1- For the Royal community and the Airport main transmission lines we don’t have the demand of each tank and
what is the total no. of tanks?
2- Is there any flow control valves at each pump station? If yes what the adjustment of the flow?
3- The connection from EPS to the PS-12 coastal and camp 11?
4- The connection between the pumps and the 3 pressure lines 900+2*1100mm?
6- Demands at each junction (the demands we received from the customer but not located on the network)
7- Is the customer junction connected to ground tank or directly to the customer network?
8- Is there any main valves in the network controlling the flow direction to certain direction?
9- The detailed demand for the customer at each junction? not the total demand of the custmer.
Data to be confirmed: -
15-
16-
17-
18-
19-
20-
Demand ?
21-
Demand??
22-
23-
24-
25-
26-