JADWAL TENTATIF KEGIATAN PEMBINAAN TEKNIK K3 DAN SERTIFIKASI KEMNAKER RI

PT. KARYA MASTER MANDIRI INDONESIA TAHUN 2020


DURASI DURASI
SERTIFIKASI KEMENAKER RI TEMPAT JAN FEB MAR APR MEI JUN JUL AGU SEPT OKT NOV DES
JP HARI
BIDANG SMK3, KELEMBAGAAN
1 Ahli K3 Umum 120 JP 12 Jakarta 06-21 10-22 09-23 06-22 08-23 06-21 10-25 02-15 05-19 02-16 01-14
3 Internal Audit SMK3 40 JP 4 Jakarta 14-16 24-27 23-27 06-04 16-19 13-16 04-07 15-18 12-15 10-13 08-11
BIDANG KESEHATAN KERJA
1 Petugas P3K 30 JP 3 Jakarta 07-09 05-07 02-04 07-09 08-10 07-09 04-06 09-11 12-14 12-16 15-17
BIDANG KONSTRUKSI BANGUNAN, LISTRIK, KEBAKARAN
1 K3 Supervisi Scaffoler 50 JP 5 Jakarta 06-11 11-15 09-13 06-10 25-01 27-01 25-29 21-25 19-23 19-25 18-24
2 Ahli Madya Konstruksi 90 JP 9 Jakarta 13-23 03-13 11-20 07-20 09-18 08-17 24-02 16-25 14-23 18-27 16-29
3 Ahli Muda Konstruksi 50 JP 5 Jakarta 15-21 05-11 11-17 13-17 09-13 14-18 27-01 15-19 20-24 24-28 17-24
4 Ahli Utama K3 Konstruksi 100 JP 10 Jakarta 02-14 03-13 06-17 14-24 08-18 15-25 21-01 10-21 16-27 17-27 11-23
5 Teknisi K3 Perancah/ Scaffolder 40 JP 4 Jakarta 20-23 11-14 16-19 20-23 16-19 01-04 05-07 07-10 07-10 19-24 21-24
6 Kebakaran Kelas A 60 JP 6 Jakarta 21-28 12-19 17-24 21-28 15-22 15-22 12-19 16-22 19-26 12-19 22-31
7 Kebakaran Kelas B 60 JP 6 Jakarta 21-28 12-19 17-24 21-28 15-22 15-22 12-19 16-22 19-26 12-19 22-31
8 Kebakaran Kelas C 60 JP 6 Jakarta 21-28 12-19 17-24 21-28 15-22 15-22 12-19 16-22 19-26 12-19 22-31
9 Kebakaran Kelas D 25 JP 3 Jakarta 24-28 26-28 18-20 28-30 23-25 21-23 18-21 23-25 26-28 17-19 29-31
10 K3 Teknisi Listrik 65 JP 6 Jakarta 27-03 27-05 23-31 23-30 10-17 07-14 11-28 10-17 15-22 11-17 16-22
11 Ahli K3 Listrik 165 JP 17 Jakarta 09-28 18-09 30-14 15-06 08-26 09-28 04-25 08-28 09-28 03-23 03-22
BIDANG PENUNJANG KONSTRUKSI DAN PESAWAT UAP DAN BEJANA TEKAN
1 Operator Boiler Kelas I 60 JP 6 Jakarta 13-20 27-04 16-23 20-27 18-25 13-20 12-21 14-21 13-20 05-11 02-08
2 Operator Boiler Kelas II 40 JP 4 Jakarta 15-20 28-04 17-23 21-27 23-26 21-24 10-13 21-24 13-16 04-09 04-09
3 Juru las SMAW kelas III 35 JP 4 Jakarta 13-15 03-05 02-04 01-03 02-04 06-08 06-10 03-07 01-05 05-09 01-03
4 Juru las SMAW kelas II 40 JP 4 Jakarta 13-16 03-06 02-05 01-06 02-05 06-09 06-11 03-08 01-06 04-09 01-04
5 Juru Las SMAW Kelas I 45 JP 5 Jakarta 13-17 03-07 02-07 02-08 02-08 06-10 06-12 03-09 01-07 05-10 01-07
6 Juru Las Termic 50 JP 5 Jakarta 16-22 24-29 09-13 24-30 15-19 13-17 10-14 07-11 08-14 12-17 09-15
BIDANG PENUNJANG KONSTRUKSI DAN PESAWAT ANGKAT DAN ANGKUT
1 Operator Gondola 30 JP 3 Jakarta 07-09 26-28 18-20 27-29 24-26 08-10 06-10 28-30 13-15 16-18 28-30
2 Operator Rigging 30 JP 3 Jakarta 08-10 17-19 16-18 28-30 15-17 21-23 12-14 22-24 12-14 26-30 14-16
3 Operator Floating Crane Kelas I 50 JP 5 Jakarta 13-17 10-14 09-13 13-17 08-12 20-24 24-28 17-23 21-27 23-27 15-21
4 Operator Floating Crane Kelas II 40 JP 4 Jakarta 14-17 11-14 08-13 14-17 09-12 21-24 25-28 18-23 22-27 24-27 16-21
5 Operator Floating Crane Kelas III 30 JP 3 Jakarta 15-17 12-14 07-13 15-17 10-12 22-24 26-28 21-23 23-27 25-27 17-21
6 Operator Drill/Mobil Crane 40 JP 4 Jakarta 27-30 17-20 30-02 20-23 22-25 27-30 18-24 28-01 27-01 17-20 09-14
7 Operator Truck Crane Kelas I 50 JP 5 Jakarta 13-17 10-14 09-13 13-17 08-12 20-24 24-28 17-23 21-27 23-27 15-21
JADWAL TENTATIF KEGIATAN PEMBINAAN TEKNIK K3 DAN SERTIFIKASI KEMNAKER RI
PT. KARYA MASTER MANDIRI INDONESIA TAHUN 2020
DURASI DURASI
SERTIFIKASI KEMENAKER RI TEMPAT JAN FEB MAR APR MEI JUN JUL AGU SEPT OKT NOV DES
JP HARI
8 Operator Truck Crane Kelas II 40 JP 4 Jakarta 14-17 11-14 10-13 14-17 09-12 21-24 25-28 18-23 22-27 24-27 16-21
9 Operator Truck Crane Kelas III 30 JP 3 Jakarta 15-17 12-14 11-13 15-17 10-12 22-24 26-28 21-23 23-27 25-27 17-21
10 Operator Pedestal Crane Kelas I 50 JP 5 Jakarta 13-17 10-14 09-13 13-17 08-12 20-24 24-28 17-23 21-27 23-27 15-21
11 Operator Pedestal Crane Kelas II 40 JP 4 Jakarta 14-17 11-14 10-13 14-17 09-12 21-24 25-28 18-23 22-27 24-27 16-21
12 Operator Pedestal Crane Kelas III 30 JP 3 Jakarta 15-17 12-14 11-13 15-17 10-12 22-24 26-28 21-23 23-27 25-27 17-21
13 Operator Hoisting Crane Kelas I 50 JP 5 Jakarta 13-17 10-14 09-13 13-17 08-12 20-24 24-28 17-23 21-27 23-27 15-21
14 Operator Hoisting Crane Kelas II 40 JP 4 Jakarta 14-17 11-14 10-13 14-17 09-12 21-24 25-28 18-23 22-27 24-27 16-21
15 Operator Hoisting Crane Kelas III 30 JP 3 Jakarta 15-17 12-14 11-13 15-17 10-12 22-24 26-28 21-23 23-27 25-27 17-21
16 Operator Gantry Crane Kelas I 50 JP 5 Jakarta 13-17 10-14 09-13 13-17 08-12 20-24 24-28 17-23 21-27 23-27 15-21
17 Operator Gantry Crane Kelas II 40 JP 4 Jakarta 14-17 11-14 10-13 14-17 09-12 21-24 25-28 18-23 22-27 24-27 16-21
18 Operator Gantry Crane Kelas III 30 JP 3 Jakarta 15-17 12-14 11-13 15-17 10-12 22-24 26-28 21-23 23-27 25-27 17-21
19 Operator Traveler Crane Kelas I 50 JP 5 Jakarta 13-17 10-14 09-13 13-17 08-12 20-24 24-28 17-23 21-27 23-27 15-21
20 Operator Traveler Crane Kelas II 40 JP 4 Jakarta 14-17 11-14 10-13 14-17 09-12 21-24 25-28 18-23 22-27 24-27 16-21
21 Operator Traveler Crane Kelas III 30 JP 3 Jakarta 15-17 12-14 11-13 15-17 10-12 22-24 26-28 21-23 23-27 25-27 17-21
22 Operator Mobile Crane Kelas I 50 JP 5 Jakarta 13-17 10-14 09-13 13-17 08-12 20-24 24-28 17-23 21-27 23-27 15-21
23 Operator Mobile Crane Kelas II 40 JP 4 Jakarta 14-17 11-14 10-13 14-17 09-12 21-24 25-28 18-23 22-27 24-27 16-21
24 Operator Mobile Crane Kelas III 30 JP 3 Jakarta 15-17 12-14 11-13 15-17 10-12 22-24 26-28 21-23 23-27 25-27 17-21
25 Operator Overhead Crane Kelas I 50 JP 5 Jakarta 13-17 10-14 09-13 13-17 08-12 20-24 24-28 17-23 21-27 23-27 15-21
26 Operator Overhead Crane Kelas II 40 JP 4 Jakarta 14-17 11-14 10-13 14-17 09-12 21-24 25-28 18-23 22-27 24-27 16-21
27 Operator Overhead Crane Kelas III 30 JP 3 Jakarta 15-17 12-14 11-13 15-17 10-12 22-24 26-28 21-23 23-27 25-27 17-21
28 Operator Loader Crane Kelas I 50 JP 5 Jakarta 13-17 10-14 09-13 13-17 08-12 20-24 24-28 17-23 21-27 23-27 15-21
29 Operator Loader Crane Kelas II 40 JP 4 Jakarta 14-17 11-14 10-13 14-17 09-12 21-24 25-28 18-23 22-27 24-27 16-21
30 Operator Loader Crane Kelas III 30 JP 3 Jakarta 15-17 12-14 11-13 15-17 10-12 22-24 26-28 21-23 23-27 25-27 17-21
31 Operator Railway Crane Kelas I 50 JP 5 Jakarta 13-17 10-14 09-13 13-17 08-12 20-24 24-28 17-23 21-27 23-27 15-21
32 Operator Railway Crane Kelas II 40 JP 4 Jakarta 14-17 11-14 10-13 14-17 09-12 21-24 25-28 18-23 22-27 24-27 16-21
33 Operator Railway Crane Kelas III 30 JP 3 Jakarta 15-17 12-14 11-13 15-17 10-12 22-24 26-28 21-23 23-27 25-27 17-21
34 Operator Hube Crane Kelas I 50 JP 5 Jakarta 13-17 10-14 09-13 13-17 08-12 20-24 24-28 17-23 21-27 23-27 15-21
35 Operator Hube Crane Kelas II 40 JP 4 Jakarta 14-17 11-14 10-13 14-17 09-12 21-24 25-28 18-23 22-27 24-27 16-21
36 Operator Hube Crane Kelas III 30 JP 3 Jakarta 15-17 12-14 11-13 15-17 10-12 22-24 26-28 21-23 23-27 25-27 17-21
JADWAL TENTATIF KEGIATAN PEMBINAAN TEKNIK K3 DAN SERTIFIKASI KEMNAKER RI
PT. KARYA MASTER MANDIRI INDONESIA TAHUN 2020
DURASI DURASI
SERTIFIKASI KEMENAKER RI TEMPAT JAN FEB MAR APR MEI JUN JUL AGU SEPT OKT NOV DES
JP HARI
37 Operator Crawler Crane Kelas I 50 JP 5 Jakarta 13-17 10-14 09-13 13-17 08-12 20-24 24-28 17-23 21-27 23-27 15-21
38 Operator Crawler Crane Kelas II 40 JP 4 Jakarta 14-17 11-14 10-13 14-17 09-12 21-24 25-28 18-23 22-27 24-27 16-21
39 Operator Crawler Crane Kelas III 30 JP 3 Jakarta 15-17 12-14 11-13 15-17 10-12 22-24 26-28 21-23 23-27 25-27 17-21
40 Operator Reach Stacker Crane Kelas I 50 JP 5 Jakarta 13-17 10-14 09-13 13-17 08-12 20-24 24-28 17-23 21-27 23-27 15-21
41 Operator Reach Stacker Crane Kelas II 40 JP 4 Jakarta 14-17 11-14 10-13 14-17 09-12 21-24 25-28 18-23 22-27 24-27 16-21
42 Operator Reach Stacker Crane Kelas III 30 JP 3 Jakarta 15-17 12-14 11-13 15-17 10-12 22-24 26-28 21-23 23-27 25-27 17-21
43 Operator RTG Crane Kelas I 50 JP 5 Jakarta 13-17 10-14 09-13 13-17 08-12 20-24 24-28 17-23 21-27 23-27 15-21
44 Operator RTG Crane Kelas II 40 JP 4 Jakarta 14-17 11-14 10-13 14-17 09-12 21-24 25-28 18-23 22-27 24-27 16-21
45 Operator RTG Crane Kelas III 30 JP 3 Jakarta 15-17 12-14 11-13 15-17 10-12 22-24 26-28 21-23 23-27 25-27 17-21
46 Operator Tower Crane Kelas I 50 JP 5 Jakarta 13-17 10-14 09-13 13-17 08-12 20-24 24-28 17-23 21-27 23-27 15-21
47 Operator Tower Crane Kelas II 40 JP 4 Jakarta 14-17 11-14 10-13 14-17 09-12 21-24 25-28 18-23 22-27 24-27 16-21
48 Operator Tower Crane Kelas III 30 JP 3 Jakarta 15-17 12-14 11-13 15-17 10-12 22-24 26-28 21-23 23-27 25-27 17-21
49 Operator Motor Grader 40 JP 4 Jakarta 27-30 17-20 30-02 20-23 22-25 27-30 18-24 28-01 27-01 17-20 09-14
50 Operator Buldozer 40 JP 4 Jakarta 27-30 17-20 30-02 20-23 22-25 27-30 18-24 28-01 27-01 17-20 09-14
51 Operator Excavator 40 JP 4 Jakarta 27-30 17-20 30-02 20-23 22-25 27-30 18-24 28-01 27-01 17-20 09-14
52 Operator Wheel Loader Case 40 JP 4 Jakarta 27-30 17-20 30-02 20-23 22-25 27-30 18-24 28-01 27-01 17-20 09-14
53 Operator Wheel Loader 40 JP 4 Jakarta 27-30 17-20 30-02 20-23 22-25 27-30 18-24 28-01 27-01 17-20 09-14
54 Operator Scafolding 40 JP 4 Jakarta 27-30 17-20 30-02 20-23 22-25 27-30 18-24 28-01 27-01 17-20 09-14
55 Operator Vibro Roller 40 JP 4 Jakarta 27-30 17-20 30-02 20-23 22-25 27-30 18-24 28-01 27-01 17-20 09-14
56 Operator Backhoe Loader LiuGong 40 JP 4 Jakarta 27-30 17-20 30-02 20-23 22-25 27-30 18-24 28-01 27-01 17-20 09-14
57 Operator Slipform Paver 40 JP 4 Jakarta 27-30 17-20 30-02 20-23 22-25 27-30 18-24 28-01 27-01 17-20 09-14
58 Operator Batching plant 40 JP 4 Jakarta 27-30 17-20 30-02 20-23 22-25 27-30 18-24 28-01 27-01 17-20 09-14
59 Operator Concrete Pump 40 JP 4 Jakarta 27-30 17-20 30-02 20-23 22-25 27-30 18-24 28-01 27-01 17-20 09-14
60 Operator Dump Truck 40 JP 4 Jakarta 27-30 17-20 30-02 20-23 22-25 27-30 18-24 28-01 27-01 17-20 09-14
61 Operator Shovel 40 JP 4 Jakarta 27-30 17-20 30-02 20-23 22-25 27-30 18-24 28-01 27-01 17-20 09-14
62 Operator Compactor 40 JP 4 Jakarta 27-30 17-20 30-02 20-23 22-25 27-30 18-24 28-01 27-01 17-20 09-14
63 Operator Tractor 40 JP 4 Jakarta 27-30 17-20 30-02 20-23 22-25 27-30 18-24 28-01 27-01 17-20 09-14
64 Operator Trailer Truck 40 JP 4 Jakarta 27-30 17-20 30-02 20-23 22-25 27-30 18-24 28-01 27-01 17-20 09-14
65 Operator Plabed Truck 40 JP 4 Jakarta 27-30 17-20 30-02 20-23 22-25 27-30 18-24 28-01 27-01 17-20 09-14
66 Operator Mixer Truck 40 JP 4 Jakarta 27-30 17-20 30-02 20-23 22-25 27-30 18-24 28-01 27-01 17-20 09-14
67 Short Loader 40 JP 4 Jakarta 27-30 17-20 30-02 20-23 22-25 27-30 18-24 28-01 27-01 17-20 09-14
68 Operator Forklift Kelas I 40 JP 4 Jakarta 21-24 24-28 16-19 27-30 15-18 07-10 11-14 22-25 26-30 09-12 28-31
69 Operator Forklift Kelas II 30 JP 3 Jakarta 22-24 26-28 17-19 28-30 16-18 08-10 27-31 23-25 26-28 10-12 29-31
JADWAL TENTATIF KEGIATAN PEMBINAAN TEKNIK K3 DAN SERTIFIKASI KEMNAKER RI
PT. KARYA MASTER MANDIRI INDONESIA TAHUN 2020
DURASI DURASI
SERTIFIKASI KEMENAKER RI TEMPAT JAN FEB MAR APR MEI JUN JUL AGU SEPT OKT NOV DES
JP HARI
BIDANG PENUNJANG KONSTRUKSI DAN PESAWAT TENAGA DAN PRODUKSI
Operator Penggerak Mula
1 Operator Motor Diesel (Genset) Kelas I 40 JP 4 Jakarta 06-09 03-06 02-05 06-09 16-19 16-21 26-31 10-15 08-12 23-26 15-18
2 Operator Motor Diesel (Genset) Kelas II 30 JP 3 Jakarta 07-09 04-06 03-05 07-09 17-19 17-21 26-28 10-14 16-12 27-30 18-22
Operator Mesin Produksi dan Perkakas
1 Operator Mesin Bubut I 50 JP 5 Jakarta 06-10 03-07 16-20 01-07 08-12 23-28 07-13 07-11 12-16 04-10 10-16
2 Operator Mesin Bubut II 40 JP 4 Jakarta 07-10 04-07 17-20 02-07 09-12 24-28 13-19 08-11 13-16 05-10 11-16
3 Operator Mesin Pres I 50 JP 5 Jakarta 06-10 03-07 16-20 01-07 08-12 23-28 07-13 07-11 12-16 04-10 10-16
4 Operator Mesin Pres II 40 JP 4 Jakarta 07-10 04-07 17-20 02-07 09-12 24-28 13-19 08-11 13-16 05-10 11-16
5 Operator Mesin Bor I 50 JP 5 Jakarta 06-10 03-07 16-20 01-07 08-12 23-28 07-13 07-11 12-16 04-10 10-16
6 Operator Mesin Bor II 40 JP 4 Jakarta 07-10 04-07 17-20 02-07 09-12 24-28 13-19 08-11 13-16 05-10 11-16
7 Operator Mesin Potong I 50 JP 5 Jakarta 06-10 26-02 16-20 08-15 24-30 23-28 07-13 07-11 12-16 04-10 10-16
8 Operator Mesin Potong II 40 JP 4 Jakarta 07-10 27-02 17-20 09-15 25-30 24-28 13-19 08-11 13-16 05-10 11-16
9 Operator Tanur Kelas I 50 JP 5 Jakarta 06-10 26-02 16-20 08-15 24-30 23-28 07-13 07-11 12-16 04-10 10-16
10 Operator Tanur Kelas II 40 JP 4 Jakarta 07-10 27-02 17-20 09-15 24-30 24-28 13-19 08-11 13-16 05-10 11-16
K3 ELEVATOR ESKALATOR
1 Ahli K3 Spesialis Elevator dan Escalator 120 JP 12 Jakarta 08-21 06-19 03-16 03-18 03-16 02-15 03-15 01-14 02-15 03-16 04-17
2 Teknisi K3 Elevator dan Eskalator 65 JP 6 Jakarta 09-15 07-13 05-11 08-16 04-10 03-09 06-12 04-10 02-08 04-10 08-14
3 Operator K3 Elevator dan Eskalator 45 JP 5 Jakarta 16-22 07-12 06-11 09-16 05-10 06-10 06-11 07-11 03-08 05-10 09-14

*Jadwal tentatif
*Biaya Pendaftaran Rp. 200.000,-
*Biaya Pelatihan dan Sertifikasi bisa langsung ditanyakan pada kontak di bawah ini: 0813 8067 6001
*Kuota Minimal Peserta per kelas 5 orang