 Excavator 

Undertake excavation to construct new roadways for pavement widening purpose and


also excavate soil around the area which bored piles are driven to cast the pile cap.

Figure 1: Excavator

 Motor Grader
A road grader with a long blade which used for road construction.

Figure 2: Motor Grader

 Continuous flight auger drill


One of the bored piling machines which undertake bore piling work to provide a solid
foundation for the station.
Figure 3: Continuous flight auger drill

 Crane
To lift the pier cap up on the pier and U trough concrete span up on pier cap.