MAPPING INSTALASI BU : BELUM UNIT

PROYEK COHIVE SAHID SUDIRMAN


PROGRESS KE-1 15/10/2019
RUANG LAMPU SAKLAR STK STK SPRIKLER HEAD
LANTAI TEMBOK DETECTOR
18 2 1 - 2
19 2 1 - 2
20 2 1 - 2
17 2 1 - 2
21 2 1 - 2
16 2 1 2 (BU) -
KORIDOR 19 DL - 3
A s/d B 3 WALL (BU)
4 PEND (BU)
12 2 1 - 2
13 2 1 - 2
14 2 1 - 2
15 2 1 - 2
9 2 1 - 2
10 2 1 - 2
11 2 1 - 2
1 3 1 - 2
2 2 1 - 2
3 2 1 - 2
4 2 1 - 2
5 2 1 - 2
7 2 1 - 2
8 3 1 - 2
6 4 1 1 (BU) 3
KORIDOR 10 1 1
B s/d C
EXPOSE 18 (BU) 4 (BU) 11 (BU) 3 (BU)
23 s/d 25 9 (BU) 4 (BU) - 5 (BU)

TOTAL TERPASANG
UNIT 75 22 0 45 0 0
KABEL 109 30 14 53