frm
fect Name City Ceetre Sohar
sie fp tinste AE.
ane satan (Al cascuzaicg — lacecojactestengneers ie
ce aoe cen cn ite
Jconrners_+ Alves
‘ [cima i020?
Non Confirmity Report - (NCR) feos eax
Stim : NKInacdwo AIT Fein
Description of Non Conenity + Deft in column in Zone 3 (Refer ached NCR 6) |
Evidence Documents «Aeatachad
Non Coniemance Reed
— :
Signa : Spn/tate
Censor Rens
Corte Action Taken 1 Cohen dtl nd wa pe with prone Math tot ep sel Manic 907
Faris photo of Repairing ongoing so show typical repiring wih cur supervision oly
Evidence photo attached & request to close the NCR
Attached Evidence Docaments + Phos tached
Preventive Action + Proper caring & nit uric nish wilb them at avo cracks in uur
Name + Srinurashnan Destgnadon + QAQC Manager Signature
neers Review
Conretve Acton Approved af Ne
NCR Cloned ont am one
Come Gorceckton fac the meattenecl elements ace
Gmpleted daccepted . “ ———
Project Manager; GAP
bios sie Pipe{aceco architects & engineers
fice Deed
- NCR lasved to:
Deseriton of Nen Contry + Defet incon a Zan 3 nd cfr scbot NR 15)
| evdence Documents Asaracbod
"on Confrmase Rleted
Tver
Sin date ‘ Sign Date
Contacto Remon
Corrective hein Taken
Atached Edenee Dosoments + Photo tac
Preventive Aton + Colma Defects eo Concrete gap ew he ones oks urine Prope natin wilds 0
vie cae ed compe mide coh te
Over Ne
Comment aed celled 4 the meAton el
colon
esner A Projest Managers CDH
Sood Arabi “
Sievbue: 2 Bem Vs yo 10)Ned Clee Crowe werATE
laceco architects &engineers ;
ive!
yb 4 Jlaalo
MAJID AL FUTTAIM
Name: City Center:
” "City Center Sohar
. _ Non Conformity Report (NCR) ___
1) Executed Works: a
2) Bxecution Drawings: a _____]
1 Issuer: Laceco To: Al-Turki Enterprises
2. Report Identification _
Zone Trade Tssuer
A ___ Civil, EK
3. Nonconformity of executed works/ Execution Drawings
(Drawings CO Specification
Method Statement 1D) Materia! Submital
(coordination Clothers (wortananship)
4. Description:
Defect io column in zone 3A found.
Refer to attached photo showing hole in column in specified area,
5. Number of document attached: 1 page photos
6. NCR related to documents referenced below:
(Doe. Type ile
(Corrective action to be filled and sent for the Engineer's approval).
‘Signature of Issuer: Signature of the Engineer:
‘Name: Name:
Dictation vicina: Contactae copys esuer (cone: Pocument Conta!‘Comments:
‘Contractor to rectify according to approved method and submit request for inspection
Page 1 of 2