3- What if the difference between network diagram and time grid diagram? Discuss with suitable
example, use of network and time grid diagram
4-Explain planning, scheduling and controlling as a function of construction management with suitable
example.
5- Discuss various cost parameters that are considered and analyzed in order to formulate equipment
replacement policy
6-Explain meaning of cash flow analysis. Discuss its purpose. What is the difference between cash flow
for contractor and cash flow for owner?
1-Describe safety requirement for demolition work and safety measure to be adopted for excavation