JIC missing data to be cleared

1- For the Royal community and the Airport main transmission lines we don’t have the demand of each tank and
what is the total no. of tanks?

2- Is there any flow control valves at each pump station? If yes what the adjustment of the flow?

3- The connection from EPS to the PS-12 coastal and camp 11?

4- The connection between the pumps and the 3 pressure lines 900+2*1100mm?

5- If there is any pressure relief valves over the network?

6- Demands at each junction (the demands we received from the customer but not located on the network)

7- Is the customer junction connected to ground tank or directly to the customer network?

8- Is there any main valves in the network controlling the flow direction to certain direction?

9- The detailed demand for the customer at each junction? not the total demand of the custmer.

Data to be confirmed: -

10- The served area of the pressure booster pump J-Block

11- The served area of the pressure booster pump B-Block

12- The served area of the pressure booster pump PS-6


13- The served area of the pressure booster pump PS-5

14- Demand from EPS to camps north to camps 11?

15-
16-

17-

18-
19-

20-

Demand ?

21-
Demand??

22-

23-
24-
25-

26-