Professional Documents
Culture Documents
RFQ LDRT2 MSB and Panel PDF
RFQ LDRT2 MSB and Panel PDF
From TRANS 2
2500kVA
MSB-2 R S
*1* : Over Voltage will trip ACB, Under voltage will alarm.
T
F
(380V-3P-4W)
Built-in MCB
ACB
3P ST UVR BZ
4000AT (*1*)
MCTx1 APFC
4000/5A
CB-01 CB-02 CB-03 CB-04 CB-05 CB-06 CB-07 CB-08 CB-09 CB-10 CB-11 CB-12 CB-13 CB-14 CB-15 CB-16
F
MCCB-3P MCCB-3P MCCB-3P MCCB-3P MCCB-3P MCCB-3P MCCB-3P MCCB-3P MCCB-3P MCCB-3P MCCB-3P MCCB-3P MCCB-3P MCCB-3P MCCB-3P MCCB-3P
LA 500AT 500AT 500AT 500AT 500AT 500AT 500AT 500AT 300AT 300AT 300AT 300AT 300AT 300AT 300AT 300AT
630AF 630AF 630AF 630AF 630AF 630AF 630AF 630AF 400AF 400AF 400AF 400AF 400AF 400AF 400AF 400AF
3xMCT 3xMCT 3xMCT 3xMCT 3xMCT 3xMCT 3xMCT 3xMCT 3xMCT 3xMCT 3xMCT 3xMCT 3xMCT 3xMCT 3xMCT 3xMCT
kWh METER 500/5A kWh METER 500/5A kWh METER 500/5A kWh METER 500/5A kWh METER 500/5A kWh METER 500/5A kWh METER 500/5A kWh METER 500/5A kWh METER 300/5A kWh METER 300/5A kWh METER 300/5A kWh METER 300/5A kWh METER 300/5A kWh METER 300/5A kWh METER 300/5A kWh METER 300/5A
(EMIC) (EMIC) (EMIC) (EMIC) (EMIC) (EMIC) (EMIC) (EMIC) (EMIC) (EMIC) (EMIC) (EMIC) (EMIC) (EMIC) (EMIC) (EMIC)
MCCB-3P MCCB-3P MCCB-3P MCCB-3P MCCB-3P MCCB-3P MCCB-3P MCCB-3P MCCB-3P MCCB-3P MCCB-3P MCCB-3P MCCB-3P MCCB-3P MCCB-3P MCCB-3P MCCB-3P MCCB-3P MCCB-3P MCCB-3P MCCB-3P MCCB-3P MCCB-3P MCCB-3P MCCB-3P MCCB-3P MCCB-3P MCCB-3P MCCB-3P MCCB-3P MCCB-3P MCCB-3P
400AT 80AT 400AT 80AT 400AT 80AT 400AT 80AT 400AT 80AT 400AT 80AT 400AT 80AT 400AT 80AT 200AT 80AT 200AT 80AT 200AT 80AT 200AT 80AT 200AT 80AT 200AT 80AT 200AT 80AT 200AT 80AT
400AF 125AF 400AF 125AF 400AF 125AF 400AF 125AF 400AF 125AF 400AF 125AF 400AF 125AF 400AF 125AF 250AF 125AF 250AF 125AF 250AF 125AF 250AF 125AF 250AF 125AF 250AF 125AF 250AF 125AF 250AF 125AF
Al/PVC 16mm2 (E)
(Al/XLPE/PVC)
(Al/XLPE/PVC)
(Al/XLPE/PVC)
(Al/XLPE/PVC)
(Al/XLPE/PVC)
(Al/XLPE/PVC)
(Al/XLPE/PVC)
(Al/XLPE/PVC)
(Al/XLPE/PVC)
(Al/XLPE/PVC)
(Al/XLPE/PVC)
(Al/XLPE/PVC)
(Al/XLPE/PVC)
(Al/XLPE/PVC)
(Al/XLPE/PVC)
PRODUCTION PRODUCTION PRODUCTION PRODUCTION PRODUCTION PRODUCTION PRODUCTION PRODUCTION PRODUCTION PRODUCTION PRODUCTION PRODUCTION PRODUCTION PRODUCTION PRODUCTION PRODUCTION
4C-35mm2
4C-35mm2
4C-35mm2
4C-35mm2
4C-35mm2
4C-35mm2
4C-35mm2
4C-35mm2
4C-35mm2
4C-35mm2
4C-35mm2
4C-35mm2
4C-35mm2
4C-35mm2
4C-35mm2
4C-35mm2
(FUTURE) (FUTURE) (FUTURE) (FUTURE) (FUTURE) (FUTURE) (FUTURE) (FUTURE) (FUTURE) (FUTURE) (FUTURE) (FUTURE) (FUTURE) (FUTURE) (FUTURE) (FUTURE)
1,080m2 1,080m2 1,080m2 1,080m2 1,080m2 1,080m2 1,080m2 1,080m2 540m2 540m2 540m2 540m2 540m2 540m2 540m2 540m2
(263.2 kVA) (263.2 kVA) (263.2 kVA) (263.2 kVA) (263.2 kVA) (263.2 kVA) (263.2 kVA) (263.2 kVA) (131.6 kVA) (131.6 kVA) (131.6 kVA) (131.6 kVA) (131.6 kVA) (131.6 kVA) (131.6 kVA) (131.6 kVA)
TERMINAL-2 PANEL
150A 150A 150A 150A 150A 150A 150A 150A 150A 150A 150A 150A 150A 150A 150A 150A
TERMINAL TERMINAL TERMINAL TERMINAL TERMINAL TERMINAL TERMINAL TERMINAL TERMINAL TERMINAL TERMINAL TERMINAL TERMINAL TERMINAL TERMINAL TERMINAL
BLOCK BLOCK BLOCK BLOCK BLOCK BLOCK BLOCK BLOCK BLOCK BLOCK BLOCK BLOCK BLOCK BLOCK BLOCK BLOCK
LIGHTING, SOCKET
LIGHTING, SOCKET
LIGHTING, SOCKET
LIGHTING, SOCKET
LIGHTING, SOCKET
LIGHTING, SOCKET
LIGHTING, SOCKET
LIGHTING, SOCKET
LIGHTING, SOCKET
LIGHTING, SOCKET
LIGHTING, SOCKET
LIGHTING, SOCKET
LIGHTING, SOCKET
LIGHTING, SOCKET
LIGHTING, SOCKET
Al/PVC 16mm2 (E)
(Al/XLPE/PVC)
(Al/XLPE/PVC)
(Al/XLPE/PVC)
(Al/XLPE/PVC)
(Al/XLPE/PVC)
(Al/XLPE/PVC)
(Al/XLPE/PVC)
(Al/XLPE/PVC)
(Al/XLPE/PVC)
(Al/XLPE/PVC)
(Al/XLPE/PVC)
(Al/XLPE/PVC)
(Al/XLPE/PVC)
(Al/XLPE/PVC)
(Al/XLPE/PVC)
(Al/XLPE/PVC)
CABLES SIZE
LOAD TYPE
4C-35mm2
4C-35mm2
4C-70mm2
4C-70mm2
4C-35mm2
4C-50mm2
4C-70mm2
4C-70mm2
4C-35mm2
4C-35mm2
4C-35mm2
4C-50mm2
4C-35mm2
4C-35mm2
4C-50mm2
4C-70mm2
FACTORY
FACTORY
FACTORY
FACTORY
FACTORY
FACTORY
FACTORY
FACTORY
FACTORY
FACTORY
FACTORY
FACTORY
FACTORY
FACTORY
FACTORY
FACTORY
LOAÏI TAÛI
NAME PANEL FDB-C-C1 FDB-C-C2 FDB-C-C5 FDB-C-C6 FDB-D-C3 FDB-D-C4 FDB-D-C7 FDB-D-C8 FDB-C-C3 FDB-C-C4 FDB-C-C7 FDB-C-C8 FDB-D-C1 FDB-D-C2 FDB-D-C5 FDB-D-C6
Capacity (kW) 4.15 4.15 4.15 4.15 4.15 4.15 4.15 4.15 2.65 2.65 2.65 2.65 2.65 2.65 2.65 2.65
Demand factor (DF) 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7
Demand Capacity (kW) 2.905 2.905 2.905 2.905 2.905 2.905 2.905 2.905 1.855 1.855 1.855 1.855 1.855 1.855 1.855 1.855
PROJECT NAME:
REVISION LIST: NOTES: Scale factor is A1 size paper OWNER GENERAL CONTRACTOR NAME SIGNATURE NAME SIGNATURE DESIGN DRAWING
Approved Designer CONSTRUCTION LONG DUC RENTAL FACTORY No.2 - PHASE 2
DATE NOV-2019
T.IMAMURA B. HIEP
MCCB-3P
MCCB-3P MCCB-3P MCCB-3P MCCB-3P MCCB-3P MCB-2P 125A-30kA
200AT 400AT 200AT 400AT 32AT 20A (10 nos)
250AF 400AF 250AF 400AF 125AF
ON CONTROL
(10 nos)
3xMCT 3xMCT 3xMCT 3xMCT 3xMCT LEGENDS :
kWh METER 200/5A kWh METER 400/5A kWh METER 200/5A kWh METER 400/5A kWh METER 50/5A
(EMIC) (EMIC) (EMIC) (EMIC) (EMIC)
OFF CONTROL LIGHTING PANEL
(10 nos)
REACTOR
(6%)
(10 nos)
75 kVAR x 10 STEP
CAPACITOR-3P-440V
To ET (IV185)
FAN, AIRCONDITIONAL
Cu/PVC 16mm2 (E)
LIGHTING, SOCKET
(Cu/XLPE/PVC)
(Cu/PVC/PVC)
3C-2.5mm2
4C-35mm2
PROJECT NAME:
REVISION LIST: NOTES: Scale factor is A1 size paper OWNER GENERAL CONTRACTOR NAME SIGNATURE NAME SIGNATURE DESIGN DRAWING
Approved Designer CONSTRUCTION LONG DUC RENTAL FACTORY No.2 - PHASE 2
DATE NOV-2019
T.IMAMURA B. HIEP
CB.2 LIGHTING, FAN & SOCKET OUTLET MCB 1 20 32 0.5 3x1Cx2.5mm2 Cu/PVC
FDB-GH-2 x3
(380/220V 3P-4W)
CB.3 FIRE ANNUNCIATOR PANEL MCB 1 10 32 0.5 3x1Cx2.5mm2 Cu/PVC
Fx3 MCCB 3P
32AT/125AF CB.4 SPARE MCB 1 20 32
FROM MSB-2
4Cx35mm2 Cu/XLPE/PVC
CB.5 SPARE MCB 1 20 32
1P+N PHOTOCELL
CB.6 LIGHTING BIKE, CAR PARKING RCBO 30mA 16 32 SWITCH 0.72 3Cx4mm2 Cu/XLPE/PVC
N-BAR CONTACTOR
(E)1Cx16mm2 Cu/PVC 1P+N
CB.7 SECURITY RCBO 30mA 16 32 0.75 3Cx2.5mm2 Cu/PVC/PVC
G-BAR
1P+N
CB.8 MOTOR GATE 2 RCBO 30mA 16 32 1.5 3Cx2.5mm2 Cu/PVC/PVC
1P+N
CB.9 AC OF GUARD HOUSE 2 RCBO 30mA 20 32 0.78 3Cx2.5mm2 Cu/PVC/PVC
1P+N
CB.10 WWT-3,4 PANEL RCBO 30mA 20 32 1.6 3Cx4.0mm2 Cu/PVC/PVC
CB.11 SPACE
DP-2 PANEL
4Cx4.0mm2 Cu/XLPE/PVC
CB.12 MCCB 3 20 63 0.74
Cu/PVC 2.5mm2 (E)
DP-3 PANEL
4Cx4.0mm2 Cu/XLPE/PVC
CB.13 MCCB 3 20 63 0.74
Cu/PVC 2.5mm2 (E)
PANEL NAME CONNECTION DIAGRAM CIRCUIT BRAND BREAKER CONNECTED LOAD (KW) CABLE
LOAD NAME CONTROL REMARKS
PHASE & VOLTAGE TOTAL LOAD No. TYPE POLE AT AF RN SN TN RST (mm2)
4Cx2.5mm2 Cu/PVC/PVC
SEWAGE PUMP 1 FLOAT SW 0.37
DP-2 CB-1 MCCB 3 15 32 (D25)
(380/220V 3P-4W) MCCB 3P 4Cx2.5mm2 Cu/PVC/PVC
20AT/50AF CB-2 SEWAGE PUMP 2 MCCB 3 15 32 FLOAT SW 0.37
4Cx4.0m2 Cu/XLPE/PVC (D25)
FROM FDB-GH-02
20KA
Fx3
ALTERNATIVE RUNNING CONTROL
LEVEL CONTROL : LOW PUMP OFF.
N-BAR x3 HIGH 1 PUMP RUN (BY 24VDC).
H. HIGH 2 PUMPS RUN.
1Cx2.5mm2 Cu/PVC
G-BAR
TOTAL 1kW
PANEL NAME CONNECTION DIAGRAM CIRCUIT BRAND BREAKER CONNECTED LOAD (KW) CABLE
LOAD NAME CONTROL REMARKS
PHASE & VOLTAGE TOTAL LOAD No. TYPE POLE AT AF RN SN TN RST (mm2)
4Cx2.5mm2 Cu/PVC/PVC
SEWAGE PUMP 1 FLOAT SW 0.37
DP-3 CB-1 MCCB 3 15 32 (D25)
(380/220V 3P-4W) MCCB 3P 4Cx2.5mm2 Cu/PVC/PVC
20AT/50AF CB-2 SEWAGE PUMP 2 MCCB 3 15 32 FLOAT SW 0.37
4Cx4.0m2 Cu/XLPE/PVC (D25)
FROM FDB-GH-02
20KA
Fx3
ALTERNATIVE RUNNING CONTROL
LEVEL CONTROL : LOW PUMP OFF.
N-BAR x3 HIGH 1 PUMP RUN (BY 24VDC).
H. HIGH 2 PUMPS RUN.
1Cx2.5mm2 Cu/PVC
G-BAR
TOTAL 1kW
: CIRCUIT NO. 3P 380V OR 3P 380V/220V : CIRCUIT NO. 3P 200V : CIRCUIT NO. 1P 220V
PROJECT NAME:
REVISION LIST: NOTES: Scale factor is A1 size paper OWNER GENERAL CONTRACTOR NAME SIGNATURE NAME SIGNATURE DESIGN DRAWING
Approved Designer CONSTRUCTION LONG DUC RENTAL FACTORY No.2 - PHASE 2
DATE NOV-2019
T.IMAMURA B. HIEP
PANEL NAME CONNECTION DIAGRAM CIRCUIT BRAND BREAKER CONNECTED LOAD (kW) CABLE PANEL NAME CONNECTION DIAGRAM CIRCUIT BRAND BREAKER CONNECTED LOAD (kW) CABLE
LOAD NAME CONTROL REMARKS LOAD NAME CONTROL REMARKS
PHASE & VOLTAGE TOTAL LOAD No. TYPE POLE AT AF RN SN TN RST (mm2) PHASE & VOLTAGE TOTAL LOAD No. TYPE POLE AT AF RN SN TN RST (mm2)
: CIRCUIT NO. 3P 380V OR 3P 380V/220V : CIRCUIT NO. 3P 200V : CIRCUIT NO. 1P 220V : CIRCUIT NO. 3P 380V OR 3P 380V/220V : CIRCUIT NO. 3P 200V : CIRCUIT NO. 1P 220V
PROJECT NAME:
REVISION LIST: NOTES: Scale factor is A1 size paper OWNER GENERAL CONTRACTOR NAME SIGNATURE NAME SIGNATURE DESIGN DRAWING
Approved Designer CONSTRUCTION LONG DUC RENTAL FACTORY No.2 - PHASE 2
DATE NOV-2019
T.IMAMURA B. HIEP
PANEL NAME CONNECTION DIAGRAM CIRCUIT BRAND BREAKER CONNECTED LOAD (kW) CABLE PANEL NAME CONNECTION DIAGRAM CIRCUIT BRAND BREAKER CONNECTED LOAD (kW) CABLE
LOAD NAME CONTROL REMARKS LOAD NAME CONTROL REMARKS
PHASE & VOLTAGE TOTAL LOAD No. TYPE POLE AT AF RN SN TN RST (mm2) PHASE & VOLTAGE TOTAL LOAD No. TYPE POLE AT AF RN SN TN RST (mm2)
: CIRCUIT NO. 3P 380V OR 3P 380V/220V : CIRCUIT NO. 3P 200V : CIRCUIT NO. 1P 220V : CIRCUIT NO. 3P 380V OR 3P 380V/220V : CIRCUIT NO. 3P 200V : CIRCUIT NO. 1P 220V
PROJECT NAME:
REVISION LIST: NOTES: Scale factor is A1 size paper OWNER GENERAL CONTRACTOR NAME SIGNATURE NAME SIGNATURE DESIGN DRAWING
Approved Designer CONSTRUCTION LONG DUC RENTAL FACTORY No.2 - PHASE 2
DATE NOV-2019
T.IMAMURA B. HIEP
PANEL NAME CONNECTION DIAGRAM CIRCUIT BRAND BREAKER CONNECTED LOAD (kW) CABLE PANEL NAME CONNECTION DIAGRAM CIRCUIT BRAND BREAKER CONNECTED LOAD (kW) CABLE
LOAD NAME CONTROL REMARKS LOAD NAME CONTROL REMARKS
PHASE & VOLTAGE TOTAL LOAD No. TYPE POLE AT AF RN SN TN RST (mm2) PHASE & VOLTAGE TOTAL LOAD No. TYPE POLE AT AF RN SN TN RST (mm2)
: CIRCUIT NO. 3P 380V OR 3P 380V/220V : CIRCUIT NO. 3P 200V : CIRCUIT NO. 1P 220V : CIRCUIT NO. 3P 380V OR 3P 380V/220V : CIRCUIT NO. 3P 200V : CIRCUIT NO. 1P 220V
PROJECT NAME:
REVISION LIST: NOTES: Scale factor is A1 size paper OWNER GENERAL CONTRACTOR NAME SIGNATURE NAME SIGNATURE DESIGN DRAWING
Approved Designer CONSTRUCTION LONG DUC RENTAL FACTORY No.2 - PHASE 2
DATE NOV-2019
T.IMAMURA B. HIEP
PANEL NAME CONNECTION DIAGRAM CIRCUIT BRAND BREAKER CONNECTED LOAD (kW) CABLE PANEL NAME CONNECTION DIAGRAM CIRCUIT BRAND BREAKER CONNECTED LOAD (kW) CABLE
LOAD NAME CONTROL REMARKS LOAD NAME CONTROL REMARKS
PHASE & VOLTAGE TOTAL LOAD No. TYPE POLE AT AF RN SN TN RST (mm2) PHASE & VOLTAGE TOTAL LOAD No. TYPE POLE AT AF RN SN TN RST (mm2)
: CIRCUIT NO. 3P 380V OR 3P 380V/220V : CIRCUIT NO. 3P 200V : CIRCUIT NO. 1P 220V : CIRCUIT NO. 3P 380V OR 3P 380V/220V : CIRCUIT NO. 3P 200V : CIRCUIT NO. 1P 220V
PROJECT NAME:
REVISION LIST: NOTES: Scale factor is A1 size paper OWNER GENERAL CONTRACTOR NAME SIGNATURE NAME SIGNATURE DESIGN DRAWING
Approved Designer CONSTRUCTION LONG DUC RENTAL FACTORY No.2 - PHASE 2
DATE NOV-2019
T.IMAMURA B. HIEP