Maintenance : Improved Maintenance system with implemented MTBF (Mean Time
Between Failures), MTTR (Mean Time To Repair) and Preventive Maintenance
Program to increase capability of Maintenance team member.
PPIC (Production Planning and Inventory Control) : Developed system for PPIC
Man power to make daily, weekly and Monthly Planning to make sure PPIC schedule
must be follow by Production/Factory team member.
August 2011- April 2012, PT Pepsi Cola Indobeverages, Purwakarta, West Java.
Position : Production Manager
Report to : Factory Manager
Target : 2,000,000 Box/Month
My duties in PT PepsiCola Indobeverages were responsible all Production matter in
Factory (Syrup Preparation and Filling/Packaging Area), especially improve The
Productivity and Efficiency (OEE) of Production Team (OEE-Overall Equipment
Effectiveness), reduce the Production Cost, Improve and implemented The 5 S
Program, Implementation GMP (Good Manufacturing Program) and developed the
others Tools to improve The Production Performance of Company.
July 2009 – April 2011, Phillips Seafood Indonesia PT., Lampung
Position : Production Manager
Report to : General Manager
Target : 130,000 Lbs Meat Crab/Month
My duties in PT. Phillips Seafood Indonesia were responsible for processing Crab to
match with production planning and Company standard. Developed production and
monitoring system in Processing Crab as company required. Implemented some system
like Kaizen, HACCP and etc to improving performance of Crab Processing and also
developed our subordinate (Team Leader and Supervisor) with new soft skill and
leadership knowledge.
June 2005 to June 2007, ABC President Indonesia PT., Klari, Karawang, West
Java
Position : Production Manager.
Report to : Factory Manager
Target :
My duty was make sure system in Manufacturing Noodle and Spice met with the
Company standart. Responsible for achivement all aspect of production noodle and
Spice (Efficiency, Production Downtime, Losses of Material Packaging and Raw
Material etc). Implemented The ISO 9001 (or Documentation System) in Noodle and
Spice Manufacturing Plant with improved Procedure and Work Instruction of
Production. Developed the ability and knowledge of Foreman, Supervisor and
Assistant Manager with some Tools for Improving Manufacturing Process like 7
Tools and 8 Step of QCC (Quality Control Cycle), OEE (Overall Equipment
Effectiveness), 5S Program, GMP (Good Manufacturing Practice), P2K3 (Panitia
Pembina Keselamatan dan Kesehatan Kerja) and HACCP (Hazard Analysis Critical
Control Point).
My achievement in this plant is reduce the reject of material packaging and product
manufacturing Noodle from average 6 % to 3% and improved Efficiency from 85 %
to 92%.
July 1999 to June 2005, Perfetti Van Melle Indonesia PT., Cibinong, Bogor, West
Java
2
Position : Unit Manager Production.
Report to : Production Manager
My duties made sure all aspect of production parameter in Line Production candy
meet with the Company standart. Organized team member to achieved the production
goal in OEE (Overall Equipment Effectiveness) target, increased the efficiency of
machine, reduced the rate of reject product and packaging material, implemented
GMP or Good Manufacturing Practice , HACCP and ISO 9002, implemented QCC
Program (Quality Control Cycle) in plant with new paradigms “Six Sigma” .
My achievement in this company is promoting or implementing SMED or Single
Minute Exchange of Dies as one of tools to solve problem in Plant.
§ August 1995 to December 1998, Coca Cola Amatil Indonesia Jakarta PT.,
Cibitung, Bekasi, West Java
Position : Production Team Leader
Report to : Production Manager
My job was lead Foreman and Operator of Production packaging to produce
carbonated beverages like Coke, Fanta and Sprite.
We make sure all system in the line meet the company requirement. Preparing
reporting every shift about the syrup yield, crown or cap yield and the efficiency of
machine.
My achievement in this plant increase the efficiency of PET Bottling Line from 60 %
to 70 % with improve the Operator skill and make gap tool standart for PET Bottle
bridge.
§ July 1993 to May 1995, Salim Indo Plantantion PT., Bagan Batu, PekanBaru, Riau
Position : Process Assistant
Report to : Plant Manager
My duties in this plant was lead foreman and operator to produced palm oil and
kernel palm where palm fruit come from our plantantion near arround the plant. We
make sure the operation can be run effective because our responsibilty to prossesing
the palm fruit. Make sure the yield of palm oil meets with company standard.