1 1 lad the patient ateraly. Incase ot room |ayout designed for longhusinal patent loading, some madiicatons must Do Drought tote table 4-4 Peripheral Equipment Consult Fospital personnel regarding edltonal specs requirements for te folowing types hospital equipment + storage cabinets, + sits, + oxygen stations, + yectors + heart monitoring equioment + crash ast PROTEUS XR's GE MEDICAL SYSTEMS Prodinealation Maral REVS DIRECTION 2260326-1° SECTION 2 ROOM LAYOUT DRAWING See Ilustration |, for recommended room layout for a Proteus XRIa system “rable 2- Waist 3 ~ Systom Console Generator Cabinet ~ XT Suspension + t - ‘The drestion of wall stand must be the samo as shown in illustration 51, Sovice ‘Manush Direction 2260326-100, Any other direction wil result in conflict with systom functions and wil not conform to HHS requiements for Automatic Colimation ‘Systems, Do NOT attompt to make any fleld mocificatlons fo support non-standard placement ofthe wall stand, It tre customer must have the wall stand $0 degrees tothe table a system with MANUAL collimation should be ordered as tha configuration is allowable with = MANUAL Collimator (Not a Automatic Colmator used in Manual mode), GE MEDICAL SYSTEMS Reva ‘PROTEUS xia SYSTEM RECOMENDED AND MHVUM ROOM SZE DMIENSION LencTH | WIDTH CEILING Recommended | 6300 500 2900) lisimum 500 4000 2500) PROTEUS xRla Pro-netallation Manual DIRECTION 22¢0226-100, PROTEUS XRis GE MEDICAL SYSTENS tion Maral Reva DIRECTION 2260326-10" CHAPTER 6 ELECTRICAL CONNECTION SECTION 1 CABLE CHANNELING 41 Conduit CCondut nas some important restrictions when used with macularsed X-ray systems. ‘The prmary consideration i thal the maloity of cables used ore Bretorminates, which greatly simples interconnection, but makes esble-puling ‘itfeul because of the added dimensions of the connectors. Condut must be large enough to pass the cable and connector trough wlth all other cables ‘ready in the condut. Aigo consider tho possibilty of adiional cabs being ‘edad asthe sysiom is developed. “The use of conduit is recommended for cables running ovemaad between ooms, especelly when @ diagonal un provides the shortest cabe pat, 4-2 Floor Duct Floor duct has advaniages when use wih @ single room oF two adiacent rooms Floor duct combines a neat, functional appearance with eccessibily and room for expansion. The cisadvantage is the amount of work requied fo fsa inion te gensraly prohibitive in old intatatons. For the same reason, i! S impractical to atompt to add on to existing for duct sytams GEMEDICAL SYSTEMS REV PROTEUS XR Prosinealiation Manual DIRECTION 2260326100, 13 Raceway Raceway is very practical to use in existing structures, since it is suxtace ‘mounted. There is no problem wit pretemminaled cables, since the entre Facenay system can be opened. Raceway systems are relatively easy 10 ‘xpane, 88 compered lo other means of rouing cables. Equipment cabinets have ben designed for extensive interfacing with raceway. GE MEDICAL SYSTENS Reva PROTEUS XRla Prednstalation Manual DIRECTION 2260926-1¢ SECTION 2 POWER REQUIREMENTS. Al components of he Protwus XRUa System oblain poner flor he Power Distriouiion Unit (POU ) inthe table. [Al electrical wirngleonnections must be installed by a qualfied eiecrcian and ‘ontoem to rstona’ and lcal ead. ‘See Table 6 for Jedi Ganeretor 24 Jodi Generator Parameters PARAMETER “JEDI GENERATOR Taput Voltage 3801500154014 0T2SOVAC Tass phase ond Ground witout nOUtaT Dally Vottage Variations SITUS (this range, the oaneretor shall operate wiaut any doraing We ina Impedance SpacTication | lec soecteatan Line impedance ‘The apparent ine Impedance guaranteed by the customer sould be equal ‘or Tess than the vales indicated below, according to the vollage value and the commercial poner ofthe generator Dally Frequency Variaion Voltage range(V) ___ line impedance (Ohms) (6 phase) 32KW SOKWOSKW 0 SOKW 380 025 Ons 0.2 0.08 ais 030018 oa oat 440 034 020 ous 0.425 480 040024 os. os HV cable wre (SORFI) (e=185pF/m) sara standard ‘Ground Wire [arash Current [Normal Frequeny [s0rs9re 5% GE MEDICAL sySTEMS PROTEUS xRia Pro-intallation Manual Reva DIRECTION 2260326-100 22 Power Supply Recommendations PDU Power Supply cable anc grounding cable are suplid by the customer. ‘Wire se for vargus lengths of te Power Supply cable are shown i olowing tables Note: For routing power cables, supplied cables should be as faible as possole Fiala engineer n Ring Terminal Per. Terminal 22 is from 9 to 354mm PARAWATER THREE FIASE GENERATOR 3a Input Valag 3ECVAC | 400 VAC aisVAC_— [waa vaca vac [ano vac i S38 (nat emis) fomna}reswa) fora fesawve) poms jes NG) pommefie AW) pom2 feAwe) fomm2|us AVG) [Eom seen) fomea}ecewe) forme fseawe) fo mm Jas ans) fa mma} atc) Homma fsa awe) foam arc) Homson) femmeboswe) farm foc avs) homme fs anc femnzfes Ano) femme [aSAWG) Femnz}es Aire) | [com 2001) Ferma )wsewe) Panm2 fosANc) bmn [ws an) bomma¥e aN) perma as AWG} fe maf ie) [Pe x z x z z s (Sons eWotaeVe 380 0 =O) 0 a 0 [Noliagenge(vae) 10 | eam 108 | e108 | aoe ra “omen ine serena) [70 co co = 3s [Continuo line curen(amp)-[——7 er ez 37 5) [Power denandVA) ze a6 6 a6 % Frsene aed STH (PARAWATER| THREE PHASE GENERATOR a0 Input Voltage] 380VAC DUVAC {aisvAC__—[aao vac [aso vac Tao 1 fSri2on) homm fasxw homme feeauay fomm2 fesaws) homm2|se aie homa2 tre awa) homme fas anc) homicaty perma freawey [nz [sre Jae ANS) fo mnglas AW) [lemma fee AWG) femme fas Ac) femiiaae) Batame fasaive) enna fesAWa) fend fas AWG) E?mna|ee AWG) Here sce) br mna fos Ane) Goniioe} farm lysaws, forme fesave) fo rera fxs AWG) BOmn2|si ANG] bornz G9 AWG) Pomne fo ANS) hase z x x z z s ‘Nominal ine Vole a0 a0 a0 at or =U Voltage range V0) ES TS TE TS ‘Monrary ine corenfaengy 110 705. 100 35 2 s ‘Continuous Tne cures) |? er a é rs] 55 Power demandVA) a0 7 70 70 70 a [remener Tr Sioa STs GE MEDICAL sysTEMS. REV PROTEUS XRla Pre-instalation Manual DIRECTION 2260226-1 “ARAWATER) THREE PHASE GENERATOR GOK (our vata 300 eat {qvae Tuo vae [wove — [awa fesar [ere : LETHE hom: feava! fem? fcpncr fmt [vane bean anwar bemoans hem’ fav Lemeasa, pen: Wave! Keone fnAng} Ut feel be Weare) bere pong bem Uae eit} mw FeANG meoee (GANG) Fear (Save oer heave! (oior beans Fem fe Sciuun Elms awe dime (Ane, Ream [sane becur eras bats fravs esc fe avs EES carcass Pie 5 5 x z 3 n a Taka Va ee ee a Canes ie arent | — fi sp [as ee aA oF 7 ra oF = = far 7 Siete ae ae Paianaten| MEE PASE GENERATOR Cartons tone aaa aevae ——raaoyae [anova — Tava ay [een Ketan» femat [rans came fsancy faa [oso 2 me eave ban! saw baat es nes Eemeama, oan: Ae! ems ue) Ween AN sme eel Feet awe) Roe Remeipe} fir rave! Ese fora} Elem fe avel mr Waa! Elect awh pst Ir a emuson) Bem fwoaWe| Bim eAaNc) Btn? fot ave) btn fo AWG] tmnt [RosviG) Berm! feo AWS) EIS) ans Tin 3 x x zl + ; Samara —| 360 —| i | ss po as aap aa Aor soe esto [a Toma cece ten | ese err [ss] ss re 7 rad Te = so aaa aon |v eae “ [= ssov | ssn ssaen0 raneoov Sa —ao0v SAOOV 35/60 ToNe00v ‘cone av S2aoov son0ov revo | e500 (tov soae00V 86/8000 eunet0v exe ‘0 20a00v “enco0v Bins00u Testo0V ‘0v AAV waa senen0y Tsao0v PROTEUS XRia GENEDICAL SYSTEMS Reva SECTION 3. INTERCONNECT AND GROUND aiercia' Fam Power supply installed at customer expense! rem ain ound pont GB Penson cea um SEE @—F] oro Si = PROTEUS XRa GE MEDICAL SYSTENS Prosinstallation Manus! REV4 DIRECTION 2260326-1¢ Legend of itustration: 1. Feeder wire and grounding cable ate to be provided by customer (See ‘Tables 6-2, Tables 63, Tales 6-4 and Tables 8) 2 Coble re tobe provided by customer. POP Pawar Citration Panel fr powering X-ray equipment (no! supplies by GEMS} [DMO Thermomsgnetic diferent crcul breaker (See table 6-10) Min contactor Y¥ Contactor Remote contol ON/OFF impulse buttons, lackablo on OFF, with Incicator taps (Red=ON, Green=OFF), located naar access dao, 1.5m aoove The Moor (proved byte customer) 65 Inet for power supply cable on plinth in connecting box (depending of Yensth between POP end Table) 10 Emergency Off button located near access door, 1.5m above the floor (provides bythe custome). |. Red continuous glowing or feshing presence incicator amp located above th ‘ooess doc, near LRX (provided by custome. LLRX Yellow X-ay emission indicator lamp above the room sovess door (provided by the customer) The system provides @ rolay in normaly open postion and closed durng prop and exposure. Feings: 2u0Vac-3Amps ‘The power supply anc witing forthe lamp is provided by the customer, (for tiling see Jed! Sere Manual, VF boaré RAD Esecirial schematic) [2PO Oper-doordetoctor (in accordance with local norms of making rules), UF ‘board HAD Elachislechematce 22252) —_themalncheult beater suppl by th comer and mua be sized in KexuTIONf - TEatancetetne oes ret’ HPOR is aguppec wth areal SESS Sorted Som te ar mac eat eset claes Aor ple eviomrent For instance with a3 phase 380Vac electrical network the circuit breaker must be sized a8 follo ‘Thermal circuit breaker=S0Amp with a magnetic breaker at 10008 +-20% (Ten times the momentary line current PROTEUS XRis GE MEDICAL SYSTEMS Presnstallation Manust REV 4 DIRECTION 2260326-100 = Reo PROTEUS Xia ce neoca ssrens reins ed weve oieston sci PROTEUS Na SYSTEM CABLES. fr umber [vem | omer . arr — perp pe 2 eee eae ee ee eee — 7 sa | Ys ra , ses eg — = Te. eS — ee ; pe pron sea eee ee aa Lf irrerenor ts 2 mew] = Bech 2 a ns ar Fe [Stee pea ar] | fe ay Fam je Sais pa charber ee ee ee [Eero] — os — ap — = Es =| errcee f-ar [7 [rosea PROTEUS XRs GEMEDICAL SYSTEMS reinstallation anual REV DIRECTION 2260326-100 “This page i intentionally let benk PROTEUS XRls GE MEDICAL SYSTEMS, Pro.inetalation Banus REV DIRECTION 2260326-100 CHAPTER 7 ADDITIONAL PLANNING AIDS. SECTION 1 PRODUCT SHIPPING INFORMATION ; See Table 7-1 T | neane | A Lee 80x CONTENTS. Nw. ow. Height (Depa kilogram kilogeam Table 1085 2410 200 350, Cabinet 1955. 790 150, 200. Wall stand, 020 2500 7100, 200. ‘Accesscry 1270 1220 50 120 SECTION2 PREPARATIONS REQUIRED IN ADVANCE OF EQUIPMENT DELIVERY + Familiarzation with site room dimensions. ‘+ Room lighting , Noor finish . and celing and wall painting + Installation of power supply when table fs not powered by the ‘generator ‘+ Installation of junction boxes of proper size inctuding covers and fitings at locations required por current installation plan. ‘+ Installation and labeling of a disconnect switch “+ Equipment delivery route checked to ensure delivery without door removal PROTEUS XRla Table is shipped In three crates. For dimensions, and weight refer to tabla below, GE MEDICAL SySTEMS REV SECTION 3 TOOLS AND TEST EQUIPMENT In addition tothe standard service tools, tis section provides a summary of the toms, tots and fest equipment neeced to instal and adjust the PROTEUS. XRle Table. the exec lool listed below is nol avaiable, use the nearest PROTEUS XRIa Pre.netalltion Maral DIRECTION 2260326-100 a auivaent DESCRIPTION USED FOR SOURCE: RECEIVED (Date) let namo Shs reinstate | (GE SewavEnainee |)! Ring terminal pr (rm 1S) | Intaiation ee eee Dial mutieter ‘catraton ana ce semee tino | 1 FL Level (rtwo aunaaratovals) | intiaion Ge sevee erin | i tt PROTEUS xRia GE MEDICAL SYSTENS Pro-installation Manual REVa DIRECTION 2260326-100 SECTION 4 ROUTE SURVEY 44 Stop One - Sketch ‘Begin preparing Route Survey by sketching the area of the hospital or clinic which wl receive the equipment. Incuce all areas on the delivery route trom Sutsde of budge destination, See sample sketch Below Reference unbers Numbers in ccs refer to Route Survey dota. The Route Survey i a frm on wien ste data fisted (802), 42 Stop Two Survey sta conceming the intended delivery route is recorded onthe Route Survey on the fellourg pages. Recerd al inacing capacities, cordor wats, coor ‘openings tung radi, flooring materals, elevator sizes, obstuctions and so on. 43 ‘very equoment can be transported ve the route specifi in stop 1. Compare Raute Survey compiec in stop 2to equipment specications in ts anc other _appicadie re-nsatation drecions. GE MEDICAL SYSTEMS REV4 PROTEUS XRis Preinstaliation tan DIRECTION 2260226-100 ROUTE SURVEY Ret “Area: bading dock, doorway, Flay, ‘um, siovator, obstruction, ee Timi ding capacty, Feigh, wih, Sea flooring meteril rads, et. SECTION 5 PRE-INSTALLATION CHECKLIST PROTEUS XRIs Preinstallation Mania DIRECTION 2260326-100, Equipment Delivery Date Salesman Customer Roomit Sositia ee PHYSICAL REQUREMENTS OF SITE 1. ts room sie acoquate for ntendod equement ‘configuration? 1s for strong enough fr intended equipment and mounting rmattods: haveselsmic codes beon considered? Does deivery outa accommodate af intended equipment? 4. Has radiation physicist been consuited? 5. Have necessary alterations been made io creumvent cbstuctions? 4. Ate mositicaens to room constuction fished? Have supports platforms, suspensions, cating ‘materiale been povided? Are support structures installed fr flor, cling, and ‘wall mounted equipment? 4 Has oar been madi fr cable ducis? 10. fecop-in clings ot use, is access pane! provised ah minimum? 11, Is electrical service in place at he rating specified in pretnstaliation documentation? 1D. ls power avalible to operate power tols? 1 Aze non-local in insiatloa? (air, water, ony96n, vacuum) se RESPONSIBILITY PURCH, OTHER COMPLE GE MEDICAL SYSTEMS REV 4 INTERCONNECTION f Have signal czble, power and grounding plans been procuced? Hs the necessary Interconnacton hardware such 2 ltneon baxes conduit or raceways, and ttings been prove? Has the intarcannecion hardware been installed? 's fexbla, sanded wire provided for Protous XRla power connecion? ‘re Prolaus Xa fader power cables pulled, wah appropiate, lnotns avalable at csconnect box? {Ara intarconnecing cables contruty checked, ana ‘abot? ‘Are HV cablelengthe voted (25'standard)? Is itertace information avalabe for equipment? GENERAL ‘re coling, was, and oor dear fal obstructions? ‘Are walls tise? {sfnch floor inttiod? ‘re room lights installed? Hos dust-creaing work been complete? Is old equipment in room removed? ‘re component postions clearly marked on floor? le space avatabe to store equipment? Is lock in doo: flocked room avaiable? Pres PROTEUS xRIa Msn DIRECTION 2260326-100 RESPONSIBILITY PuRcH. LOE ET Y LTA OTHER LP Tt ttt | COMPLE PROTEUS XRia GE MEDICAL SYSTEMS Preanstallation Manat REV4 DIRECTION 2260326-100 ‘Comments: Inspection Dates: Approvals ee Date: SERVICE;

You might also like